Sei sulla pagina 1di 4

d B'0!

1 |d
-.II.- ,aII---: sy -'.ras-I- :.I-
www.thebrownstitch.com
A seamless short-sleeved pullover with top-down raglan construction.
Uses bulky weight yarn.
Mud Season
www.thebrownstitch.com

Techniques:
ssk: Slip the next 2 sts knitwise one at a time.
Insert LN into front of both sts and k them together
(1 st decd)
k2tog: K next 2 sts together (1 st decd)
YO: yarn over (bring yarn to front of work)
m1-R: With LN pick up strand in between 2 sts
from back to front. Knit into front of this st with RN
(1 st incd)
m1-L: With LN pick up strand in between 2 sts
from front to back. Knit into back of this st with RN
(1 st incd)
kfb: Knit into the front and back of the next st (1 st
incd)
knitting on cast-on method: Insert RN into st
on LN and work just as you would if you were knit-
ting it, but do not pull st off needle-- instead, place
new st onto left needle. You can learn more about
this technique here: http://www.knitty.com/ISSUE-
summer05/FEATsum05TT.html
Notes:
Mud Season has top-down raglan construction and is
worked in the round in one piece with circular needles.
Sleeves are split at the underarms and the body is
worked in one piece to the hem (with a little waist and
hip shaping). Sleeve sts are transfered to smaller cir-
cular needles and worked in the round. For additional
pictures of this sweater please visit www.thebrown-
stitch.com.
Abbreviations:
CO = cast on pm = place marker
k = knit MM = main marker
p = purl sm = slip marker
st(s) = stitch(es) rw(s) = rows
RN = right needle decd = decreased
LN = left needle incd = increased
RS = right side of work BO = bind off
WS = wrong side of work
Pattern Info:
Sizes: XS (S, M, L, 1X, 2X, 3X, 4X)
Finished Bust: 34 (35, 36.5, 38.5, 40, 41,
43.5, 46, 47) / 86 (89, 93, 98, 102, 104, 110, 117, 119)
cm
Gauge: 3.5 sts & 5 rws = 1 in St st
Yarn: 650 (690, 730, 770, 810, 850, 890, 920) yds
of bulky weight yarn, shown in Cuzco by Berroco (50%
Superfne Alpaca, 50% Peruvian Wool; 100 g=130
yds), 5 (6, 6, 6, 7, 7, 7, 8) skeins. Another option: Vin-
tage Chunky by Berroco
Needles and other supplies:
24 / 61 cm, 29 / 74 cm, & 16 / 41 cm circular
knitting needles in size US 10 / 6 mm or size
needed to obtain gauge
29 / 74 cm & 16 / 41 cm circular knitting needles
in size US 9 / 5.5 mm or 1 needle size smaller
than used to obtain gauge
4 stitch markers in 1 color, 1 stitch marker in a
different color
2 pieces of scrap yarn, around 20 / 51 cm in
length
Tapestry needle or crochet hook to weave in ends
Pattern stitches:
Stockinette Stitch (St st):
in the round: knit all rws
fat: k on RS rws, p on WS ws
2x2 Rib: *k2,p2; repeat from * to end.
1
www.thebrownstitch.com

Beginning:
Using larger 24 / 61 cm circular needles, CO 42 (42, 43, 43, 46, 46, 47, 47, 47) sts.
Next Rw: p 1 for right front, pm, p 8 (8, 8, 8, 9, 9, 9, 9, 9) for right sleeve, pm, p 24 (24, 25, 25, 26, 26, 27, 27, 27) for back,
pm (making sure to use a different color marker than other 3 markers-this is the MM and will make the begin-
ning/end of round once piece is joined and worked in the round), p 8 (8, 8, 8, 9, 9, 9, 9, 9) for right sleeve, pm, p1 for
right front.
Neck Shaping:
Rw 1 (RS): kfb of 1
st
st, sm, YO, *k to 1 st before marker, YO, k1, sm, YO; repeat from * once, k to 1 st before last marker,
YO, k1, sm, kfb of last st
Rw 2 (WS): p to end, slipping markers as you reach them
Rw 3: *k to 1 st before marker, YO, k1, sm, YO; repeat from * 3 times, k to end
Rw 4: p to end, slipping markers as you reach them
Rw 5: kfb of 1st st, *k to 1 st before marker, YO, k1, sm, YO; repeat from * 3 times, k to last 2 sts, kfb, k1
Rw 6: p to end, slipping markers as you reach them
Rw 7: *k to 1 st before marker, YO, k1, sm, YO; repeat from * 3 times, k to end
Rw 8: p to end, slipping markers as you reach them
Repeat rws 5-8: 3 times
Stitch Count = each front: 15, each sleeve: 28 (28, 28, 28, 29, 29, 29, 29, 29), back: 44 (44, 45, 45, 46, 46, 47, 47, 47)
Joining Round:
(RS) Using knitting on CO method, CO 15 (15, 15, 15, 16, 16, 16, 16, 16) sts. Working these new sts, *k to 1 st before
marker, YO, k1, sm, YO; repeat from * 3 times, k to end. DO NOT TURN WORK. With RS of work facing you, join left and
right fronts together by knitting into 1st st on left needle (instead of turning work), making sure not to twist sts. k to MM.
Remaining Yoke
You will now be working in the round. The different color marker at the back left shoulder will mark the beginning and end of the
round. From now on it will be referred to as the MM (main marker).
Rnd 1 (non-increasing round): k to mm, slipping markers as you reach them
Rnd 2 (increasing round): *k to 1 st before marker, YO, k1, sm, YO; repeat from * 3 times
[Recommendation: because you are working in the round, it will be hard to tell which is a non-increasing round and which is an
increasing round. Using a row counter can help (or keep track of it on paper)]
Repeat rnds 1 & 2: 5 (6, 7, 8, 9, 9, 10, 11, 11) times
Last round: k to MM
Stitch Count = front: 59 (61, 63, 65, 68, 68, 70, 72, 72), each sleeve: 42 (44, 46, 48, 51, 51, 53, 55, 55), back: 58 (60, 63, 65,
68, 68, 71, 73, 73)
Pattern Instructions:
Page 2
2
www.thebrownstitch.com

If you have any questions about this pattern Id love to
hear from you! thebrownstitch@gmail.com
Images and pattern 2011 Elizabeth Smith. All rights re-
served. It should not be duplicated or distributed without
permission from the designer. Contact designer regard-
ing commercial use of this pattern.
Underarm Divide:
Slip MM from LN to RN, k across back sts to next marker, remove marker, using tapestry needle, transfer right sleeve sts
to scrap yarn, remove next marker, fip work over and using knitting on CO method, CO 1 (1, 1, 1, 1, 2, 3, 4, 5) sts, pm,
CO 0 (0, 0, 1, 1, 2, 3, 4, 5) sts, fip work back over and k to next marker, remove marker, using tapestry needle, transfer
left sleeve sts to scrap yarn, remove MM, fip work over and using knitting on CO method, CO 1 (1, 1, 1, 1, 2, 3, 4, 5)
sts, place MM, CO 0 (0, 0, 1, 1, 2, 3, 4, 5) sts, fip work back over, k into next st (front and back are now joined).
Total sts on needles: 119 (123, 128, 134, 140, 144, 153, 161, 165)
[Note: you should have 2 markers placed nowyour MM which marks the beginning/end of the rnd as well as the left side of
sweater and another marker which marks the right side of sweater]
Body:
Work in St st (in the round) for 10 rounds
Waist Dec Round: k1, k2tog, k to 3 sts before next marker, ssk, k1, sm, k1, k2tog, k to 3 sts before MM, ssk, k1.
Work in St st, repeating above dec round every 19 (18, 18, 18, 17, 17, 17, 17, 17)th round 1 time
Work in St st for 18 (17, 17, 17, 16, 16, 16, 16, 16) rounds. Total sts: 111 (115, 120, 126, 132, 136, 145, 153, 157)
Waist Inc Round: k1, m1-R, k to 1 st before next marker, m1-L, k1, sm, k1, m1-R, k to 1 st before MM, m1-L, k1.
Work in St st, repeating above inc round every 6 (7, 7, 7, 8, 8, 9, 9, 9)th round 2 times.
Work in St st for 5 (6, 6, 6, 7, 7, 8, 8, 8) rounds. Total sts: 123 (127, 132, 138, 144, 148, 157, 165, 169)
Next rnd: k across to MM, decreasing 3 (3, 0, 2, 0, 0, 1, 1, 1) sts evenly in the round. Total sts: 120 (124, 132, 136, 144,
148, 156, 164, 168)
Bottom Ribbing: Switch to smaller 24 / 61 cm circular needles. Work in 2x2 Rib until measures 2 / 5 cm. BO in pat-
tern
Sleeves (work for both):
Transfer sleeve sts from scrap yarn onto larger 16 / 41 cm, circular needles.
Join yarn at right side of underarm and pick up and k 1 (1, 1, 1, 1, 2, 3, 4, 5) sts, pm, pick up and k 0 (0, 0, 1, 1, 2, 3, 4, 5)
sts. Total sts: 43 (45, 47, 50, 53, 55, 59, 63, 65).
Joining to work in the round, work in St st until measures 2.25 (2.5, 2.75, 3, 3, 3.25, 3.5, 3.75) / 6 (6, 7, 8, 8, 8, 9, 10) cm, or
1 / 2.5 cm above desired sleeve length.
Last Rnd: k to end, decreasing 3 (1, 3, 2, 1, 3, 3, 3, 1) sts evenly on the round. Total sts: 40 (44, 44, 48, 52, 52, 56, 60, 64).
Switch to smaller 16 / 41 cm circular needles. Work in 2x2 Rib until measures 1 / 2.5 cm. BO in pattern.
Neck Ribbing:
Using smaller 16 / 41 cm circular needles, join yarn at back left shoulder. Pick up and knit sts along left shoulder, left front
curve (approx. 16 sts), center front, right front curve (also approx. 16 sts), right shoulder, and back neck, making sure total
number picked up is divisible by 4, pm, join for working in the round
Work in 2x2 rib until measures 1.5 / 4 cm. BO in pattern.
Finishing: Weave in all ends and block
3

Potrebbero piacerti anche