TEACHING PLAN
Institute Code :1221 Course and Code : CE3G Semester : Third Academic Year: 2013-14 Subject & Code: Surveying (17310) Name of Faculty: Mr. Awasare V. G.
Ch. No. 1 01
Topic 2
Overview Of Estimating & Costing
No. of Lecture
3 4
Lect. No.
4
L.R Media
6
Date of Completion
Remark
9
1 2 3 4
02
Detailed Estimate
5 6 7 8
03
Mode of Measurements
9 10 11 12
Units of Measurements for different item of works as per IS 1200 Units of Measurements for different item of works as per IS 1200 Desired accuracy in taking measurements of various items of works, Rules of deductions for openings as per IS 1200 for brickwork, plastering, painting. Procedure for taking out quantities for various items of works as per IS 1200.
04
16
13
14 15 16 17 18 19 20 21 22 23 24 25
Provisions to be made in detailed estimate viz. contingencies, work charged establishment, centage charges, water Supply & Sanitary arrangements, Electrification. Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure -Center line method Load bearing Structure Long Wall and short wall method Load bearing Structure Long Wall and short wall method Load bearing Structure Long Wall and short wall method Framed Structure building. centre line method Framed Structure building. centre line method Percentage of reinforcement for various structural members Preparing bar bending Schedule for footing, column
26 27 28
Preparing bar bending Schedule for beam, Preparing bar bending Schedule for slab Preparing bar bending Schedule for chajja
05
Rate analysis
08
29 30 31 32 33 34 35 36
Meaning of term Rate analysis Factors affecting rate analysis, lead (standard & extra), lift, task work, materials and labour, Market Rate DSR Transportation of Materials, capacity of conveyance for different materials. Transportation Charges. Labour - Categories of labours, labour rates, overhead charges, contractors profit, water charges. DSR Preparing rate analysis of different items of work viz P.C.C., Preparing rate analysis of different items of work RCC works, Preparing rate analysis of different items of work Brickwork, Preparing rate analysis of different items of work plastering, Preparing rate analysis of different items of work flooring Framing estimate by taking out quantities of road embankment using mean area method method and also to draw L section of road embankment. mean area method mean area method mid sectional area method, mid sectional area method, Prismoidal formula method
06
12
37 38 39 40 41 42
43 44 45 46 47 48
Prismoidal formula method Prismoidal formula method BBM septic tank for 25 users BBM septic tank for 25 users Community well for 10m. dia. Community well for 10m. dia.
Teachers Sign
HOD
D-2
For AICTE Diploma Courses With Effect From 2011-12
Name of Faculty
Name of H.O.D