7SA611 V4_7 FINAL TESTED_prn

SIMATIC

STERLING & WILSON / Folder /


7SA611 V4.7 FINAL TESTED/7SA611

13.02.14 19:43:51

STERLING & WILSON / Folder / 7SA611 V4.7 FINAL TESTED


ML
7SA61115AB924PR4
Parameter set versi
V04.70.07
Device path: C:\Siemens\Digsi4\D4PROJ\Sterling\P7DI\GV\SD\00000004
Author:
Creation date:
12.02.14 12:52:38
Last modified:
13.02.14 19:42:13
Operating mode:
Offline
Comme
Setting value
Primary value descripti

PRINT - CONTENTS
1
2
3
3.1
4
4.1
4.2
4.3
5
5.1
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23

Device Configuration .................................................................................................... ............................................... 3


Configuration - complete (sorted by line) .................................................................................................................... 4
General Device Settings .................................................................................................... ......................................... 5
Group Device .................................................................................................... .......................................................... 5
Power System Data 1 .................................................................................................... ............................................. 6
Group Power System Data 1; Group Transformers .................................................................................................... 6
Group Power System Data 1; Group Power System .................................................................................................. 6
Group Power System Data 1; Group Breaker ............................................................................................................. 6
Oscillographic Fault Records .................................................................................................... .................................. 7
Group Oscillographic Fault Records ........................................................................................................................... 7
Settings groups .................................................................................................... ....................................................... 8
Group Power System Data 2; Group Power System .................................................................................................. 8
Group Power System Data 2; Group Line Status ....................................................................................................... 8
Group Power System Data 2; Group Trip 1-/3-pole .................................................................................................... 9
Group Distance protection, general settings; Group General ..................................................................................... 9
Group Distance protection, general settings; Group Earth faults ............................................................................... 9
Group Distance protection, general settings; Group Time Delays ............................................................................ 10
Group Distance zones (quadrilateral); Group Zone Z1 ............................................................................................. 10
Group Distance zones (quadrilateral); Group Zone Z1B-exten. ............................................................................... 11
Group Distance zones (quadrilateral); Group Zone Z2 ............................................................................................. 11
Group Distance zones (quadrilateral); Group Zone Z3 ............................................................................................. 11
Group Distance zones (quadrilateral); Group Zone Z4 ............................................................................................. 12
Group Distance zones (quadrilateral); Group Zone Z5 ............................................................................................. 12
Group Distance zones (quadrilateral); Group Zone Z6 ............................................................................................. 12
Group Teleprotection for Distance prot. .................................................................................................................... 13
Group Instantaneous HighSpeed SOTF Overcurrent ............................................................................................... 13
Group Measurement Supervision; Group Balance / Summ. ..................................................................................... 13
Group Measurement Supervision; Group Fuse Fail. Mon. ....................................................................................... 14
Group Measurement Supervision; Group VT mcb .................................................................................................... 14
Group Measurement Supervision; Group Load Angle .............................................................................................. 14
Group Automatic Reclosure; Group General ............................................................................................................ 15
Group Automatic Reclosure; Group 1st AR-cyle ...................................................................................................... 15
Group Automatic Reclosure; Group 3pTRIP/DLC/RDT ............................................................................................ 15
Group Automatic Reclosure; Group Start AR with.. .................................................................................................. 16
Page 1 of 19

7SA611 V4_7 FINAL TESTED_prn

SIMATIC
6.25
6.26
6.27
7
8
8.1
8.2
8.3

STERLING & WILSON / Folder /


7SA611 V4.7 FINAL TESTED/7SA611

13.02.14 19:43:51

Group Breaker Failure; Group Breaker Failure .........................................................................................................


Group Breaker Failure; Group End fault prot. ...........................................................................................................
Group Breaker Failure; Group PoleDiscrepancy ......................................................................................................
Time Synchronization .................................................................................................... ...........................................
Annunciation .................................................................................................... .........................................................
Event Log - 2/12/2014 2:28:53.750 PM (SIGNALS\BM000001.SFP) .....................................................................
Trip Log .................................................................................................... .................................................................
Spontaneous Annunciation .................................................................................................... ...................................

Page 2 of 19

16
17
17
18
19
19
19
19

7SA611 V4_7 FINAL TESTED_prn


Device Configuration
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

13.02.14 19:43:51

Device Configuration

No.

Function

Scope

0103 Setting Group Change Option

Disabled

0110 Trip mode

1-/3pole

0114 Distance protection pickup program

Z< (quadrilateral)

0119 Additional Threshold Iph>(Z1)

Disabled

0120 Power Swing detection

Disabled

0121 Teleprotection for Distance prot.

PUTT (Z1B acceleration)

0122 DTT Direct Transfer Trip

Disabled

0124 Instantaneous HighSpeed SOTF Overcurrent Enabled


0125 Weak Infeed (Trip and/or Echo)

Disabled

0126 Backup overcurrent

Disabled

0131 Earth fault overcurrent

Disabled

0132 Teleprotection for Earth fault overcurr.

Disabled

0133 Auto-Reclose Function

1 AR-cycle

0134 Auto-Reclose control mode

with Trip and Action time

0135 Synchronism and Voltage Check

Disabled

0136 Over / Underfrequency Protection

Disabled

0137 Under / Overvoltage Protection

Disabled

0138 Fault Locator

Enabled

0139 Breaker Failure Protection

Enabled

0140 Trip Circuit Supervision

Disabled

Page 3 of 19

7SA611 V4_7 FINAL TESTED_prn


Configuration - complete (sorted by line)
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

13.02.14 19:43:51

Configuration - complete (sorted by line)

No filter

Page 4 of 19

7SA611 V4_7 FINAL TESTED_prn


General Device Settings
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

General Device Settings

3.1

Group Device

13.02.14 19:43:51

Group Device
No.
0610

Settings
Fault Display on LED / LCD

Value

Group

Display Targets on every Pickup All

0625A Minimum hold time of latched LEDs 0 min

All

0640

All

Start image Default Display

image 1

Page 5 of 19

7SA611 V4_7 FINAL TESTED_prn


Power System Data 1
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

Power System Data 1

4.1

Group Power System Data 1; Group Transformers

13.02.14 19:43:51

Group Power System Data 1; Group Transformers


No.

Settings

Value

Group

0201 CT Starpoint

towards Line

All

0203 Rated Primary Voltage

132.0 kV

All

0204 Rated Secondary Voltage (Ph-Ph)

110 V

All

0205 CT Rated Primary Current

400 A

All

0206 CT Rated Secondary Current

1A

All

0210 U4 voltage transformer is

not connected All

0211 Matching ratio Phase-VT To Open-Delta-VT 1.

All

0215 Matching ratio Usy1 / Usy2

1.

All

0220 I4 current transformer is

not connected All

0221 Matching ratio I4/Iph for CT's

1.0

4.2

All

Group Power System Data 1; Group Power System

Group Power System Data 1; Group Power System


No.

Settings

Value

Group

0207 System Starpoint is

Solid Earthed

All

0230 Rated Frequency

50 Hz

All

0235 Phase Sequence

L1 L2 L3

All

0236 Distance measurement unit

km

All

0237 Setting format for zero seq.comp. format Zero seq. comp. factors RE/RL and XE/XL All

4.3

Group Power System Data 1; Group Breaker

Group Power System Data 1; Group Breaker


No.

Settings

0240A Minimum TRIP Command Duration

Value

Group

0.10 sec All

0241A Maximum Close Command Duration 0.10 sec All


0242

Dead Time for CB test-autoreclosure 0.10 sec All

Page 6 of 19

7SA611 V4_7 FINAL TESTED_prn


Oscillographic Fault Records
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

Oscillographic Fault Records

5.1

Group Oscillographic Fault Records

13.02.14 19:43:51

Group Oscillographic Fault Records


No.

Settings

Value

Group

0402A Waveform Capture

Save with Pickup All

0403A Scope of Waveform Data

Fault event

All

0410

Max. length of a Waveform Capture Record 2.00 sec

All

0411

Captured Waveform Prior to Trigger

0.25 sec

All

0412

Captured Waveform after Event

0.10 sec

All

0415

Capture Time via Binary Input

0.50 sec

All

Page 7 of 19

7SA611 V4_7 FINAL TESTED_prn


Settings groups
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

Settings groups

6.1

Group Power System Data 2; Group Power System

13.02.14 19:43:51

Group Power System Data 2; Group Power System


No.

Settings

Value

Group

1103 Measurement: Full Scale Voltage (100%) 132.0 kV

1104 Measurement: Full Scale Current (100%) 400 A

1105 Line Angle

68

1211 Angle of inclination, distance charact.

68

1107 P,Q operational measured values sign

not reversed

1110 x' - Line Reactance per length unit

0.130 Ohm / km A

1111 Line Length

16.3 km

1116 Zero seq. comp. factor RE/RL for Z1

0.

1117 Zero seq. comp. factor XE/XL for Z1

0.

1118 Zero seq. comp.factor RE/RL(> Z1)

0.

1119 Zero seq. comp.factor XE/XL(> Z1)

0.

6.2

Group Power System Data 2; Group Line Status

Group Power System Data 2; Group Line Status


No.

Settings

Value

Group

1130A Pole Open Current Threshold

40 A

1131A Pole Open Voltage Threshold

36.0 kV

1132A Seal-in Time after ALL closures

0.05 sec

1133A minimal time for line open before SOTF

0.25 sec

1134

Recognition of Line Closures with

Current OR Voltage or Manual close BI

1135

RESET of Trip Command

with Pole Open Current Threshold only

1136

open pole detector

with measurement (U/I,trip,pickup,CBaux) A

1140A CT Saturation Threshold

8000 A

1150A Seal-in Time after MANUAL closures

0.30 sec

1151

Manual CLOSE COMMAND generation

NO

1152

MANUAL Closure Impulse after CONTROL <none>

All

Page 8 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Power System Data 2; Group Trip 1-/3-pole
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.3

13.02.14 19:43:51

Group Power System Data 2; Group Trip 1-/3-pole

Group Power System Data 2; Group Trip 1-/3-pole


No.
1155

Settings
3 pole coupling

Value

with Trip A

1156A Trip type with 2phase faults 3pole

6.4

Group

Group Distance protection, general settings; Group General

Group Distance protection, general settings; Group General


No.

Settings

Value

Group

1201

Distance protection

ON

1202

Phase Current threshold for dist. meas.

40 A

1211

Angle of inclination, distance charact.

68

1208

Series compensated line

NO

1232

Instantaneous trip after SwitchOnToFault

Inactive

1241

R load, minimum Load Impedance (ph-e)

69.999 Ohm A

1242

PHI load, maximum Load Angle (ph-e)

60

1243

R load, minimum Load Impedance (ph-ph) 69.999 Ohm A

1244

PHI load, maximum Load Angle (ph-ph)

35

1317A Single pole trip for faults in Z2

NO

1357

Z1B enabled before 1st AR (int. or ext.)

NO

6.5

Group Distance protection, general settings; Group Earth faults

Group Distance protection, general settings; Group Earth faults


No.

Settings

Value

1203

3I0 threshold for neutral current pickup

1204

3U0 threshold zero seq. voltage pickup 6.0 kV

40 A

Group
A
A

1207A 3I0>-pickup-stabilisation (3I0> /Iphmax) 0.

1209A criterion of earth fault recognition

3I0> OR 3U0>

1221A Loop selection with 2Ph-E faults

block leading ph-e loop A

Page 9 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Distance protection, general settings; Group Time Delays
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.6

13.02.14 19:43:51

Group Distance protection, general settings; Group Time Delays

Group Distance protection, general settings; Group Time Delays


No.

Settings

1210 Condition for zone timer start

Value

Group

with distance pickup A

1305 T1-1phase, delay for single phase faults 0.00 sec

1306 T1multi-ph, delay for multi phase faults

0.00 sec

1315 T2-1phase, delay for single phase faults 0.30 sec

1316 T2multi-ph, delay for multi phase faults

0.30 sec

1325 T3 delay

0.60 sec

1335 T4 delay

1.00 sec

1345 T5 delay

0.90 sec

1365 T6 delay

1.50 sec

1355 T1B-1phase, delay for single ph. faults

0.00 sec

1356 T1B-multi-ph, delay for multi ph. faults

0.00 sec

6.7

Group Distance zones (quadrilateral); Group Zone Z1

Group Distance zones (quadrilateral); Group Zone Z1


No.

Settings

Value

Group

1301 Operating mode Z1

Forward

1302 R(Z1), Resistance for ph-ph-faults

4.005 Ohm A

1303 X(Z1), Reactance

1.680 Ohm A

1304 RE(Z1), Resistance for ph-e faults

9.006 Ohm A

1305 T1-1phase, delay for single phase faults

0.00 sec

1306 T1multi-ph, delay for multi phase faults

0.00 sec

1307 Zone Reduction Angle (load compensation) 0

Page 10 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Distance zones (quadrilateral); Group Zone Z1B-exten.
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.8

13.02.14 19:43:51

Group Distance zones (quadrilateral); Group Zone Z1B-exten.

Group Distance zones (quadrilateral); Group Zone Z1B-exten.


No.

Settings

Value

1351 Operating mode Z1B (overrreach zone) Inactive

Group
A

1352 R(Z1B), Resistance for ph-ph-faults

14.136 Ohm A

1353 X(Z1B), Reactance

9.996 Ohm

1354 RE(Z1B), Resistance for ph-e faults

29.130 Ohm A

1355 T1B-1phase, delay for single ph. faults

0.00 sec

1356 T1B-multi-ph, delay for multi ph. faults

0.00 sec

1357 Z1B enabled before 1st AR (int. or ext.) NO

6.9

Group Distance zones (quadrilateral); Group Zone Z2

Group Distance zones (quadrilateral); Group Zone Z2


No.

Settings

Value

Group

1311

Operating mode Z2

Forward

1312

R(Z2), Resistance for ph-ph-faults

4.473 Ohm A

1313

X(Z2), Reactance

2.844 Ohm A

1314

RE(Z2), Resistance for ph-e faults

9.471 Ohm A

1315

T2-1phase, delay for single phase faults 0.30 sec

1316

T2multi-ph, delay for multi phase faults

0.30 sec

NO

1317A Single pole trip for faults in Z2

6.10

Group Distance zones (quadrilateral); Group Zone Z3

Group Distance zones (quadrilateral); Group Zone Z3


No.

Settings

1321 Operating mode Z3

Value
Forward

Group
A

1322 R(Z3), Resistance for ph-ph-faults 6.249 Ohm

1323 X(Z3), Reactance

7.290 Ohm

1324 RE(Z3), Resistance for ph-e faults 11.250 Ohm A


1325 T3 delay

0.60 sec

Page 11 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Distance zones (quadrilateral); Group Zone Z4
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.11

13.02.14 19:43:51

Group Distance zones (quadrilateral); Group Zone Z4

Group Distance zones (quadrilateral); Group Zone Z4


No.

Settings

1331 Operating mode Z4

Value

Group

Reverse

1332 R(Z4), Resistance for ph-ph-faults 3.501 Ohm A


1333 X(Z4), Reactance

0.420 Ohm A

1334 RE(Z4), Resistance for ph-e faults 8.502 Ohm A


1335 T4 delay

6.12

1.00 sec

Group Distance zones (quadrilateral); Group Zone Z5

Group Distance zones (quadrilateral); Group Zone Z5


No.

Settings

Value

Group

1341 Operating mode Z5

Inactive

1342 R(Z5), Resistance for ph-ph-faults

36.000 Ohm A

1343 X(Z5)+, Reactance for Forward direction 36.000 Ohm A


1344 RE(Z5), Resistance for ph-e faults

36.000 Ohm A

1345 T5 delay

0.90 sec

1346 X(Z5)-, Reactance for Reverse direction 12.000 Ohm A

6.13

Group Distance zones (quadrilateral); Group Zone Z6

Group Distance zones (quadrilateral); Group Zone Z6


No.

Settings

Value

Group

1361 Operating mode Z6

Inactive

1362 R(Z6), Resistance for ph-ph-faults

45.000 Ohm A

1363 X(Z6)+, Reactance for Forward direction 45.000 Ohm A


1364 RE(Z6), Resistance for ph-e faults

45.000 Ohm A

1365 T6 delay

1.50 sec

1366 X(Z6)-, Reactance for Reverse direction 12.000 Ohm A

Page 12 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Teleprotection for Distance prot.
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

6.14

13.02.14 19:43:51

Group Teleprotection for Distance prot.

Group Teleprotection for Distance prot.


No.

Settings

Value

2101

Teleprotection for Distance protection ON

2102

Type of Line

Group
A

Two Terminals A

2103A Time for send signal prolongation

0.05 sec

2112A DIS transient block by EF

YES

2113

Memorize receive signal

NO

6.15

Group Instantaneous HighSpeed SOTF Overcurrent

Group Instantaneous HighSpeed SOTF Overcurrent


No.

Settings

Value Group

2401 Inst. High Speed SOTF-O/C is ON


2404 I>>> Pickup

6.16

1000 A A

Group Measurement Supervision; Group Balance / Summ.

Group Measurement Supervision; Group Balance / Summ.


No.
2901

Settings
Measurement Supervision

Value
ON

Group
A

2902A Voltage Threshold for Balance Monitoring 60.0 kV A


2903A Balance Factor for Voltage Monitor

0.

2904A Current Balance Monitor

200 A

2905A Balance Factor for Current Monitor

0.

2906A Summated Current Monitoring Threshold

40 A

2907A Summated Current Monitoring Factor

0.

2908A T Balance Factor for Voltage Monitor

5 sec

2909A T Current Balance Monitor

5 sec

Page 13 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Measurement Supervision; Group Fuse Fail. Mon.
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.17

13.02.14 19:43:51

Group Measurement Supervision; Group Fuse Fail. Mon.

Group Measurement Supervision; Group Fuse Fail. Mon.


No.
2910

Settings

Value

Fuse Failure Monitor

Group

ON

2911A Minimum Voltage Threshold U>

36.0 kV

2912A Maximum Current Threshold I<

40 A

2913A Maximum Voltage Threshold U< (3phase) 18.0 kV

2914A Delta Current Threshold (3phase)

40 A

2915

with current supervision A

Voltage Failure Supervision

2916A Delay Voltage Failure Supervision

6.18

3.00 sec

Group Measurement Supervision; Group VT mcb

Group Measurement Supervision; Group VT mcb


No.

Settings

Value Group

2921 VT mcb operating time 0 ms

6.19

Group Measurement Supervision; Group Load Angle

Group Measurement Supervision; Group Load Angle


No.

Settings

Value

Group

2941 Limit setting PhiA

200

2942 Limit setting PhiB

340

2943 Minimum value I1>

20 A

2944 Minimum value U1> 24.0 kV A

Page 14 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Automatic Reclosure; Group General
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.20

13.02.14 19:43:51

Group Automatic Reclosure; Group General

Group Automatic Reclosure; Group General


No.

Settings

Value

Group

3401

Auto-Reclose function

ON

3402

CB ready interrogation at 1st trip

NO

3403

Reclaim time after successful AR cycle

3.00 sec

3404

AR blocking duration after manual close 1.00 sec

3406

Evolving fault recognition

with Trip

3407

Evolving fault (during the dead time)

starts 3pole AR-cycle A

3408

AR start-signal monitoring time

0.20 sec

3409

Circuit Breaker (CB) Supervision Time

3.00 sec

3410

Send delay for remote close command

oo sec

oo sec

3411A Maximum dead time extension

6.21

Group Automatic Reclosure; Group 1st AR-cyle

Group Automatic Reclosure; Group 1st AR-cyle


No.

Settings

Value

Group

3450 Start of AR allowed in this cycle

YES

3451 Action time

0.20 sec A

3456 Dead time after 1pole trip

1.20 sec A

3457 Dead time after 3pole trip

0.50 sec A

3458 Dead time after evolving fault

1.20 sec A

3459 CB ready interrogation before reclosing

NO

3460 Request for synchro-check after 3pole AR NO

6.22

Group Automatic Reclosure; Group 3pTRIP/DLC/RDT

Group Automatic Reclosure; Group 3pTRIP/DLC/RDT


No.

Settings

3430 3pole TRIP by AR

Value
YES

Group
A

3431 Dead Line Check or Reduced Dead Time Without A


3438 Supervision time for dead/ live voltage

0.10 sec A

3440 Voltage threshold for live line or bus

57.6 kV

3441 Voltage threshold for dead line or bus

36.0 kV

Page 15 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Automatic Reclosure; Group 3pTRIP/DLC/RDT
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.23

13.02.14 19:43:51

Group Automatic Reclosure; Group Start AR with..

Group Automatic Reclosure; Group Start AR with..


No.

Settings

Value Group

3420 AR with distance protection

YES

3421 AR with switch-onto-fault overcurrent YES

6.24

Group Fault Locator; Group Fault Locator

Group Fault Locator; Group Fault Locator


No.

Settings

Value Group

3802 Start fault locator with TRIP

3806 Load Compensation

6.25

YES

Group Breaker Failure; Group Breaker Failure

Group Breaker Failure; Group Breaker Failure


No.

Settings

Value

Group

3901 Breaker Failure Protection

OFF

3902 Pick-up threshold I>

40 A

3903 1pole retrip with stage T1 (local trip)

YES

3904 T1, Delay after 1pole start (local trip)

0.00 sec

3905 T1, Delay after 3pole start (local trip)

0.00 sec

3906 T2, Delay of 2nd stage (busbar trip)

0.15 sec

3907 T3, Delay for start with defective bkr.

0.00 sec

3908 Trip output selection with defective bkr NO

3909 Check Breaker contacts

YES

3913 T2 Start Criteria

Parallel with delay time T1 A

Page 16 of 19

7SA611 V4_7 FINAL TESTED_prn


Group Breaker Failure; Group End fault prot.
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611
SIMATIC

6.26

13.02.14 19:43:51

Group Breaker Failure; Group End fault prot.

Group Breaker Failure; Group End fault prot.


No.

Settings

3921 End fault protection

Value
OFF

Group
A

3922 Trip delay of end fault protection 2.00 sec A

6.27

Group Breaker Failure; Group PoleDiscrepancy

Group Breaker Failure; Group PoleDiscrepancy


No.

Settings

3931 Pole Discrepancy supervision

Value
OFF

Group
A

3932 Trip delay with pole discrepancy 2.00 sec A

Page 17 of 19

7SA611 V4_7 FINAL TESTED_prn


Time Synchronization
SIMATIC

STERLING & WILSON / Folder /


7SA611 V4.7 FINAL TESTED/7SA611

13.02.14 19:43:51

Time Synchronization

Source of time synchronization: Ethernet NTP


Fault indication after: 10 Min.
Time format for display German
Offset to time signal: 00:00
No summer time switchover
Summer time offset to GMT: +06:30
Start of summer time: Sunday in at 00:00 o'clock
End of summer time: Sunday in at 00:00 o'clock
Time zone offset to GMT: +05:30

Page 18 of 19

7SA611 V4_7 FINAL TESTED_prn


Annunciation
STERLING & WILSON / Folder /
7SA611 V4.7 FINAL TESTED/7SA611

SIMATIC

13.02.14 19:43:51

Annunciation

8.1

Event Log - 2/12/2014 2:28:53.750 PM (SIGNALS\BM000001.SFP)

Event Log - 2/12/2014 2:28:53.750 PM (SIGNALS\BM000001.SFP)


Number

Indication

Value

Date and time

Cause

00070

Setting calculation is running

OFF

12.02.2014 14:27:32.699 Spontaneous


Com.Issued=AutoLocal

00072

Level-2 change

ON

12.02.2014 14:27:32.508 Spontaneous


Com.Issued=AutoLocal

00070

Setting calculation is running

ON

12.02.2014 14:27:25.466 Spontaneous


Com.Issued=AutoLocal

00068

Clock Synchronization Error

ON

12.02.2014 14:26:58.864 Spontaneous


Com.Issued=AutoLocal

Control DIGSI

12.02.2014 14:17:01.976 Spontaneous


Com.Issued=AutoLocal

00303

E/Flt.det. in isol/comp.netw.

0 - OFF 12.02.2014 14:17:01.989 Spontaneous

00301

Power System fault

0 - OFF 12.02.2014 14:17:01.977 Spontaneous

Test Operation

12.02.2014 14:17:01.976 Spontaneous


Com.Issued=AutoLocal

009.0102.01 Failure EN100 Link Channel 2 (Ch2) ON

12.02.2014 14:16:52.964 Spontaneous


Com.Issued=AutoLocal

009.0101.01 Failure EN100 Link Channel 1 (Ch1) ON

12.02.2014 14:16:52.964 Spontaneous


Com.Issued=AutoLocal

00051

Device is Operational and Protecting ON

12.02.2014 14:16:52.794 Spontaneous


Com.Issued=AutoLocal

00052

At Least 1 Protection Funct. is Active ON

12.02.2014 14:16:52.774 Spontaneous

01451

Breaker failure is switched OFF

ON

12.02.2014 14:16:52.774 Spontaneous


Com.Issued=AutoLocal

00056

Initial Start of Device

ON

12.02.2014 14:16:52.754 Spontaneous


Com.Issued=AutoLocal

009.0100.01 Failure EN100 Modul

ON

12.02.2014 14:16:52.771 Spontaneous


Com.Issued=AutoLocal

8.2

Trip Log
nothing allocated

8.3

Spontaneous Annunciation
nothing allocated

Page 19 of 19

State