Meridian City Hall, Suite 102 33 E. Broadway Avenue Meridian, Idaho 83642
Building Services
Fee Calculator Instructions: Enter appropriate data into the Blue Cells Only. Values and Costs will be calculated automatically based upon user entered data. This Calculator is being furnished as an estimating tool for our customers, and the generated results shall not be considered completely accurate for permitting purposes. Basis for Building Permit Cost: Apply $50.00 Base Fee, then multiply $5.50 per $1,000.00 in value or fraction thereof. Values are based upon the International Code Council's Building Valuation Data from 2009.
Enter
Permit Fee
$50.00 $50.00 Permit Fee $32.50 $15.00 $47.50 Total Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Building Permit Fee Plan Check and Review Fees Plan Check Fee Fire Review Fee Building Permit Fee $50.00 $50.00 Percentage of Permit Fee 65% 30%
Total Plan Check and Review Fees Utility Fees New Water Meter - 3/4" New Water Meter - 1" New Water Meter - 1 1/2" New Water Meter - 2" New Water Meter - 3" New Water Meter - 4" Compound New Water Meter - 4" Turbo Water Assessment (See Blue Tab to Calculate) Water Assessment Landscaping (See Blue Tab to Calculate) Sanitary Sewer Assessment (See Blue Tab to Calculate) Enter Y or N Cost $231.00 $327.00 $543.00 $686.00 $1,202.00 $3,028.00 $2,196.00 $1,794.00 $525.00 $2,749.00
Page 1
Impact Fees and Other Fees Meridian Police Impact Fee (Per Sq. Ft.) Meridian Fire Impact Fee (Per Sq. Ft.)
Yes or No No No
Total Impact Fees Miscellaneous Fees Meridian Sewer Pre-Treatment Review Fee Meridian Public Works Review Fee
This fee has many variables depending on the infrastructure needs. Please call Meridian Development Services - (208) 887-2211 to obtain estimated fee
Enter
Cost $150.00
To Be Determined To Be Determined
$247.50
Page 2
Meridian City Hall, Suite 102 33 E. Broadway Avenue Meridian, Idaho 83642
Building Services
Appliancse, Appurtenance, or Fixtures Water Closet, 1.6 GPF Flushometer Tank Lavatory Urinal,1.0 GPF Flushometer Valve Sink, Bar Sink Kitchen, Dual Faucet Domestic Sink Kitchen, Single Faucet Domestic Sink Laundry Sink Service or Mop Basin Sink Washup, Each Set of Faucets Bathtub or Combination, Bath/Shower (Fill) Shower, Per Head Dishwasher, Domestic Clothes Washer Drinking Fountain or Watercooler (Hi-Lo Fountain Counts as 1) Hose Bibb Hose Bibb, Each Additional Floor Drain Floor Sink
No of Fixtures
WSFU / Fixture 2.5 1.0 5.0 2.0 3.0 1.5 1.5 3.0 2.0 4.0 2.0 1.5 4.0 0.5 2.5 1.0 2.0 Total WSFU
Total WSFU 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DFU / Fixture 4.0 1.0 2.0 2.0 4.0 2.0 2.0 3.0 2.0 2.0 2.0 2.0 3.0 0.5 0.0 0.0 2.0 2.0
Total DFU 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total ERU for Water Assessment (Total WSFU divided by 21) Total ERU for Sewer Assessment (Total DFU divided by 21)
Landscape Irrigation Total Landscaping Square Footage Landscaping Square Footage Credit Based on Above Total ERU Total Square Footage After Credit
0.00