Transport facilities include:

1 Systems of road traffic, except independent cycling, walking and rural roads and open spaces
according to 2 paragraph 11,
2 Systems of rail transport,
3 Systems of air traffic.
45 Special foundations of the fee
(1) 41 shall apply accordingly.
(2) Chargeable services are for the phases 1 to 7 and 9 of Annex 12 for traffic installations:
1 the cost of earthworks including rock works up to 40 percent of the other eligible costs referred to in
paragraph 1 and
2 10 percent of the cost of civil engineering structures, where the Contractor is not the same benefits
under 46 are transmitted for these engineering structures.
(3) Chargeable are for services of phases 1 to 7 and 9 of 46 in streets with a plurality of through lanes if
they have a common design axis and a common Entwurfsgradiente, as well as track-and platform
systems with two tracks when a common subgrade have, only the following percentages of the costs
determined under paragraphs 1 and 2:
1 three-lane roads at 85 percent,
2 70 percent at four-lane roads,
3 more than four-lane road 60 percent,
4 in track-and platform systems with two Gleisen90 percent.
46 power image transport facilities
(1) Clauses 1 and 2 of 33, paragraph 1 shall apply accordingly. They are evaluated in the following
table for traffic installations as a percentage of fees in 47:
1 for the power phase 1 (basic evaluation) with 2 per cent,
2 for power phase 2 (Preliminary) with 15 percent,
3 for the power phase 3 (preliminary design) with 30 percent,
4 for the performance of Phase 4 (planning permission) with 5 percent,
5 for the performance of Phase 5 (detailed design) with 15 percent,
6 for the performance of Phase 6 (Preparation of tender) with 10 percent,
7 for the performance of phase 7 (Participation in the award) with 5 percent,
8 for the performance of Phase 8 (construction management) with 15 percent,
9 for the power stage 9 (Property maintenance and documentation) with 3 percent.

(2) The individual performance of each performance period are set out in Annex 12.
(3) 35 and 36, paragraph 2 shall apply accordingly.
47 Fees for services for traffic installations
(1) The minimum and maximum rates of fees for the services listed in 46 for traffic installations are set
out in the following table fee for the application of 44:
Honorary board to 47 paragraph 1 - Road equipment (scope of 44)

Eligible Zone
Zone I
Zone II
Zone III
Zone IV
Zone V
Costs of
up
to
up
to
up
to
up
to
up
to
Euro
Euro
Euro
Euro
Euro
Euro
25.565
2.874
3.610
3.610
4.347
4.347
5.090
5.090
5.827
5.827
6.564
30.000
3.269
4.094
4.094
4.918
4.918
5.744
5.744
6.568
6.568
7.393
35.000
3.700
4.624
4.624
5.543
5.543
6.467
6.467
7.385
7.385
8.309
40.000
4.111
5.124
5.124
6.141
6.141
7.154
7.154
8.172
8.172
9.185
45.000
4.518
5.619
5.619
6.727
6.727
7.828
7.828
8.934
8.934
10.035
50.000
4.912
6.101
6.101
7.292
7.292
8.481
8.481
9.671
9.671
10.861
75.000
6.775
8.357
8.357
9.940
9.940
11.527
11.527
13.109
13.109
14.691
100.000
8.516
10.452
10.452
12.389
12.389
14.321
14.321
16.258
16.258
18.195
150.000
11.718
14.280
14.280
16.837
16.837
19.399
19.399
21.955
21.955
24.517
200.000
14.642
17.758
17.758
20.875
20.875
23.997
23.997
27.113
27.113
30.230
250.000
17.381
21.002
21.002
24.625
24.625
28.241
28.241
31.864
31.864
35.485
300.000
19.962
24.045
24.045
28.133
28.133
32.216
32.216
36.303
36.303
40.387
350.000
22.410
26.927
26.927
31.444
31.444
35.955
35.955
40.471
40.471
44.987
400.000
24.735
29.657
29.657
34.579
34.579
39.494
39.494
44.417
44.417
49.338
450.000
26.954
32.254
32.254
37.555
37.555
42.855
42.855
48.156
48.156
53.457
500.000
29.084
34.746
34.746
40.407
40.407
46.065
46.065
51.725
51.725
57.387
750.000
38.446
45.634
45.634
52.814
52.814
60.001
60.001
67.181
67.181
74.368
1.000.000
46.193
54.575
54.575
62.955
62.955
71.332
71.332
79.713
79.713
88.094
1.500.000
63.820
74.911
74.911
86.004
86.004
97.100
97.100
108.192
108.192
119.283
2.000.000
80.496
94.064
94.064
107.633
107.633
121.207
121.207
134.775
134.775
148.344
2.500.000
96.370
112.231
112.231
128.093
128.093
143.956
143.956
159.818
159.818
175.680
3.000.000
111.639
129.652
129.652
147.663
147.663
165.675
165.675
183.687
183.687
201.699
3.500.000
126.423
146.474
146.474
166.525
166.525
186.575
186.575
206.626
206.626
226.677
4.000.000
140.808
162.808
162.808
184.809
184.809
206.806
206.806
228.806
228.806
250.807
4.500.000
154.832
178.710
178.710
202.588
202.588
226.461
226.461
250.339
250.339
274.218
5.000.000
168.563
194.249
194.249
219.935
219.935
245.623
245.623
271.310
271.310
296.996
7.500.000
233.640
267.609
267.609
301.577
301.577
335.551
335.551
369.519
369.519
403.487
10.000.000
294.697
336.115
336.115
377.533
377.533
418.957
418.957
460.375
460.375
501.794
15.000.000
408.590
463.264
463.264
517.937
517.937
572.617
572.617
627.292
627.292
681.965
20.000.000
515.368
581.913
581.913
648.458
648.458
715.009
715.009
781.553
781.553
848.098
25.000.000
617.043
694.507
694.507
771.967
771.967
849.433
849.433
926.893
926.893 1.004.357
25.564.594
628.472
707.160
707.160
785.843
785.843
864.531
864.531
943.214
943.214 1.021.902
Section 2: Free plants
37 Special foundations of the fee
(1) The allowable costs for services for outdoor areas in addition to the expected cost of foreign investments and the costs for the
following buildings and facilities, as far as she plans and supervises the contractor:
1 Single waters with predominantly ecological and landscape design elements,
2 Ponds without dams,

3 areal earthworks for landscaping,


4 simple culverts and embankments not claim benefits under Part 4 are required as a means to landscaping, to the extent
5 Noise barriers as a means of landscaping,
6 Retaining structures and ground traffic load without outriggers as a means of landscaping, if no services are required under Part
4,
7 Walkways and bridges, where no services are required under Part 4,
8 Ways without eligibility for regular vehicular traffic with simple drainage conditions, and other paths and paved areas that are
planned as a design element of outdoor installations and for the benefits under Part 3 are not required.
(2) Can not be the cost of services for outdoor areas for:
1 the building and the costs in 32 paragraph 3 and
2 the substructure and superstructure of pedestrian areas, excluding the costs for surface mounting.
(3) 11, paragraph 1 shall not apply to the calculation below 7500 euros eligible costs of the building. Paragraph 2 shall not apply
in so far.
38 power plants free image
(1) 33 section 1 sentence 1 shall apply with the exception of the discussion of the spatial extensions. The services for outdoor
areas are grouped into nine phases and evaluated as a percentage of the fees of 39 as follows:
1 for the power phase 1 (basic evaluation) with 3 percent,
2 for power phase 2 (Preliminary) with 10 percent,
3 for the power phase 3 (preliminary design) with 15 percent,
4 for the performance of Phase 4 (planning permission) with 6 percent,
5 for the performance of Phase 5 (detailed design) with 24 percent,
6 for the performance of Phase 6 (Preparation of tender) with 7 percent,
7 for the performance of phase 7 (Participation in the award) with 3 percent,
8 for the performance of Phase 8 (site supervision - supervision) with 29 percent and
9 for the power stage 9 (Property maintenance and documentation) with 3 percent.
(2) The individual performance of each performance period are set out in Appendix 11.
39 Fees for services for outdoor areas
(1) The minimum and maximum rates of fees for the services listed in 38 for outdoor areas are set out in the table following fees:
Honorary board to 39 paragraph 1 - outdoor facilities
Eligible
costs

Zone I
from

to

Zone II
from

to

Zone III
from

to

Zone IV
from

to

Zone V
from

to

20.452 2.616
25.000
3.186
30.000
3.798
35.000
4.409
40.000
5.015
45.000
5.610
50.000
6.200
100.000
11.730
150.000
16.590
200.000
20.814
250.000
24.364
300.000
29.051
350.000
33.897
400.000
38.737
450.000
43.581
500.000
48.418
1.000.000
96.839
1.500.000
145.255
1.533.876
148.535

3.205
3.902
4.651
5.394
6.133
6.861
7.578
14.276
20.103
25.089
29.196
34.471
39.806
45.026
50.122
55.091
107.026
159.689
163.260

3.205
3.902
4.651
5.394
6.133
6.861
7.578
14.276
20.103
25.089
29.196
34.471
39.806
45.026
50.122
55.091
107.026
159.689
163.260

3.988
4.853
5.785
6.710
7.624
8.524
9.412
17.665
24.785
30.781
35.638
41.693
47.685
53.411
58.839
63.989
120.607
178.937
182.894

3.988
4.853
5.785
6.710
7.624
8.524
9.412
17.665
24.785
30.781
35.638
41.693
47.685
53.411
58.839
63.989
120.607
178.937
182.894

5.163
6.279
7.486
8.676
9.855
11.019
12.162
22.756
31.810
39.329
45.308
52.534
59.505
65.990
71.915
77.340
140.982
207.811
212.347

5.163
6.279
7.486
8.676
9.855
11.019
12.162
22.756
31.810
39.329
45.308
52.534
59.505
65.990
71.915
77.340
140.982
207.811
212.347

5.944
7.230
8.620
9.991
11.348
12.682
13.995
26.145
36.491
45.022
51.750
59.755
67.384
74.373
80.633
86.238
154.563
227.058
231.982

5.944
7.230
8.620
9.991
11.348
12.682
13.995
26.145
36.491
45.022
51.750
59.755
67.384
74.373
80.633
86.238
154.563
227.058
231.982

6.535
7.946
9.468
10.977
12.465
13.932
15.373
28.690
40.004
49.297
56.582
65.175
73.293
80.663
87.173
92.912
164.750
241.492
246.706

(2) The allocation to the fee zones will be determined by evaluation criteria for the planning requirements:
1 Requirements for integration into the environment,
2 Requirements for protection, maintenance and development of nature and landscape,
3 Number of functional areas,
4 design requirements,
5 Supply and waste disposal facilities.
(3) If applicable for a free system evaluation criteria of several honorary zones and are therefore doubt as to which fees zone free
system can be assigned, the number of evaluation points shall be determined in accordance with paragraph 4, and the free facility
is associated with the following fees zones according to the sum of the features:
1 Honorary Zone I: Free systems with up to 8 points
2 Honorary Zone II: free plants with 9-15 points
3 Honorary Zone III: Free plants with 16 to 22 points,
4 Honorary Zone IV: Free plants with 23 to 29 points,
5 Honorary Zone V: Free plants with 30 to 36 points.
(4) The allocation of a free system to a fee band are according to the difficulty of planning requirements, the criteria as laid down in
paragraph 2, point 1, 2 and 4, each with up to 8 points, the criteria as laid down in paragraph 2, point 3 and 5, each with up to 6
points to evaluate.