Sei sulla pagina 1di 2

Joseph Torres

3938 E. Baranca Rd Gilbert, AZ 85297 3615225713 joseph.c.torres02@gmail.com

Objective To work in a position that will allow me to build on my design experience while incorporating academic engineering principles. Education Bachelor of Science in Mechanical Engineering, Pursuing, May 2015 GPA 3.13 Arizona State University - Tempe, AZ Bachelor of Science in Industrial Technology, August 2004 GPA 3.00 Minor in Business Administration Texas A&M University Kingsville - Kingsville, TX Skills
CAD, SolidWorks, ANSYS, FEA

MATLAB, MS Office Structural Mech., Principles of Mech. Design, Thermofluids I&II, Computer-Aided Eng. I&II, Circuits Bilingual (Spanish) Organizations Society of Automotive Engineers Formula Team

Experience Mechanical Design Engineer, December 2010 - Current TBD Engineering LLC, Scottsdale, AZ Process equipment for high purity containers, Contract Period February 2013 January 2014 Developed a fully functional system for automated assembly of handles to plastic bottles. Improved product throughput by 60% above current equipment capabilities. Responsible for the design of all mechanical components and assemblies within SolidWorks. Conceptualized and modeled 75 individual components and 11 subassemblies. Managed manufacturing schedule and maintained inventory. Performed final product assembly verifying clearance, range of motion, ease of use and performance. Semiconductor manufacturing equipment, Contract Period December 2010 August 2012 On site at MGI Automation, Tempe, AZ Designed mechanical components and assemblies for automated semiconductor wafer placement systems. Conceptualized and manufactured 164 individual components and 15 subassemblies with in SolidWorks. Examined purchase component specifications and integrated critical features into designs. Compiled bills of material to aid with work order tracking, inventory tracking and purchasing. Worked closely with machinist to improve component manufacturability and reduce waste. Performed prototype assembly noting fit, clearance, range of motion and performance. 3D Draftsman, Contract Period July December 2007 Western Semi Solutions Inc., Mesa, AZ Created semiconductor related parts and assemblies using SolidWorks. Performed reverse engineering of parts and subassemblies. Created working drawings and bills of materials within SolidWorks.

Technician Associate I, January April 2006 Precision Technician Inc., Mesa, AZ Assembled, troubleshot and tested remanufactured semiconductor manufacturing equipment. Performed high precision mechanical assembly on high vacuum equipment. Experience with Applied Materials Endura and P5000 systems.

Quality Control Analyst, January 2004 - August 2005 Intern, June August 2003 Texas Center for Applied Technology/Texas Engineering Experiment Station On site at Corpus Christi Army Depot (CCAD), Corpus Christi, TX Project lead for Rotor Head Shop (various aircraft). Directed 5S Lean Events for AH-64 Apache and CH-47 Chinook rotor head assembly. Coordinated with supply chain management to maintain improvements made during Lean Events. Created point of use storage units for tools, and shadowed kit carts for components. Member of team that performed analysis on various painting processes throughout the Airframe Paint Shop. Co-author of Method Improvements and Ergonomic Analysis of Airframe Paint Shop presented to CCAD upper management. Employed Lean Manufacturing and Ergonomic principles in method improvement recommendations. Proposed improvements that provided an ROI of $779,389 annually with a four month payback. Studied assembly process of UH-60 Black Hawk aircraft evaluating part installation precedence and noting bottlenecks. Collected data on delays and investigated root causes throughout the overhaul process. Researched assembly methods and processes and developed workstation requirements. Emphasis on improving the reliability of the delivery schedule for components and hardware. Performed time studies and established standard hours to ensure customer billing accuracy and detect variances in the overhaul process. HH-60 Pave Hawk disassembly 80 hrs. Composites repair shop (various aircraft) 40 hrs.

Potrebbero piacerti anche