Sei sulla pagina 1di 4

SPECIFICATIONS

SECTION 22

PART 220516

UPVC PIPES AND FITTINGS

PART 220516
220516.40
1

PLUMBING PIPING AND FITTINGS


UPVC PIPES AND FITTINGS

RELATED SECTIONS Related Sections are as follow Section 13 Section 21 Section 23 Section 33 Section 35 Special Construction Fire Suppression Heating Ventilation and Air Conditioning Utilities Waterways and Marine Construction

REFERENCES Pipes and fittings shall comply fully with the latest relevant international standards. The contractor shall ensure that all requirements of materials specified in this part of specification are in compliance with applicable standards. 2.1 ASTM (AMERICAN SOCIETY OF TESTING MATERIALS) ASTM D 2122 ASTM D-695 ASTM D-2444 2.2 (Standard Test Method for Determining Thermoplastic Pipe and Fittings) Dimensions of

(Standard Method of Test for Compressive Properties of Rigid Plastics) (Standard Method of Test for Thermoplastic Pipe and Fittings) Impact Resistance of

DIN (DEUTSCHES INSTITUTE FOR NORMUNG) DIN 3441-1 DIN 3441-2 DIN 3441-3 DIN 3441-4 DIN 3441-5 DIN 3441-6 (Unplasticized polyvinyl chloride valves, requirements and testing) (Unplasticized polyvinyl chloride valves, ball valves; dimensions) (Unplasticized polyvinyl chloride valves, diaphragm valves; dimensions) (Unplasticized polyvinyl chloride valves, Y-valves (Inclined-seat Valves); dimensions) (Unplasticized polyvinyl chloride valves, PN 6 and PN 10 wafer type butterfly valves; dimensions) (Unplasticized polyvinyl chloride valves, gate valves with inside screw stem; dimensions)

2.3

BS (BRITISH STANDARD) BS 3505 BS EN 1401 (Specification for unplasticized polyvinyl chloride pressure pipes for cold potable water) (Plastic piping systems for non-pressure underground drainage and sewerage. Unplasticized poly vinyl chloride. Specifications for pipes, fittings and the system)

Page 1 of 4

SPECIFICATIONS

SECTION 22

PART 220516

UPVC PIPES AND FITTINGS

BS EN 1452-2 BS EN 1452-3 BS EN 1329

(Plastic piping system for water supply. Unplasticized poly vinyl chloride. Pipes) (Plastics piping systems for water supply. Unplasticized poly vinyl chloride. Fittings) (Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure. Unplasticized poly vinyl chloride (UPVC). Specifications for pipes, fittings and the system) (Joints and fittings for use with unplasticized PVC pressure pipes) (Specifications for thermoplastics waste pipe and fittings) (Unplasticized PVC soil and ventilating pipes of 82.4 mm minimum mean outside diameter, fittings and accessories of 82.4 mm and other sizes-Specification) (Thermoplastics ancillary fittings of normal sizes 110 and 160 for below ground gravity drainage and sewerage)

BS 4346 Part 1 BS 5255 BS 4514

BS 4660 2.4

ISO ( International Standard Organization) ISO 7508 ISO 264 ISO 265-1 (Unplasticized polyvinyl chloride (UPVC) valves for pipes under pressure; Basic dimensions; Metric series) (Unplasticized polyvinyl chloride (UPVC) fittings with plain sockets for pipes under pressure; Laying lengths; Metric series) (Pipes and fittings of plastics materials; fittings for domestic and industrial waste pipes; basic dimensions: metric series; part 1: unplasticized polyvinyl chloride) (UPVC)) (Injection-molded unplasticized poly(vinyl chloride) (UPVC) fittings; oven test; test method and basic specifications) (Fittings for unplasticized polyvinyl chloride (UPVC) pressure pipes with elastic sealing ring type joints; Pressure test for leakproofness) (Fittings for unplasticized polyvinyl chloride (UPVC) pressure pipes with elastic sealing ring type joints; Pressure test for leakproofness under conditions of external hydraulic pressure) (Plastics piping systems for soil and waste discharge (low and high temperature) inside buildings - Unplasticized polyvinyl chloride) (UPVC)) (Plastics piping systems for water supply and for buried and above-ground drainage and sewerage under pressure Unplasticized polyvinyl chloride(UPVC))

ISO 580 ISO 3603

ISO 3604

ISO 3633

ISO 1452-3

SOURCE APPROVAL The contractor shall submit to the Engineer for his review and approval full detail of the proposed sources of plumbing piping and fittings. These Sources of pipe and fitting supply shall be regularly and thoroughly examine to ensure that the quality of the material supplied is satisfactory and that it does not deteriorate during the entire performance period of the project. Predefined sources may be specified in the Special Provisions of Contract Documents.

Page 2 of 4

SPECIFICATIONS
4

SECTION 22

PART 220516

UPVC PIPES AND FITTINGS

PERFORMANCE CRITERIA/QUALITY REQUIREMENTS 4.1 Pipes a. b. UPVC non-pressure pipes for water supply & distribution shall comply with the requirements of BS 3505 Class O. UPVC pressure pipes for water supply and distribution for use at pressures 0 up to 14 bar at 20 C shall comply with the requirements of BS 3505 Class B, C, D, E. UPVC pipes for soil and waste drainage shall comply with the requirements of BS 5255, BS 4514, BS 4660, EN 1329. Underground sewer and drain UPVC pipes for applications in domestic and commercial applications shall meet the requirements of EN 1401.

c. d. 4.2

Fittings a. b. c. d. e. f. g. h. i. Solvent cement joints and fitting for use with UPVC shall comply with the requirements of BS 4346 Part 1. UPVC pipe threaded fittings shall meet the requirements of BS21, DIN2999. UPVC pipe fittings for drainage shall comply with the requirements of BS 5255, BS 4514, BS 4660, ISO 3633 and EN 1329. Specifications and tolerances of unplasticized UPVC fittings under pressure shall meet the requirements of ISO 264. Socket fittings with curved entries and branches of UPVC shall meet with the requirements of ISO 265-1. Specifications of injection molded fittings shall meet the requirements of ISO 580. UPVC pipe fittings with elastic sealing ring type joints shall meet the requirements of ISO 3603, ISO 3604. UPVC pipe fittings for domestic soil and waste discharge, ventilation and rainwater shall comply with ISO 3633. Diameters and basic dimensions of UPVC valves for pipes under pressure of 10 bar to 16 bar shall meet the requirements of ISO 7508, 3441-2~6.

SUBMITTAL AND SAMPLING 5.1 5.2 5.3 Sections of pipe for visual inspection shall be randomly selected by the Engineer. The methods of obtaining samples of pipes and fittings for testing shall be carried out as described in ISO 3603, ISO 7508, DIN 3441 1~6. The Contractor shall provide samples from each consignment of pipes delivered to the Site, or as required by the Engineer. The Contractor shall supply to the Engineer test certificates with the appropriate standard in respect of the samples of pipes from the work-site.

TESTING OF MATERIAL 6.1 6.2 6.3 The quality requirements and testing of UPVC valves shall be in accordance with the provisions of DIN 3441-1. The quality requirement and testing of UPVC pipes and fittings shall be in accordance with ISO 1452-3, ISO 3633. Pipe stiffness shall be tested in accordance with the requirements of ASTM D-695.

Page 3 of 4

SPECIFICATIONS
6.4 6.5 6.6 7

SECTION 22

PART 220516

UPVC PIPES AND FITTINGS

Impact Resistance of pipes and fittings shall be tested in accordance with requirements of ASTM D-2444. Physical dimensions of plastic pipes and fittings shall be in accordance with ASTM D 2122. Sufficient time shall be allowed for the Engineer's review of test results.

DELIVERY, STORAGE AND HANDLING 7.1 7.2 Unloading at the Site shall be made during normal day working hours. The Contractor shall handle, transport, unload and store the pipe using the proper equipment and preventing any damage to the pipe. For this purpose the Contractor shall provide and install all suitable equipment at the pipe yard and shall be responsible for all handling and storage prior to laying of the pipes. The facilities, equipment and procedure for handling of pipe shall be approved in advance by the Engineer. Transport of pipe work to the Site shall be in accordance with the program of laying of pipeline, submitted by the Contractor and approved by the Engineer. Any part of the pipe work which is ready to be brought to the Site, shall be tested and examined by the Engineer in the factory to ensure that it conforms with the relevant specifications. Any portion or part of the pipe work which is defective or in the opinion of the Engineer is not in accordance with the specification shall be rejected. The Engineer shall decide whether this portion or part of the pipe work may be repaired or shall be replaced by a new portion or part of the pipe work. All rejected portions shall be replaced or repaired by the Contractor at his own cost, as directed by the Engineer. The pipe shall be handled without causing any damage to the ends of the pipe. Pipe stored along the trench side shall be supported by padded wooden timbers place under the pipe to hold the pipe off the ground. Dragging or skidding the pipe will not be permitted.

7.3 7.4

7.5

7.6 7.7 7.8 7.9

WARRANTY
Not Applicable

DEFINITIONS 9.1 UPVC Unplasticized Polyvinylchloride is the rigid grade of Polyvinylchloride suitable for pipelines applications. 9.2 Solvent Cement Solvent Cement is a blend of three aggressive solvents and sufficient resin to provide a brushing consistency. It is not an adhesive. It is designed for solvent welding UPVC pipe joints by softening and swelling UPVC when applied on the pipe surface. 9.3 Rubber Ring Joint Rubber ring joint is a special joint in which one pipe has spigot end and the other pipe has socket end with ring groove for rubber ring. The spigot end is inserted inside the socket end.

Page 4 of 4

Potrebbero piacerti anche