Retaining wall length 60m BOQ for Retaining & Boundary wall Item Quantity Excavation 237.6 Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all 45.9 materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-incharge. Construction of RR Masonry in CM (1:6) using hard rough granite stone (0.50 Cum) , CR stone (0.44 cum ) and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . Plastering with CM (1:5), 12 mm thick to even surface walls including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. & Plastering to Uneven surfaces of RR /CR, Brick/PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work. Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).
Sr.No 1
Uom Cum
Our Price
Cum
4900
216.225
Cum
5500
194.903
Cum
6000
1589.014
Sq.m
350
4950
RM
Page 1
Sheet1
Supply and fixing in position of MS angles (embedded in CC (1:3:6) to compound wall including ) over compound wall including painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the finished item of work. 50X50X6
178.2
RM
745.2 Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)
Kgs
2.91
Cum
5500
Sub Total