A PROJECT REPORT ON

COOLING WATER PIPING FOR REFRIGERATION PLANT


A PROJECT REPORT SUBMITTED TO THE MIT SKILL IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF DEGREE OF PIPING ENGINEERING BY ......................... ........................... ..................... UNDER THE GUIDENCE OF ROLL NO-01 ROLL NO-05 ROLL NO-08

DEPARTMENT OF PIPING DESIGN AND ENGINEERING MAEERS MAHARASTRA INSTITUTE OF TECHNOLOGY PUNE (YEAR 2013)

2013-2014

CERTIFICATE
This is to certify that the Project entitled

COOLING WATER PIPING FOR REFRIGERATION PLANT


Submitted by A JINKYA SANDE NITISH VARVATKAR AMIT PATIL ROLL NO-01 ROLL NO-05 ROLL NO-08

is a bonafied work carried out under the guidance of Mr. PANKAJ KHANDELWAL and it is approved for the partial fulfillment of the requirement of MIT SKILLS PIPING ENGINEERING, for the award of Degree in PIPING Engineering. This project work has not been earlier submitted to any other institute or University for the award of any degree or diploma.

Mr. PANKAJ KHANDELWAL


Project Guide

Mr. PRAMOD DESHMUKH


Head of Department PIPING Engg.

Principal

Examiner

ACKNOWLEDGEMENT
Amongst a wide panorama of people who provided us inspiring guidance and encouragement, we take opportunity to thank those who gave indebted assistance for completing this project. We humbly wish to extend our cordial gratitude with profound thanks to Mr. our guide. We are wholeheartedly thankful to him for giving us his valuable

time and attention for providing us systematic way for completing our project in time. We would also thank to our H.O.D. Mr. ..and all other staff for providing us assistance in various problems encountered during course of our project. We are also thankful to DEPARTMENT OF PIPING DESIGN AND ENGINEERING MAEERS MAHARASTRA INSTITUTE OF TECHNOLOGY who gave us an opportunity to present this project.

PREFACE
We take an opportunity to present this project entitled COOLING WATER PIPING FOR REFRIGERATION PLANT in partial fulfillment for degree in Piping engineering. The object of this project report is to present our efforts taken during the course of project in the most concise, compact and to the point manner. This report is brief record of the tings observed, studied and experienced by us in carrying out the project work.

ABSTRACT

The function of a cooling system is to remove heat from processes or equipment. Heat removed from one medium is transferred to another medium, or process fluid. The cooling tower removes heat from fluid used in cooling systems within the plant. The heat is released to the air rather than to a lake or stream. This allows facilities to locate in areas with less water available because the cooled water can be recycled. The cooling fluid after passing through the refrigeration plant absorbs heat and needs to be cooled for its reuse. To achieve this, condenser or heat exchanger is used in which cooling water from cooling tower absorbs heat from the process fluid. The cooling water then flows back to cooling tower where its temperature is again reduced so that it can be reused.

INDEX
Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Introduction PFD - Process Flow Diagram Line List P&Id Plot Plan Unit Plot Plan Equipment Drawings Line Routing Pressure Drop Calculations Line Thickness Calculations PMS Piping Material Specifications Calculations of Velocities after Finalizing Thickness Reinforcement Calculations GAD General Arrangement Drawings Isometric Drawings Stress Analysis Reports Topic Page No. 1 3 4 6 7 8 9 10 11 15 17 22 27 30 31 32