BASIC DATA

STANDARD DATA FOR MACHINERY ( Contd ) Sl No. Description of machinery Life in years n 10 1 10 8 10 8 10 20 10 18 18 18 15 3 5 5 5 5 5 16 10 1 8 10 10 10 8 12 8 12 8 12 10 8 1 8 1 5 10 5 20 10 Life in hours h 10000 950 16000 10000 16000 10000 16000 30000 12000 30000 30000 30000 30000 5000 6000 6000 6000 6000 6000 20000 15000 950 8000 20000 20000 16000 10000 20000 10000 20000 10000 20000 8000 12000 950 10000 950 10000 10000 6000 40000 8000 Repair cost % C r 120 25 80 100 80 100 80 80 200 75 75 75 50 25 80 80 80 80 80 100 100 25 80 100 100 120 100 70 100 70 100 70 80 100 25 175 25 75 80 100 75 80 Type Factor c1 0.50 --1.00 1.00 1.00 1.00 1.00 1.00 0.57 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.58 --1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.30 --0.30 --1.00 1.00 1.00 1.00 1.00 Duty Factor c2 1.00 --0.75 0.75 0.75 0.75 0.75 1.00 0.75 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 --1.00 1.00 1.00 0.75 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.10 --0.70 --1.00 1.00 1.00 0.75 1.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Agitator car / Transit mixer 2 cum Tyres and tubes 6 sets Air compressor 5 cmm ( electric ) Air compressor 7 cmm ( diesel ) Air compressor 7 cmm ( electric ) Air compressor 8.5 cmm ( diesel ) Air compressor 8.5 cmm ( electric ) Air compressor 15 cmm ( electric ) Angle Dozer 90 hp Batching plant 6 cum / hr Batching plant 15 cum / hr Batching plant 50 cum / hr Bending machine Concrete bucket 1.5 cum Concrete hand mixer 45 / 30 ltr Concrete mixer 300 / 200 ltr ( diesel ) Concrete mixer 300 / 200 ltr ( electric ) Concrete mixer 600 / 400 ltr ( diesel ) Concrete mixer 600 / 400 ltr ( electric ) Concrete paver 100 sqm / hr Convey mucker Tyres and tubes 6 sets Core drilling machine Diesel generating set 30 KVA Diesel generating set 50 KVA Diesel Loco 45 hp Dewatering pump 5 hp ( diesel ) Dewatering pump 5 hp ( electric ) Dewatering pump 10 hp ( diesel ) Dewatering pump 10 hp ( electric ) Dewatering pump 20 hp ( diesel ) Dewatering pump 20 hp ( electric ) Drifter Drilling jumbo Tyres and tubes 6 sets Dumper 4.5 cum Tyres and tubes 6 sets Geophysical electric resistivity meter Grouting pump Guniting / sand blasting equipment Ice plant & accessories 30 t / day Jack hammer

40

BASIC DATA

STANDARD DATA FOR MACHINERY ( contd ) Sl No. Description of machinery Life in years n 10 1 12 1 3 3 3 3 16 15 5 10 10 10 8 10 10 5 10 10 1 5 20 15 10 1 10 12 8 8 8 10 1 10 8 10 Life in hours h 12000 1300 15000 1300 5000 5000 5000 5000 20000 30000 8000 10000 8000 10000 10000 12000 12000 6000 16000 16000 1300 8000 30000 --16000 1300 8000 58000 8000 8000 8000 16000 1300 8000 8000 12000 Repair cost % C r 150 25 150 25 70 70 70 70 100 100 100 80 150 80 80 150 150 80 50 175 25 80 120 25 175 25 150 80 200 200 80 175 25 100 120 150 Type Factor c1 0.50 --0.50 --1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0.50 1.00 1.00 0.30 --1.00 1.00 1.00 0.30 --1.00 1.00 1.00 1.00 1.00 0.30 --0.50 1.00 1.00 Duty Factor c2 1.00 --1.00 --0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.80 1.00 1.00 1.00 0.70 --1.00 1.00 1.00 0.70 --1.00 1.00 1.00 1.00 1.00 0.70 --1.00 1.00 1.00

39 Mobile crane 8 t ( pick & carry ) Tyres and tubes 6 sets 40 Mobole crane 25 t ( revolving ) Tyres and tubes 6 sets 41 Needle vibrator 40 mm ( petrol ) 42 Needle vibrator 40 mm ( electric ) 43 Needle vibrator 60 mm ( petrol ) 44 Needle vibrator 60 mm ( electric ) 45 Planing machine 4 m stroke 46 Plate shearing machine 47 Pneumatic placer 0.5 cum 48 Pneumatic tamper 49 Pug cutting machine 50 Pusher leg 51 Road roller diesel 10 t 52 Shovel 0.50 cum 75 hp 53 Shovel 0.85 cum 110 hp 54 Spinning machine 55 Stationery derric crane 56 Tipper 5 cum Tyres and tubes 6 sets 57 Tipping tub 1.5 cum 58 Tower crane 5 tonne 59 Transformer 250 KVA 60 Truck 10 t Tyres and tubes 6 sets 61 Upright drilling machine 62 Ventilation fan 20 hp 63 Vibrating plate compactor ( diesel ) 64 Vibratory pad foot roller 8 t 65 Waggon drill 66 Water tanker 8000 ltr Tyres and tubes 6 sets 67 Welding set 68 Winch 35 hp ( electric ) Pile boring rig with accessories

41

BASIC DATA

RATE ANALYSIS FOR HIRE CHARGES OF MACHINERY ( EXCLUDING FUEL & CREW ) FOR THE YEAR : 2010-11 Capital cost of machinery / equipment :C Salvage value of machinery / equipment ( as percentage of capital cost ) :s Rate of interest per annum :I Life of machinery / equipment in years :n Life of machinery / equipment in hours :h Average capital cost Cx(n+1)/2n : C' Repair charges ( as percentage of capital cost ) :r Insurance premium per annum ( as percentage of average capital cost ) :p Road tax per annum ( considered only for tipper / truck ) :t Depreciation charges / hour : ( 1 - Salvage value / 100 ) x Capital cost / life in hours Interest charges / hour : Av.Capital cost x Rate of interest x life in years / life in hours / 100 Repair charges / hour : Repair provision x Capital cost / life in hours / 100 Miscellaneous charges / hour : ( as percentage of repair charges ) : 10% Insurance charges : ( Av. capital cost x % premium per annum / 100 ) x Life in years / Life in hours Road tax ( considered only for tipper / truck ) : Annual tax x Life in years / Life in hours Sl No. Description of machinery Depreciation Interest Repair Misce. Ins+Rdtax + t*n/h in Rs 9.97425 --1.55 2.95 1.98 3.58 2.43 3.74 16.88 4.32 10.05 16.68 1.30 0.16 0.14 0.58 0.54 1.18 1.08 7.93 11.40 --4.88 1.24 Total

(1-s/100)*C/ h C'*I*n/h/100 r*C / h/100

r*C/ h/1000 C'*p*n/h/100

in Rs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Agitator truck mounted 2 cum Tyres and tubes 6 sets Air compressor 5 cmm (ele) Air compressor 7 cmm (diesel) Air compressor 7 cmm (ele) Air compressor 8.5 cmm diesel Air compressor 8.5 cmm (ele) Air compressor 15 cmm (ele) Angle Dozer 90 hp Batching plant 6 cum / hr Batching plant 15 cum / hr Batching plant 50 cum / hr Bending machine Concrete bucket 1.5 cum Concrete hand mixer 45/30 ltr Concrete mixer 300/200(diesel) Concrete mixer 300/200 (ele) Concrete mixer 600/400(diesel) Concrete mixer 600/400 (ele ) Concrete paver 100 sqm/ hr Convey mucker Tyres and tubes 6 sets Core drilling machine Diesel generating set 30 KVA

in Rs

in Rs 217.62 20.53 22.59 65.50 28.80 79.46 35.35 28.48 613.83 34.08 79.31 131.70 8.14 1.98 3.85 15.55 14.33 31.40 28.81 93.30 207.33 20.53 86.74 22.50

in Rs 21.76 2.05 2.26 6.55 2.88 7.95 3.54 2.85 61.38 3.41 7.93 13.17 0.81 0.20 0.39 1.55 1.43 3.14 2.88 9.33 20.73 2.05 8.67 2.25

in Rs 522.00 106.00 69.00 166.00 88.00 202.00 108.00 108.00 1154.00 130.00 303.00 503.00 39.00 11.00 10.00 42.00 38.00 84.00 77.00 282.00 552.00 106.00 252.00 60.00

163.22 109.7168 73.89 9.03 25.41 17.08 58.95 32.42 32.40 21.78 71.51 39.33 39.77 26.73 32.04 41.12 276.23 185.68 40.89 47.48 95.18 110.51 158.04 183.50 14.66 14.33 7.13 1.74 4.34 1.59 17.49 6.41 16.13 5.91 35.33 12.95 32.42 11.89 83.97 87.24 186.60 125.44 73.89 9.03 97.58 53.67 20.25 13.61

42

BASIC DATA

RATE ANALYSIS FOR HIRE CHARGES ( contd ) Sl No. Description of machinery Depreciation Interest
(1-s/100)*C/ h C'*I*n/h/100

Repair
r*C/ h/100

Misce.

Ins+Rdtax + t*n/h in Rs 1.95 4.53 0.12 0.07 0.20 0.13 0.49 0.29 4.87 3.83 --4.80 --0.90 0.44 1.07 4.82 0.32 4.89 --72.76 --0.08 0.07 0.09 0.08 2.47 1.67 1.69 0.27 0.28 0.18 4.43 12.42 20.55 1.72 10.17 --0.42 30.00 132.00

Total

r*C/ h/1000 C'*p*n/h/100

in Rs 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Diesel generating set 50 KVA Diesel Loco 45 hp Dewatering pump 5 hp (diesel) Dewatering pump 5 hp (electric) Dewatering pump 10 hp (diesel) Dewatering pump 10 hp (ele) Dewatering pump 20 hp (diesel) Dewatering pump 20 hp (ele) Drifter Drilling jumbo Tyres and tubes 6 sets Dumper 4.5 cum Tyres and tubes 6 sets Geophysical resistivity meter Grouting pump Guniting/Sand blast equipment Ice plant & accessories 30t/day Jack hammer Mobile crane 8 t ( pick & carry ) Tyres and tubes 6 sets Mobile crane 25 t ( revolving ) Tyres and tubes 6 sets Needle vibrator 40 mm (petrol) Needle vibrator 40 mm (ele) Needle vibrator 60 mm (petrol) Needle vibrator 60 mm (ele) Planing machine 4 m stroke Plate shearing machine Pneumatic placer 0.5 cum Pneumatic tamper Pug cutting machine Pusher leg Road roller diesel 10 t Shovel 0.50 cum 75 hp Shovel 0.85 cum 110 hp Stationery derric crane 5 t Tipper 5 cum Tyres and tubes 6 sets Tipping tub 1.5 cum Tower crane 5 tonne Transformer 250 KVA 31.84 74.19 2.40 1.02 4.02 1.77 9.71 4.00 79.76 76.50 73.89 95.94 84.98 27.00 7.15 32.06 41.36 5.22 80.03 54.00 1007.40 54.00 3.65 3.24 4.12 3.67 26.10 18.76 50.77 4.35 4.56 2.90 88.56 203.25 336.23 28.13 48.12 54.00 12.60 257.10 1485.00

in Rs 21.40 49.87 1.32 0.81 2.21 1.41 5.34 3.17 53.62 42.08 9.03 52.77 10.39 9.90 4.80 11.75 53.07 3.51 53.79 6.60 800.32 6.60 0.89 0.79 1.01 0.90 27.12 18.35 18.62 2.93 3.06 1.95 48.71 136.63 226.02 18.91 32.34 6.60 4.62 329.95 1452.00

in Rs 35.38 98.93 2.67 0.79 4.47 1.38 10.79 3.11 70.90 85.00 20.53 186.55 23.61 22.50 6.35 35.62 34.46 4.64 133.38 15.00 1679.00 15.00 2.84 2.52 3.21 2.86 29.00 20.85 56.41 3.87 7.59 2.58 78.72 338.75 560.38 15.63 93.56 15.00 11.20 342.80 412.50

in Rs 3.54 9.89 0.27 0.08 0.45 0.14 1.08 0.31 7.09 8.50 2.05 18.66 2.36 2.25 0.64 3.56 3.45 0.46 13.34 1.50 167.90 1.50 0.28 0.25 0.32 0.29 2.90 2.08 5.64 0.39 0.76 0.26 7.87 33.88 56.04 1.56 9.36 1.50 1.12 34.28 41.25

in Rs 94.00 237.00 7.00 3.00 11.00 5.00 27.00 11.00 216.00 216.00 106.00 359.00 121.00 63.00 19.00 84.00 137.00 14.00 285.00 77.00 3727.00 77.00 8.00 7.00 9.00 8.00 88.00 62.00 133.00 12.00 16.00 8.00 228.00 725.00 1199.00 66.00 194.00 77.00 30.00 994.00 3523.00

43

BASIC DATA

RATE ANALYSIS FOR HIRE CHARGES ( contd ) Sl No. Description of machinery Depreciation Interest
(1-s/100)*C/ h C'*I*n/h/100

Repair
r*C/ h/100

Misce.

Ins+Rdtax + t*n/h in Rs 10.15 --0.32 0.15 0.68 13.97 4.20 10.12 --0.24 1.60 17.88

Total

r*C/ h/1000 C'*p*n/h/100

in Rs 59 Truck 10 t Tyres and tubes 6 sets 60 Upright drilling machine 61 Ventilation fan 20 hp 62 Vibrating plate compactor 63 Vibratory pad foot roller 8 t 64 Waggon drill 65 Water tanker 8000 ltr Tyres and tubes 6 sets 66 Welding set 67 Winch 35 hp (electric) Pile boring rig 47.84 54.00 5.18 2.03 13.50 279.34 83.98 47.39 54.00 3.97 31.95 292.50

in Rs 32.16 6.60 3.48 1.61 7.43 153.64 46.19 31.86 6.60 2.67 17.57 196.63

in Rs 93.02 15.00 8.63 1.81 30.00 620.75 74.65 92.15 15.00 4.41 42.60 487.50

in Rs 9.30 1.50 0.86 0.18 3.00 62.08 7.47 9.21 1.50 0.44 4.26 48.75

in Rs 192.00 77.00 18.00 6.00 55.00 1130.00 216.00 191.00 77.00 12.00 98.00 1043.00

RATE ANALYSIS FOR FUEL CHARGES OF MACHINERY FOR THE YEAR : 2010-11 Diesel engine powered machinery : Diesel consumption ( in ltr / hr ) Provision for Oil & Lubricants Electric motor powered machinery : Energy consumption ( in kwhr / hr ) Provision for Oil & Lubricants

: 0.220 x FHP x c1 x c2 : 25 percent of fuel charges

: 0.746 x BHP x c1 x c2 : 20 percent of energy charges

Note : 1. BHP / FHP are horse power rating of plant / equipment. 2. c1 and c2 are type and duty factors ( refer standard data table for values of c1 and c2 ). 3. For equipments like jack hammer / Waggon drill / Pneumatic tamper / Pusher leg etc., provision is made for lubricants on lumpsum basis.

Sl No.

Description of machinery

FHP / BHP of machine

Diesel Ele power Fuel/power Lubricant/ ltr / hour kwhr / hr charges/hr oil / hour in Rs in Rs 12.10 ----25.18 484 140.99 121.00 28.20

Total in Rs 605.00 169.00

1 2

Agitator car/Transit mixer 2cum Air compressor 5 cmm(electric)

110.00 45.00

44

BASIC DATA

RATE ANALYSIS FOR FUEL CHARGES ( contd ) Sl No. Description of machinery FHP / BHP of machine Diesel Ele power Fuel/power Lubricant/ ltr / hour kwhr / hr charges/ hr oil / hour in Rs in Rs 9.90 --12.38 ----8.46 ------------1.10 --2.20 ------3.30 8.80 13.20 7.43 1.10 --2.20 --4.40 ----0.59 5.54 ----------9.90 27.50 0.22 --0.33 ------33.57 --41.96 93.25 --18.65 33.57 41.03 11.19 ------3.73 --7.46 --25.96 ----------3.73 --7.46 --14.92 --------3.73 --117.50 ------0.75 --1.12 11.19 396.00 187.99 495.00 234.99 522.20 338.58 104.44 187.99 229.77 62.66 ----44.00 20.89 88.00 41.78 --145.38 132.00 352.00 528.00 297.00 44.00 20.89 88.00 41.78 176.00 83.55 --23.76 221.76 --20.89 --657.97 --396.00 1100.00 12.1 4.18 18.15 6.27 62.66 99.00 37.60 123.75 47.00 104.44 84.65 20.89 37.60 45.95 12.53 5.10 3.40 11.00 4.18 22.00 8.36 17.00 29.08 33.00 88.00 132.00 74.25 11.00 4.18 22.00 8.36 44.00 16.71 5.10 5.94 55.44 0.00 4.18 8.50 131.59 5.10 99.00 275.00 3.025 0.84 4.54 1.25 12.53 Total in Rs 495.00 226.00 619.00 282.00 627.00 423.00 125.00 226.00 276.00 75.00 5.00 3.00 55.00 25.00 110.00 50.00 17.00 174.00 165.00 440.00 660.00 371.00 55.00 25.00 110.00 50.00 220.00 100.00 5.00 30.00 277.00 0.00 25.00 9.00 790.00 5.00 495.00 1375.00 15.00 5.00 23.00 8.00 75.00

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Air compressor 7 cmm (diesel) Air compressor 7 cmm (ele) Air compressor 8.5 cmm(diesel) Air compressor 8.5 cmm ( ele ) Air compressor 15 cmm ( ele ) Angle Dozer 90 hp Batching plant 6 cum / hr Batching plant 15 cum / hr Batching plant 50 cum / hr Bending machine Concrete bucket 1.5 cum Concrete hand mixer 45/30 ltr Concrete mixer 300/200 (diesel) Concrete mixer 300/200 ltr (ele) Concrete mixer 600/400 (diesel) Concrete mixer 600/400 ltr (ele) Concrete paver 100 sqm/ hr Convey mucker Core drilling machine Diesel generating set 30 KVA Diesel generating set 50 KVA Diesel Loco 45 hp Dewatering pump 5 hp (diesel) Dewatering pump 5 hp (electric) Dewatering pump 10 hp (diesel) Dewatering pump 10 hp (ele) Dewatering pump 20 hp (diesel) Dewatering pump 20 hp (ele) Drifter Drilling jumbo Dumper 4.5 cum Geophysical resistivity meter Grouting pump Guniting/Sand blast equipment Ice plant & accessories30 t/day Jack hammer Mobile crane 8 t ( pick & carry ) Mobile crane 25 t ( revolving ) Needle vibrator 40 mm (petrol) Needle vibrator 40 mm (ele) Needle vibrator 60 mm (petrol) Needle vibrator 60 mm (ele) Planing machine 4 m stroke

60.00 60.00 75.00 75.00 125.00 90.00 25.00 45.00 55.00 15.00 ----5.00 5.00 10.00 10.00 --60.00 15.00 40.00 60.00 45.00 5.00 5.00 10.00 10.00 20.00 20.00 --90.00 120.00 --5.00 --210.00 --90.00 125.00 2.00 2.00 3.00 3.00 15.00

45

BASIC DATA

RATE ANALYSIS FOR FUEL CHARGES ( contd ) Sl No. Description of machinery FHP / BHP of machine Diesel Ele power Fuel/power Lubricant/ ltr / hour kwhr / hr charges/ hr oil / hour in Rs in Rs ----------9.9 6.6 12.1 --4.16 ------4.16 ----1.10 14.30 --4.16 ----19.80 14.92 ----0.37 --------------19.40 ----3.73 14.92 --------9.00 26.11 83.55 ----2.09 --396 264.00 484 --166.32 --108.62 --166.32 20.89 83.55 44.00 572.00 --166.32 50.40 146.22 792.00 16.71 3.40 5.10 0.42 3.40 99.00 66.00 121.00 8.50 41.58 8.50 21.72 --41.58 4.18 16.71 11.00 143.00 8.50 41.58 10.08 29.24 198.00 Total in Rs 100.00 3.00 5.00 3.00 3.00 495.00 330.00 605.00 9.00 208.00 9.00 130.00 0.00 208.00 25.00 100.00 55.00 715.00 9.00 208.00 60.00 175.00 990.00

46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

Plate shearing machine Pneumatic placer 0.5 cum Pneumatic tamper Pug cutting machine Pusher leg Road roller diesel 10 t Shovel 0.50 cum 75 hp Shovel 0.85 cum 110 hp Stationery derric crane Tipper 5 cum Tipping tub 1.5 cum Tower crane 5 tonne Transformer 250 KVA Truck 10 t Upright drilling machine Ventilation fan 20 hp Vibrating plate compactor Vibratory pad foot roller 8 t Waggon drill Water tanker 8000 ltr Welding set Winch 35 hp (electric) Pile boring rig

20.00 ----0.50 --45.00 75.00 110.00 --90.00 --26.00 --90.00 5.00 20.00 5.00 65.00 --90.00 --35.00 90.00

RATE ANALYSIS FOR OPERATING CREW CHARGES FOR THE YEAR : 2010-11 For the purpose of working out wages of crew on hourly basis the daily wages are converted to yearly wages by multiplying the daily wages with ( 26 days x 12 months). The yearly wages are then divided by yearly usage of machinery in hours to get hourly wages of operating crew. Yearly usage of machinery in hours = Life of machinery in hours / Life of machinery in years Example: Operating crew charges for Air compressor ( diesel ) : Operator compressor per day Rs: 147.50 Helper compressor per day Rs: 141.50 Life of Air compressor ( diesel ) in hours : 10000 Life of Air compressor ( diesel ) in years :8

46

BASIC DATA

RATE ANALYSIS FOR CREW CHARGES ( contd ) Yearly usage of Air compressor in hours ( 10000 / 8 ) : Yearly wages of Operator compressor = ( 26 x 12 x Daily wages ) Rs: Yearly wages of Helper compressor = ( 26 x 12 x Daily wages ) Rs: Total yearly operating crew charges for Air compressor ( diesel ) Rs: Hourly operating crew charges= ( yearly crew charges / yearly usage of machinery) Rs: Rounded off to Rs: 1250 46020.00 44148.00 90168.00 72.13 72.10

Sl No.

Description of machinery

No. of Operator

No. of Helper

Total Yearly wages Operator Helper in Rs in Rs 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 88296.00 88296.00 88296.00 44148.00 ----44148.00 44148.00 44148.00 44148.00 88296.00 44148.00 44148.00 44148.00 44148.00 44148.00 ------------44148.00 44148.00 44148.00 ---

Yearly Hourly usage of Crew machinery Charges in hours in Rs 1000 1600 1250 1600 1250 1600 1500 1200 1667 1667 1667 2000 ----1200 1200 1200 1200 1250 1500 1000 2000 2000 1600 1250 1667 1250 1667 1250 1667 800 1500 1250 --90.80 56.40 72.10 56.40 72.10 56.40 60.10 77.50 108.20 108.20 108.20 45.90 ----75.10 75.10 75.10 75.10 144.30 60.10 90.20 45.10 45.10 56.70 35.80 26.90 35.80 26.90 35.80 26.90 111.90 60.50 72.60 ---

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Agitator car/Transit mixer 2cum Air compressor 5 cmm (ele) Air compressor 7 cmm (diesel) Air compressor 7 cmm (ele) Air compressor 8.5 cmm diesel Air compressor 8.5 cmm ( ele ) Air compressor 15 cmm ( ele ) Angle Dozer 90 hp Batching plant 6 cum / hr Batching plant 15 cum / hr Batching plant 50 cum / hr Bending machine Concrete bucket 1.5 cum Concrete hand mixer 45/30 ltr Concrete mixer 300/200 (diesel) Concrete mixer 300/200 ltr (ele) Concrete mixer 600/400 (diesel) Concrete mixer 600/400 ltr (ele) Concrete paver 100 sqm / hr Convey mucker Core drilling machine Diesel generating set 30 KVA Diesel generating set 50 KVA Diesel Loco 45 hp Dewatering pump 5 hp (diesel) Dewatering pump 5 hp (ele) Dewatering pump 10 hp (diesel) Dewatering pump 10 hp (ele) Dewatering pump 20 hp (diesel) Dewatering pump 20 hp (ele) Drifter Drilling jumbo Dumper 4.5 cum Geophysical resistivity meter

1 1 1 1 1 1 1 1 2 2 2 1 ----1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ---

1 1 1 1 1 1 1 1 2 2 2 1 ----1 1 1 1 2 1 1 1 1 1 ------------1 1 1 ---

46644.00 46020.00 46020.00 46020.00 46020.00 46020.00 46020.00 48828.00 92040.00 92040.00 92040.00 47580.00 ----46020.00 46020.00 46020.00 46020.00 92040.00 46020.00 46020.00 46020.00 46020.00 46644.00 44772.00 44772.00 44772.00 44772.00 44772.00 44772.00 45396.00 46644.00 46644.00 ---

47

BASIC DATA

RATE ANALYSIS FOR CREW CHARGES ( contd ) Sl No. Description of machinery No. of Operator No. of Helper Total Yearly wages Operator Helper in Rs 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 Grouting pump Guniting/Sand blast equipment Ice plant & accessories30 t/day Jack hammer Mobile crane 8 t ( pick & carry ) Mobile crane 25 t ( revolving ) Needle vibrator 40 mm (petrol) Needle vibrator 40 mm (ele) Needle vibrator 60 mm (petrol) Needle vibrator 60 mm (ele) Planing machine 4 m stroke Plate shearing machine Pneumatic placer 0.5 cum Pneumatic tamper Pug cutting machine Pusher leg Road roller diesel 10 t Shovel 0.50 cum 75 hp Shovel 0.85 cum 110 hp Stationery derric crane Tipper 5 cum Tipping tub 1.5 cum Tower crane 5 tonne Transformer 250 KVA Truck 10 t Upright drilling machine Ventilation fan 20 hp Vibrating plate compactor Vibratory pad foot roller 8 t Waggon drill Water tanker 8000 ltr Welding set Winch 35 hp (electric) Pile boring rig 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ----1 1 1 --1 --1 --1 1 1 1 1 1 1 --1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ----1 1 1 --1 --1 --1 1 1 1 1 1 1 --1 1 45084.00 45084.00 46020.00 45396.00 46644.00 46644.00 44772.00 44772.00 44772.00 44772.00 47580.00 47580.00 46020.00 45396.00 ----45864.00 48828.00 48828.00 --46644.00 --48828.00 --46644.00 47580.00 44772.00 45396.00 46488.00 45396.00 46644.00 --46644.00 48828.00 in Rs 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 44148.00 --44148.00 ----44148.00 44148.00 44148.00 --44148.00 --44148.00 --44148.00 ----44148.00 44148.00 44148.00 44148.00 --44148.00 44148.00 Yearly Hourly usage of Crew machinery Charges in hours in Rs 1000 1200 2000 800 1200 1250 1667 1667 1667 1667 1250 2000 1600 1000 ----1250 1200 1200 --1600 --1500 --1600 800 4833 1000 1000 1000 1600 --1000 1200 89.20 74.40 45.10 111.90 75.70 72.60 53.30 53.30 53.30 53.30 73.40 45.90 28.80 89.50 ----72.00 77.50 77.50 --56.70 --62.00 --56.70 59.50 9.30 89.50 90.60 89.50 56.70 --90.80 77.50

48

BASIC DATA

SCHEDULE OF RATES
FOR THE YEAR : 2010-11

DATA FOR COMPUTATION OF LEAD / LIFT CHARGES AND LOADING / UNLOADING CHARGES

49

BASIC DATA

50

BASIC DATA

LEAD / LIFT / LOADING & UNLOADING CHARGES FOR THE YEAR : 2010-11 REFERENCE DATA HIRE CHARGES OF MACHINERY: Truck 10 t per hour Tipper 5 cum per hour Water tanker 8000 ltr per hour Pump 5 hp diesel per hour WAGES OF WORKERS: Cement / Steel handling mazdoor Heavy mazdoor Light mazdoor OTHERS : Sundries Rs: 30.00 Rs: Rs: Rs: Rs: Rs: Rs: Rs: Hire Charge 269.00 271.00 268.00 7.00 Fuel Charge 208.00 208.00 208.00 55.00 Crew Charge 56.70 56.70 56.70 35.80 Per Day 134.00 132.00 130.50

51

BASIC DATA

NOTES ON SCHEDULE OF RATES LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MOTERIALS FOR THE YEAR : 2010-11 1 For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be adopted irrespective of mode of conveyance. For total lead exceeding 150 m conveyance of materials by mechanical means only shall be adopted irrespective of mode of conveyance. The rates for lead charges by head load and upto 5 km by any mode are cumulative and inclusive of lead charges for preceding lead. Example: Lead charges for conveyance of Earth / Sand for total lead of 100 m shall be corrosponding to lead charges ' Total lead upto 100 m ' in the statement of lead charges by head load. Lead charges for Earth / Sand for total lead of 100 m Rs: 24.40 / cum

Lead charges for conveyance of Earth / Sand for total lead of 4 kms shall be corrosponding to lead charges ' Beyond 3 km upto 4 km ' in the statement of lead charges by any mode. Lead charges for Earth / Sand for total lead of 4 km 4 Rs: 58.40 / cum

Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume and not for compacted or in-situ volume. The rates for lift charges are cumulative and inclusive of rates for preceding lift. Example : Lift charges for total lift of 6 m shall be orrosponding to lift charges ' 4.50 m to 6.00 m ' in the statement of lift charges. Lift charges for Earth / Sand for total lift of 6 m Rs: 12.80 / cum

Lift charges are not payable where conveyance of materials is by mechanical means to final placing point. Loading and unloading charges are not payable for conveyance by head load. Loading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond initial lead of 50 m wherever specified. Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond initial lead of 1 km wherever specified.

7 8

10 The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut stone are inclusive of stacking.

52

BASIC DATA

CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD FOR THE YEAR : 2010-11 Sl No. Total distance ( Total lead includes initial lead ) Earth /Sand /Gravel / Cement / PCC slabs / Murrum / Lime / Reinforce- Shahbad slabs / BS Surki / Size stone / ment steel slabs / CC blocks / Cut stone / Rubble / / StructuLaterite blocks / ral steel Coarse aggregate Wood Rs / tonne Rs / cum Rs / cum 4 3 5 initial lead 24.40 48.80 initial lead 14.60 29.30 initial lead 31.40 62.90

1 1 2 3

2 Total lead upto 50 m (covered by item rate) Total lead upto 100 m Total lead upto 150 m

Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges for materials by mechanical means only shall be adopted irrespective of mode of conveyance. CONVEYANCE CHARGES FOR MATERIALS BY ANY MODE ( Excluding loading and unloading charges ) FOR THE YEAR : 2010-11 Sl No. Distance Earth / Rubble / Cement / Sand / Size stone/ Steel / Murum / Cut stone/ Pipes / Gravel / Coarse AC & GI Lime / aggregate sheets / Surki RCC pole in Rs / cum 3 35.10 43.10 50.90 58.40 65.70 7.10 6.70 in Rs / cum 4 48.70 56.70 64.50 71.90 79.20 7.10 6.70 in Rs / tonne 5 37.90 42.90 47.80 52.40 57.00 4.40 4.20 PCC slab/ Shahbad slab / B.S slab / CC block / Laterite / Wood in Rs / cum 6 94.70 106.50 118.00 128.90 139.60 10.40 9.80

Water

1 1 2 3 4 5 6 7 Lead upto 1 km

in Rs / 1000 ltr 7 29.30 34.30 39.20 43.80 48.30 4.40 4.20

Lead more than 1 km upto 2 km Lead more than 2 km upto 3 km Lead more than 3 km upto 4 km Lead more than 4 km upto 5 km Every km beyond 5 km upto 30 km Every km beyond 30 km

53

BASIC DATA

LOADING AND UNLOADING CHARGES FOR MATERIALS FOR THE YEAR : 2010-11 Sl No. Description of item Earth / Rubble / Cement / PCC slab/ Water Sand / Size stone/ Steel / Shahabad Murum / Cut stone/ AC sheet/ slab / B.S Gravel / Coarse GI sheet / slab / CC Lime / aggregate RCC pole/ block / Hume pipe Laterite / Wood in Rs / in Rs / in Rs / in Rs / in Rs / cum cum tonne cum 1000 ltr 3 4 5 6 7 41.30 8.50 48.80 24.40 45.60 45.60 43.20 43.20 13.50 Gravity

1 1 2 Loading Unloading

Notes: 1. Unloading of materials includes stacking wherever applicable.

LIFT CHARGES FOR MATERIALS FOR THE YEAR : 2010-11 Sl No. Total lift ( Total lift includes initial lift ) Earth /Sand /Gravel / Murrum/ Lime/ Surki/ Size stone/Cut stone Rubble / Coarse aggregate Rs / cum 3 Initial lift 4.30 8.50 12.80 17.10 Cement / PCC slab / Shahbad Reinforce- slab / CC block / ment steel BS slab / Laterite / / Str steel Wood /RCC pole Rs / tonne Rs / cum 4 5 Initial lift 3.10 6.30 9.40 12.50 Initial lift 5.80 11.50 17.30 23.10

1 1 2 3 4 5

2 Total lift upto 1.50 m (covered by item rate) Total lift upto 3.00 m Total lift upto 4.50 m Total lift upto 6.00 m Total lift upto 7.50 m

54

BASIC DATA

LEAD / LIFT / LOADING & UNLOADING CHARGES - DATA RATES I. a. GENERAL DATA FOR LEAD / LIFT / LOADING & UNLOADING: Grouping of materials : Construction materials can be conveyed from source of supply to the location of their use by head load or by mechanical means or a combination of both depending on the distance involved, type of material, site conditions etc. Conveyance of materials by mechanical means also requires loading and unloading. In certain cases materials are to be lifted vertically or along a steep rampway to the place of their use. For the purpose of working out additional lead / lift / loading and unloading charges, various construction materials / manufactured products are grouped into five categories as under : CATEGORY - I : Earth / Sand / Murum / Gravel / Lime / Surki In this group materials comperatively lighter in weight and the quantity of which per loading cycle can be varied to suite the manual labour or machinery for loading, unloading and coneyance are included. Handling of these materials is relatively easy during loading and unloading. Loading and unloading can be by manual labour or by mechanical loader. The unit of measurement for these materials is per cum. CATEGORY - II : Rubble / Size stone / Cut stone / Coarse aggregate In this group the materials which are quarried / cut / crushed to required sizes and the quantity of which per loading cycle can be varied to suite manual labour or machinery for loading, unloading and conveyance are included. These materials require more time for loading or unloading when compared to materials grouped under Category-I. Loading or unloading can be either by manual labour or by machinery. The unit of measurement for these materials is per cum. CATEGORY - III : Cement / Steel / Pipes / AC & GI sheets / Packed materials / RCC poles In this group the materials in packed / rolled / fabricated condition which are heavier per load compared to the materials under Category-I and II and which can not be split into small quantities for the purpose of loading or unloading or conveyance are included. The unit of measurement for these materials is per tonne. CATEGORY - IV : PCC / Shahabad / B S slabs / CC block / Laterite / Wood In this group the materials in moulded condition / cut to standard sizes which are to be handled carefully during loading and unloading compared to materials under Category-I and II are included. The unit of measurement for these materials is per cum. CATEGORY - V : Water In this group water is included which requires container for conveyance and a pump for loading. No mazdoor or machinery is required for unloading. The unit of measurement is per 1000 ltrs. b. Stages for lead charges : Lead charges for conveyance of materials by head load are worked out in stages of 50 m distance on cumulative basis. First 50 m is considered as initial lead and the cost of conveyance is covered by work item basic rate. Lead charges for coneyance by head load is limited to total lead of 150 m.

55

BASIC DATA

For the total lead exceeding 150 m, lead charges by any mode is proposed irrespective of mode of conveyance. Lead charges for conveyance of materials by any mode are worked out in stages of 1 km distance on cumulative basis upto 5 km distance. Beyond 5 km upto 30 km and beyond 30 km distance the lead charges are worked out separately on per km basis. Conveyance of materials by any mode requires loading and unloading of materials either manually or mechanically. Separate rates are worked out for loading and unloading of materials. II. DATA FOR LEAD CHARGES BY HEAD LOAD : For the purpose of working out conveyance charges by head load the category of materials as classified in ( I ) above are adopted. Category V - ( Water ) is not considered for conveyance by head load. CATEGORY I : Earth / Sand / Gravel / Murrum / Lime / Surki CATEGORY II : Rubble / Cut stone / Size stone / Coarse aggregate CATEGORY III : Cement / Steel / AC & GI sheets / Pipes / Poles / Packed materials CATEGORY IV : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood As the method of conveyance, approximate weight per load and time required to cover specified additional distance will be generally same for materials under Category-I & II of the classification common data is prepared for conveyance by head load for materials under these two categories. FOR MATERIALS UNDER CATEGORY I & II : Lead upto 50 m : This is initial lead and cost is covered under item basic rate. Lead upto 100 m : Average distance to be covered beyond initial lead of 50 m Average speed of conveyance by head load / minute Round trip cycle time for 25 m considering 50 min / hr working ( 2 x 25 x 60 / 50 / 60 ) No. of trips per day for additional lead ( 8 x 60 / 1 ) Quantity of material by head load per load Quantity of material by head load per day ( 480 x 0.015 ) Deploy one light mazdoor for every 50 m additional lead beyond initial lead. Unit : Quantity 1.00 0.00 1% 10% 15% 5% 7.00 cum Rate per cum

: 25 m : 60 m : : : say : 1 minute 480 0.015cum 7.00 cum

Sl No. 1

Description Light mazdoor

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category I or II for

7.00 cum Rate Amount in Rs. in Rs. 130.50 130.50 0.00 0.00 Total Rs: 130.50 Rs: 1.31 Rs: 13.05 Rs: 19.58 Rs: 6.53 Rs: 170.96 Rs: 24.40

56

BASIC DATA

Lead upto 150 m : Average distance to be covered beyond initial of 50 m Deploy two light mazdoors for conveyance beyond initial lead. Unit : Quantity 2.00 0.00 1% 10% 15% 5% 7.00 cum Rate per cum

: 50 m

Sl No. 1

Description Light mazdoor

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category I or II for

7.00 cum Rate Amount in Rs. in Rs. 130.50 261.00 0.00 0.00 Total Rs: 261.00 Rs: 2.61 Rs: 26.10 Rs: 39.15 Rs: 13.05 Rs: 341.91 Rs: 48.80

FOR MATERIALS UNDER CATEGORY III : Lead upto 50 m : This is initial lead and cost is covered under item basic rate. Lead upto 100 m : Average distance to be covered beyond initial lead of 50 m : 25 m Average speed of conveyance by head load per minute : 30 m Round trip cycle time for 25 m considering 50 min/ hr working ( 2 x 25 x 60 / 50 / 30 ) : 2 min No. of trips per day for lead upto 100 m ( 8 x 60 / 2 ) : 240 Quantity of material by head load per load : 50 kg Quantity of material by head load per day ( 240 x 50 / 1000 ) : 12 tonne Deploy one cement / steel handling mazdoor for every 50 m additional lead beyond initial lead. Unit : Quantity 1.00 0.00 1% 10% 15% 5% 12.00 tonne Rate per tonne 12.00 tonne Rate Amount in Rs. in Rs. 134.00 134.00 0.00 0.00 Total Rs: 134.00 Rs: 1.34 Rs: 13.40 Rs: 20.10 Rs: 6.70 Rs: 175.54 Rs: 14.60

Sl No. 1

Description Cement / Steel handling mazdoor

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category III for

Lead upto 150 m : Average distance to be covered beyond initial of 50 m Deploy two cement / steel handling mazdoors for conveyance beyond initial lead.

: 50 m

Unit :

12.00 tonne

57

BASIC DATA

Sl No. 1

Description Cement / Steel handling mazdoor

Unit Day

Quantity 2.00 0.00 1% 10% 15% 5%

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category III for

12.00 tonne Rate per tonne

Rate in Rs. 134.00 0.00 Total Rs: Rs: Rs: Rs: Rs: Rs: Rs:

Amount in Rs. 268.00 0.00 268.00 2.68 26.80 40.20 13.40 351.08 29.30

FOR MATERIALS UNDER CATEGORY IV : Lead upto 50 m : This is initial lead and cost is covered under item basic rate. Lead upto 100 m : Average distance to be covered beyond initial lead of 50 m Average speed of conveyance by head load per minute Round trip cycle time for 25 m considering 50 min / hr working ( 2 x 25 x 60 / 50 / 40 ) No. of trips per day for lead upto 100 m ( 8 x 60 / 1.5 ) Quantity of material by head load per load Quantity of material by head load per day ( 320 x 0.017 ) Deploy one heavy mazdoor for every 50 m additional lead beyond initial lead. Unit : Quantity 1.00 0.00 1% 10% 15% 5% 5.50 cum Rate per cum

: 25 m : 40 m : : : say : 1.5 min 320 0.017cum 5.50 cum

Sl No. 1

Description Heavy mazdoor

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category IV for

5.50 cum Rate Amount in Rs. in Rs. 132.00 132.00 0.00 0.00 Total Rs: 132.00 Rs: 1.32 Rs: 13.20 Rs: 19.80 Rs: 6.60 Rs: 172.92 Rs: 31.40

Lead upto 150 m : Average distance to be covered beyond initial of 50 m Deploy two heavy mazdoors for conveyance beyond initial lead. Unit : Quantity

: 50 m

Sl No. 1

Description Heavy mazdoor

Unit Day

5.50 cum Rate Amount in Rs. in Rs. 2.00 132.00 264.00 0.00 0.00 0.00 Total Rs: 264.00 Contd

58

BASIC DATA

Sl No.

Description

Unit

Quantity

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for materials under Category IV for

1% 10% 15% 5% 5.50 cum Rate per cum

Rate in Rs. Contd Rs: Rs: Rs: Rs: Rs: Rs:

Amount in Rs. 2.64 26.40 39.60 13.20 345.84 62.90

III. DATA FOR LEAD CHARGES BY ANY MODE : a. For the purpose of working out conveyance charges by any mode the category of materials as classified in ( I ) above are adopted. For the purpose of data rate analysis the following assumptions are made : For materials under categories I and II truck or tipper can be deployed for conveyance. Loading can be either by manual labour or by mechanical loader. Unloading can be either by manual labour or by mechanical tipping arrangement. For the purpose of data rate analysis tipper with manual loading and mechanical unloading is assumed for category I and truck with manual loading and unloading is assumed for category II. For materials under categories III & IV truck is considered for conveyance with loading and unloading by manual labour. For material under category V water tanker is considered for conveyance with loading by running 5 hp diesel pump and unloading by gravity flow.

1.

2. 3.

b. Average quantity of material per load : Materials under category - I Materials under category - II Materials under category - III Materials under category - IV Materials under category - V c. Loading and unloading time per load : CATEGORY- I : Earth / Sand / Murum / Gravel / Lime / Surki : : : : : 5.00 5.00 8.00 3.40 8000.00 cum ( approx 8 t ) cum ( approx 8 t ) tonne cum ( approx 8 t ) litres ( 8 tonne )

Loading : Manual Unloading : Mechanical tipping Quantity per load: Output of 1 heavy and 1 light mazdoor per day for loading Deploy 7 heavy and 5 light mazdoors for loading. Output of 7 heavy and 5 light mazdoor per day for loading Time for loading 5 cum ( 480 x 5 / 50 ) Time for unloading by mechanical tipping Number of loads / day for loading ( 50 / 5 ) CATEGORY- II Loading : Manual Quantity per load:

: 5.0 cum : 10.0 cum : : say : : 50.0 cum 50 min 2.5 min 10

: Rubble / Size stone / Cut stone / Coarse aggregate Unloading : Manual : 5.0 cum

59

BASIC DATA

Output of 1 heavy & 1 light mazdoor per day for loading Deploy 7 heavy and 5 light mazdoors for loading. Deploy 5 heavy mazdoors for unloading. Output of 12 heavy and 5 light mazdoor per day Time for loading 5 cum ( 480 x 5 / 40 ) Time for unloading @ 50 percent of loading ( Manual ) Number of loads / day for loading or unloading ( 40 / 5 ) CATEGORY- III

: 8.0 cum

: : : :

40.0 cum 60 min 30 min 8

: Cement / Steel / Pipes / AC & GI sheets / Packed materials / RCC poles. Consider loading and unloading cement. Loading : Manual Unloading : Manual Quantity per load: : 8.0 t Output of 4 heavy mazdoor per day for loading or unloading : 16.0 t Deploy 16 heavy mazdoors for loading Deploy 16 heavy mazdoors for unloading Output of 32 heavy mazdoors per day : 64.0 t Time for loading 160 bags ( 480 x 8 / 64 ) : 60 min Time for unloading 160 bags same as loading : 60 min Number of loads / day for loading or unloading ( 64 / 8 ) :8 CATEGORY- IV : PCC / Shahabad / B.S slab / CC block / Laterite / Wood

Consider PCC slabs of size 550 x 550 x 55 mm Loading : Manual Unloading : Manual Approximate weight of each slab Quantity per load: Number of slabs for 3.40 cum @ 60 slabs / cum Output of 2 heavy mazdoors per day for loading @ 60 slabs / hour Deploy 6 heavy mazdoors for loading Deploy 6 heavy mazdoors for unloading Output of 12 heavy mazdoors per day Time for loading 200 slabs ( 480 x 3.4 / 24 ) Time for unloading 200 slabs same as loading Number of loads / day for loading or unloading ( 24/ 3.4 ) CATEGORY- V : Water

: : : :

40.0 kg 3.4 cum 200 480 slabs

: : : say :

24.0 cum 68 min 68 min 7

Loading : By pumping Unloading : By gravity flow Output of 5 hp diesel pump per minute considered Time for loading 8000 litres ( 8000 / 250 ) Time for unloading by gravity flow @ av 150 ltr / min Abstract of Loading / Unloading time per load : ( considering 50 min / hr working ) CATEGORY- I ( Manual loading and mechanical unloading ) CATEGORY- II ( Manual loading and manual unloading ) CATEGORY- III ( Manual loading and manual unloading ) CATEGORY- IV ( Manual loading and manual unloading ) CATEGORY- V ( Loading by pump and unloading by gravity )

: 250 ltrs : 32 min : 53 min Loading Unloading Total in minutes in minutes in minutes 50 2.5 52.5 60 30 90 60 60 120 68 68 136 32 53 85

60