FibeAir 1500P FibeAir IP-MAX FibeAir IP-MAX2

IDU Installation Guide

Part ID: BM-0127-0 Doc ID: DOC-00016217 Rev a.03 October 2008

Notice
This document contains information that is proprietary to Ceragon Networks Ltd. No part of this publication may be reproduced, modified, or distributed without prior written authorization of Ceragon Networks Ltd. This document is provided as is, without warranty of any kind.

Registered TradeMarks
Ceragon Networks , FibeAir and CeraView are registered trademarks of Ceragon Networks Ltd. Other names mentioned in this publication are owned by their respective holders.

TradeMarks
CeraMapTM, ConfigAirTM, PolyViewTM, EncryptAirTM, CeraMonTM, EtherAirTM, and MicroWave FiberTM, are trademarks of Ceragon Networks Ltd. Other names mentioned in this publication are owned by their respective holders.

Statement of Conditions
The information contained in this document is subject to change without notice. Ceragon Networks Ltd. shall not be liable for errors contained herein or for incidental or consequential damage in connection with the furnishing, performance, or use of this document or equipment supplied with it.

Information to User
Any changes or modifications of equipment not expressly approved by the manufacturer could void the users authority to operate the equipment and the warranty for such equipment. Copyright 2008 by Ceragon Networks Ltd. All rights reserved.

Corporate Headquarters: Ceragon Networks Ltd. 24 Raoul Wallenberg St. Tel Aviv 69719, Israel Tel: 972-3-645-5733 Fax: 972-3-645-5499 Email: info@ceragon.com North American Headquarters: Ceragon Networks Inc. 10 Forest Avenue, Paramus, NJ 07652, USA Tel: 1-201-845-6955 Toll Free: 1-877-FIBEAIR Fax: 1-201-845-5665 Email: infous@ceragon.com

www.ceragon.com

European Headquarters: Ceragon Networks (UK) Ltd. 4 Oak Tree Park, Burnt Meadow Road North Moons Moat, Redditch, Worcestershire B98 9NZ, UK Tel: 44-(0)-1527-591900 Fax: 44-(0)-1527-591903 Email: infoeuro@ceragon.com APAC Headquarters: Ceragon Networks APAC (S'pore) Pte Ltd 100 Beach Road #27-01/03 Shaw Towers Singapore 189702 Tel.: 65 65724170 Fax: 65 65724199

Contents
Chapter 1: Installation................................................................................... 1-1
General................................................................................................................................ 1-1 Site Requirements.............................................................................................................. 1-1 Pre-Installation ................................................................................................................... 1-1 Unpacking Equipment at the Site..................................................................................... 1-2 Installation Requirements ................................................................................................. 1-2 FibeAir 1500P Description ................................................................................................ 1-4 FibeAir IP-MAX Description .............................................................................................. 1-7 FibeAir IP-MAX2 Description ............................................................................................. 1-8 Installing the IDU in a Rack............................................................................................... 1-9 Grounding the IDU ........................................................................................................... 1-11 Connecting the IDU.......................................................................................................... 1-13

Chapter 2: Initial System Setup.................................................................... 2-1


General................................................................................................................................ 2-1 Initial Setup using the Craft Terminal .............................................................................. 2-2 Additional Setup using CeraView..................................................................................... 2-5 Connecting Line Interfaces............................................................................................. 2-12

Chapter 3: Acceptance and Commissioning Procedures .......................... 3-1


General................................................................................................................................ 3-1 Site Acceptance Procedure .............................................................................................. 3-2 1+0 Commissioning Procedure ........................................................................................ 3-7 1+1 Commissioning Procedure ........................................................................................ 3-9 2+0 XPIC Commissioning Procedure............................................................................. 3-12 FibeAir 1500P/IP-MAX/IP-MAX2 Commissioning Log ................................................... 3-15

Appendix A: Line Interfaces and Cables .....................................................A-1 Appendix B: Connector Pin-Outs.................................................................B-1 Appendix C: Protection Kits .........................................................................C-1 Appendix D PPP/SLIP Driver Installation ....................................................D-1

Safety Precautions & Declared Material


Fiber Optic Line Precautions

! ! !

Before turning on the equipment, make sure that the fiber optic cable is intact and is connected to the transmitter. Do not attempt to adjust the laser drive current.

Do not use broken or non-terminated fiber optic cables/connectors or look straight at the laser beam. ATTENTION: The laser beam is invisible! The use of optical devices with the equipment will increase eye hazard. CLASS 1 LASER PRODUCT Complies with IEC 60 825-1:1993 + A1:1997 + A2:2001, and EN 60825-1:1994 + A1:1996 + A2:2001

General Equipment Precautions

! !

Use of controls, adjustments, or performing procedures other than those specified herein, may result in hazardous radiation exposure. When working with a FibeAir IDU, note the following risk of electric shock and energy hazard: Diconnecting one power supply disconnects only one power supply module. To isolate the unit completely, disconnect all power supplies. Machine noise information order - 3. GPSGV, the highest sound pressure level amounts to 70 dB (A) or less, in accordance with ISO EN 7779. Maschinenlrminformations-Verordnung - 3. GPSGV, der hchste Schalldruckpegel betrgt 70 dB(A) oder weniger gemss EN ISO 7779. Bruit de machine dordre - 3. GPSGV, le plus haut niveau de pression sonore s'lve 70 dB (A) au maximum, dans le respect de la norme ISO EN 7779.

Safety Precautions & Declared Material


(continued) Static electricity may cause body harm, as well as harm to electronic components inside the device. Anyone responsible for the installation or maintainance of the FibeAir IDU must use an ESD Wrist Strap. ESD protection measures must be observed when touching the IDU. To prevent damage, before touching components inside the device, all electrostatic must be discharged from both personnel and tools.

RoHS Compliance Declaration


Electronic Information Products Declaration of Hazardous/Toxic Substances
Hazardous Substance Component Lead (Pb) Mercury (Hg) Cadmium (Cd) Hexavalent Chromium (Cr VI) Comply Polybrominated Biphenyls (PBB) Polybrominated Diphenyl Ethers (PBDE) Comply

/ PCB/Circuit Modules Mechanical Parts Cables

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Comply

Chapter 1: Installation
General
This chapter provides instructions for the installation of the FibeAir 1500P/IP-MAX/IP-MAX2 IDU at the customer site.

Site Requirements
Must be located indoors. The environment temperature must be between -5 C and +45 C. Easily accessible, but only by authorized personnel. Available power source of -48 VDC, and the site must comply with National Electric Code (NEC) standards. Available management connection (Ethernet or dial-up). No more than 300 m from ODU location. In addition, since the IDU will be connected to the ODU, when considering a site, it is important to check for current and future obstacles on the roof or tower. Possible future obstacles may include trees, new buildings, window cleaners on the roof, snow that may accumulate in front of the antenna, etc. The site should be accessible to certified personnel only. Note about Antenna Location: As with any type of construction, a local permit may be required before installing an antenna. It is the owners responsibility to obtain any and all permits.

Pre-Installation
Packing
The equipment is packed at the factory, and sealed moisture-absorbing bags are inserted.

Transportation
The equipment is prepared for public transportation. The cargo must be kept dry during transportation, in accordance with ETS 300 019-1-2, Class 2.3. It is recommended to transport the equipment to the installation site in its original packing case. If intermediate storage is required, the packed equipment must be stored in dry and cool conditions and out of direct sunlight, in accordance with ETS 300 019-1-1, Class 1.2.

FibeAir 1500P/IP-MAX/IP-MAX2 Installation Guide

1-1

Inspection
Check the packing lists, and ensure that the correct part numbers and quantities of components arrived.

Unpacking Equipment at the Site


A single FibeAir system (1+0) is shipped in 5 crates. Upon delivery, make sure that the following items are included: Two indoor units and accessories Two outdoor units One CD with CeraView management software (if ordered) and a CeraView user guide. Unpack the contents and check for damaged or missing parts. If any part is damaged or missing, contact your local distributor.

Installation Requirements
Required Tools
The following tools are required to install the IDU: Philips screwdriver (for mounting the IDU to the rack and grounding screw) Flathead small screwdriver (for PSU connector and to unlock the IDC/IDMs from the chassis) Sharp cutting knife (for wire stripping) Crimping tool for ground cable lug crimping (optional: if alternative grounding cable is used).

Cables
In addition to the tools mentioned above, the cables necessary for IDU installation, and their pin-outs, can be found in the following sections in this guide: Appendix A: Line Interfaces and Cables Appendix B: Connector Pin-Outs

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-2

Requirements for North America


Restricted Access Area: DC powered equipment should only be installed in a Restricted Access Area. Installation Codes: The equipment must be installed according to country national electrical codes. For North America, equipment must be installed in accordance to the US National Electrical Code, Articles 11016, 110-17 and 110-18, and the Canadian Electrical Code, Section 12. Overcurrent Protection: A readily accessible Listed branch circuit overcurrent protective device, rated 15 A, must be incorporated in the building wiring. CAUTION: This equipment is designed to permit connection between the earthed conductor of the DC supply circuit and the earthing conductor at the equipment. Grounded Supply System: The equipment shall be connected to a properly grounded supply system. All equipment in the immediate vicinity shall be grounded the same way, and shall not be grounded elsewhere. Local Supply System: The DC supply system is to be local, i.e. within the same premises as the equipment. Disconnect Device: A disconnect device is not allowed in the grounded circuit between the DC supply source and the frame/grounded circuit connection.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-3

FibeAir 1500P Description


FibeAir 1500P is Ceragons modular ultra high capacity network connectivity solution designed to meet growing market demands for increased spectral-efficient systems. FibeAir 1500P is designed to deliver double the capacity using a single 28 MHz channel. In addition, the system is modular, easy to install, and a cost-effective alternative to fiber. With FibeAir 1500P operating in co-channel dual polarization (CCDP) mode, using the cross polarization interference canceller (XPIC) algorithm, two STM-1 signals can be transmitted over a single 28 MHz channel, using vertical and horizontal polarization. This enables double capacity in the same spectrum bandwidth.

A cost-effective STM-1 ring configuration is achieved using a single FibeAir 1500P IDU located at each of the nodes, with one ODU providing the West connection and another providing the East connection. For upgrading to a 311 Mbps ring, the built in CCDP mode can be activated to use the same single 28 MHz channel and equipment. FibeAir 1500P can also be configured as an STM-1 1+1 hot standby terminal, in a 2U IDU shelf, with either a single or double antenna installation. FibeAir 1500P is equipped with an internal SNMP agent for easy integration with standard network management systems, and can also be managed via CeraView, Ceragons network element manager, and PolyView, Ceragons network management platform. FibeAir 1500P also provides an internal Ethernet hub for in-band transmission of third party management information. FibeAir 1500P can operate together with any industry standard ADM.

FibeAir 1500P IDU

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-4

The following figure shows the FibeAir 1500P main modules and components.
IDC Drawer
Protection SLIP/PPP Ethernet Alarm FANS

IDC

LED+interface module XPIC mode synchronization cable

IDC+WSC+Fans Module

Terminal

WSC optional

ODU

5,3.3[v] STM1/2 Daughter Board Power Supply

-48[V]

ODU

Carrier A

B A C K P L A N E

To IF channel1 Modem Board Channel A IF board Channel A

To IF channel1 STM1/2 Daughter Board Modem Board Channel B IF board Channel B

5,3.3[v] Power Supply

-48[V]

Carrier B

Carrier Drawers A & B

As shown in the block diagram, the FibeAir 1500P IDU includes the following sections and functions:
Control Module

The drawer on the left side of the IDU front panel. Includes the IDC (IDU Controller), wayside channel (optional), and replaceable fan unit. The IDC handles the configuration and control of all system functions, including trail configurations, protection algorithms, network management tasks, performance monitoring, alarms detection/generation, and diagnostics. Note that if a fan unit failure occurs, the entire IDC is replaced, a process that may take approximately 30 seconds.

Carrier Drawers

The drawers to the right of the IDC Drawer. Include multiplexers, modem interfaces, line interfaces, and power supply units. Note that in a 1+0 configuration the right drawer is used.

Multiplexer

Receives data delivered via different communication protocols (such as DS-3, Ethernet, etc.) and converts it to a standard SDH framework for transmission through the air. On the receiving end, this module separates the SDH payload and overhead and reconstructs the original data that was converted. The ODU receives its DC power from the IDU. The PWR LED on the front panel of the IDU continuously lights to indicate the existence of input voltage. The DC input range is -40.5 VDC to -72 VDC.

Power Supply

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-5

Modem

Upon transmission, performs data conversion from the baseband frequency to the IF frequency. Upon receiving, performs data conversion from the IF frequency to the baseband frequency. It also performs AGC (Automatic Gain Control). Performs data framing and scrambling, and LOF detection.

Line Interface

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-6

FibeAir IP-MAX Description


FibeAir IP-MAX is Ceragons comprehensive Ethernet solution that offers Fast and Gigabit Ethernet wireless transmission with fiber-like quality. The IDU of the system is based on the 1500P IDU, and the components, except for the interfaces, are the same. With the highest available throughput on the market, this Ethernet solution, with ultra-low latency, is optimized for IP based applications including IP-DSLAM connectivity for triple play services, WiMAX backhauling and any delay-sensitive application. With upgradeable capacities of 50 to 400 Mbps per radio carrier, the IP-MAX carrier class solution provides a pay-as-you-grow, simple, and scaleable migration path for the ever-increasing demand for data-rich services.

Indoor Modules (IDMs)

FE IDM The Fast Ethernet IDM is a hot-swappable module inserted in the IP-MAX IDU. It provides configurable highcapacity Fast-Ethernet wireless transmission with Quality-of-Service (QOS) controls. Each Fast Ethernet IDM contains 2 x FE ports or 2 x FE with 8 x E1/DS1 ports and one radio interface. Wire-speed FE IDMs are available with a single FE port (100 or 50 Mbps throughput) or 2 x FE ports with 200 Mbps full-duplex throughput. Capacity upgrades using software-licensed keys with specific serial numbers are available with 50 to 100 Mbps throughput and 100 to 200 Mbps throughput. Physical Port Priority - If both Fast Ethernet ports are used, total Ethernet capacity is dynamically allocated between the two ports, or priority can be given to one port over the other. Built-in Quality of Service - Provides priority support for different classes of service, according to VLAN priority (802.1p) and DiffServ / IPv4 TOS or IPv6 TC bit values. All classes use 4 levels of prioritization with user selectable options between strict priority queuing, or weighted fair queuing, with 8:4:2:1 strict weights. Layer 2 Switch - Enables two separate LAN connections, while ensuring security between them.

GbE IDM The Gigabit Ethernet IDM is a hot-swappable module inserted in the IP-MAX IDU. It provides Gigabit wireless transmission, with each GbE IDM containing one GbE port, or GbE with 8 x E1/DS1 ports and one radio interface. GbE IDMs support traffic throughputs of up to 400 Mbps, full duplex, per single radio carrier. Maximum Throughput - Supports 800 Mbps over a single 56 MHz channel, using co-channel and dual polarization (CCDP) with XPIC, in a single IDU (two IDMs with two carriers, and two different GbE physical interfaces). Super Jumbo Frame Support - The Gigabit IDM supports frame sizes of up to 12,000 bytes. With this feature, IP-MAX is ready to support next generation Ethernet networks. In heavily loaded networks, where continuous data transfer is required, jumbo frames can significantly enhance the efficiency of Ethernet servers and networks. Jumbo frames enable the reduction of the packet processing by the server, thereby increasing end-to-end throughput.
FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide 1-7

FibeAir IP-MAX2 Description


FibeAir IP-MAX2 is Ceragons comprehensive Gigabit Ethernet wireless transmission solution that delivers fiber-like quality. FibeAir IP-MAX2 enables native Ethernet transmission with multiple frequencies, software selectable capacities, modulation schemes, and configurations for various network requirements, using the same hardware and state-of-the-art technology. The system supports high-capacity data services as well as traditional voice services, with both Ethernet and TDM interfaces. This innovative platform uses an on-the-fly upgrade method, whereby network operators only buy capacity as needed, benefiting from savings on initial investments and OPEX. The IP-MAX2 IDU (Indoor Unit) can host up to two carriers, each delivering up to 450 Mbps, optimizing the solution for different network topologies and configurations. Traffic capacity throughput and spectral efficiency are optimized with the desired channel bandwidth. For maximum user choice flexibility, channel bandwidths can be selected together with a range of modulations, from QPSK to 256 QAM. Two independent hot swappable Indoor Unit Modules (IDMs) can be used for hotstandby hardware protection, diversity, East-West configuration, or double capacity (2+0). High spectral efficiency is ensured by choosing the same bandwidth for double the capacity, via two carriers with vertical and horizontal polarizations. This feature is implemented by a built-in XPIC mechanism. In short, IP-MAX2 is ideal for all your IP network-building needs.

Indoor Modules (IDMs)


GBE IDMs come in two hardware types - optical and electrical.

Electrical GBE IDM

Optical GBE IDM

Both IDMs are hot-swappable modules inserted in the IP-MAX2 IDU, providing wireless transmission with Quality-of-Service (QOS) controls. Each GBE IDM optionally allocates 8 x E1/T1 ports and one radio interface. The electrical Gigabit Ethernet provides configurable high-capacity 10/100/1000BaseT while the optical GBE IDM has an SFP-based optics receptacle. Capacity upgrades using software-licensed keys with specific serial numbers are available with 100, 200, 300, and 400 Mbps throughputs.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-8

Installing the IDU in a Rack


Warning! The intra-building port(s) of the equipment or subassembly is suitable for
connection to intra-building or exposed wiring or cabling only. The intra-building port(s) of the eqiupment or subassembly MUST NOT be metallically connected to interfaces that connect to the OSP or its wiring. These interfaces are designed for use as intra-building interfaces only (Type 2 or Type 4 port as described in GR-1089-CORE, Issue 4) and require isolation from the exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring.

The FibeAir 1500P/IP-MAX/IP-MAX2 IDU is installed in a standard ETSI 19" rack as shown in the following illustration.

As shown in the illustration, four screws, supplied with the installation kit, are used to secure the IDU to the rack.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-9

IDU Dimensions The following illustration shows the dimensions (in millimeters) of the FibeAir 1500P/IP-MAX/IP-MAX2 IDU.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-10

Grounding the IDU


The following illustration shows how the IDU is grounded to the rack.

Single Point Stud

A grounding wire is connected below the IDU-ODU interface using a single screw with two washers. IDU Grounding Notes The IDU is suitable for installation in a Common Bonding Network (CBN). Only copper wire should be used. The wire must be at least 6 AWG. Connector and connection surfaces must be plated. Bare conductors must be be coated with antioxidant before crimp connections are made to the screws. FibeAir provides a ground for each drawer, via a one-hole mounted lug onto a single-point stud. The stud must be installed using a UL-listed ring tongue terminal, and two star washers for anti-rotation.
1-11

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

For antenna ports, lightning protection is used that does not permit transients of a greater magnitude than the following: Open Circuit: 1.2-50us 600V Short Circuit: 8-20us 300A

The ampacity of the conductor connecting the IDU frame to the DC return conductor is equal to, or greater than, the ampacity of the associated DC return conductor.

Power Supply Notes When selecting a power source, the following must be considered: DC power can be from -40.5 VDC to -72 VDC. Recommended: Availability of a UPS (Uninterrupted Power Source), battery backup, and emergency power generator. Whether or not the power source provides constant power (i.e., power is secured on weekends or is shut off frequently and consistently). The power supply must have grounding points on the AC and DC sides. The user power supply GND must be connected to the positive pole in the IDU power supply. Power supply grounding should be in accordance with the following illustration:

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-12

CAUTION! It is extremely important not to short the -48 VDC (-) to GND. This will damage the IDUs internal power supply module and terminate its operation.

Connecting the IDU


This section describes how the IDU interfaces are connected. The interfaces include line, system (IDU-ODU), and management ports. For interface specifications, see Appendix A - Line Interfaces and Cables. For connector pin-outs, see Appendix B - Connector Pin-Outs. For a description of the protection kits, see Appendix C - Protection Kits.

Interface Descriptions
The following photo shows the different IDU ports and their functions.

Interface Ports Built-in Ethernet Hub (for management) 2 x Wayside Channels Terminal & SLIP User Channel External Alarms Protection

DC Power N-Type Connector to ODU

Interface Ports

DC Power

N-Type Connector to ODU

As shown in the photo above, the IDC (Indoor Controller), in the left section of the FibeAir front panel, includes 2 Ethernet ports for management, Wayside channel connectors, terminal and SLIP connectors, an external alarms port, and a protection cable connector. In addition, the front panel includes two drawers (IDMs) with internal modems, STM-1/OC-3 connectors, an N-Type IDU-ODU connector, and a DC power input connector. In a 1+0 configuration, the right drawer (IDM) is used. Each modem drawer includes its own independent power supply unit and can be removed/replaced without causing other radio operation interference.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-13

The Indoor Controller (IDC) provides advanced options, such as the Wayside channel, Engineering Order Wire, external alarm interfaces, external protection interface, auxiliary user channels, and Ethernet management interfaces. The controller is an extractable, hot swappable, and non-traffic-affecting drawer, with four different models to choose from. All IDC models include management, external alarms, and protection interfaces. Only the type of auxiliary channel may vary in accordance with the specific system configuration. The IDC can include the following: TDM Wayside Channel - Two IDC models with either E1 or T1 wayside channel ports. Ethernet Wayside Channel - 2 Mbps Ethernet channels (one per carrier). This IDC includes an Engineering Order Wire interface (G.711 CVSD) for point-to-point voice connectivity. Ethernet Wayside Channel with Auxiliary User Channels - 2 Mbps Ethernet channels (one per carrier). In addition, two software-selectable user channels with the following options: 2 x RS-232 Asynchronous 9.6 Kbps, or 1 x RS-232 Asynchronous and 1 x V.11 Asynchronous (both 9.6 Kbps), or 1 x V.11 Synchronous co/contra-directional (64 Kbps). In asynchronous mode, each user channel can be associated with a different carrier. In synchronous mode, the single user channel can only be associated with the right side IDM carrier. This IDC also includes an Engineering Order Wire interface (G.711 CVSD) for point-to-point or concatenated voice connectivity.

IDU-ODU Coax Cable


The Coax Cable that connects between the IUD and the ODU should be terminated with N-type male connectors. Important! Make sure that the inner pin of the connector does not exceed the edge of the connector. The cable should have a maximum attenuation of 30 dB at 350 MHz.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

1-14

Chapter 2: Initial System Setup


General
After the system is installed and tested, and antenna alignment is performed, the next step is initial IDU setup and configuration. Initial setup procedures are performed on a craft terminal via a serial port connection. Note: Configuration procedures are generally performed using the CeraView software supplied with FibeAir. A description of CeraView and how to use it is provided in the CeraView User Guide. The craft terminal should be used only to perform the initial setup procedures desribed in this chapter. Once the system is up and running, use CeraView to maintain and operate the system on a regular basis.

Initial Setup Steps


The initial FibeAir setup procedure includes the following steps: Procedures Performed using a Craft Terminal: - Connecting to the IDU via the terminal port - Defining IP addresses - Setup Options Procedures Performed using CeraView: - Connecting to the Ethernet port - Installing the software - Setting the local Tx frequency channel - Specifying system information - Configuring the local/remote transport - Configuring trap forwarding - Setting up external alarms Connecting the Line Interfaces

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-1

Initial Setup using the Craft Terminal


The following procedures are performed after the RFU and antenna are installed.

Connecting to the IDU via Serial Port


Turn the IDU power switch ON. On the front panel of the IDU, the DRWR LED should be lit green. To set up the HyperTerminal connection: 1. 2. 3. 4. 5. 6. Connect the RS-232 port of your computer to the RS-232 (9-pin) port on the IDU front panel. This port is labeled Terminal. Select Start, Programs, Accessories, Communication, HyperTerminal. Double-click the HyperTerminal application icon. For Connection Description, type Terminal, and click OK. In the Connect Using field (Phone Number), select Direct to Com 1, and click OK. In the Port Settings tab (Com 1 Properties), specify the following settings: Bits per second - 19,200 Data bits - 8 Parity - None Stop bits - 1 Flow control - Hardware 7. 8. 9. Click OK. After you connect to the terminal, to enter the terminal setup program, press Enter. For password, use ceragon.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-2

Defining IP Addresses
Before you can configure the FibeAir system, you need to define IP addresses using the craft terminal. FibeAir includes two IP interfaces: an Ethernet interface, and a serial interface. Each interface has its own IP address and IP mask. The IP address is a four digit number separated by decimal points. Each IP address is a pair netid,hostid, where netid identifies a network, and hostid identifies a host on the network. The IP mask separates between the netid and hostid. For example, if the IP address is 192.114.35.12 (11000000 01110010 00100011 00001100), and the IP mask is 255.255.255.0 (11111111 11111111 11111111 00000000), the netid is 192.114.35, and the hostid is 12. An IP interface can only communicate with hosts that are on the same net (have the same netid). In the example above, the interface can communicate only with hosts that have netid 192.114.35 (for 1 to 255). If FibeAir has a frame to send to a host that is not on the Ethernet IP netid or the serial IP netid, the frame sould be sent to an intelligent device (usually a gateway) on the network. Such a device, known as a "default router", will know how to send the frame over the internet. The default gateway should be a host on one of the FibeAir interface netids. The following figure shows how FibeAir is integrated in the local network.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-3

To define IP Addresses:
1. 2. 3. In the main terminal program menu, select Configuration. Select IDC. Select Basic.

4.

Select IP and define the addresses as described above.

Important After you set up IP addresses, restart the IDU to activate them.

Setup Options in the Terminal Program


The main menu in the terminal setup program includes the following options: Configuration (1) - the main setup section in which you can configure the IDC, the right and left drawers, protection, SNMP management, in-band routing, and other such parameters. System Status (2) - used to obtain information about the different software versions currently used in the system. Maintenance (3) - used to perform software upload, download, and reset. Diagnostics (4) - used to perform loopbacks and obtain system information. Logs (5) - used to view alarm and configuration log reports.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-4

Additional Setup Using CeraView


Some of the initial setup procedures require the use of CeraView. Once initial setup is complete, use CeraView to run the system on a daily basis.

Connecting to the Ethernet Port


1. 2. Connect a crossed Ethernet cable from your PC to the Ethernet Port. If the connection is to a LAN (wall connection) use the standard Ethernet cable. Make sure the IP address on your PC is on the same sub-net as you defined in the FibeAir indoor unit (in most cases, the first three numbers of the IP address must be identical, depending on the sub-net mask).

CeraView PC Requirements
Before you install the CeraView software, verify that your PC has the following minimum requirements: For Windows Processor: Memory (RAM): Operating System: Serial Port: For UNIX Processor: Memory (RAM): Operating System: Blade 100 Ultra 5 (minimum) 256 MB minimum Solaris 8 or 10 Pentium 4, 2.8 GHz (minimum) 256 MB minimum Windows 2000 or above RS-232 (Hyper-Terminal)

Installing the CeraView Management Software


Note: More detailed information about CeraView installation is provided in Chapter 5 - Operation. 1. 2. Insert the CeraView CD in the CD drive. In Windows Explorer, double-click the setup.exe file. The installation program begins. 3. Follow the instructions displayed.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-5

Starting CeraView
1. Select Start, Programs, CeraView, CeraView Element Manager. The CeraView Login window appears.

CeraView Login Window 2. 3. 4. Enter the IP address of the IDU, and the SNMP community (for SNMP protocol access). For User Name use admin and for Password use ceragon. Select Save Password if you want CeraView to remember the password you entered. Note that there are two types of passwords, each with a different security level for authorized activities:Read Only - user is permitted to perform monitoring activities only.Read/Write - user is permitted to change system configuration and system administrator parameters, and perform monitoring activities. After you log in, the Main CeraView window appears.

Main CeraView Window

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-6

Setting the Local Tx Frequency Channel


If the Tx frequency was previously defined using the Hyperterminal, use this screen only to verify that the correct frequency was set. 1. Select Configuration, ODU Left/Right, ODU Configuration, or click the ODU icon in the tool bar.

At the top of the window, the system displays Tx/Rx ranges, the gap between them, and the channel bandwidth.

ODU Configuration Window 2. In the Frequency Control section, set the Tx Channel to the required channel. By default it is set to the first channel. If you are unsure of the required channel, refer to Appendix E for channel allocations. The frequency of the selected Tx channel appears in the Tx Frequency field. If you prefer, you may set the Tx frequency by entering a frequency in MHz in the Tx Frequency section. If the frequency is not available, a warning message appears to enable the entered frequency or to change it to the next available channel. Select the XPIC option (which appears under the ODU illustration) to activate the XPIC mechanism. The mechanism is used to cancel cross polar interference in a dual polarization system. Select the Local Only option. By default, the Local + Remote option is selected. However, since there is no connection to the remote unit at this time, the Local + Remote option is not available.

3.

4. 5.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-7

6. 7.

Click Apply to save the settings. Click Close.

Specifying System Information


To specify system information: 1. Select File, Local/Remote, System Information., or click the System Information icon

System Information Window 2. 3. 4. 5. 6. In the Current Time area, click Date/Time Configuration and set the date and time (in the format HH:MM:SS). The read-only Description field provides information about the FibeAir system. (Optional) In the Name field, enter a name for this link. By convention, this is the nodes fully-qualified domain name. (Optional) In the Contact field, enter the name of the person to be contacted when a problem with the system occurs. Include information on how to contact the designated person. (Optional) In the Location field, enter the actual physical location of the node or agent.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-8

7. 8. 9.

The Up Time field, Software Versions area, and Serial Numbers area are read-only. Click Apply. The settings are saved. Click Close.

Local/Remote Transport Configuration


The Local/Remote Transport Configuration window allows you to change threshold levels for the radio and alarms, and to configure special transmission parameters. This is recommended for advanced users only. Note: You will need to restart CeraView if you change the transport protocol. 1. Select Configuration, Local/Remote, IDU, Transport. The Transport Configuration window appears.

Transport Configuration Window 2. 3. 4. The Protocol field displays the current data transfer protocol. To change the protocol, click the drop down list and select SDH, SONET, or SONET-C. Click Apply to save the settings. Click Close.

Trap Forwarding Configuration


This section explains how to set up a trap forwarding plan. If your application does not require trap forwarding, you can skip the following procedure. 1. Select Configuration, Local/Remote, Management System, Traps Configuration, or click the Traps Configuration icon.

The Trap Forwarding Configuration window appears.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-9

Trap Forwarding Configuration Window 2. In the Managers IP Address area, specify the IP addresses of the managers to which you want traps to be sent. For each manager IP you specify, specify the Trap Port, and for Send Trap for Alarms with Severity, select the severity filter to determine which types of alarms will be forwarded. In the Send Trap for Alarms of Group section, you determine which alarms will be sent as SNMP traps to each manager. In each manager column, select the alarm types you want to include for that manager. In the Trap Options area, select Standard traps include serial number if you want trap messages to include the IDU serial number. Select Report local traps of far end IDU if you want remote IDU trap messages to be reported locally. Select Use different ID for each alarm type if you want each type of alarm to receive a unique ID. Select Send clear traps with zero severity if you want a trap with a clear severity (instead of the alarm's original severity) to be sent to the IP addresses you specified. 5. 6. For CLLI (Common Language Location Identifier), enter up to 18 characters that will represent your system ID when traps are sent. For Heartbeat Period, a heartbeat signal will be generated every x minutes (the number you enter) to tell your system that the trap meachnism is working.

3. 4.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-10

7.

Click Apply to save the settings.

External Alarms Setup


The procedure detailed in this section is required only if alarms generated by external equipment are connected to the IDU, or if the IDU alarm outputs are connected to other equipment (using the alarms I/O connector). 1. Select Configuration, Local/Remote, IDU, External Alarms, or click the Local/Remote External Alarms icon.

The Input/Output External Alarms window appears.

Input/Output External Alarms Window Follow the steps below for both the Local and Remote sides. The microcontroller in the IDU reads alarm inputs (dry contact) and transmits them to the CeraView management system. This allows FibeAir to report external alarms that are not related to its own system. For each alarm on the left side of the window, do the following: 2. 3. 4. 5. Click on the box next to the alarm number to enable/disable the alarm. If you enable an alarm, enter a description of the alarm in the text field. Select the alarms severity level from the drop-down list (Major, Minor, Warning, or Event). FibeAir provides three alarm outputs that can be used by other systems to sense FibeAir alarms. The outputs are configured on the right side of the window.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-11

The alarm outputs are Form C Relays. Each output relay provides three pins, as follows: Normally Open (NO) Normally Closed (NC) Common (C) Output alarms can be defined as any of the following: Major Minor Warning External Power BER Line Loopback LOF IDU ODU Cable Remote The default alarm output setting for each relay is Power. The relays may be connected to customer-specific applications. Refer to Appendix B for details concerning the alarm connector pin assignments. 6. 7. After you complete the configuration, click Apply to save the settings. Click Close.

Exiting CeraView
To exit CeraView, select File, Exit in the main window.

Connecting Line Interfaces


After configuring the system in accordance with the previous sections, the line interfaces can be connected to the IDU. For a description of the line interfaces, see Appendix A in this guide. Note the following interface terminology: For connectors or signals labeled TX, the signals are sent from FibeAir. For connectors or signals labeled RX, the signals are sent to FibeAir.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

2-12

Chapter 3: Acceptance & Commisssioning Procedures


General
This chapter provides Ceragon's recommended Acceptance and Commissioning Procedure for FibeAir 1500P/IP-MAX/IP-MAX2. Acceptance and commissioning should be performed after initial setup is complete. The purpose of this procedure is to verify correct installation and operation of the installed link and the interoperability with customer end equipment. Ceragon's Acceptance and Commissioning procedure includes the following stages: Site Acceptance Procedure Commissioning of radio link in a 1+0 configuration Commissioning of radio link in a 1+1 configuration Commissioning of radio link in a 2+0 XPIC configuration The Site Acceptance Procedure is a checklist that summarizes the installation requirements of the site at which the products were installed. The commissioning tests cover the required configuration information that should be recorded, and the tests that should be performed on the radio link in 1+0, 1+1 and 2+0 XPIC configurations.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-1

Site Acceptance Procedure


The purpose of the following procedures is to verify that all installation requirements were noted and checked. Following this procedure will ensure proper, long-lasting, and safe operation of the product. The checklist below summarizes the installation requirements of the site.

SITE ACCEPTANCE CHECKLIST 1. SITE INFORMATION Customer: Radio model: Site name: Site code: Radio link code: Site address: 2. ANTENNA MOUNTING Antenna mount type: Mount is of sufficient height to clear local obstructions Mount is safely positioned to not cause a safety hazard Mount is secure and perpendicular Mount is grounded as per site specifications All steelwork is Galvanized or Stainless Steel as appropriate 3. ANTENNA Antenna type (model and size): Antenna is securely fixed to mount Antenna is grounded as per site specifications Antenna sway braces are installed correctly (where applicable) Antenna Radome is securely fitted (where applicable) Water drain plugs are fitted and removed, as appropriate Antenna sealing O-Ring is properly fitted and not damaged Antenna/Launch unit polarization is as per link requirements OK OK OK OK OK OK OK OK OK OK OK OK

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-2

SITE ACCEPTANCE CHECKLIST (continued) 4. OUT-DOOR UNIT Type of ODU mount: ODU is securely mounted to the antenna or pole ODU is grounded as per installation instructions ODUs polarization is as per link requirements ODU is installed properly and has no physical damage For Remote-Mount Only: Remote mount kit is securely mounted to the pole Flexible waveguide has no physical damage and connectors are sealed All flexible waveguide bolts are secured using washers and lock-washers, as appropriate Flexible waveguide is secured to the pole 6. COAX CABLE Overall cable length: Cable type: N-Type connectors assembled properly on the cable Cable connected securely to ODU and IDU Cable connector is weather-proofed (sealed) at the ODU At the ODU, cable has a service/drip loop to prevent moisture from entering the connector Cable is secured using suitable restraints to fixed points at regular intervals (0.5 m recommended) Cable has no sharp bends, kinks, or crushed areas. All bends are per manufacturer specifications Grounding/lightning protection is as per site specifications Lightning protection type and model: Cable point-of-entry to building/shelter is weather-proof Cable ends are properly labeled OK OK OK OK OK OK OK OK OK OK OK OK OK (Direct or Remote mount) OK OK OK OK

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-3

SITE ACCEPTANCE CHECKLIST (continued) 7. FLEXIBLE WAVEGUIDE Overall flexible WG length: Flexible WG type: Flexible WG is connected securely to ODU and Antenna Flexible WG connector is weather-proofed (sealed) at the ODU At the ODU, the flexible WG has a service/drip loop to prevent moisture from entering the connector Flexible WG is secured using suitable restraints to fixed points at regular intervals (0.5 m recommended) Flexible WG has no sharp bends, kinks, or crushed areas. All bends are per manufacturer specifications Flexible WG point-of-entry to building/shelter is weatherproof Flexible WG ends are properly labeled 8. INDOOR UNIT IDU is securely mounted to the rack IDU is located in a properly ventilated environment IDU fans are functional and air flow to the fans is not disrupted IDU and rack are grounded as per site specifications Traffic cables and connections are properly terminated as per manufacturer/cable instructions All cabling is secured, tidy, and visibly labeled 9. DC POWER SUPPLY - Two Inputs Measured DC voltage input to the IDU: Power-Supply maximum current: Power-Supply is properly grounded DC power backup type: IDU DC connector is secure and the DC input leads are correctly terminated (no bare wires are visible) IDU DC connector (+) and (GND) leads are shorted and GND is grounded 10. RACK INSTALLATION Rack is mounted to the shelter floor with four screws Rack is mounted to the shelter wall with two screws OK OK OK OK (-40.5 to -72 VDC) (at least 3 Ampere) OK OK OK OK OK OK OK OK OK OK OK OK OK OK

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-4

SITE ACCEPTANCE CHECKLIST (continued) 11. REMARKS/NOTES

12. GENERAL INFORMATION Name: Title: Site accepted by: Company: Signature: Date: Name: Title: Site approved by: Company: Signature: Date:

Site Acceptance Checklist Notes


The following notes provide important additional information about the Site Acceptance Checklist. 1. Antenna Mounting Mounting pole is of sufficient height to clear local obstructions, such as parapets, window cleaning gantries, and lift housings. Mounting Pole is of sufficient height, and is safely positioned, so as not to cause a safety hazard. No person should be able to walk in front of, or look directly into the path of the microwave radio beam. Where possible, the pole should be away from the edge of the building. Mounting pole is secure and perpendicular. A pole that is not perpendicular may cause problems during antenna alignment. Mounting pole is grounded as per site specifications. All operators and site owners have specific requirements regarding the grounding of installations. As a minimum, typical requirements are such that any metal structure must be connected to the existing lightning protection ground of the building. Where it extends beyond the 45 degree cone of protection of existing lightning conductors, additional lightning protectors should be installed. All steelwork is Galvanized or Stainless Steel, as appropriate to prevent corrosion.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-5

2.

Antenna Antenna is grounded as per site specifications. See the third point in the Antenna Mounting section above. Antenna sway braces are fitted and installed correctly, where applicable. Typically, for an antenna of 1.2 m or larger, an extra sway brace is fitted to the mounting frame of the antenna. This sway brace should not be mounted to the same pole as the antenna, but should be installed directly back to the tower or an alternative point. Antenna Water Drain Plugs are fitted and removed, where appropriate. Some antennas have moisture drain plugs installed at various points around the antenna. The purpose of these plugs is to allow any moisture that forms on the inside of the antenna or radome to drip out and prevent a pool within the antenna. Only the plugs at the bottom of the antenna, after installation, should be removed. All other plugs should be left in position.

3.

ODU (Outdoor Unit) The ODU is grounded as per installation instructions. See the third point in the Antenna Mounting section above. The ODU polarization is as per link requirements and matches the polarization of the antenna.

4.

Indoor Unit The main traffic connections are correctly terminated and crimped as per cable and connector manufacturer instructions. All fiber optic patch leads should be routed carefully and efficiently, using conduits to prevent damage to the cables. All other user terminations are secure and correctly terminated. All labeling is complete as per site requirements. Labeling is specific to each customer. At a site with only one installation, labeling may be unnecessary. However, at sites with multiple installations, correct and adequate labeling is essential for future maintenance operations. Typical labeling requirements include: Antenna labels - for link identity and bearing ODU labels - for link identity, frequency, and polarization Coax cable labels - for link identity, close to the ODU, IDU, and either end of any joint IDU labels - for link identity

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-6

1+0 Commissioning Procedure


Scope
This section describes the recommended commissioning tests for a FibeAir radio link in a 1+0 configuration. The purpose of the commissioning tests is to verify correct and proper operation of the product.

Commissioning Test
The following tests should be performed on each installed link.

Link Verification
Radio LED on the IDM front panel is green, indicating the radio link is up. Received Signal Level (RSL) is up to +/- 4 dB from the expected (calculated) level at both ends of the link. Radio Bit Error Rate (BER) is 10E-11 or higher. If working with ATPC, ATPC is operating as expected (RSL = reference level). After connecting test equipment or end equipment to the line interfaces, all LEDs on the front panel of the IDM are green.

Line Interfaces Test


155 Mbps Interface - connect SDH/SONET/ATM test equipment to the 155 Mbps interface and verify error-free operation for at least 1 hour. Use a physical or software loop at the far end. 50/100/200 Mbps, GbE Interface - connect a Packet Analyzer to the Fast Ethernet interface and verify error-free operation (no packet loss) for at least 1 hour. Use a physical loop at the far end. 45 Mbps Interface - connect PDH test equipment to the DS3 interface and verify error-free operation for at least 1 hour. Use a physical or software loop at the far end. 2 Mbps/1.5 Mbps - connect PDH test equipment to the E1/T1 interface and verify error-free operation for at least 1 hour. Use a physical or software loop at the far end.

Interoperability Verification
Connect customer end equipment to the line interfaces, and verify correct operation. Further interoperability tests should be performed in accordance with the specific requirements of the connected end equipment.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-7

Management Verification
Install CeraView element manager software on the PC, and launch the program. Verify that you can manage the link and that you are able to perform changes to the link configuration (frequency channel, Tx power, system name, time & date, etc.) via CeraView. Verify that CeraView reports the correct parameters when performing the above. Verify that there are no active alarms on the link. If the management station is located at a remote site (Network Operation Center), verify that the management station can manage the link and receive traps.

Loopback Operation
Perform line loopback, IDU loopback, ODU loopback, and Remote loopback, and verify that the system operates accordingly.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-8

1+1 Commissioning Procedure


Scope
This section describes the recommended commissioning tests for a FibeAir radio link in 1+1 HSB (Hot Standby) and SD (Space Diversity) or FD (Frequency Diversity) configurations (internal protection). The purpose of the commissioning tests is to verify correct and proper operation of the product. Note that in this section: Primary refers to the the ODUs connected to the main path of the directional coupler in a 1+1 HSB configuration. Secondary refers to the ODUs connected to the secondary path of the directional coupler in a 1+1 HSB configuration.

Commissioning Tests
The following tests should be performed on each installed link.

Link Verification
The following steps should be repeated for each of the four ODU combinations (Primary-Primary, PrimarySecondary, Secondary-Primary, Secondary-Secondary). Radio LED on the IDM front panel is green, indicating the radio link is up. Received Signal Level (RSL) is up to +/- 4 dB from the expected (calculated) level at both ends of the link. Radio Bit Error Rate (BER) is 10E-11 or higher. If working with ATPC, ATPC is operating as expected (RSL = reference level). After connecting test equipment or end equipment to the line interfaces, all LEDs on the front panel of the IDM are green.

Line Interfaces Test


155 Mbps interface - connect SDH/SONET/ATM test equipment to the 155 Mbps interfaces using splitters, and verify error-free operation for at least 1 hour. Use physical loop between the splitters at the far end. 50/100/200 Mbps, GbE interface - connect a Packet Analyzer to the Fast Ethernet interfaces using an FE splitter, and verify error-free operation (no packet loss) for at least 1 hour. Use a physical loop at the far end. 45 Mbps interface - connect PDH test equipment to the DS3 interfaces using splitters, and verify error-free operation for at least 1 hour. Use a physical loop between the splitters at the far end. 2 Mbps/1.5 Mbps - connect PDH test equipment to the E1/T1 interfaces using splitters, and verify error-free operation for at least 1 hour. Use a physical loop between the splitters at the far end.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-9

Switching Tests
Define each of the N channels as preferred (one at a time) for errorless switching to the +1 channel. The regular channel supports hitless switching to the +1 channel. 155 Mbps Interface Connect SDH/SONET/ATM test equipment to the 155 Mbps interfaces using splitters. Use physical loop between the splitters at the far end. Verify that there are no alarms. Perform the following switching tests from one IDM to the other, and verify the system switches automatically. - Power: power off the active IDM - Radio: disconnect the coax cable of the active IDM - Line: disconnect the 155 Mbps line input of the active IDM - Management: force a switch using CeraView For diversity configurations, verify that each receiver is receiving its own signal, and then mute the active ODU. Verify that the receiver at the far end still receives from the diversity path. Verify that there are no errors in the test equipment. 50/100/200 Mbps, GbE Interface Connect a Packet Analyzer to the Fast Ethernet interfaces using splitters. Use a physical loop between the splitters at the far end. Verify no alarms exist. Perform the following switching tests from one IDM to the other, and verify the system switches automatically. - Power: power off the active IDM - Radio: disconnect the coax cable of the active IDM - Management: force a switch using CeraView 45/2/1.5 Mbps Interface Connect PDH test equipment to the interfaces using splitters. Use a physical loop between the splitters at the far end. Verify no alarms exist. Perform the following switching tests from one IDM to the other, and verify the system switches automatically. - Power: power off the active IDM - Radio: disconnect the coax cable of the active IDM - Management: force a switch using CeraView

Interoperability Verification
Connect the customer end equipment to the line interfaces and verify correct operation. Further interoperability tests should be performed in accordance with the specific requirements of the connected end equipment.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-10

Management Verification
Install CeraView element manager software on the PC and launch the program. Verify that you can manage the link and that you are able to perform changes to the link configuration (frequency channel, Tx power, system name, time & date, etc.) via CeraView. Verify that CeraView reports the correct parameters when performing the above. Verify that there are no active alarms on the link. If the management station is located a t a remote site (Network Operation Center), verify that the management station can manage the link and receive traps.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-11

2+0 XPIC Commissioning Procedure


Scope
This section describes the recommended commissioning tests for a FibeAir radio link in a 2+0 XPIC CoChannel-Dual-Polarization configuration. The purpose of the commissioning tests is to verify correct and proper operation of the product. Important! Since operation of the XPIC system depends on correct installation, make sure the guidelines for XPIC system installation provided below are followed correctly.

XPIC Installation Guidelines


Antenna and ODU Installation
1. 2. Install the dual polarization antenna and point it in the direction of the other site. Install the two ODUs on a dual polarization antenna using the appropriate mounting kit, and mark the ODUs with V and H respectively.

IDU-ODU Cable Installation


1. 2. 3. Install two cables between the ODUs and the drawers (IDMs). Note that cable length difference should not exceed 10 meters. Mark the cables with V and H respectively, and make sure V is connected to the right drawer and H is connected to the left drawer. Mark the drawers respectively.

Antenna Alignment
1. 2. Power up drawer V on both ends of the link and configure it to the desired frequency channel and maximum power. Align the antennas, one at a time, until expected RSL is achieved. Make sure the achieved RSL is no more than +/-4 dB from the expected level.

Polarization Alignment
Polarization alignment is required to verify that the antenna feeds are adjusted, to ensure that the antenna XPD (Cross Polarization Discrimination) is achieved. Polarization adjustment should be done on one antenna only. 1. 2. Power up drawer V on both ends of the link and record the RSL reading on one end. Power off drawer V on that end and power on drawer H.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-12

3. 4.

Check the RSL obtained on this ODU on H pol, and compare it to the RSL obtained by the ODU installed on the V pol. Verify that XPI (Cross Polarization Interference) is at least 25 dB where:

XPI = RSLPOL RSLXPOL RSLPOL Link RSL with thesamepolarizati on used at both sites. RSLXPOL Link RSL with orthogonalpolarizati ons used at both sites.
5. If XPI is less than 25 dB, adjust the feed polarization by opening the polarization screw and gently rotating the feed to minimize the RSLXPOL. Note that polarization alignment is not always possible since the RSLXPOL may fall below the sensitivity threshold of the ODU. It is also recommended to try to maximize the XPI as much as possible, by aligning the polarization.

XPIC Commissioning Tests


Individual Link Verification
Before operating in XPIC configuration, each of the links (V and H) should be commissioned individually in order to verify its proper operation. 1 2 3 4 5 6 Power up only drawer V at both ends and verify its frequency channel and Tx power configuration. Verify that the RSL is no more than +/-4 dB from the expected level. Run BER stability test on the link for at least 15 minutes to ensure error-free operation. Power up only drawer H at both ends and verify its frequency channel and Tx power configuration. Verify that the RSL is no more than +/-4 dB from the expected level. Run BER stability test on the link for at least 15 minutes to ensure error-free operation.

XPIC Configuration Verification


1 2 3 4 5 Using the XPIC cable, connect the two ODUs at each end to the TNC connectors. Make sure the cable is no longer than 3 meters. Configure the drawers to work in XPIC mode. Verify that the RSL at all four ODUs is no more than +/-4 dB from the expected level. Verify that no alarms exist (if a 155 Mbps line is connected). Run BER stability test on each of the 155 Mbps links for at least 1 hour to ensure error-free operation.

Note: In a 2+2 configuration, repeat each step above for each of the four coupled ODU combinations.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-13

XPIC Recovery Verification


In order to verify XPIC operation, simulate the faults described below. 1 2 3 4 5 Disconnect the IDU-ODU cable for each of the drawers (one at a time), and verify that the other link is operating. Disconnect the XPIC cable and check that the relevant alarms are generated. Power down each of the drawers and verify that the other link is operating. Swap the V and H cables and check that the relevant alarm is generated. Mute and then un-mute one ODU at a time and verify that the other link is operating.

Note: In a 2+2 configuration, repeat each step above for each of the four coupled ODUs connected to the two standby IDUs.

2+2 Verification
Perform the tests specified in Switching Tests in the 1+1 Commissioning Procedure section earlier in this guide. In this case, the switch will be from a main IDU connected to the main V and main H ODUs, to the secondary IDU connected to the coupled V and coupled H ODUs.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-14

FibeAir 1500P/IP-MAX/IP-MAX2 Commissioning Log


The Commissioning Log is an integral part of the commissioning procedure and should be filled in for each installed link. The Commissioning Log gathers all relevant information regarding the installed link and contains a checklist of all recommended commissioning tests. Maintaining the Commissioning Log is important for tracking your installations, and to provide essential data for Ceragon Networks. Upon completing the Commissioning Log, send the log to Ceragon support center at support@ceragon.com.

FIBEAIR 1500P/IP-MAX/IP-MAX2 LINK COMMISSIONING LOG 1. GENERAL INFORMATION Customer: Radio model: Configuration: Radio link code: Site 1 name & add: Site 2 name & add: 2. INDOOR UNIT IDC model: Wayside channel: IDC p/n: IDC s/n: SW IDC: Drawer model Main channel Drawer p/n Drawer s/n FW Mux: FW Modem: Cfg Modem: Site 1 Drawers Right / Left Site 2 Drawers Rigt / Left

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-15

FIBEAIR 1500P/IP-MAX/IP-MAX2 LINK COMMISSIONING LOG (continued) 3. ODU ODU model: ODU p/n: ODU Main s/n: SW ODU: Tx frequency (MHz): Rx frequency (MHz): Link ID: Tx power (dBm): ATPC on/off: ATPC ref level: ODU Polarization: 4. ANTENNA Antenna model: Antenna size: Manufacturer: Mounting type: Mounting losses: 5. LINK PARAMETERS Link distance: Rain zone: Expected RSL (dBm): Expected Diversity RSL (dBm): RSL Main (dBm): RSL Diversity (dBm): Deviation from exp? RSL 4 dB? Site 1 Drawers Right / Left Site 2 Drawers Right / Left Site 1 Drawers Right / Left Site 2 Drawers Right / Left Site 1 Drawers Right / Left Site 2 Drawers Right / Left

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-16

FIBEAIR 1500P/IP-MAX/IP-MAX2 LINK COMMISSIONING LOG (continued) 6. COMMISSIONING TESTS Front panel LEDs: Line loopback: IDU loopback: ODU loopback: Radio BER: STM-1 test: Fast Ethernet test: 8 x E1/T1 test: E3/DS3 test: Wayside E1 test: Wayside Eth test: XPIC test: Switching test: 7. MANAGEMENT CONFIGURATION Eth Main IP address: Eth Coupled IP address: Eth IP mask: Serial IP address: Serial IP mask: Default router: In-band enabled? Gateway/NE: In-band channel 1: In-band channel 2: Ring IP address: Ring IP mask: Network ID: 8. REMARKS/NOTES Site 1 Drawers Right / Left All green Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Site 1 All green Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Site 2 Drawers Right / Left All green Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Site 2 All green Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-17

FIBEAIR 1500P/IP-MAX/IP-MAX2 LINK COMMISSIONING LOG (continued) 9. INSTALLATION INFORMATION Name: Installed by: Company: Date: Signature: Name: Commissioned by: Company: Date: Signature:

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

3-18

Appendix A: Line Interfaces and Cables


This section provides a description of the FibeAir main channel, wayside channel, and order wire channel interfaces. The interfaces are located on the FibeAir IDU front panel. The following interface terms should be noted: For connectors or signals labeled TX, the signals are sent from FibeAir. For connectors or signals labeled RX, the signals are sent to FibeAir.

Main Channel Interfaces


Main channel interfaces include the following:

SC/MM/13 Multi Mode 155 Mbps, SC Optical Connector


Wavelength: Connector: Used with: Protocols supported: Timing mode: Coding method: Optical output to 62.5/125 fiber: Receiver sensitivity: Maximum input power: 850 nm SC Multi mode fiber STS-3c, STM-1, OC-3, STS-1, FDDI, TAXI, Fast Ethernet Retimed 4B/5B, NRZ -18 dBm -31 dBm -14 dBm

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-1

SC/SM/13 Single Mode 155 Mbps, SC Optical Connector


Wavelength: Connector: Used with: Protocols supported: Timing mode: Coding method: Maximum output to 9/125 fiber: Receiver sensitivity: Maximum input power: 1310 nm SC Single mode fiber STS-3c, STM-1, OC-3, STS-1, FDDI, TAXI, Fast Ethernet Retimed 4B/5B, NRZ -8 dBm -31 dBm -8 dBm

CMI Electrical 155 Mbps Connector


Connector: Used with: Protocols supported: Line coding: Timing mode: Range calculation: DIN 1.0/2.3 Coax cable STS-3c, STM-1, OC-3 CMI Retimed 12.7 dB at 78 MHz according to square root of frequency law 150 m is attainable using RG-59 B/U cables (cable length varies in accordance with type) 75

Impedance:

DS-3
Connector: Used with: Protocols supported: Line coding: Timing mode: Range calculation: DIN 1.0/2.3 Coax cable DS-3 B3ZS Retimed 12.7 dB at 78 MHz according to square root of frequency law 150 m is attainable using RG-59 B/U cables (cable length varies in accordance with type) Impedance: 75 A-2

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

8xE1/T1
Connector: Used with: Protocols supported: Timing mode: Range: Impedance: SCSI-36 Twisted Pair E1/T1 Retimed 100 m 120 /100
Receive Cable Twisted Pairs Twisted Pair RX Signals R-RING0 R-TIP0 R-RING1 R-TIP1 R-RING2 R-TIP2 R-RING3 R-TIP3 R-RING4 R-TIP4 R-RING5 R-TIP5 R-RING6 R-TIP6 R-RING7 R-TIP7 CGND (1) SCSI-36 Pin # 19 1 20 2 21 3 22 4 23 5 24 6 25 7 26 8 9

Twisted Pair

Twisted Pair

Twisted Pair

Twisted Pair

Twisted Pair

Twisted Pair

Twisted Pair Shield

Transmit Cable Twisted Pairs Twisted Pair RX Signals T-RING0 T-TIP0 T-RING1 T-TIP1 T-RING2 T-TIP2 T-RING3 T-TIP3 T-RING4 T-TIP4 SCSI-36 Pin # 29 11 30 12 31 13 32 14 33 15

Twisted Pair

Twisted Pair

Twisted Pair

Twisted Pair

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-3

Transmit Cable (contd) Twisted Pairs Twisted Pair RX Signals T-RING5 T-TIP5 T-RING6 T-TIP6 T-RING7 T-TIP7 CGND SCSI-36 Pin # 34 16 35 17 36 18 10

Twisted Pair

Twisted Pair Shield

100Base-T (Fast Ethernet, Electrical)


Connector: Used with: Protocols supported: Timing mode: Range: Impedance: Shielded RJ-45 UTP Cat 5 Fast Ethernet (100Base-T), full/half duplex Retimed 100 m 100

100Base-T LED Indicators LED LINK ACT Color Constant Green Blinking Green Indication Normal operation LAN receiving/transmitting data

100Base-T Connector Pin-Out Pin Pin 1 Pin 2 Pin 3 Pin 4 Pin 5 Pin 6 Pin 7 Pin 8 Function CH1_Tx+ CH1_Tx CH1_Rx+ CH2_Tx+ CH2_Tx CH1_Rx CH2_Rx+ CH2_Rx

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-4

Gigabit Ethernet (Optical)


1000Base-SX (Short Haul Fiber) Wavelength: Receptacle: Connector: Max Segment Length: Cable Type: 850 nm MSA compliant, SFP (Small Form Factor Pluggable Ports) LC 220 m (1351 ft), 500 m (1650 ft) For Max Segment = 220 m: 62.5 m MMF For Max Segment = 500 m: 50 m MMF 1000Base-LX (Long Haul Fiber) Wavelength: Receptacle: Connector: Max Segment Length: Cable Type: 1350 nm MSA compliant, SFP (Small Form Factor Pluggable Ports) LC 550 m (1805 ft), 5000 m (16404 ft) For Max Segment = 550 m: 62.5 m MMF, 50 m MMF For Max Segment = 5000 m: 10 m SMF

Gigabit Ethernet (Electrical)


1000BaseT (Twisted Pair Cable) Receptacle: Connector: Max Segment Length: Cable Type: MSA compliant SFP (Small Form Factor Pluggable Ports) RJ-45 Up to 100 m (328 ft) per IEEE802.3 Compatible with shielded and unshielded twisted pair category 5 cables.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-5

Wayside Channel Interfaces


The Wayside channel is used as an auxiliary audio or data channel. FibeAir supports the following wayside interfaces:

10BaseT (Ethernet)
Connector: Used with: Protocols supported: Timing mode: Range: Impedance: Shielded RJ-45 UTP Cat 5 Ethernet (100/10Base-T), half or full duplex Retimed 100 m 100

100/10Base-T LED Indications LED LINK RX/TX LINK Down Disabled Color Green Red Grey (LED off) Indication Normal operation with wayside enabled LOS - Loss of Signal Wayside channel is disabled

100/10Base-T Connector Pin-Out Pin Pin 1 Pin 2 Pin 3 Pin 4 Pin 5 Pin 6 Pin 7 Pin 8 Function CH1_Tx+ CH1_Tx CH1_Rx+ CH2_Tx+ CH2_Tx CH1_Rx CH2_Rx+ CH2_Rx

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-6

E1/G.703
Connector: Used with: Protocols supported: Timing mode: Range: Impedance: Shielded RJ-45 UTP Cat 5 E1 Retimed 100 m 120 E1 LED Indications LED LINK RX/TX LINK Down Disabled Color Green Red Grey (LED off) Indication Normal operation with waysdie enabled LOS - Loss of Signal Wayside channel is disabled

G.703/E1 Connector Pinout Pin Pin 1 Pin 2 Pin 3 Pin 4 Pin 5 Pin 6 Pin 7 Pin 8 Function CH1_Rx+ CH1_RxCH2_Rx+ CH1_Tx+ CH1_TxCH2_Rx+ CH2_Tx+ CH2_Tx-

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-7

T1
Connector: Used with: Impedance Type: Impedance: RJ-45 UTP Cat 5 Balanced 100 T1 LED Indications LED LINK RX/TX LINK Down Disabled Color Green Red Grey (LED off) Indication Normal operation with wayside enabled LOS - Loss of Signal Wayside channel is disabled

T1 Connector Pinout Pin Pin 1 Pin 2 Pin 3 Pin 4 Pin 5 Pin 6 Pin 7 Pin 8 Function CH1_Rx+ CH1_RxCH2_Rx+ CH1_Tx+ CH1_TxCH2_Rx+ CH2_Tx+ CH2_Tx-

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-8

Order Wire Channel Interface


The Order Wire is used for audio transmission for testing or maintenance purposes. The specifications for this channel are as follows:

Termination Type: Frequency band (KHz) Input impedance (ohms) Output impedance (ohms) Input signal level (dBm) Output signal level (dBm) Signal level vs frequency (dB) Input/output backside signal attenuation (dB) out of frequency band: Analog input gain (dB) Analog output gain (dB)

Headset stereo plug, 2.5 mm 0.3-3.4 2000 32 0 to -27 38 In accordance with ITU-T G.712 For 300-600 KHz, no less than 16 For 600-3400 KHz, no less than 20 14 0

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

A-9

Appendix B: Connector Pin-Outs


General
This appendix provides pin-outs for FibeAir IDU connectors, including the following: External Alarms Connector Protection Connector 8 x E1/T1 Connector Modem-PPP Cross Cable Wayside Channel Connectors User Channel

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-1

External Alarms Connector Pin-Out


The External Alarms connector is a D-type 15 pin connector.
Pin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Signal EXT_IN_1 EXT_IN_2 EXT_IN_3 EXT_IN_4 EXT_IN_5 Relay 3 C Relay 3 NO Relay 2 NO GND Relay 1 NC Relay 3 NC Relay 2 C Relay 2 NC Relay 1 C Relay 1 NO I/O Input Input Input Input Input Output Output Output GND Output Output Output Output Output Output Description External input alarm #1 External input alarm # 2 External input alarm #3 External input alarm #4 External input alarm #5 Relay #3 common pin Relay #3 normally open pin Relay #2 normally open pin GND Relay #1 normally closed pin Relay #3 normally closed pin Relay #2 common pin Relay #2 normally closed pin Relay #1 common pin Relay #1 normally open pin

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-2

Protection Connector Pin-Out


The Protection connector for is an Rj-45, 8-pin, male type connector.
Pin Left 1 2 3 4 5 6 7 8 Right 1 5 6 7 2 3 4 8 Function GND E_SLF_OUT IDC TXD Cable Echo E_MT_IN IDC RXD NA GND

8 x E1/T1 Connector Pin-Out


The 8 x E1/T1 connector is a 36-pin connector.
Connector Pin #
11 29 12 30 13 31 14 32 15 33 16 34 17 35 18 36 9,10

Signals
OUT - TIP 1 OUT - RING 1 OUT - TIP 2 OUT - RING 2 OUT - TIP 3 OUT - RING 3 OUT - TIP 4 OUT - RING 4 OUT - TIP 5 OUT - RING 5 OUT - TIP 6 OUT - RING 6 OUT - TIP 7 OUT - RING 7 OUT - TIP 8 OUT - RING 8 Shell (1)

Color
Brown/Red Red/Brown DarkBlue/Red Red/DarkBlue Blue/Black Black/Blue Orange/Black Black/Orange Green/Black Black/Green Brown/Black Black/Brown DarkBlue/Black Black/DarkBlue Blue/Yellow Yellow/Blue TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR SHIELD

Connector Pin #
1 19 2 20 3 21 4 22 5 23 6 24 7 25 8 26

Signals
IN - TIP 1 IN - RING 1 IN - TIP 2 IN - RING 2 IN - TIP 3 IN - RING 3 IN - TIP 4 IN - RING 4 IN - TIP 5 IN - RING 5 IN - TIP 6 IN - RING 6 IN - TIP 7 IN - RING 7 IN - TIP 8 IN - RING 8

Color
Blue/White White/Blue Orange/White White/Orange Green/White White/Green Brown/White White/Brown DarkBlue/White White/DarkBlue Blue/Red Red/Blue Orange/Red Red/Orange Green/Red Red/Green TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR TWISTED PAIR

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-3

Notes: Shell is connected to IDU chassis GND. The following pins are not connected: 27,28.

Modem-PPP Cross Cable Pin-Outs


This section provides pin-outs for the cross cable installed between the dial-up modem and the FibeAir PPP interface. DB9 to DB9 Cross Cable
DB9 Male TX RX DTR CTS RTS DCD GND 2 3 4 8 7 1 5 Connection DB9 Male 2 3 1 7 8 4 5 RX TX DCD RTS CTS DTR GND

DB9 to DB25 Cross Cable DB9 1 2 3 4 5 7 8 Notes: 1. 2. Shell is connected to IDU chassis GND. The following pins are not connected: 6, 7, 8, 9, 15, 23, 36, 37, 38, 39. DB25 20 2 3 8 7 5 4

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-4

Wayside Channel Connector Pin-Outs


The following are pin-outs for Wayside channel interfaces.

E1/T1 Connector Pin-Out


RJ-45 Male Connector Pin 1 2 3 4 5 6 7 8 Signal Ch1_Rx+, Receive Positive - Primary Ch1_Rx-, Receive Negative - Primary Ch2_Rx+, Receive Positive - Secondary Ch1_Tx+, Transmit Positive- Primary Ch1_Tx-, Transmit Negative - Primary Ch2_Rx-, Receive Negative - Secondary Ch2_Tx+, Transmit Positive - Secondary Ch2_Tx-, Transmit Negative Secondary

10BaseT Connector Pin-Out


RJ-45 Male Connector Pin 1 2 3 6 4 5 7 8 Signal

Twisted Pair, Out - Tx Ch2 (Right) Twisted Pair, In - Rx Ch2 (Right) Twisted Pair, Out - Ch1 Tx (Left) Twisted Pair, In - Ch1 Rx (Left)

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-5

User Channel Connector Pin-Out


The following table lists the pins for the user channel interface. The user channel connector is D-type 9-pin connector.
Asynchronous UC - RS-232 (N.C) UC1_TxD Transmitted Data UC1_RxD Received Data (N.C) SG Signal Ground (N.C) UC2_RxD Received Data UC2_TxD Transmitted Data (N.C) Asynchronous UC - V.11 UC1_TxD Synchronous UC - V.11 UC_TxCLK Transmitted Clock UC_TxCLK+ Transmitted Clock UC_RxCLK+ Received Clock UC_RxCLKReceived Clock SG Signal Ground UC_TxD UC_RxD + UC_TxD +

Pin 1

Serial PPP DCD Data Carrier Detected RxD Received Data TxD Transmitted Data DTR Data Terminal Ready SG Signal Ground DSR Data Set Ready RTS Request To Send CTS Clear To Send RI Ring Indicator (N.C)

I/O Out

2 3 4 5 6 7 8

UC1_TxD + UC1_RxD + UC1_RxD SG Signal Ground UC2_TxD UC2_RxD + UC2_TxD +

Out In/Out * In/Out * Com Out In Out

UC2_RxD -

UC_RxD -

In

* Output in case of contra-directional mode

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

B-6

Appendix C: Protection Information


STM-1/OC-3 SM/SC Protection Kit (PRT-SM/SC)
This kit is used for protected configurations with STM1/OC3 optical SM (Single Mode) interfaces.

Two optical splitters (SM/SC OPTICAL SPLITTER, CONN. 1300 nm 50/50 1M, AO-0007-0) are included in the kit (one for Rx and the other for Tx).

STM-1/OC-3 MM/SC Protection Kit (PRT-P-STM1-MM/SC)


This kit is used for protected configurations with STM-1/OC-3 optical MM (Multi Mode) interfaces. Two optical splitters (MM/SC/PC OPTICAL, SPLITTER 62.5/125 L=0.5 m, WP-0003-0) are included in the kit (one for Rx and the other for Tx). The splitter is the same as the one shown above for single mode, except for its color, which is orange.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

C-1

STM-1/OC-3 Electrical Protection Kit (PRT-P-STM1-ELC_10/23)


This kit is used for protected configurations with STM-1 electrical interfaces.

Four coax cables (COAX.1.0/2.3 TO BNC STR. PLUG CABLE, 25 cm, 75 Ohm, WA-0175-0), and two electrical splitters (ELECTRICAL SPLITTER POWER 75 OHM 2:1 5-600 MHz, AO-0047-0) are included in the kit. Splitter with two cables:

Assembled kit:

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

C-2

DS3 Internal Protection Kit (PRT-P-DS3)


This kit is used for protected configurations with DS3 electrical interfaces. Four coax cables (COAX.1.0/2.3 TO BNC STR. PLUG CABLE, 25 cm, 75 Ohm, WA-0175-0), and two electrical splitters (ELECTRICAL SPLITTER POWER 75 OHM 2:1 5-600 MHz, AO-0047-0) are included in the kit.

3xDS3 Internal Protection Kit (PRT-P-3DS3)


This kit is used for protected configurations with 3xDS3 electrical interfaces.

Twelve coax cables (COAX.1.0/2.3 TO BNC STR. PLUG CABLE, 25 cm, 75 Ohm, WA-0175-0), and six electrical splitters (ELECTRICAL SPLITTER POWER 75 OHM 2:1 5-600 MHz, AO-0047-0) are included in the kit.

2xFast Ethernet Protection Kit (PRT-P-2ETH)


This kit is used for protected configurations with 2xFE interfaces. Each RJ-45 connector includes two FE ports.

One Ethernet WSCH split cable (WA-0245-0) is used, which splits two FE inputs in one RJ-45 connector, to two separate inputs.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

C-3

One RJ-45 spliced twisted pair cable for Ethernet (WA-0244-0) is shown below. The "Y" splitter connects two RJ-45 ports.

Assembled kit:

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

C-4

Kits for Unprotected Configurations


For unprotected configurations with DS3, 3xDS3, or STM-1 electrical interfaces, we use a 1.0/2.3-to-BNC adapter (1.0/2.3-to-BNC) (COAX.1.0/2.3 TO BNC STR. PLUG CABLE, 25 cm, 75 Ohm, WA-0175-0). The number of 1.0/2.3-to-BNC adapters depends on the type of configuration and interface. For example, for a 1+0 configuration with STM-1/OC-3 electrical interfaces, one adapter is required for the site (two for a link).

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

C-5

Appendix D: PPP/SLIP Driver Installation


Installation for Windows 2000/2003/XP
1. 2. 3. 4. 5. 6. 7. 8. 9. Click Start, Settings, Network and Dialup, Make New Connection. Click Next. Mark Connect directly to another computer. Click Next. Mark Guest. Click Next. Select Communication cable between two computers. Click Next. Select For all users.

10. Click Next. 11. Type The connection Name. 12. Click Finish.

Configuring PPP
1. 2. 3. 4. 5. 6. 7. 8. 9. Click Start, Settings, Network and Dialup. Select The connection Name. In the General tab click Configure, and set the speed to 38400. Check Enable Hardware flow control. Uncheck Modem Error control, Modem Compression. Select Network tab. Select Type PPP. Select Internet protocol (TCP/IP) and click Properties. Uncheck all options except TCP/IP.

10. Check Use the following IP. 11. Insert IP Address (the same subnet as the Indoor). 12. Click OK. 13. Click OK.

FibeAir 1500P/IP-MAX/IP-MAX2 IDU Installation Guide

D-1