ROAD METAL RATES

DIVISION: NH Division, PWD, BAREILLY KM 300 NH-74 ( New N H No -30 )


Km. No. Quarry Quarry Rate ( Rs) 3 500 510 540 600 600 Distence from Quarry to Site (KM) 5 85 85 85 85 85 Cost of cartage without loading 6 594.50 594.50 594.50 594.50 594.50 Cost of cartage excluding C.P. (Rs) 7 540.45 540.45 540.45 540.45 540.45 Total (3+7) (Rs) 8 1040.45 1050.45 1080.45 1140.45 1140.45

CIRCLE : 28th .Circle, N.H. P.W.D. , Bareilly BAREILLY


I.S. Transit Tax (Rs) 9 Total of col. (8+9) (Rs) 10 1040.45 1050.45 1080.45 1140.45 1140.45 Trade Tax on col. 11 (Rs) 11 G.Total of col 11+12 (Rs) 12 1040.45 1050.45 1080.45 1140.45 1140.45
Quarry to KM - 300 of NH -74 = 85 KM

Remarks

1 300 300 300 300 300

Stone Ballast ( 45-90 mm)

13 up to 50 KM = 439.75 51 to 75 KM = Total = 131.25 613.50


76 to 85KM @4.25= 42.50

Lal Kuan Lal Kuan Lal Kuan Lal Kuan Lal Kuan Lal Kuan Lal Kuan Lal Kuan Lal Kuan

Stone Ballast ( 45-63 mm) Stone Ballast ( 22.4-53 mm) 16mm-22.4mm/ 11.2mm/13.2mm/ 10-16mm 11.2-2.8 mm / 2.3-9.5 (6.7mm) Stone grit 5.6 mm and below
300 300 300 300 600 470 550 500 85 85 85 85 594.50 594.50 594.50 594.50 540.45 1140.45 1010.45 1090.45 1040.45 1140.45 1010.45 1090.45 1040.45 1140.45 1010.45 1090.45 1040.45

Less Loading= (-)19.0 Rs 594.50

mean km (from km 295 to km 304 )=(83+88)/2


= 85 km

Stone Dust
540.45 540.45

stone boulder 25-60 Kgs Coarse Sand


540.45

1) Distances from quarry have been taken from the shortest route. 2) Quarry rates have been taken of the respective circle applicable. 3) Cartage rates has been taken approved by SE Lko. Circle in the RMR. 4) Quarry rates are for approved quarry and RMR rates are minimum . JUNIOR ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

N.H. Construction Division P.W.D. Bareilly

N.H. Construction Division P.W.D. Bareilly

28th Circle N.H. P.W.D. Bareilly

503

Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Unit = sqm Taking output = 3500 sqm a) Labour Mate Mazdoor b) Machinery Mechanical broom @ 1250 sqm per hour Air compressor 250 cfm Emulsion pressure distributor @ 1750 sqm per hour add : escaslation @ 35 % on machinery sub total c) Material Bitumen @ 0.25 kg per sqm a+b+c Overhead charges @10% input on (a+b+c) Contractor's profit @10% input on (a+b+c+d) tonne 0.875 33295.02 sub total

day day

0.080 2.000

125.00 125.00 sub total 230.00 206.00 516.00

10.00 250.00 260.00 644.00 576.80 1032.00 788.48 3041.28 29133.14 29133.14 32434.42 3243.44 3567.79 39245.65 11.21 11.30

hour hour hour

2.800 2.800 2.000

d) e)

Cost for 3500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/3500 Say

Junior Engineer

Assistant Engineer

Executive Engineer

3004

Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Unit = Sqm Taking out put = 10250 sqm (205 cum)(405 tonne) a) Labour Mate Mazdoor Mazdoor skilled b) Machinery Air compressor 250 cfm HMP 100-110 TPH Capacity Tipper 5.5 tonnes capacity Smooth wheeled roller 8-10 tonnes add : escaslation @ 35 % on machinery c) Material Crushed stone aggregates nominal size 13.2mm Crushed stone aggregates nominal size 11.2mm Bitumen 60/70 Bitumen emulsion for tack coat including vertical sides of pot hole. d) Overhead charges @10% input on (a+b+c) e) Contractor's profit @10% input on (a+b+c+d) Cost for 10250 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/10250 say

Day Day Day hour hour hour hour

3.760 90.000 4.000 6.000 6.000 45.000 12.000

125.00 120.00 130.00 206.00 11167.00 200.00 297.00

470.00 10800.00 520.00 1236.00 67002.00 9000.00 3564.00 28280.70 210413.86 105206.93 612107.73 81905.75 113050.70 124355.77 1367913.44 133.45 133.00

cum cum tonne tonne

184.500 92.250 14.970 2.460

1140.45 1140.45 40888.96 33295.02

Junior Engineer

Assistant Engineer

Executive Engineer

513 (ii)

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats Case - II : Type B Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. Unit = sqm Taking output = 7858 sqm (47.16 cum) a) Labour Mate Mazdoor b) Machinery HMP of 75 tonnes/hour. Electric Generator Set 250 KVA Front end loader 1 cum bucket capacity Tipper 10 tonne capacity Add 10 per cent of cost of carriage to cover cost of loading and unloading Paver finisher hydrostatic with sensor attachment Smooth wheeled 8-10 tonnes capacity add : escaslation @ 35 % on machinery c) Material Bitumen@ 6.80 kg per 10 sqm Crushed stone chipping of 6.7 mm size defined as passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.06 cum per 10 sqm d) Overhead charges @10% input on (a+b+c) e) Contractor's profit @10% input on (a+b+c+d) Cost for 7858 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/7858

day day hour hour hour tonne.k m hour hour

0.160 4.000 2.000 2.000 2.000 104 x 5'

125.00 125.00 11167.00 450.00 520.00 14.50

20.00 500.00 22334.00 900.00 1040.00 75400.00 7540.00 1258.00 594.00 30041.20 218347.05 53783.62 41175.79

2.000 2.000

629.00 297.00

tonne cum

5.340 47.160

40888.96 1140.45

45293.37 498227.02 63.40 63.00

say

Junior Engineer

Assistant Engineer

Executive Engineer

506

Built-up-Spray Grout Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness being 75 mm

Unit = sqm Taking output = 3000 sqm (225 cum) a) Labour Mate Mazdoor including for brooming of key aggregates Mazdoor skilled b) Machinery Hydraulic self propelled chip spreader both for aggregates and key aggregates@ 1500 sqm per hour for 3000 x 3 sqm Bitumen pressure distributor for 3000 x 2 sqm @ 1750 sqm per hour Tipper 5.5 cum capacity smooth wheel roller 8 tonnes Front end loader 1 cum bucket capacity add : escaslation @ 35 % on machinery c) Material Bitumen30 kg per 10 sqm @ 15 kg per 10 sqm for each layer Crushed stone coarse aggregate passing 53 mm and retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each layer Key aggregates passing 22.4 mm and retained on 2.8 mm sieve @ 0.13 cum per 10 sqm d) Overhead charges @10% input on (a+b+c) e) Contractor's profit @10% input on (a+b+c+d) Cost for 3000 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/3000

day day day

0.400 8.000 2.000

125.00 125.00 130.00

50.00 1000.00 260.00

hour hour

6.000 3.430

1700.00 516.00

10200.00 1769.88

hour hour hour

10.000 6.000 6.000

200.00 297.00 520.00

2000.00 1782.00 3120.00 6605.16 368000.64 324136.36 44477.73

tonne cum cum

9.000 300.000 39.000

40888.96 1080.45 1140.45

76340.18 83974.19 923716.14 307.91 308.00

say

Junior Engineer

Assistant Engineer

Executive Engineer

522 (i)

Crack Prevention Courses


Stress absorbing membrane (SAM) crack width less than 6 mm Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902. Unit = sqm Taking output = 10500 sqm a) Labour Mate Mazdoor b) Machinery Mechanical broom @ 1250 sqm per hour Air compressor 250 cfm Bitumen pressure distributor @ 1750 sqm per hour Hydraulic Chip spreader Smooth wheeled road roller 8-10 tonne c) Material Modified binder Crushed stone aggregates 5.6 mm size d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 10500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/10500

day day hour hour hour hour hour tonne cum

0.240 6.000 6.000 6.000 6.000 6.000 input 6.000 9.450 input 105.000 input

125.00 120.00 230.00 206.00 516.00 297.00

30.00 720.00 1380.00 1236.00 3096.00 #VALUE! 1782.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

say

Junior Engineer

Assistant Engineer

Executive Engineer

Analysis of Rate
Ref. to Sr No MoRTH Spec. 5.21 Description (ii) Stress absorbing membrane (SAM) with crack width 6 mm to 9 mm Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902. Unit = sqm Taking output = 10500 sqm a) Labour Mate Mazdoor b) Machinery Mechanical broom @ 1250 sqm per hour Air compressor 250 cfm capacity Bitumen pressure distributor @ 1750 sqm per hour Hydraulic Chip spreader Smooth wheeled road roller 8-10 tonne ADD 35 % ESCALATION ON MACHINARY SUB TOTAL c) Material Modified binder Crushed stone chipping 11.2 mm size tonne cum 11.550 105.000 40888.96 1140.45 SUB TOTAL Unit Quantity Rate Rs Cost Rs

day day

0.240 6.000

125.00 120.00 SUB TOTAL 230.00 206.00 516.00 1700.00 297.00

30.00 720.00 750.00 1380.00 1236.00 3096.00 10200.00 1782.00 17694.00 6192.90 23886.90 472267.48 119747.73 592015.21 616652.11 61665.21 67831.73 746149.05 71.06 71.00

hour hour hour hour hour

6.000 6.000 6.000 6.000 6.000

A+B+C d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 10500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/10500 say

Junior Engineer

Assistant Engineer

Executive Engineer

Rate w.e.f.
CIRCLE : 28th Circle, NH , PWD, BAREILLY DIVISION : N H Construction Division, PWD ,Bareilly

16- 04 - 2012

NH-74

IN KM

300

Distance from Mathura Refinery Distance from Panipat Refinery

MATERIAL

Bitumen VG30(Bulk)
From Mathura Refinery

Emulsion M/S (Packed


Reconditioned Drums from Panipat Refinery

279 489 CRMB-55(Bulk)


Mathura Refinery

from

( Rs )
Basic Rates 16-04-2012 Excise Duty@14% on 'A' Education Cess@ 3% on 'B' Cartage(1.75/km ) excluding 10% O.H. 2792 km Cartage(1.75/km ) excluding 10% O.H. 489X1.75 EMPTY DRUMS Total '(A+B+C+D+ E)' SAY A B 34960.00 4894.40

( Rs )
29730.00 4162.20

( Rs )

35090.00 4912.60

146.83

124.87

147.38

887.73

887.73

777.95

40888.96

(-)1500 33295.02

41037.71

40889

33295

41038

JUNIOR ENGINEER

ASSISTANT

ENGINEER

EXECUTIVE ENGINEER

BILL OF QUANTITY Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix surfacing From km 295.00 to 304.00 of NH-74 (New NH-30 )
1 2 3 4 5 6 7 S. No. 1 Date of Calling Tender Date of Receiving Tender Date of Openning Technical bid Bid Security Time of Completion Validity Period Cost of Tender Form Item of work Built-up-Spray Grout Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness being 75 mm km-295 km-296 km-297 km-299 km-300 km-302 Total Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Qty same as above item no-1 Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 km-295 km-296

Unit

Qty.

Rate

Per

Amount

sqm sqm sqm sqm sqm sqm sqm

250.00 260.00 80.00 70.00 110.00 120.00 890.00

308.00

274120.00

sqm

890.00

11.30

10057.00

sqm sqm

320.00 300.00

km-297 km-299 km-300 km-302 Total 4 Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B seal coats Qty same as above item no-3 Total

sqm sqm sqm sqm sqm

100.00 110.00 125.00 85.00 1040.00

133.00

138320.00

sqm

1040.00

63.00

65520.00 488017.00

Signature of Contractor

Complete Adress of Contractor

BILL OF QUANTITY Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix surfacing From km 295.00 to 304.00 of NH-74 (New NH-30 )
1 2 3 4 5 6 7 S. No. 1 Date of Calling Tender Date of Receiving Tender Date of Openning Tender Security E/M Time of Completion Validity Period Cost of Tender Form Item of work Built-up-Spray Grout Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness being 75 mm km-295 km-296 km-297 km-299 km-300 km-302 Total Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Qty same as above item no-1 Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 km-295 km-296 25th April 2012 11th May 2012 14 th May 2012 Rs. 50000/One Month Three Months 150+500+88 = 738/Rate In Figure In Words

Unit

Qty.

Rate

sqm sqm sqm sqm sqm sqm sqm

250.00 260.00 80.00 70.00 110.00 120.00 890.00

308.00

sqm

890.00

11.30

sqm sqm

320.00 300.00

km-297 km-299 km-300 km-302 Total 4

sqm sqm sqm sqm sqm

100.00 110.00 125.00 85.00 1040.00

133.00

Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B seal coats Qty same as above item no-3 sqm Total

1040.00

63.00

Signature of Contractor

Officer Calling Tender

Officer Openning Tender

Complete Adress of Contractor

Officer Accepting Tender

BILL OF QUANTITY Name of work : Crack Sealing with Stress absorbing membrane (SAM) with crack width 6 mm to 9 mm repair over a crack road surface From km 294.00 to 304.00 of NH-74 (New NH30 )
1 2 3 4 5 6 7 S. No. 1 Date of Calling Tender Date of Receiving Tender Date of Openning Tender Security E/M Time of Completion Validity Period Cost of Tender Form Item of work Stress absorbing membrane (SAM) with crack width 6 mm to 9 mm Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902. km-295 km-296 km-297 & 298 km-299 & 300 km-301 & 302 km-303 & 304 Total 25th April 2012 11th May 2012 14 th May 2012 Rs. 50000/One Month Three Months 150+500+88 = 738/Rate In Figure In Words

Unit

Qty.

sqm sqm sqm sqm sqm sqm sqm

950.00 1200.00 950.00 1050.00 1400.00 1450.00 7000.00

71.00

Rs Seventy One only

I/We here by tender my / our rates ...% above/below/atpar the departmental rates.

Signature of Contractor Complete Adress of Contractor

Officer calling Tender

Officer openning Tender

Officer Accepting Tender

Details Of Measurments
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix surfacing From km 295.00 to 304.00 of NH-74 (New NH-30 )
S. No. 1 Item of work Built-up-Spray Grout Providing, laying and rolling of built-upspray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a Base conforming to the line, grades and crosssection specified, the compacted layer thickness being 75 mm km-295 km-296 km-297 km-299 km-300 km-302 Total 2 Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Qty same as above item no-1 Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm. no. L B H/D Qty

sqm sqm sqm sqm sqm sqm sqm

250.00 260.00 80.00 70.00 110.00 120.00 890.00

0.00

0.00

sqm

890.00

0.00

0.00

Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 km-295 km-296 km-297 km-299 km-300 km-302 Total 4 Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B seal coats Qty same as above item no-3 Total sqm 1040.00 0.00 0.00 0.00 sqm sqm sqm sqm sqm sqm sqm 320.00 300.00 100.00 110.00 125.00 85.00 1040.00