CEMENT PORT DEVELOPMENT

IN MANOKWARI REGENCY
WEST PAPUA PROVINCE

PR0POSAL

PT HASTA PERKASA KONSULTAN

LIST OF CONTENT
1.

INTRODUCTION

1.1.

GENERAL

1.2.
2

PROPOSED PROJECT AREA


1.2.1. Manokwari Regency
2
1.2.2. The location and Boundaries
3

2.

OBJECTIVES
4

3.

OUTPUT

4.

SCOPE OF THE PROCET PROPOSAL


4

5.

IMPLEMENTATION PHASE OF WORCK


6

6.

SCHEDULE

7.

COST PROPOSAL

8.

TERM OF PAYMENT
7

1. INTRODUCTION
1.1. GENERAL
Upon request regarding Cement Special Port development plan in Manokwari,
West Papua Province, PT. Hasta Perkasa consultant submit "Proposal Planning
Stages Port Cement in South Manokwari, West Papua Province", based on the
laws and regulations relevant in Indonesia.

The Special Port, according to legislation is Port which is managed for their own
interests, in order to support specific activities. Where organizer of Special Port is
the Government, Provincial Government, District / City Government or Indonesian
legal entity who has a license to manage the special port.

1.2. PROPOSED PROJECT AREA


1.2.1.Manokwari Regency
Proposed Project area is in Manokwari Regency, West Papua Province, the
Capital District is located in the city of Manokwari.

Manokwari Regency

Gambar Manokwari Regency Map

Manokwari regency consists of 29 sub-district / district, 132 Village with an


area of 14448.50 km2. Manokwari district mostly located in the highlands of
Papua island. Geographically located in 0o15 - 3o25 South Latitude and
between 132o35 - 134o45 East Longitude, this area is directly adjacent to the
Pacific Ocean in the north, Fakfak districts in the south, Sorong Regency in
the west, and Paniai District in the east.
1.2.2.Position and Boundaries
Manokwari district lies in the 0o015 '- 3o025' South latitude and 132o035 '134o045' east longitude. The boundaries are as follows:

Northen boundary is Pasific Ocean

South boundary is Fakfak Regency

West boundary is Sorong Regency

East boundaries are Biak Numfor, Yapen Waropen and Nabire


Regency

In government administration, Manokwari before expansion is divided into 17


districts, with Manokwari as the district capital. From the 17 districts, 10 are in
the mountain areas, the rest are in the lowland and coastal areas.

Gambar Administrative Map of Manokwary Regency

2. OBJECTIVE
The objective of the proposal is to give brief explanation to arrange legal documents
which must be completed to develop Special Port, the documents are Feasibility
Study, Masterplan dan Detail Desain for Special Port Development.

3. OUTPUT
-

Feasibility Study Document

Masterplan Document

Detail Desain Document

4. SCOPE OF THE PROJECT PROPOSAL


1. Scope of Work of Feasibility Study Document are:

Preparation Work

Literature analysis and data collection

Survey of alternative location port and existing transportation network

Feasibility Study analysis

Spatial

Social and Cultural

Economy

Technical

Initial Environment

Conclution and recommendation

2. Scope of Work of Masterplan Document are:


-

Preparation Work

Literature analysis and data collection

Location Survey

Spatial analysis (Regency and Province)

Existing Port analysis study

Hinterland and existing network transportation

Economic growth potential analysis

Cement projection needs

Port development concept

Short term, medium and long development stategy

Requirement of landside and seaside area

Port Layout Plan

Cost estimation

3. Scope of Work of Detail Design Document are:

Preparation Work

Literature analysis and data collection

Survey

Topography and bathymetry

Hidro-oceanografi

Water Quality

Geotechnical

Data Analysis
o

Tide

Wind

Wave

Current

Geotechnical

Hydro-oceanography modelling

Seaside and Landside layout planning

Detail Structure Analysis

Cost Estimation

5. IMPLEMENTATION PHASE OF WORK


Stages implementation document preparation activities involving Consultants, Owner
Employment (Owner), the Regional Government and the Central Government in this
regard the Ministry of Communications as ters presented in flow chart below:

Gambar Imolementation Phase of Work

6. SCHEDULE
No
1
2
3

Document Arrangement

Feasibility Study
Masterplan
Detail Design

7. COST PROPOSAL
Cost of the project are:
a. Feasibility Study

Rp.

b. Masterplan

Rp.

c. Detail Design

Rp.

812,500,000
1,027,500,000
1,267,500,000

8. TERM OF PAYMET
a. Down Payment

10

: 40% as contract signed

b. Second Payment

: 40% as interim report submitted

c. Final Payment

: 20% as final report submitted

Month
5

Attachment
Cost Proposal

11

1 FEASIBILITY STUDY
A
No
1
2
3
4
5
6
7
8

Remuneration
Expert Position
Team Leader (Port)
Planology
Civil
Economy
Social and Cultural
Legal
Engineer
Drafter

Survey Cost

No
1
2
3
4
5
6

C
No
1
2
3
4
5

Type of Survey
Reconnaissance
Data Collection
Spatial and Transportation
Legal and land status
Technical
Initial Environment

Amount (Rp)
50,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
40,000,000
10,000,000
250,000,000

Volume
1
1
1
1
1
1

Unit
ls
ls
ls
ls
ls
ls

Unit Price (Rp)


50,000,000
50,000,000
75,000,000
50,000,000
75,000,000
50,000,000
Sub Total B

Amount (Rp)
50,000,000
50,000,000
75,000,000
50,000,000
75,000,000
50,000,000
350,000,000

Volume
5
5
5
5
5

Unit
pcs
pcs
pcs
pcs
pcs

Unit Price (Rp)


500,000
500,000
500,000
500,000
500,000
Sub Total C

Amount (Rp)
2,500,000
2,500,000
2,500,000
2,500,000
2,500,000
12,500,000

Volume
1
1

Unit
ls
ls

Unit Price (Rp)


100,000,000
100,000,000
Sub Total D

Amount (Rp)
100,000,000
100,000,000
200,000,000

Rp

812,500,000

Document Report
Report
Inception
Interim
Draft Final
Final
Initial Environment

Discussion

No
Type
1 Local Government
2 Central Government

TOTAL COST - FEASIBILITY STUDY-

12

Volume Duration (Month) Unit Price (Rp)


1
2
25,000,000
1
2
15,000,000
1
2
15,000,000
1
2
15,000,000
1
2
15,000,000
1
2
15,000,000
2
2
10,000,000
1
2
5,000,000
Sub Total A

2 MASTERPLAN
A
No
1
2
3
4
5
6
7
8

Remuneration
Expert Position
Team Leader (Port/ Plano)
Planology
Civil
Economy
Social and Cultural
Legal
Engineer
Drafter

Survey Cost

No
1
2
3
4
5

C
No
1
2
3
4
5

Type of Survey
Reconnaissance
Data Collection
Spatial and Transportation
Legal and land status
Technical

Volume Duration (Month) Unit Price (Rp)


1
4
25,000,000
1
4
15,000,000
1
3
15,000,000
1
2
15,000,000
1
2
15,000,000
1
4
15,000,000
3
4
10,000,000
1
4
5,000,000
Sub Total A

Amount (Rp)
100,000,000
60,000,000
45,000,000
30,000,000
30,000,000
60,000,000
120,000,000
20,000,000
465,000,000

Volume
1
1
1
1
1

Unit
ls
ls
ls
ls
ls

Unit Price (Rp)


50,000,000
75,000,000
100,000,000
75,000,000
100,000,000
Sub Total B

Amount (Rp)
50,000,000
75,000,000
100,000,000
75,000,000
100,000,000
400,000,000

Volume
5
5
5
5
5

Unit
pcs
pcs
pcs
pcs
pcs

Unit Price (Rp)


500,000
500,000
500,000
500,000
500,000
Sub Total C

Amount (Rp)
2,500,000
2,500,000
2,500,000
2,500,000
2,500,000
12,500,000

Volume
1
1

Unit
ls
ls

Unit Price (Rp)


50,000,000
100,000,000
Sub Total D

Amount (Rp)
50,000,000
100,000,000
150,000,000

Rp

1,027,500,000

Document Report
Report
Inception
Interim
Draft Final
Final
Drawing

Discussion

No
Type
1 Local Government
2 Central Government

TOTAL COST - MASTERPLAN-

13

14

3 DETAIL DESIGN
A
No
1
2
3
4
5
6
7
8

Remuneration
Expert Position
Team Leader (Port/ Civil)
Port
Civil
Geotechnic
Ocean Engineering (Modelling)
Chief Surveyor
Engineer
Drafter

Survey Cost

No
1
2
3
4

Type of Survey
Reconnaissance
Data Collection
Batimetry and Topography
Geotechnical

No
1
2
3
4
5

Volume
1
1
1
1

Unit
ls
ls
ls
ls

Unit Price (Rp)


50,000,000
75,000,000
200,000,000
250,000,000
Sub Total B

Amount (Rp)
50,000,000
75,000,000
200,000,000
250,000,000
575,000,000

Volume
1
1

Unit
ls
ls

Unit Price (Rp)


50,000,000
75,000,000
Sub Total C

Amount (Rp)
50,000,000
75,000,000
125,000,000

Volume
5
5
5
5
5

Unit
pcs
pcs
pcs
pcs
pcs

Unit Price (Rp)


500,000
500,000
500,000
500,000
500,000
Sub Total D

Amount (Rp)
2,500,000
2,500,000
2,500,000
2,500,000
2,500,000
12,500,000

Volume
1
1

Unit
ls
ls

Unit Price (Rp)


50,000,000
100,000,000
Sub Total E

Amount (Rp)
50,000,000
100,000,000
150,000,000

Rp

1,267,500,000

Document Report
Report
Inception
Interim
Draft Final
Final
Drawing

Discussion

No
Type
1 Local Government
2 Central Government

TOTAL COST - DETAIL DESIGN-

15

Amount (Rp)
75,000,000
45,000,000
45,000,000
30,000,000
45,000,000
45,000,000
90,000,000
30,000,000
405,000,000

Laboratory Work

No
Type of Survey
1 Water Quality
2 Soil Investigation

Volume Duration (Month) Unit Price (Rp)


1
3
25,000,000
1
3
15,000,000
1
3
15,000,000
1
2
15,000,000
1
3
15,000,000
1
3
15,000,000
3
3
10,000,000
2
3
5,000,000
Sub Total A