PROJECT TRACK RECORDS

Design Engineering Consultant and Supervision Pulau Sambu Terminal Project, Batam Island, Indonesia (2012)
PT PERTAMINA (Persero) would like to improvement capacity oil storage terminal. Refurbisment 17 Units existing tank. Four Units new tanks built with capacity of 2 x 50,000 & 2 x 25,000 including the foundation and the bund wall, ATG, piping systems, heating systems, Backloading pump, and metering. Repair Jetty existing type MR existing capacity 17.000 to 50,000 DWT. Construction new jetty type LR capacity 50000100000 DWT. Project still on going.

Design Review Of The Central Crude Terminal Project at Pertamina Lawe Lawe, East Kalimantan, Indonesia (2012)
Pertamina currently is considering to construct a Central Crude Terminal (CCT) to provide crude oil supply for Pertaminas Refineries in optimally manner to increase Pertamina margin by reducing crude cost, providing better refinery feed quality, higher refinery throughputs and security of crude supply. For that propose Audex has already completed Front End Engineering Design (FEED) in May 2012. Front End Engineering Design Package for this project is developed to provide engineering information to be used as part of a bidding document for EPC Contractors. - Plant Location : Lawe-Lawe, East Kalimantan, Indonesia - Project Name : Central Crude Terminal Lawe-Lawe. - Storage Capacity : 12.1 million barrels of New Tanks.

PMC Services for Oil Storage Terminal at Ciwandan Banten, Jakarta, Indonesia (2010)
PT Taruna Bina expansion of its existing oil storage terminal in Ciwandan, Banten, Indonesia. Additional 9 Tanks. The tanks are to store HSD and MFO. Storage tanks capacities during this phase will be 54,000m3. Audex Pte Ltd did the total engineering design and project management consultancy services for the tank farm. Project ends in January 2011.

PT AUDEX INDONESIA

PRINT DATE Rev.1 10/10/2013

PROJECT TRACK RECORDS


Engineering, Procurement, Construction, Testing & Commissioning of Tanjung Priok Terminal, Jakarta, Indonesia (2010)
The Tanjung Priok Terminal has facilities for a Petroleum Terminal to handle a range of liquid Gasoil and Mogas products. The terminal total area is 13 hectares and consists of four Tank Pits with a total storage capacity of approx. 435,600 m3. These tanks are for storage of Class 1 and Class 2 petroleum products. The modes of transportation of products are as follows: - Unload from ships to storage tanks, - Load from storage tanks onto tank trucks - Load from storage tanks onto small vessels To implement the above process, the jetties at the opposite riverbank will be linked to terminal by sub-sea pipelines. The jetties consist of 2 jetties: Jetty 1 (500 ~ 65000dwt) and Jetty 2 (500~5000dwt). Project ends in August 2009.