TEACHING PLAN
Institute Code :1221 Course and Code : CE3G Semester : Third Academic Year: 2013-14 Subject & Code: Surveying (17310) Name of Faculty: Mr. Awasare V. G.

Ch. No. 1 01

Topic 2
Overview Of Estimating & Costing

No. of Lecture
3 4

Lect. No.
4

Sub Topic to be Covered


5
Meaning of the terms estimating, costing. Purpose of estimating and costing. Approximate estimate - Plinth area rate method, Cubical Content method, Service Unit method, Typical bay method, Approximate Quantity method Problems on Approximate estimate Detailed estimate, Revised estimate, Supplementary estimate, Revised & supplementary estimate and Repair estimate. Unit quantity method, Total quantity method, Data required for detailed estimate. Factors to be considered during preparation of detailed estimate. Steps in preparing detailed estimate. Taking out quantity, squaring, abstracting. Preparing check list by adoption of Sequence of execution. Describing item of works, formats of measurement Sheet , Abstract sheet, face sheet

L.R Media
6

Date of Commencem ent

Date of Completion

Remark
9

1 2 3 4

02

Detailed Estimate

5 6 7 8

03

Mode of Measurements

9 10 11 12

Units of Measurements for different item of works as per IS 1200 Units of Measurements for different item of works as per IS 1200 Desired accuracy in taking measurements of various items of works, Rules of deductions for openings as per IS 1200 for brickwork, plastering, painting. Procedure for taking out quantities for various items of works as per IS 1200.

04

Procedure for Preparing Detailed Estimate

16

13

14 15 16 17 18 19 20 21 22 23 24 25

Provisions to be made in detailed estimate viz. contingencies, work charged establishment, centage charges, water Supply & Sanitary arrangements, Electrification. Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure Long Wall and short wall method Load bearing Structure Long Wall and short wall method Load bearing Structure Long Wall and short wall method Framed Structure building. centre line method Framed Structure building. centre line method Percentage of reinforcement for various structural members Preparing bar bending Schedule for footing, column

26 27 28

Preparing bar bending Schedule for beam, Preparing bar bending Schedule for slab Preparing bar bending Schedule for chajja

05

Rate analysis

08

29 30 31 32 33 34 35 36

Meaning of term Rate analysis Factors affecting rate analysis, lead (standard & extra), lift, task work, materials and labour, Market Rate DSR Transportation of Materials, capacity of conveyance for different materials. Transportation Charges. Labour - Categories of labours, labour rates, overhead charges, contractors profit, water charges. DSR Preparing rate analysis of different items of work viz P.C.C., Preparing rate analysis of different items of work RCC works, Preparing rate analysis of different items of work Brickwork, Preparing rate analysis of different items of work plastering, Preparing rate analysis of different items of work flooring Framing estimate by taking out quantities of road embankment using mean area method method and also to draw L section of road embankment. mean area method mean area method mid sectional area method, mid sectional area method, Prismoidal formula method

06

Estimate for Civil Engineering works

12

37 38 39 40 41 42

43 44 45 46 47 48

Prismoidal formula method Prismoidal formula method BBM septic tank for 25 users BBM septic tank for 25 users Community well for 10m. dia. Community well for 10m. dia.

Teachers Sign

HOD

D-2
For AICTE Diploma Courses With Effect From 2011-12

Maharashtra State Board of Technical Education


LABORATORY/ASSIGNMENT /SHEET/ JOB/PROJECT ACTIVITY PLANNING (LP) Institute Code :1221 Course and Code : ___________________________ Subject Code: _________ Semester : _____________ Name of Faculty : _______________
Sr. No 1 2 3 4 5 6 7 8 9 10 11 12 13 Name of Experiment/ Assignment/Sheet/Job/Project Activity Date of Performance Planned Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Batch A Date of Completion Remark

Name of Faculty

Name of H.O.D