PART - A (STRUCTURE)
PG 24 (SILENCER ) TOTAL
26.419
24.689
1.730
4184.529
4089.546
94.983
2417.436
992.198
810.361
8.177
802.184
100.460
0.000
100.460
45.970
0.000
45.970
8577.372
6539.848
2037.524
PAGE 1 OF 13
655.071
653.474
1.593
12.817
12.410
0.407
21.619
11.658
9.961
79.098
75.024
4.074
94.067
50.907
43.160
PG 28 (DOORS) TOTAL
12.616
0.000
12.616
165.104
94.421
70.683
15.702
11.689
4.013
PG 41 (OIL GUNS)
3.598
0.000
3.598
37.611
0.000
37.611
PAGE 2 OF 13
81.405
0.460
80.945
152.625
150.003
2.622
716.376
184.183
532.193
PG 48 (DUCTING) TOTAL
1748.971
902.880
846.091
PG 50 (SCAPH) TOTAL
20.260
0.000
20.260
PG 57 (DAMPERS) TOTAL
356.327
129.885
226.442
107.958
0.000
107.958
4281.225
2276.994
2004.227
PAGE 3 OF 13
182.636 883.964
182.636 883.964
0.000 0.000
455.314
449.068
6.246
51.161
51.161
0.000
309.805 97.694
309.804 87.739
0.000 9.955
19 (ECO SYSTEM)
888.234
888.198
0.000
PAGE 4 OF 13
214.138
125.293
88.845
40.582
7.146
33.436
TOTAL (IN MT) PART - D (ROTATING MACHINES) 52 (AIR PRE HEATER) TOTAL
4495.164
4319.158
175.968
1457.717
1401.970
55.747
204.375
68.277
136.098
242.605
116.421
126.184
61 (MILLS) TOTAL 63 (DRIVE MOTORS FOR ROT M/Cs) TOTAL 65 (FEEDER) TOTAL (IN MT)
57.563
53.385
4.178
167.000
35.286
131.714
224.563 21126.550
88.671 14835
135.892 6291.694
PAGE 6 OF 13
LTD.
All 18 nos. of Silencer Supports are completed. Balance supports can be completed after erection of exhaust piping.
Excess grills suplied in '35' group. It will be consumed in later stage of additional platforms for equipments.
Work in progress.Bunker bay structure clearance required to start interconnection platforms. Sequential holdup of FD FAN Duct, Eco. & Hot Pri. Air Ducts in IIIrd Pass Area. Work consist of Lift structure , Mill Maintenance Platforms. IInd Pass Coil Handling Structure work will start after Eco. Ducting/Outside Ducting erection. Sequential of Fans Foundations/Fan Handling Structure Column erection work Sequential holdup of APH & FAN erection.
PAGE 7 OF 13
LTD.
For completion of Buckstay Links missing buckstay pins yet to received. Work in Progress. Balance work will be completed after fixing of Acoustic Steam leak detecting system area. Work in progress. Completion after completion of Pourable/Refactory insulation. Work in progress.
Silencer erection completed; Balance (43 MT) is Trimpiping. Fabrication work in progress. Balance materials (Mill Board DU: 011, 012) yet to be received. Work in Progress. Vertical Roof Enclosure started on 06.04.2009. Work in Progress. Sequential Erection of Burner Skid Assy(42-070- DU: 001 & 002 materials yet to be received). Boiler floor piping work in Progress. Fuel Oil Pump House is not ready.
PAGE 8 OF 13
LTD.
nd its Auxiliaries of III. As on 01.09.09 Remarks Scanner Air, Elbow, reducer materials yet to be received. Seal Air fan foundation not ready to start seal air piping. Burner Tilt, Power Cylinder fixing work balance Work in Progress. RHS, LHS Mills & Bunker structures are not ready. Burner Corner Vertical Pipes erection slow down all 05 level main platform members are fouling. Modification is required. Work in progress, (Clearance from Mill Bay Structure Agency for erection of Ducts and other structures in our scope.) Sequential erection of PA & FD Fan Ducts. FD Fan SCAPH material damaged. Replacement yet to be received. Work in progress, (Clearance from Mill Bay Structure Agency for erection of Ducts and other structures in our scope.) Sequential holdup. To start after completion of Feeder Floor.
PAGE 9 OF 13
LTD.
Drum erected on 27.02.2008. Drum internal balance. Bottom Ring header Orifice Plate Fixing work Balance.
Work in progress. RH Steam cooled spacers (material Pending) , Ist Pass links supports.(link support materials yet to be received)
PAGE 10 OF 13
LTD.
Sequential holdup Work in progress. SH. RH. Spray lines, Non drainable portions vent & drains supports balance. SH Startup vent balance material yet to be received. Boiler floor piping work in progress. Fuel Oil Pump House is not ready. Pump skid assy. are not received.
Work in progress.
FD Fan 'A' foundations are not ready . To start PA Fan 'B' & FD Fan 'B' Silencers the supporting structures are not available. ID FAN 'A' work in progress. ID FAN 'B' foundation is not ready. Seal Air Fan foundation not ready. Both LHS & RHS Mill foundations are not ready. Sequential erection of Fans & Mills Feeder floor is not ready.
PAGE 11 OF 13
LTD.
Work in progress.
PAGE 12 OF 13
MAIN
30-215 BOILER
ENCL deleted
12.638
12.638