Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
http://primaweld.com.au/index.php/projects/australian-paper/
Home About Us News Services Safety and Quality Projects Contact Us ISO 9001 Australian Paper, Maryvale, Vic APA Group, Euroa, Vic Victorian Desalination Project, Wonthaggi, Vic Patricia Baleen, Newmerella, Vic Gippsland Water, Morwell, Vic Woodside Petroleum/Otway Gas Plant, Port Campbell, Vic Esso, Hastings, Vic Lang Lang processing gas plant, Vic Toyota Mechanical Division, Altona Vic Thompson Dam, Vic Hazelwood Power, Hazelwood, Vic Telstra Dome/Etihad, Docklands, Vic
Australian Paper
Gas Fired Boiler #9
In June 2012, Primaweld was awarded the contract to supply labour and resources to repair the economiser and bifurcation sections of #9 gas fired boiled at Australian Paper Maryvale Mill. The duration of this shut lasted a total of 4 weeks and was finished early July 2012
M5 Steam Upgrade
Fabrication and Installation of new steam lines including NDT testing
1 of 3
26/03/2014 16:34
http://primaweld.com.au/index.php/projects/australian-paper/
Blow Tank
As part of the Batch mill upgrade, Primaweld was awarded the supply, fabrication, testing and installation of the blow tank. Material used was 2205 Stainless Steel and had a circumference of approx. 7.5m, was 36 metres long and weight 80 tonnes.
2 of 3
26/03/2014 16:34
http://primaweld.com.au/index.php/projects/australian-paper/
Sign In to Edit this Site 2014 Primaweld Group. Built with concrete5 - an open source CMS
3 of 3
26/03/2014 16:34