Sei sulla pagina 1di 1

G

GRCC INFRASTRUCTURE 2nd UPGR A DAnnual E R E N O VAT I O N West Michigan INFORMATIONAL Construction SESSION Summit!
D R A P I D S C O M M U N I T Y C O L L E G E

Have you heard about the $30M bond issue and the associated projects at GRCC for the next three years? Would you like to learn more about the requirements and how to participate as subcontractor? If so, then this session is designed for you!

March 13, 2014 2:00 - 5:00 p.m. GRCC Sneden Hall, Room 108
You are invited to attend the 2nd Annual West Michigan Construction Summit!
Join GMB ARCHITECTURE + Join ENGINEERING us on the afternoon of Thursday, March 13, 2014 BIM (Building at Grand Rapids Community College to meet with Information Modeling) Manager construction & facilities managers and corporate Paul buyers whoBlanchard, are looking for along supplierswith in the GMB, Skilled Trades including but not limited to masonry, millwrights, OAK and GRCC staff as they talk HVAC, plumbing, roong, asphalt, concrete, electrical, about upcoming projects, to drywall, landscaping, ooring, carpentry, how glass & glazing, frames doors suppression, be placed onhardware, the bidre list and most earthwork, general trades and general contracting. importantly BIM requirements Managers and buyers represent necessary to participating participate as a the Bronson Healthcare Group, CEED (Center for viable bidder. Paul will be sharing Empowerment and Economic Development ) valuable information on CSM the Group, BIM Chemical Bank, City of Grand Rapids, Fifth Third Bank, Grand Area Chamber of to process to aidRapids you in preparing Commerce, Grand Rapids Black Chamber of participate in forthcoming projects.

WHO WHAT

GRCC, GMB

WHEN WHY COST

digital representation of physical and functional characteristics of a facility. A BIM is a https://learning.grcc.edu/ec2k/maps/LocMap_100.pdf shared knowledge resource for information about a facility forming a reliable basis for isdefined limited as soexisting register today at: conception to demolition decisions duringAttendance its life-cycle; from earliest https://2ndWMConstructionSummit.eventbrite.com

Briefing on upcoming GRCC projects and valuable information on Parking: Please enter DeVos Campus/Sneden Hall student parking lot (#20) off Fountain BIM (BuildingSt. Information Modeling) Building Information Modeling (BIM) is a (across from Central High School). Parking passes will be provided.

Commerce, Grand Rapids Community College, GROW (Grand Rapids Opportunities for Women), Kellogg Company, Kent County, Michigan Minority Supplier Development Council, Pzer, SpartanNash, State of Michigan, VetBizCentral, A+E, OAK and YOU and West Michigan Hispanic Chamber of Commerce. Together these entities have upcoming opportunities across Michigan, Ohio and Indiana.

Thursday, November 8, 2012, 3:30PM to 5:30PM

WHERE

GRCC DeVos Campus, Sneden Hall, 435 E. Fulton, Room 108 To prepare to participate in $30M of upcoming GRCC projects FREE!
Grand Rapids Community College is an equal opportunity institution. GRCC is a tobacco free campus. 1314-26043

Potrebbero piacerti anche