Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel

Dam and Crest Data (East and West)


Design Cross

Existing Cross

Design Sectional Volume of

Cross
Section #

Chainage (m)

0+090

East
30.12

West
24.66

East
9.13

West
9.22

0+140

27.60

23.16

16.35

14.08

0+190

24.94

23.16

14.11

14.87

0+240

23.50

23.39

30.32

0.00

Sectional Area (m )

Sectional Area (m )

Material (m )

22.88

23.44

15.11

East

West

1443.0

1195.5

637.0

582.5

1158.0
1163.8

761.5

0+474

24.19

25.28

18.34

27.06

0+574

22.50

25.00

19.53

20.87

1110.8

3137.6

3043.8

1261.6

2353.5

2436.0

1672.5

2294.5

1170.0
0+624

24.30

25.07

18.37

19.00

175.7

168.1

122.9

104.9
(m3)

2514.0
1251.8

Excess (+) (m )
East
-20.990

West
-15.440

-11.250

-9.080

-10.830

-8.290

6.820

-23.390

371.8

3107.5

2334.5

Shortfall (-) /

723.8

18.83

(m )

Material (m )

West

1211.0

0+374

East

1313.5

Existing Volume of

1893.5

-7.770

-4.610

-5.850

1.780

-2.970

-4.130

2396.5

947.5

996.8
-5.930

12933

12857

10067

8627

East
Shortfall

-2866

West
Shortfall

-4229

Req. Material = ( * 1.3) m

Volume of Material
3

Required (m )

Material Required (m )

East

West

-806.0

-613.0

1419.00

-552.0

-434.3

986.25

-100.3

-792.0

892.25

-63.6

-1876.0

1939.65

-681.0

-141.5

822.50

-441.0

-117.5

558.50

-222.5

-255.0

477.50

-6.070

7096
(m3)

-2866

-4229

East
3726

West
5498

East

Total Volume Required (m3) to Complete Earthen Dams

Total Volume of

9224

West

9224

9224

Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel
Bed Elevation Data
New Design
Existing Channel
Diff. in
Channel Elevation
Elevation (m G.D)
Elevation (m)
(m G.D)

Existing Channel Bed


Width (m)

New Channel Bed


Width (m) at New
Elevation

Cross Sectional Area


2

(m )

14.06

13.25

0.81

30.00

26.76

22.99

13.96

13.25

0.71

30.00

27.16

20.29

14.01

13.25

0.76

30.00

26.96

21.64

14.03

13.25

0.78

30.00

26.88

22.18

14.06

13.25

0.81

30.00

26.76

22.99

14.02

13.25

0.77

30.00

26.92

21.91

14.02

13.25

0.77

30.00

26.92

21.91

13.96

13.25

0.71

30.00

27.16

Volume of Material
3

Available (m )

Spreading of Material for Earthen Dam(s)


completion (%) Measured from Centre Line
East

West

1081.99

56.80

43.20

1048.42

55.97

44.03

1095.70

11.24

88.76

3026.46

3.28

96.72

2245.1

82.80

17.20

2191.42

78.96

21.04

1055.15

46.60

53.40

20.29

(m3)

11744

(m3) of material available and material available at 13.25 m


G.D

Remark (s)

Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel
Bed Elevation Data
New Design
Existing Channel
Diff. in
Channel Elevation
Elevation (m G.D)
Elevation (m)
(m G.D)

Existing Channel Bed


Width (m)

New Channel Bed


Width (m) at New
Elevation

Cross Sectional Area


2

(m )

14.06

13.50

0.56

30.00

27.76

16.17

13.96

13.50

0.46

30.00

28.16

13.38

14.01

13.50

0.51

30.00

27.96

14.78

14.03

13.50

0.53

30.00

27.88

15.34

14.06

13.50

0.56

30.00

27.76

16.17

14.02

13.50

0.52

30.00

27.92

15.06

14.02

13.50

0.52

30.00

27.92

15.06

13.96

13.50

0.46

30.00

28.16

Volume of Material
3

Available (m )

Spreading of Material for Earthen Dam(s)


completion (%) Measured from Centre Line
East

West

738.74

56.80

43.20

703.92

55.97

44.03

752.95

11.24

88.76

2111.24

3.28

96.72

1561.6

82.80

17.20

1505.92

78.96

21.04

710.9

46.60

53.40

13.38

(m3)

8085

(m3) of material available and material available at 13.50 m


G.D

Remark (s)

Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel
Bed Elevation Data
New Design
Existing Channel
Diff. in
Channel Elevation
Elevation (m G.D)
Elevation (m)
(m G.D)

Existing Channel Bed


Width (m)

New Channel Bed


Width (m) at New
Elevation

Cross Sectional Area


2

(m )

14.06

13.60

0.46

30.00

28.16

13.38

13.96

13.60

0.36

30.00

28.56

10.54

14.01

13.60

0.41

30.00

28.36

11.96

14.03

13.60

0.43

30.00

28.28

12.53

14.06

13.60

0.46

30.00

28.16

13.38

14.02

13.60

0.42

30.00

28.32

12.25

14.02

13.60

0.42

30.00

28.32

12.25

13.96

13.60

0.36

30.00

28.56

Volume of Material
3

Available (m )

Spreading of Material for Earthen Dam(s)


completion (%) Measured from Centre Line
East

West

597.94

56.80

43.20

562.62

55.97

44.03

612.35

11.24

88.76

1735.77

3.28

96.72

1281.2

82.80

17.20

1224.72

78.96

21.04

569.7

46.60

53.40

10.54

(m3)

6584

(m3) of material available and material available at 13.60 m


G.D

Remark (s)

Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel
Bed Elevation Data
New Design
Existing Channel
Diff. in
Channel Elevation
Elevation (m G.D)
Elevation (m)
(m G.D)

Existing Channel Bed


Width (m)

New Channel Bed


Width (m) at New
Elevation

Cross Sectional Area


2

(m )

14.06

13.70

0.36

30.00

28.56

10.54

13.96

13.70

0.26

30.00

28.96

7.66

14.01

13.70

0.31

30.00

28.76

9.11

14.03

13.70

0.33

30.00

28.68

9.68

14.06

13.70

0.36

30.00

28.56

10.54

14.02

13.70

0.32

30.00

28.72

9.40

14.02

13.70

0.32

30.00

28.72

9.40

13.96

13.70

0.26

30.00

28.96

Volume of Material
3

Available (m )

Spreading of Material for Earthen Dam(s)


completion (%) Measured from Centre Line
East

West

455.14

56.80

43.20

419.32

55.97

44.03

469.75

11.24

88.76

1354.94

3.28

96.72

996.8

82.80

17.20

939.52

78.96

21.04

426.5

46.60

53.40

7.66

(m3)

5062

(m3) of material available and material available at 13.70 m


G.D

Remark (s)

Calculations for Material Required to Complete Eastern and Western Earthen Dam HD4 Relief Channel
Bed Elevation Data
New Design
Existing Channel
Diff. in
Channel Elevation
Elevation (m G.D)
Elevation (m)
(m G.D)

Existing Channel Bed


Width (m)

New Channel Bed


Width (m) at New
Elevation

Cross Sectional Area


2

(m )

14.06

13.80

0.26

30.00

28.96

7.66

13.96

13.80

0.16

30.00

29.36

4.75

14.01

13.80

0.21

30.00

29.16

6.21

14.03

13.80

0.23

30.00

29.08

6.79

14.06

13.80

0.26

30.00

28.96

7.66

14.02

13.80

0.22

30.00

29.12

6.50

14.02

13.80

0.22

30.00

29.12

6.50

13.96

13.80

0.16

30.00

29.36

Volume of Material
3

Available (m )

Spreading of Material for Earthen Dam(s)


completion (%) Measured from Centre Line
East

West

310.34

56.80

43.20

274.01

55.97

44.03

325.15

11.24

88.76

968.75

3.28

96.72

708.4

82.80

17.20

650.32

78.96

21.04

281.3

46.60

53.40

4.75

(m3)

3518

(m3) of material available and material available at 13.80 m


G.D

Remark (s)

Potrebbero piacerti anche