Sei sulla pagina 1di 2

Energy Conservation | Environment | Process Efficiency www.forbesmarshall.

com
Forbes Marshall Forbes Marshall Arca Forbes Marshall Codel J N Marshall Krohne Marshall Spirax Marshall Forbes Vyncke
Balanced Pressure
Thermostatic Steam Trap BPT21Y
Dimensions : (approx.) mm
NB
15
20
A
125
125
B
57
57
C
54
54
D
30
38
E
40
40
BPT21Y CV
Check
Valve
Withdrawl
Distance
4
5
7
1
10
2
9
3
6
88
E
Withdrawl
Distance
SPIRAX
C
B
D
A
A

5
1
0
Description :
Sizes and Pipe Connections :
BPT21Y is a carbon steel maintainable balanced pressure
thermostatic steam trap with integral flanged connections and has
a Y-type strainer screen having 0.8 mm dia. perforation and
Standard CapsuIe is marked with the letter 'E/'STD' for operation
0
at approximately 12 Cbelowsteam saturation temperature.
15 NB - ANS 150, 300
20 NB - ANS 150
Maximum Operating Conditions
PMO - Max. Operating Pressure 21 bar g
0
285 C.
42 bar g
TMO - Max. Operating Temperature
Cold hydraulic test pressure
Standard Unit BPT21Y
BPT21Y CV Also available
Capsule fill and operation
having 'E / 'STD' fill capsule
having 'E / 'STD' fill capsule &
in-built check valve
Limiting Conditions :
MateriaIs :
Certification :
BR approved BPT21Y can be supplied on request.
The product must not be used in this region
The product should not be used in this region or beyond its
operating range as damage to the internals may occur.
PMO Maximum Operating Pressure 21 bar g
(*PMO = 32 bar g available on special request)
No. Part
1 Cover Forged Carbon Steel ASTM A 105
ASTM A 276
ASTM A 240
ASTM A 105
ASTM A 240
ASTM A 276
ASTM A 105
S 1367
Stainless Steel
St. Steel type 431
St. Steel type 304
Reinforced
Exfoliated Graphite
Forged Carbon Steel
Carbon Steel-HT Gr 8.8
Forged Carbon Steel
St. Steel type 304
St. Steel type 302
2 Capsule
3 Valve Seat
4 Strainer Screen
5 Cover Gasket
6 Body
7 Cover Bolts
8 Strainer Cap
9 Spacer Plate
10 Spring
MateriaI Standard
Operating Range
0
0
100
0
T
e
m
p
e
r
a
t
u
r
e

C
200
300
400
10 20
Pressure bar g
30 32* 40 50
Steam
saturation
curve
OptionaIIy, the capsule can be supplied for sub-cooled 'F/'SUB'
0
operation at approximately 24 C below steam saturation
temperature or near to steam 'G/'NTS' operation at approximately
0
4 Cbelowsteam temperature.
Also available on special request :*
PMO - Max. Operating Pressure 32 bar g
0
300 C.
64 bar g
TMO - Max. Operating Temperature
Cold hydraulic test pressure
21
How to cIean or repIace the strainer screen
Undo the strainer cap and remove the screen. Clean or replace as
required and reassemble the strainer cap into the body, ensuring
that the screen is located centrally. Using a little anti-seize
compound on the threads tighten to the recommended torque.
DisposaI

This product is recyclable. No ecological hazard is anticipated
with the disposal of this product, providing due care is taken.
How to order
Example : Spirax Marshall 15 NB BPT21Y Carbon steel bodied
maintainable balanced pressure steam trap. Flanged ASA 150
O
with 'E / 'STD' fill capsule for operation at approximately 12 C
belowsteam saturation temperature.
Spare parts
The Spare parts available are shown in heavy outline. Parts
drawn in broken line are not supplied as spares.
AvaiIabIe spares
Capsule and seat assembly set
Strainer screen & gasket kit (Packet of 3)
2,3,9,10
4,5
How to order spares
Always order spares by using the description given in the column
headed 'Available spares' and state the trap size and capsule
fill type.
ExampIe : Refer 'User Manual' for appropriate code numbers.
7
10
2
9
3
5
4
8
P B # 29, Mumbai Pune Road, Kasarwadi, Pune 411 034. ndia.
Tel.: 91(0)20 - 27145595 / 39858555 Fax: 91(0)20 - 27147413
Spirax Marshall Pvt. Ltd.
Ahmedabad, Alibag, Bangalore, Bhopal / ndore, Chandigarh, Chennai, Coimbatore, Delhi, Hyderabad, Jamshedpur, Kolkata
nternational Operations:
Mumbai, Nagpur, Navi Mumbai, Surat, Trichy, Vadodara & Visakhapatanam
Bangladesh, Canada, Egypt, ndonesia, ran, Kenya, Malaysia, Nepal, Sri Lanka, Thailand, U.A.E. (nstrumentation)
(Boilers & Boiler accessories), USA
Call +91-9225637451.Your helpline for Everything in Steam
P
a
r
t

c
o
d
e

N
o
.

S
T

S

-

5
3



R
E
V
.
0
1
5
0
0
/
M
a
y

2
0
1
0
/
7
6
7
S
u
b
j
e
c
t

t
o

c
h
a
n
g
e

w
i
t
h
o
u
t

n
o
t
i
c
e
.
B
2
1
Y
P
T
B
P
T
2
1
Y
P
T
B
2
1
Y
C
V
P
V
B
T
2
1
Y
C
1
B
P
T
2
Y
C
V
B
P
T
2
1
Y
C
V
P
T
1
Y
B
2
P
T
2
Y
B
1
Capacities
3000
2000
1000
500
400
300
C
o
n
d
e
n
s
a
t
e

k
g
/
h
200
100
50
0.1 0.2 0.3 0.5 1 2
DifferentiaI pressure bar (x 100 = kPa)
Hot water capacity
CoId water capacity
3 4 5 10 20 32
Safety information
Pressure
Before attempting any maintenance of the steam trap, consider
what is or may have been in the pipeline. Ensure that any pressure
is isolated and safely vented to atmospheric pressure before
attempting to maintain the steam trap. Do not assume that the
system is depressurised even when a pressure gauge indicates
zero.
Temperature
Allow time for temperature to normalise after isolation to avoid the
danger of burns and consider whether protective clothing
(including safety glasses) required is
Caution
The body/cover gasket contains a thin stainless steel support ring,
which may cause physical injury if it is not handled and disposed of
carefully
.
InstaIIation
The trap is designed for installation with the capsule in a horizontal
plane and the cover at the top, preferably with a drop leg
immediately preceding the trap. Suitable isolation valves must be
installed to allow for safe maintenance and trap replacement.
Remove all protective caps prior to installation. Open isolation
valves slowly unit normal operating conditions are achieved.
Check for leaks and correct operation.
Maintenance
Maintenance can be completed with the trap in the pipeline, once
the safety procedures have been observed. t is recommended
that new gaskets and spares are used whenever maintenance is
undertaken. Ensure that the correct tools and necessary
protective equipment are used at all times. When maintenance is
complete open isolation valves slowly and check for leaks.
How to fit a new capsuIe and seat
Remove the cover from the body by unscrewing the cover bolts.
Remove the capsule assembly and unscrew the valve seat from
the body. Replace with new gasket and valve seat. and tighten to
the recommended torque.
Reassemble the spacer plate, capsule and spring. Fit new cover
gasket and retighten cover bolts evenly to the recommended
torque,

Potrebbero piacerti anche