Summary of Cost

Name of work: FDR from Km.74.00 to 92.00 & 110.00 to 118.00 of NH-730 and from Km.50.675 to 106.00, repair of
approaches of Gomti river in Km.14, repair of RCC slab culvert in Km.100 and rehabilitation of bridge on Bhainsi Nala in
Km.68 of NH-730A during 2013-14 under NH Division, Bareilly in the State of Uttar Pradesh.

Sl.
No.

Pkg.
No.

1
2
3
4
5

I
II
III
IV
V

Stretch from Km. to Km.

Km.74.00 to 92.00 of NH-730


Km.110.00 to 118.00 of NH-730
Km.50.675 to 80.00 of NH-730A
Km.80.00 to 106.00 of NH-730A
Repair of approaches of Gomti river in Km.14, repair of RCC slab culvert in Km.100 and
rehabilitation of bridge on Bhainsi Nala in Km.68 of NH-730A

Cost in Rs.
including
cenatges
1003840.00
1013323.00
1014981.00
1001935.00
1011063.00

Total
5045142.00
Say Rs.50.45 lakh

210743324.xls.ms_office

BOQ FDR 2013-14 RO I

BOQ and Asbstract of Cost


Package-I
Name of work: FDR from Km.74.00 to 85.00 & 86.00 to 92.00 of NH-730 during 2013-14 under NH Division, Bareilly in
the State of Uttar Pradesh.
Sl.
No.
(A)
1
2
3

NH No.
730
730
730
730

(B)
1
2
3

730
730
730
730

Item

Qty.

Unit

Km.74.00 to 85.00 of NH-730


Pot hole repair with WBM Gr.III
Primer coat
Patch Repair with 20mm open graded Premix surfacing

37.21
619.25
1482.40

Cum
Sqm
Sqm

Km.85.00 to 92.00 of NH-730


Pot hole repair with WBM Gr.III
Primer coat
Patch Repair with 20mm open graded Premix surfacing

61.46
1077.62
1567.77

Cum
Sqm
Sqm

Rate

Amount

2598.40
34.50
189.00
Sub Total

96686.00
21364.00
280174.00
398224.00

2645.50
34.50
190.00
Sub Total
Total 'A'
Contengencies @ 2.8 % on 'A'
Total 'B'
Agency Charges @ 9 % on 'B'
Total 'C'

162592.00
37178.00
297876.00
497646.00
895870.00
25084.00
920954.00
82886.00
1003840.00

BOQ and Asbstract of Cost


Package-II
Name of work: FDR from Km.110.00 to 118.00 of NH-730 during 2013-14 under NH Division, Bareilly in the State of
Uttar Pradesh.
Sl.
No.
1
2
3

NH No.
730
730
730

Item
Pot hole repair with WBM Gr.III
Primer coat
Patch Repair with 20mm open graded Premix surfacing

Qty.

Unit

135.08
2326.58
2326.58

Cum
Sqm
Sqm

Rate

Amount

2776.40
34.50
193.00
Sub Total
Total 'A'
Contengencies @ 2.8 % on 'A'
Total 'B'
Agency Charges @ 9 % on 'B'
Total 'C'

375036.00
80267.00
449030.00
904333.00
904333.00
25321.00
929654.00
83669.00
1013323.00

BOQ and Asbstract of Cost


Package-III
Name of work: FDR from Km.50.675 to 80.00 of NH-730A during 2013-14 under NH Division, Bareilly in the State of
Uttar Pradesh.
Sl.
No.
1
2
3

NH No.
730A
730A
730A

Item
Pot hole repair with WBM Gr.III
Primer coat
Patch Repair with 20mm open graded Premix surfacing

210743324.xls.ms_office

Qty.

Unit

83.42
1112.27
3395.00

Cum
Sqm
Sqm

Rate

Amount

2665.90
34.50
190.00
Sub Total
Total 'A'
Contengencies @ 2.8 % on 'A'
Total 'B'
Agency Charges @ 9 % on 'B'
Total 'C'

222389.00
38373.00
645050.00
905812.00
905812.00
25363.00
931175.00
83806.00
1014981.00

BOQ FDR 2013-14 RO I

BOQ and Asbstract of Cost


Package-IV
Name of work: FDR from Km.80.00 to 106.00 of NH-730A during 2013-14 under NH Division, Bareilly in the State of
Uttar Pradesh.
Sl.
No.
1
2
3

NH No.
730A
730A
730A

Item
Pot hole repair with WBM Gr.III
Primer coat
Patch Repair with 20mm open graded Premix surfacing

Qty.

Unit

146.45
1952.66
2296.74

Cum
Sqm
Sqm

Rate

Amount

2665.90
34.50
190.00
Sub Total
Total 'A'
Contengencies @ 2.8 % on 'A'
Total 'B'
Agency Charges @ 9 % on 'B'
Total 'C'

390421.00
67367.00
436381.00
894169.00
894169.00
25037.00
919206.00
82729.00
1001935.00

BOQ and Asbstract of Cost


Package-V
Name of work: FDR for repair of approaches of Gomti river in Km.14, repair of RCC slab culvert in Km.100 and
rehabilitation of bridge on Bhainsi Nala in Km.68 of NH-730A during 2013-14 under NH Division, Bareilly in the State of
Uttar Pradesh.
Sl.
No.
(A)
1
2

NH No.

Item

730A
730A
730A

Repair of approaches of Gomti river in Km.14 of NH-730A


Earthwork in patries with carted earth (2 Km lead)
640.00
Supply and laying empty cement bags
4450

Cum
No.

150.00
12.00
Sub Total

96000.00
53400.00
149400.00

(B)
1
2
3
4
5
6
7
8

730A
730A
730A
730A
730A
730A
730A
730A
730A

Repair of RCC slab culvert in Km.100 of NH-730A


Dismantling of Brick/Stone work
Dismantling of RCC work
E/w in excavation of foundation
Brick masonry in 1:3
PCC in 1:3:6
RCC M-25 in super structure
M.S Bar
Struck pointing in 1:2 cement & fine sand

9.26
12.60
7.72
4.00
5.73
21.01
10.52
30.66

Cum
Cum
Cum
Cum
Cum
Cum
Qtl.
Sqm

200.00
500.00
90.00
5267.00
5897.00
8634.00
5760.00
114.00
Sub Total

1852.00
6300.00
695.00
21068.00
33790.00
181400.00
60595.00
3495.00
309195.00

(C)
1
2
3
4

730A
730A
730A
730A
730A

Rehabilitation of bridge on Bhainsi Nala in Km.68 of NH-730A


M.S & iron works
50.93
WBM Gr.III
12.20
Primer coat
122.00
Patch Repair with 20mm open graded Premix surfacing
122.00

Qtl.
Cum
Sqm
Sqm

7536.00
2665.90
34.50
190.00
Sub Total
Total 'A'
Contengencies @ 2.8 % on 'A'
Total 'B'
Agency Charges @ 9 % on 'B'
Total 'C'

383808.00
32524.00
4209.00
23180.00
443721.00
902316.00
25265.00
927581.00
83482.00
1011063.00

210743324.xls.ms_office

Qty.

Unit

Rate

Amount

BOQ FDR 2013-14 RO I