PROJECT : PROJ. NO.

: CLIENT : UNIT :

DATE : BY : REV : DOC NO.: Y Type Strainer Pressure Drop Calculation

S.R.M

Liquid Connection Type Strainer Nominal Size Mass flow rate Density Viscosity Kv Pressure Drop

---in m3/hr kg/m3 cp m3/hr/bar bar

Flanged 2 15 764 1.10 60.3 0.043

Gas / Steam Connection Type Strainer Nominal Size Upstream Pressure Mass flow rate Density Kv Pressure Drop

---in bara m3/hr kg/m3 m3/hr/bar bar

Threaded 3 17 180 8 137.9 0.010

Notes

www.chemwork.org

PROJECT : PROJ. NO.: CLIENT : UNIT :

DATE : BY : REV : DOC NO.: T Type Strainer Pressure Drop Calculation

S.R.M

Liquid Connection Type Strainer Nominal Size Mass flow rate Density Viscosity Kv Pressure Drop Gas / Steam Connection Type Strainer Nominal Size Upstream Pressure Mass flow rate Density Kv Pressure Drop Notes

---in m3/hr kg/m3 cp m3/hr/bar bar

Flanged 4 50 1000 0.70 241.4 0.061

---in bara m3/hr kg/m3 m3/hr/bar bar

Flanged 10 20 18000 1 1465.5 0.012

www.chemwork.org

PROJECT : PROJ. NO.: CLIENT : UNIT : Basket Strainer Pressure Drop Calculation

DATE : BY : REV : DOC NO.:

S.R.M

Fluid Data Service (Equipment/line No) Volumetric Flow Rate Fluid Density Fluid Viscosity Clogged Condition percent

P-51-001 m3/hr 2271.2934 kg/m3 764 cp 1.10 % 50

Strainer Data Inlet Pipe Internal Dia Mesh Size Pore Size Open Area Fraction Basket Diameter Effective Length of Basket No of baskets B k t Free Basket F Area A

m ---micron ---m m ---m2 2

0.1524 40 440 0.30 0.254 0.9 1 0.231 0 231

100% Clean Condition Basket Free Area / Pipe Area Superficial Velocity Re C Mesh Pressure drop Housing Pressure drop Total Pressure Drop

--m/sec -----bar bar bar

12.6 2.737 2788 1.40 0.148 0.012 0.160

50% Clogged Condition Open Area Fraction Re C Mesh Pressure drop Housing Pressure drop Total Pressure Drop

--------bar bar bar

0.15 5576 1.41 0.622 0.012 0.634