Sei sulla pagina 1di 54

4 YEAR OLD MODEL HOOKS FOR A "DELUXE" WOMEN

Thursday, May 26, 2011 9:06 to quote pad +

DIARY

http://pautinka.3dn.ru/publ/skhemy_dlja_vjazanija/skhemy_vjazanija_platev/azh urnaja_tunika_s_razrezami_azhurnoe_vjazanie/6-1-0-592

Openwork Sizes: S (M) L

tunic (XL) XXL size

with products in finished

slits form:

chest - 90 (98) 106 (114) 122 cm, length tunics 64 (66) 68 (70) 72 cm sleeve length by ext. seam 26 (27) 28 (29) 30 cm You will need: Yarn Novita Kotivaki (100% Mears, cotton, 663 m/200 g) -400 (450) 500 (550) 600g black, hook number 2 and number 2, 5. Density knitting: 7.5 repeat repeat scheme x 12 rows = 10 cm x 10 cm Back: tie ku chain of 140 (148) 160 (172) 184 Begin to knit Fig. 11 th row: 1 Art. b / n of 8 temperature. chain and repeat rapport Fig. of 4 n 33 (35) 38 (41) 44 times. The paper is now 34 (36) 39 (42) 45 repeats in Fig. Knit on Figure 1: 1-7th rows, then 2-7th rows. When the height of the items will be 43 (44) 45 (46) 47 cm, remove both sides by 4 (4) 4 (5) 5 fragments repeats Fig. for neck. In operation 26 (28) 31 (32) 35 rapportov.Kogda armhole height is 21 (22) 23 (24) 25 cm, cut the thread. Rack: knit as well as back to a height of 35 (36) 37 (38 ) 39 cm and finish binding the 2nd or 5th series (group Art. s / n). Divide in half for work cutout shelves and further knit the parts separately. Do not forget to make the dec for armhole cutout at the same height as on the back. When the height of the armhole is 15 (16) 17 (18) 19 cm, reduce side cutout transmission and 6 repeats in the following order 1 more rapport. Work even until armhole height will not be the same height as on the back. The second part of knit as well. Sleeves: a cut in the sleeve, knit start of 2 parts.Tie a string of 48 (48) 48 (52) 52 temperature. Begin to knit Fig.1 1st row: knit 1 tbsp. b / n of 8 temperature. chain and repeat rapport Fig. 4 10 (10) 10 (11) 11 times. In this paper, 11 (11) 11 (12) 12 fragments rapport. Knit on Figure 1 :1-7-series, and then 2-7th rows. When will involve 11 rows, cut the thread and put the work on time. second part of the same tie. Work even further both parts together (= 22 (22) 22 (24) 24 repeat), knit on Figure 2. Start each side gain rapport 1. Make allowances in every 3rd row 3 (4) 4 (4) 5 times. In this paper, after increases of must be 30 (32) 32 (34) 36 repeats. Work even until sleeve height is not equal to 31 (32033 (35.5) 36.5 cm Assembly: sew or knit shoulder seams. Sew sleeve to armhole, sew sleeve seams. Sew side seams, leaving a 20 cm side slits. tie all the edges of two tunics rows Art. 6 / n.

TRINA UNCINETTO (spiegazione)

Diversi di voi mi hanno chiesto la spiegazione di questa trina, bella da usare anche come tramezzo per biancheria, ma che sicuramente pu arricchire i nostri lavori di macrame rumeno. Di solito si usa negli spazi che fanno da passe partout ai centro tavola, o comunque ai centrini lavorati con questa tecnica.
Inizio lavoro: Avviare 6 cat e chiudere a cerchio. lavorare 3 cat, 3 p.alti allungati chiusi assieme (Punto NOCCIOLINA):

Proseguire lavorando 4 cat., 1 p. basso nel cerchio iniziale, 1 cat, voltare il lavoro :

Lavorare 6 p.bassi nell'arco che si formato, 3 punti alti allungati chiusi assieme, 3 cat, 1 punto basso nel cerchio d'inizio, 1 cat. voltare il lavoro:

Lavorare *6 p. bassi nell'arco, 3 p. alti allungati chiusi assieme (nello spazio subito dopo i punti alti chiusi assieme sottostanti), 4 cat., 1 p.basso sul 1p.bassso che segue, 1 cat.** voltare il lavoro:

Proseguire da * fino ad ** per la lunguezza desiderata.

Se preferite potete fare un pippiolino al centro dei 6 punti bassi, ottenendo cos una variante del modello.

Ti potrebbero anche interessare:

BASKET OF A ROPE WITH STRAPPING. MASTER CLASS


Wednesday, July 11, 2012 10:50 + to quote pad

HOOK

http://www.stranamam.ru/post/3493961/

Published GalinaIvan

Basket made of rope tied around a hook and ordinary yarn. You can use any rope, whether synthetic underwear, natural or rough construction, hemp twine and so on. In the same way you can associate bags, coasters or hot pads. Threads can choose a contrasting color, as in the photo, but you can take the same hue.

So, is such a need rope, yarn

and hook 4 mm Start knitting with a chain of 2 loops, then - without nakida 8 columns.

>>>

Getting fasten the rope. Use a pin to mark the start of the series. Second row between the posts provyazyvat 2 air loops fasten rope, capturing the previous row. Here is the bottom should get in the

basket:

HOME HOOK BOOTS. MASTER CLASS


Friday, September 16, 2011 8:56 to quote pad +

http://www.stranamam.ru/post/1785517/ Published maxi


For 1. Threads. took me 300 gr., the length can not say-thread unmarked crocheting 3.5 but could Coy 2. Hook. I 3. Insole. I 4. Needle and 4, took felt, with a ie, 3.5 you thick the and can ear 2 thread (for search for is quite obvyazki and stitching plump. insoles). leather. motifs. these boots will need:

5. Awl to pierce holes in the footbed.

I took the insole size 38, although the size of my legs 36. First, the insole is always slightly less than the shoe, and secondly, with insoles trim its size slightly decreases. knit 26 square motifs-13 on each boot. Pattern can be anything, it all depends on the thickness of the threads and your

imagination. Tie to begin with one motive, he should be diagonally along the length as about 1 \ 3 insoles precisely we Adjust later. Two reasons we banded on two sides another near-nakida columns with these motivations will boots socks.

>>>>>

Begin to collect bootleg and heels, which consist of 12 motifs. I sewed them as the picture 2.

First collected motifs in 4 stripes, three in each motif, to steam the seams. Then sewed these stripes together.Attention, only a sew stripes motif 2, and in the middle of a will sew sock.

Initially I joined sock in three places not to move with stitch and then sewed. Here are the top of the boot and ready.Let us soles.

Pierce a hole with an awl and a retractable hook loop smaller. If someone initially started small crochet knit accordingly change nothing, just my 3.5 prolazili not in the hole. Undergirding the insole near bars without nakida. Then again, take a big hook and knit a number of columns without nakida, but it at will, but you can not fasten, and immediately ready to assemble.

Putting the boot. Putting it inside out. Evert our knitting and sole, I baste the sole ankle in 4 places: on the sides, and pyatochku sock. This is to make it easier to sew and was nothing in the process did not move.

If not enough length on your toes a little bit, you can still knit on both sides (which we previously provyazyvali) number of columns without nakida or nakida (this is optional, if the length of the insole and the boot is the same, I dovyazyvala row). Adjust the length?

Excellent

sew

boot.

last spurt. Associate shnurochek any convenient way (I have a chain of stitches, knitting threads of the other) or recoverable ready lace, braid. We put it on high, where the ankle turns into pyatochku.

All

pets

warm

boots

ready.

This happy owners boots (sorry for the quality, fotkala in the mirror)

Workshop: Knitted slippers "Three Flowers". Size 38


For the work we need: 100 grams of red yarn production Kamteks Romance (50% wool, 50% acrylic, 120m/100g); 100 g gray yarn production Kamteks Romance (50% wool, 50% acrylic, 120m/100g); skein of jute production Kamteks to increase wear shoes and foot massage; number 4 hook, hook number 2.5; sewing thread gray and red colors for sewing; scissors; 4:00 time; good mood.

Types of loops: Aerial loop without nakida Column Column 1 nakida Column 2 NACD Connection column. Job Description: 1. Schemes used in knitting

2. For the sole red thread thread crochet jute number 4 dial 23 loops. Knit the scheme (Fig. 1)

3. Tie pigtail on both sides with columns nakida. Run allowances for rounding the edges 6 loops on each side.

4. 3 series in mysochkah knit columns with 1 nakida, while heels without nakida bars (Fig. 1), allowances under the scheme At the completion of a number of threads are cut

5. We take out the middle of the red tangle thread. Next knit in 2 additions.

6. Stepping back from the edge of 5-6 cm heels begin to knit 4 row toward heels.

7. Undergirding pyatochku slipper in-loop (see diagram in Figure 1)

8. Dovyazyvaem series to end.

9. We take out the middle gray skein of yarn. Continue to knit in 2 additions gray thread 5th row. (See the diagram in Figure 2).

10. Banded gray thread pyatochku

11. On mysochkah do subtraction scheme in Figure 2. Dovyazyvaem series to end.

12. 6 series continue knitting red thread in 2 additions. Decremented by mysochkah scheme in Figure 2

13. On the seventh row to do subtraction on heels scheme (Fig. 2)

14. Decremented by mysochkah also scheme in Figure 2

15. Banded red thread in 2 additions top slipper. By subtracting mysochkah 3 loops on one heel. Cut the thread and refuel. Slippers ready!

16. Crochet 2,5 knit items for flowers. In order to contact the stamens recruit 4 air loop and tied their columns without nakida.

17. It turns out this stamen. Flower knit scheme.

18. Dovyazyvaem all the other elements.

19. These are the flowers were obtained:

20. Fix the stamens on slippers, knotting the thread ends inside the slipper.

21. Strung on stalks stamens.

22. Fasten onto a sewing needle. Slippers with flowers ready!

23. By analogy, the second knit slippers. And wear your health!

SWEATER WITH SLEEVES "BAT" HOOK AND SCARF

DIARY

Friday, October 21, 2011 13:08 + to quote pad

http://xomyachok.ru/index.php?option=com_content&task=view&id=10 09&Itemid=55

Crocheted sweater with sleeves "bat." Extra long strap sleeveless fitted with thumbhole. Ideal two-tone scarf linked wavy pattern.

Sizes: 34-40 (42-46). Knitting pullover and scarf you will need: 350 (400) g and 50 g of caramel gray yarn Kashmire (100% cashmere, 112 m/25 g); hook 5,5; straight needles, number 4; short circular needles number 4. Pattern width of the hook 6 : knit crochet scheme. Each row starting with the number given on the temperature. Lifting and loops to repeat, repeat loop repeat, repeat after finishing loops, repeat from the 1st to the 6th district. The front surface of: persons. p. - Persons. etc., WS. p. - WS. Circle. rows: Knit all sts persons. Wrong expanse: persons. p. Circle. rows: Knit all sts WS. WS. etc., WS. p. Persons.

Garter: persons. and WS. p. - Persons. Gum: alternately claim 2 persons. waste, 2 WS. surface. Planck sleeve: with individuals. hand to translate the spoke chrome half. paragraph, tie 3 p.persons. stitch in the 4th district. (Izn. p.) Loop postponed. Now with WS. dial side of the other wall chrome. n the same loops and knit as well. Then tie 1 p. persons., provyazyvaya with 1 st persons.side with 1 st WS. sides together. Tie a rubber band 34 cm, with 26 cm through the loop holes for thumb divide: for right sleeve before the last paragraph 24 series for the left sleeve after the 24th paragraph and link 4 cm apart. Then knit to the end of all loops. Close the loop. Inlay for neck: knit as a plank for sleeves, only circle. rows and 12 cm band. Close the loop. Wavy pattern width of 20 claim: knit scheme in which individuals are given. and WS. series.Repeat loop repeat, repeat after finishing the loop. Repeat from 1st to 10th district.

Density knitting. hook Pattern: 18 sts and 6 p. = 10 x 10 cm, wavy pattern: 16 sts and 26 p.= 10 x 10 cm Tip: make a pattern in full size and perform the subtraction and addition, putting the item to the pattern. Caution details before and knit back together with sleeves. Knitted pullover Back: dial 90 (102) sts and link chrome. 10 cm band. Close the loop. The closed edge to bind 91 (103) Art. b / n and then knit pattern hook. To add to the pattern sleeves 35 cm in 25 (21.5), see After 35 cm from the gum directly bind 15 cm backrest finish. Before: how to knit back, only neckline. To do this through a 2 cm from the end of the additions close to the pattern averages 20 15 cm from the end of the end item additions. Assembling knit pullover: perform shoulder seams. Along the edges of the sleeves on the dial 54 sts and tie straps, as described above. By neckline dial on circular needles 88 sts and tie Bakey, as described above. Run side seams and sleeves. Knitted scarf Job Description: gray thread dial 382 8 and associate p. garter. Then knit wavy pattern, with the 1st to the 6th district. caramel, from the 7th to the 10th district. gray thread. Repeat 2 more times and finish 4 p. garter gray thread. Close the loop.
Scheme

Potrebbero piacerti anche