CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No.

O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4364 4365 4366 4367 4368 4369 4370 4371 4372 4373 4374 4375 Sub. Date 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 Activity Excavation Excavation Excavation Excavation Excavation Excavation Hydrostatic & Deflection Test Handing Over Concreting concreting Backdrop Reinstatement Location ( Sector No ) E16 E10 E15 E15 E15 E13 E13 E13 E13 E13 E16 E16/02 LINE No. Description New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia from C19/2N to C19/3N Replacement UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from 125/2/4/N to 125/2 including MH connections Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/9 to C16/8 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/6A to C16/1 including MH connections Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/5A to C16/2 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C7/8 to C7/4/2/N including MH connections Hydrostatic and deflection test for sewer line C7/8 to C7/4/2/N 225mm, UPVC initial inspection prior to hand over for sewer line C7/8 to C7/4/2/N 225mm, UPVC Casting of adjustable ring and cover slab for MH C13C/1/N and C7/2/N Concreting of shaft for existing MH C19/10 (1.9 m) construction of Backdrop for MH C19/3N for sewer line C24/29/3 to C24/29/2 reinstatement of: Curb stone, 7.40 LM Interlock tiles, 4.80 LM grouting for abounded line between MH: C14A/104 to 14/A9, 200mm VC 37.42 LM 14/A9 to C14A/8, 400mm VC 58.52 LM C14A/9/1 to 14/A9, 150mm VC 8.50 LM Ex. MH to 14/A9, 250mm VC 23.00 LM C14/10 to Ex. MH, 150 VC 62.22 LM Rec'd Date 6-Jan-13 28-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13 8-Jan-13 8-Jan-13 13-Jan-12 8-Jan-13 6-Jan-13 6-Jan-13 12-Jan-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4376

3-Jan-13

Grouting

E14

21-Jan-13

Approved

Approved

4377 4378 4378A 4379 4380 4381 4382 4383 4384

3-Jan-13 3-Jan-13 3-Jan-13 3-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13

Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Reinstatement Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation

E16/01 E16/02 E16/02 W03 E10 E10 E10 E10 E10

hydrostatic and deflection test for sewer line C21/3 to C21/2 315mm, UPVC hydrostatic and deflection test for sewer line C24/30/2 to C24/30/1 280mm, UPVC initial inspection prior to hand over for sewer line C24/30/2 to C24/30/1 280mm, UPVC For MH H18/2 removal and reinstatement of: Interlock tiles, 7.00 LM Curb stone, 7.00 LM Asphalt, 5.65 LM Post CCTV survey for sewer line 126A/1B to 126A/1A Post CCTV survey for sewer line 126A/3 to 126A/2 sewer over pumping for Rehabilitation works for sewer line 126A/3 to 126A/2 sewer over pumping for Rehabilitation works for sewer line E121 to 120 Post CCTV survey for sewer line E121 to 120 Grouting for abounded lines from MH: C14/26 to Ex MH, 250mm Dia 52.81 LM C14A/8/1 to C14A/8, 150mm Dia 12.50 LM C14A/7/1 to C14A/7, 150mm Dia 15.201 LM C14A/8 to C14A/7, 400mm Dia 38.97 LM Blinding and concreting for base and shaft for MH C3A/N concreting for second shaft for MH C3A/N Casting of cover slab & Adjustable ring for new MH C3A/N installation of Adjustable ring, cover slab, and cover frame (H.D.) for MH C3A/N for sewer line E128/7/1/1A/N to E128/7N, removal of ashpalt 38.82 LM Rehabilitation work at existing MH C9/5: 1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.) 2. Removal of ladder and closing of holes by lamination (2.0 LM ) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (16 nos)

8-Jun-13 12-Jan-13 12-Jan-13

Approved Approved Approved CHECK

CLAIMED/P27 Approved Approved existing asphalt to be rectified Approved Approved Approved Approved Approved

12-Jan-13 12-Jan-13 7-Jan-13 7-Jan-13 12-Jan-13

Approved Approved Approved Approved Approved

4385

6-Jan-13

Grouting

E14

8-Jan-13

Approved

Approved

4386 4387 4388 4389 4390

6-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13 6-Jan-13

concreting concreting Concreting Installation removal

E14 E14 E14 E14 E10

8-Jan-13 21-Jan-13 22-Jan-13 21-Jan-13 10-Jan-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved

4391

10-Jan-13

Rehabilitation

E12

2-Feb-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C9/6: 1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (6 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rec'd Date Status

MACE
Remarks 12-Jan-13 Approved Approved

4392

10-Jan-13

Rehabilitation

E12

4393

10-Jan-13

Rehabilitation

E12

: Rehabilitation work at existing MH C9/7: 1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 4. Replacing of sealing plate by new ( 600 x 600 )

12-Jan-13

Approved

Approved

4394

10-Jan-13

Rehabilitation

E10

Rehabilitation work at existing MH 126A/1A: 1. Demolishing of existing cover slab ( 700 x 700 ) 2. Casting of new cover slab ( 700 x 700 ) and installing 3. Installation of new DI cover frame ( 600 x 600, L.D. ) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 5. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (2 nos) 6. Repairing of benching 7. Removal and renew of defective GRP joint in MH shaft (2 nos)

22-Jan-13

Approved

Approved

4395

10-Jan-13

Rehabilitation

E10

: Rehabilitation work at existing MH 126B 1. Demolishing of existing cover slab ( 1.0 m internal Dia ) 2. Casting of new cover slab ( 1.0 internal dai ) and installing and installation 3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 5. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (5 nos)

16-Jan-13

Approved

Approved

4396

10-Jan-13

Rehabilitation

E10

Rehabilitation work at existing MH 126A/1B 1. Demolishing of existing cover slab ( 1.0 m internal Dia ) 2. Casting of new cover slab and adjustable ring ( 1.0m internal dia ) and installing and installation 3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate Rehabilitation work at existing MH 126A/3 1. Removal of existing cover slab and re-installing 2. Removing, cleaning and recoating of DI cover frame (600 x 600, L.D.) 3. Replacing sealing plate by new ( 600 x 600 ) Rehabilitation work at existing MH 45/1A/1: 1. Removal of ladder and closing of holes by lamination (1.5LM ) 2. Removing, cleaning and recoating of DI cover frame (600 Dia L.D.) 3. Replacing sealing plate by new ( 600 Dia) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) Rehabilitation work at existing MH H7/28: 1. Demolishing of existing cover slab ( 1.5m internal dia) 2. Casting of cover slab ( 1.5m internal dia) and installation 3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate

28-Jan-13

Approved

Approved

4397

10-Jan-13

Rehabilitation

E10

28-Jan-13

Approved

Approved

4398

10-Jan-13

Rehabilitation

E10

17-Feb-13

Approved

Approved

4399

10-Jan-13

Rehabilitation

W7/01

27-Mar-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH 123/1/3/2: 1. Demolishing of existing cover slab ( 1.2 x 1.0 m internal ) 2. Casting of cover slab ( 1.2 x 1.0 m internal ) and installation 3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate Rehabilitation work at existing MH E120: 1. Demolishing of existing cover slab ( 1.2 m internal Dia ) 2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and installation 3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate 4. Removal of internal existing GRP liner from shaft, repairing of damaged concrete and relining with GRP lamination for all internal shaft ( 1.2 m Dia, C.L= 102.110, I.L= 99.330) 5. Removal of existing GRP in benching, repairing of damaged concrete and relining for full bench Rehabilitation work at existing MH E121: 1. Demolishing of existing cover slab ( 1.2 m internal Dia ) 2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and installation 3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate 4. Removal of internal existing GRP liner from shaft, repairing of damaged concrete and relining with GRP lamination for all internal shaft ( 1.2 m Dia, C.L= 101.980, I.L= 99.640) 5. Removal of existing GRP in benching, repairing of damaged concrete and relining for full bench Rehabilitation work at existing MH C3/6: 1. Demolishing of existing cover slab ( 1.2 m internal Dia ) 2. Casting of cover slab ( 1.2 m internal Dia ) and installation 3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate Rehabilitation work at existing MH H7/15: 1. Removal, clean and recoat of DI cover frame ( 750 x 600, H.D. ) 2. Replacing of sealing plate by new one ( 750 x 600 ) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 4. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (11 nos) 5. Removal of existing GRP in benching, repairing of damaged concrete and relining for full bench Rec'd Date Status

MACE
Remarks 17-Jan-13 Approved Approved

4400

10-Jan-13

Rehabilitation

E10

4401

10-Jan-13

Rehabilitation

E10

11-Feb-13

Approved

Approved

4402

10-Jan-13

Rehabilitation

E10

11-Feb-13

Approved

Approved

4403

10-Jan-13

Rehabilitation

E14

16-Jan-13

Approved

Approved

4404

10-Jan-13

Rehabilitation

W7/01

12-Jan-13

Approved

Approved

4405

10-Jan-13

Rehabilitation

E16

Rehabilitation work at existing MHC19/14: 1. Removal of existing shaft ( 1.55 m ) and cover slab ( 0.5 m) 2. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (3 nos) 3. Removal and renew of defective GRP joint in MH shaft (1 nos) 4. Concreting of new shaft ( 1.55 m) 5. Casting of adjustable ring and cover slab ( 1.5m internal dia) and installation 6. Installation of new DI cover frame ( 750mm, H.D) with sealing plate

21-Feb-13

Approved

Approved

4406

10-Jan-13

Rehabilitation

W7/01

Rehabilitation work at existing MH H7/28/2: 1. Removal, cleaning and recoating of DI cover frame ( 750 x 600 ) Rehabilitation work at existing MH C19/10 1. Casting of adjustable ring and cover slab ( 1.5m internal dia) and installation 2. Installation of new cover frame ( 750mm Dia, L.D.) with sealing plate for pipe jacking between MH C14A/7/1N to C14A/6A Checking of laser target level for the NDM driving excavation up to formation for Driving pit (3.85 x 2.85 x 4.153 m) near MH C14A/7/1N hydrostatic and deflection test for sewer line C24/30/1 to C24/30 280mm, UPVC initial inspection prior to hand over for sewer line C24/30/1 to C24/30 280mm, UPVC initial inspection prior to hand over for sewer line C24/29/1 to C24/29 225mm, UPVC Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from H7/14 to H7/3 including MH connections

17-Jan-13

Approved

Approved

4407 4408 4409 4410 4411 4412 4413

10-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13

Rehabilitation NDM NDM Hydrostatic & Deflection Test Handing Over Handing Over Excavation

E16 E14 E14 E16/02 E16/02 E16/02 W7/01

16-Jan-13 21-Jan-13 21-Jan-13 16-Jan-13 17-Jan-13 17-Jan-13 19-Jan-13

Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4414 4415 4416 4417 4418 4419 4420 4421 4422 4423 4424 4425 4426 4427 4428 4429 4430 4431 4432 4433 4434 4435 4436 4437 4438 4439 4440 4441 4442 Sub. Date 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 16-Jan-13 Activity Excavation Excavation Excavation Excavation Excavation Excavation Excavation Excavation Excavation Excavation Excavation removal Excavation Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Backdrop NDM removal Backdrop Handing Over Handing Over Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test removal Location ( Sector No ) E10 E16/01 E16/02 E16 E16 E16 E16 E15 E15 E15 E14 E14 E14 E14 E13 E13 E14 E13 E13 E14 E14 W7/01 W7/01 W7/01 E15 E15 E15 E15 E19 LINE No. Description New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from E128/7/1/1A/N to E128/7N including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 315mm Dia from C21/3 to C21/2 including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C24/30/1 to C24/30 including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 160mm Dia from C19/27 to C19/14 including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/2N to C19/14 including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 160mm Dia from C19/3/1 to C19/3N including MH connections NEW UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia from C19/3N to C19/2N including MH connections Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/5A to C16/2 including MH connections Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7/1 to C16/7 including MH connections Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/9 to C16/8 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from C3A to C3A/N including MH connections for sewer line C3A to C3A/N, removal of asphalt 8.84 LM hydrostatic and deflection test for sewer line C3A to C3A/N 315mm, UPVC initial inspection prior to hand over for sewer line C3A to C3A/N 315mm, UPVC New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia from C13/4/1/N to C13/4/2/N including MH connections for sewer line C3A to C3A/N, removal of interlock tiles 36.410 LM hydrostatic and deflection test for sewer line C13/4/1/N to C13/4/2/N25mm, UPVC initial inspection prior to hand over for sewer lineC13/4/1/N to C13/4/2/N 225mm, UPVC construction of backdrop for MH C13/4/2/N coming from C13?1A/1, 160mm UPVC fencing for NDM pits 77.0 LM, between sewer line C14A/7/1N to C14A/6A demolishing of existing MH and backdrop for MH C14A/7 construction of Backdrop for MH H7/3 coming from H7/14, 225mm UPVC initial inspection prior to hand over for sewer line H7/15 to H17/14, 225mm UPVC initial inspection prior to hand over for sewer line H7/14 to H17/3, 225mm UPVC hydrostatic and deflection test for sewer line C16/5A to C16/2, 225mm UPVC hydrostatic and deflection test for sewer line C16/6A to C16/1, 225mm UPVC initial inspection prior to hand over for sewer line C16/6A to C16/1, 225mm UPVC initial inspection prior to hand over for sewer line C16/5A to C16/2, 225mm UPVC initial inspection prior to hand over for sewer line D26N/8/1N to D26N/8/2N 315mm UPVC initial inspection prior to hand over for sewer line D26N/8/2N to D26N/8/3N 315mm UPVC initial inspection prior to hand over for sewer line D26N/8/3N to D26N/8/4N 315mm UPVC initial inspection prior to hand over for sewer line D26N/8/4N to D26N/8/5N 315mm UPVC hydrostatic and deflection test for sewer line 125/2/4N to 125/2 160mm UPVC hydrostatic and deflection test for sewer line C19/4N to C19/3N 315mm UPVC hydrostatic and deflection test for sewer line C19/10 to C19/3N 225mm UPVC hydrostatic and deflection test for sewer line C19/14 to C19/2N 225mm UPVC hydrostatic and deflection test for sewer line C19/3N to C19/2N 450mm UPVC hydrostatic and deflection test for sewer line C19/27 to C19/14 160mm UPVC for sewer line C16/8/2 to C16/8, removal of interlock tiles 12.00 LM Rec'd Date 20-Jan-13 20-Jan-13 22-Jan-13 21-Jan-13 Status

MACE
Remarks Approved Approved Approved Approved waiting Consultant approval Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved CHECK 21-Jan-13 21-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 21-Jan-13 21-Jan-13 21-Jan-13 22-Jan-13 27-Jan-13 21-Jan-13 13-Feb-13 17-Feb-13 21-Jan-13 21-Jan-13 21-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 20-Jan-13 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4443 4444 4445 4446 4447 4448 4449

19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13

E10 E16 E16 E16 E16 E16 E15

22-Jan-13 29-Jan-13 29-Jan-13 20-Mar-13 29-Jan-13 26-Mar-13 22-Jan-13

Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) E15 E8 E8 E16 LINE No. Description for sewer line C16/7 to C16/7/1, removal of: Asphalt, 15.00 LM Interlock tiles, 2.00 LM for sewer line G14/105/8/1 to G14/105/8, reinstatement of: Asphalt, 2.10 LM for sewer line G14/103/1/3 to G14/103/1/2, reinstatement of: Asphalt, 2.60 LM for sewer line C19/5N to C19/4N, reinstatement of: Asphalt, 11.40 LM for sewer line, reinstatement of: 123/5/3 to 123/5/2, Asphalt 8.50 LM 123/5/2 to 123/5/1, Asphalt 9.60 LM 123/5/1 to C14/120N/3, Asphalt 9.6 LM for sewer line E128/6N to E128/7N, reinstatement of: Asphalt, 99.00 LM for sewer line E128/5N to E128/6N, reinstatement of: Asphalt, 30.90 LM for sewer line E128/2/7N to C14/120N/4, reinstatement of: Asphalt, 7.50 LM for sewer line 123/6N to C14/120N/5, reinstatement of: Asphalt, 7.50 LM for sewer line 125/4N to C14/120N/7, reinstatement of: Asphalt, 5.40 LM for sewer line C21/19/2 to C21/19/1, reinstatement of: Asphalt, 15.00 LM for sewer line C21/19 to C21/18, reinstatement of: Asphalt, 15.50 LM Interlock tiles, 3.10 LM Curb stone, 4.30 LM for sewer line C21/18 to C21/17, reinstatement of: Asphalt, 12.10 LM Interlock tiles, 2.10 LM Curb stone, 12.00 LM for sewer line C21/12 to C21/5, reinstatement of: Asphalt, 27.60 LM Interlock tiles, 12.8 LM Curb stone, 13.8 LM for sewer line C21/5 to C21/4, reinstatement of: Asphalt, 19.70 LM Interlock tiles, 21.30 LM Curb stone, 26.30 LM for sewer line C21/25 to C21/7, reinstatement of: Asphalt, 31.90 LM Interlock tiles, 6.80 LM Curb stone, 36.50 LM for sewer line C21/21 to C21/20, reinstatement of: Asphalt, 41.10 LM for sewer line C21/7/1 to C21/7, reinstatement of: Asphalt, 27.90 LM Interlock tiles, 9.70 LM Curb stone, 11.30 LM for sewer line C21A/24/1 to C21A/24, reinstatement of: Asphalt, 41.00 LM for sewer line C21A/22/3/2 to C21A/22/3/3, Removal of: Asphalt, 21.90 LM for sewer line C21A/22/3/4 to C21A/22/3/3, Removal of: Interlock tiles, 36.80 LM for sewer line C19/1A to C19/1N, reinstatement of: Curb stone, 8.45 LM Rec'd Date Status

MACE
Remarks 22-Jan-13 26-Jan-13 26-Jan-13 30-Jan-13 Approved Approved Approved Approved Approved Approved Approved Approved

4450 4451 4452 4454

19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13

removal Reinstatement Reinstatement Reinstatement

4455

19-Jan-13

Reinstatement

E10

19-Jan-13

Approved

Approved

4456 4457 4458 4459 4460 4461

19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13

Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement

E10 E10 E10 E10 E10 E16/01

19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13 19-Mar-13

Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved

4462

19-Jan-13

Reinstatement

E16/01

20-Jan-13

Approved

Approved

4463

19-Jan-13

Reinstatement

E16/01

20-Jan-13

Approved

Approved

4464

19-Jan-13

Reinstatement

E16/01

13-Feb-13

Approved

Approved

4465

19-Jan-13

Reinstatement

E16/01

20-Jan-13

Approved

Approved

4466

19-Jan-13

Reinstatement

E16/01

18-Mar-13

Approved

Approved

4467

19-Jan-13

Reinstatement

E16/01

20-Jan-13

Approved

Approved

4468

19-Jan-13

Reinstatement

E16/01

20-Jan-13

Approved

Approved

4469 4470 4471 4472

19-Jan-13 19-Jan-13 19-Jan-13 19-Jan-13

Reinstatement Removal Removal Removal

E16/01 E16/01 E16/01 E16

20-Jan-13 20-Jan-13 20-Jan-13 30-Jan-13

Approved Approved Approved Approved

Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4473 Sub. Date 19-Jan-13 Activity Removal Location ( Sector No ) E16 LINE No. for sewer line C19/3/1 to C19/3N, Removal of: Asphalt, 8.100 LM reinstatement of interlock tiles for sewer line: C17/8A/1 to C17/8A, 6.00 LM line # 4 C17/8A to C17/8, 7.50 LM line # 4 C17/8A/4 to C17/8A/5, 20.00 LM line # 5 C17/16A/1 to C17/16A/2, 3.00 LM line # 6 C17/14 to C17/15, 20.00 LM line # 7 C17/9 to C17/8, 5.70 LM line # 12 reinstatement of interlock tiles for sewer line: C17/11 to C17/10, 27.00 LM C17/10 to C17/9, 62.7 LM reinstatement of interlock tiles for sewer line: C15/1A to C15, 10.7 LM reinstatement of Asphalt, for sewer line: C15/2 to C15/1, 35.00 LM C15/1 to C15/1A, 15.40 LM C15/1A to C15, 3.50 LM road marking sector E8 total area 3.352 m2, between sewer lines G14/105/9/3N to G14/105/9/1, 0.617 m2 line # 6 G14/107A/4/1 to G14/107A/4, 2.735 m2 line # 11 New UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from 576/1/1 to D26N/8/1N including MH connections replacement UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from 576/1 to 576/1/1 including MH connections replacement UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from D26N/10/N to D26N/9/N including MH connections replacement UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from C16/8/2 to C16/8 including MH connections replacement UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from C16/8/1A including MH connections Casting of cover slab & Adjustable ring for new MH C12/N Blinding and Concreting of Base and shaft for MH C13/4/1/N and C13/4/2/N Casting of cover slab & Adjustable ring for new MH C13/4/1/N and C13/4/2/N installation of cover slab, adjustable ring and DI cover frame (H.D.) for MHs: C13/4/1/N C13/4/2/N Grouting for abounded line (26, 27 and 28) between MH: C3/3/3 to C3/3/2, 150 VC 14.77 LM C3/3/3 to C3/3/1, 150 VC 28.43 LM C3/3/2N to C3/3, 150 VC 29.57 LM C3/7N to C3/3, 150 VC 10.39 LM C3/3 to C3/2, 150 VC 48.74 LM C3A/2N to C3/2, 150 VC 10.39 LM C3A/1N to C3/1, 150 VC 9.00 LM C3/1 to C3A/3, 150 VC 26.87 LM C3A/3 to C3A, 150 VC 23.25 LM removal and reinstatement of curb stone and interlock tiles for sewer line D26N/8/2N to D26N/8/3N: Curb stone, 11 LM Interlock tiles, 11 LM Hydrostatic and deflection test for sewer line 576/1/1 to D26N/8/1N 160mm, UPVC Hydrostatic and deflection test for sewer line 576/1/1 to 5761/1 160mm, UPVC initial inspection prior to hand over for sewer line 576/1/1 to 5761/1 160mm, UPVC initial inspection prior to hand over for sewer line 576/1/1 to D26N/8/1N 160mm, UPVC initial inspection prior to hand over for sewer line D25 to D26N/8/5N 315mm, UPVC Description Rec'd Date 30-Jan-13 Status

MACE
Remarks Approved Approved

4474

19-Jan-13

Reinstatement

E15

29-Jan-13

Approved

CLAIMED/P27

4475

19-Jan-13

Reinstatement

E15

29-Jan-13

Approved

Approved

4476

19-Jan-13

Reinstatement

E15

29-Jan-13

Approved

Approved

4477

19-Jan-13

Reinstatement

E15

21-Jan-13

Approved

Approved

4478 4479 4480 4481 4482 4483 4484 4485 4486 4487

19-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13

Reinstatement Excavation Excavation Excavation Excavation Excavation Concreting concreting Concreting Installation

E8 E19 E19 E19 E15 E15 E13 E13 E13 E13

26-Jan-13 22-Jan-13 22-Jan-13 11-Mar-13 21-Jan-13 21-Jan-13 22-Jan-13 17-Feb-13 17-Feb-13

Approved Approved Approved Approved Approved Approved Approved CHECK Approved Approved

Approved Approved Approved Approved Approved Approved Approved waiting Consultant approval Approved Approved

4488

20-Jan-13

Grouting

E14

22-Jan-13

Approved

Approved

4489 4490 4491 4492 4493 4494

20-Jan-13 Removal & Reinstatment 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over

E19 E19 E19 E19 E19 E19

12-Feb-13 22-Jan-13 22-Jan-13 21-Jan-13 21-Jan-13 21-Jan-13

Approved Approved Approved Approved Approved Approved

Approved Approved Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4495 Sub. Date 20-Jan-13 Activity NDM Location ( Sector No ) E14 LINE No. Description excavation up to formation for NDM receiving pit between sewer line C14A/7/1N to C14A/6A (4.42 X 1.72 X 4.135 m) For sewer line H7/31 to H7/30 reinstatement of: Asphalt, 27.10 LM Curb stone, 12.67 LM Interlock tiles, 5.60 LM For OPS and trail pit of sewer line H8/6 to H8/4 reinstatement of: Asphalt, 10.00 LM For sewer line C19/11 to C19/10A reinstatement of: Asphalt, 12.50 LM demolishing and removal of existing MH D26N/10/N road markings for sector W7/01 line # 12 total area of 20.31 m2 road markings for sector W06 line # 3 and 8 total area of 22.44 m2 initial inspection prior to hand over for sewer line C21/20 to C21/19 225mm, UPVC initial inspection prior to hand over for sewer line C21/21 to C21/20 225mm, UPVC initial inspection prior to hand over for sewer line C21/19/2 to C21/19/1 160mm, UPVC initial inspection prior to hand over for sewer line C21/19 to C21/19/1 160mm, UPVC initial inspection prior to hand over for sewer line C21/18 to C21/17 225mm, UPVC Rehabilitation work at existing MH C11/5/1A: 1. Demolishing and removal of existing cover slab (65 cm) 2. Casting of cover slab and adjustable ring 3. Installation of cover slab, adjustable ring and DI cover frame ( 750 mm, H.D.) with sealing plate 4. Removal of GRP ladder and closing of holes by lamination (1.0 LM ) 5. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (8 nos) 6. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C24/30/1: 1. Cleaning and recoating of DI cover frame 750 x 600 H.D 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (4 nos) Rehabilitation work at existing MH C16/1: 1. Demolishing and removal of existing shaft and cover slab (2.30 m, internal dia 1.0 m) 2. Casting of shaft (1.70 m), cover slab and adjustable ring ( 1.5m internal dia) 3. Installation of shaft, cover slab, adjustable ring and DI cover frame ( 750 mm, H.D.) with sealing plate 4. Repairing of damaged benching 5. Removal and renew of defective GRP joint in MH shaft (1 nos) 6. Removal of GRP ladder and closing of holes by lamination (3.5 LM) Rehabilitation work at existing MH C16/9: 1. Removal of GRP ladder and closing of holes by lamination (2.5 LM) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (12 nos) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 4. Cleaning and recoating of DI cover frame 600 x 600 supporting of obstructions between sewer line C19/2N to C19/3N supporting of obstructions between sewer line C19/27 to C19/14 supporting of obstructions between sewer line C19/14 to C19/2N supporting of obstructions between sewer line H7/28 to H7/5 construction of Backdrop at existing MH C21/7 asphalt reinstatement for sewer line: 571/N to 571/1A/N, 91.36 LM 571/1A/N to D26N/10/1, 4.80 LM 571/1A/N to D25/5B/N , 53.24 LM D25/5B/N to D26N/9/N, 31.2 LM replacement UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from 125/2/1 to 125/2 including MH connections New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from E128/5N to E128/4N including MH connections Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C21A/24 to C21A/23 including MH connections Rec'd Date 3-Feb-13 Status

MACE
Remarks Approved Approved 28-Jan-13 Approved Approved

4496

20-Jan-13

Reinstatement

W7/01

4497 4498 4499 4500 4501 4502 4503 4504 4505 4506

20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 20-Jan-13 21-Jan-13 21-Jan-13 21-Jan-13 21-Jan-13

Reinstatement Reinstatement removal Road Marking Road Marking Handing Over Handing Over Handing Over Handing Over Handing Over

W7/01 E16 E19 W7/01 W06 E14 E16/01 E16/01 E16/01 E16/01

21-Jan-13

Approved Cancelled

Approved Repeated Approved Approved Approved Approved Approved Approved Approved Approved

22-Jan-13 21-Jan-13 21-Jan-13 22-Jan-13 22-Jan-13 22-Jan-13 22-Jan-13 22-Jan-13

Approved Approved Approved Approved Approved Approved Approved Approved

4507

21-Jan-13

Rehabilitation

E13

31-Jan-13

Approved

Approved

4508

21-Jan-13

Rehabilitation

E16/02

26-Jan-13

Approved

Approved

4509

21-Jan-13

Rehabilitation

E15

CHECK

Resubmitted

4510

21-Jan-13

Rehabilitation

E15

29-Jan-13

Approved

Approved

4511 4512 4513 4514

21-Jan-13 21-Jan-13 21-Jan-13 22-Jan-13

supporting supporting supporting Backdrop

E16 E16 W7/01 E16/01

22-Jan-13 22-Jan-13 22-Jan-13 3-Feb-13

Approved Approved Approved Approved

Approved Approved Approved Approved

4515

23-Jan-13

Reinstatement

E19

10-Feb-13

Approved

P26-CLAIMED

4516 4517 4518

24-Jan-13 24-Jan-13 24-Jan-13

Excavation Excavation Excavation

E10 E10 E16/01

26-Jan-13 26-Jan-13 27-Jan-13

Approved Approved Approved

Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4519 4520 4521 4522 4523 4524 4525 4526 4527 4528 4529 4530 4531 4532 4533 4534 4535 4536 4537 4538 4539 4540 4541 Sub. Date 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 24-Jan-13 Activity Excavation Excavation removal Hydrostatic & Deflection Test Handing Over removal concreting Concreting concreting Installation Handing Over Handing Over Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Removal removal Removal removal removal removal removal Reinstatement Location ( Sector No ) E16/01 E13 E13 E13 E13 E13 E13 E13 E13 E13 E10 E16/01 E16/01 E16/01 E10 E16/01 E19 E16/01 E10 E15 E15 E15 E15 LINE No. Description Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 160mm Dia from C21/2/1A to C21/2/1 including MH connections Replacement UPVC / Excavation up to formation & pipe laying C.B.S for 280mm Dia from C7/3 to C7/2/N including MH connections for sewer line C7/3 to C7/2/N, removal of: Asphalt, 46.810 LM Hydrostatic and deflection test for sewer line C7/3 to C7/2/N, 280mm UPVC Initial inspection prior to hand over for sewer line C7/3 to C7/2/N, 280mm UPVC demolishing and removal of existing MH C7/2/N Blinding and Concreting of Base and shaft for MH C7/2/N Casting of cover slab & Adjustable ring for new MH C7/2/N Concreting of second shaft for MH C7/2/N installation of cover slab, adjustable ring and DI cover frame (H.D., 750mm) with sealing plate initial inspection prior to hand over for sewer line 125/2 to E128/5/2N, 160mm UPVC initial inspection prior to hand over for sewer line 125/2/1 to 125/2, 160mm UPVC initial inspection prior to hand over for sewer line E128/5/2N to E128/3/1A/N, 225mm UPVC initial inspection prior to hand over for sewer line 125/2/4N to 125/2, 160mm UPVC initial inspection prior to hand over for sewer line C21/19 to C21/18, 225 UPVC hydrostatic and deflection test for sewer line C21A/24 to C21A/23, 225 UPVC hydrostatic and deflection test for sewer line C21/2/1A to C21/2/1, 160mm UPVC hydrostatic and deflection test for sewer line 125/2/1 to 125/2, 160mm UPVC demolishing of concrete obstruction between sewer line C21/3 to C21/4, 14.0 x 2.50 x 1.75 m sewer line D22/22/1N to D22/2N, removal of asphalt 15 LM for sewer line C21/2/1A to C21/2/1, Removal: Interlock tiles, 15 LM Curb stone, 15 LM for sewer line 125/2 to 125/2/1, removal: Asphalt, 10.0 LM for sewer line C16/8/1A to C16/8 removal: Interlock tile, 10.0 LM for sewer line C16/8 to C16/7 removal: Interlock tile, 18.0 LM Asphalt, 18 LM for sewer line C16/9 to C16/8 removal: Interlock tile, 5.0 LM for sewer line C15/1 to C15/1A, reinstatement of: Interlock tile, 14.0 LM for sewer line C21/6 to C21/5, reinstatement of: Interlock tile, 43.64 LM Asphalt, 43.64 LM Curb stone, 43.64 LM New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from E128/1N to E128/N including MH connection reinstatement of asphalt between sewer line: H7/18 to H7/19, 5.480 LM H7/19 to H7/19/1, 9.25 LM Hydrostatic and deflection test for sewer line E128/1N to E128/N, 315mm UPVC Hydrostatic and deflection test for sewer line C24/27/7 to C24/27/2, 160mm UPVC initial inspection prior to hand over for sewer line C21/2/1A to C21/2/1, 160mm UPVC initial inspection prior to hand over for sewer line C21A/24 to C21A/23, 225mm UPVC initial inspection prior to hand over for sewer line C24/27/7 to C24/27/2, 160mm UPVC for sewer line C21/4 to C21/3, Removal of concrete obstruction (7.0 X 2.60 X 0.65 m) for sewer line C24/29/5 to C24/29/1, reinstatement of asphalt 13.0 LM for sewer line C24/29/4 to C24/29/2, reinstatement of asphalt 13.2 LM Rec'd Date 26-Jan-13 4-Feb-13 30-Jan-13 23-Feb-13 25-Feb-13 30-Jan-13 9-Feb-13 6-Feb-13 9-Feb-13 23-Feb-13 26-Jan-13 26-Jan-13 23-Apr-13 27-Jan-13 26-Jan-13 28-Jan-13 31-Jan-13 27-Jan-13 26-Jan-13 29-Jan-13 29-Jan-13 29-Jan-13 29-Jan-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved P26-CLAIMED P26-CLAIMED Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4542

24-Jan-13

Reinstatement

E16/01

10-Feb-13

Approved

Approved

4573 4574 4575 4576 4577 4578 4579 4580 4581 4582

2-Feb-13 2-Feb-13 2-Feb-13 2-Feb-13 2-Feb-13 2-Feb-13 19-Jun-13 2-Feb-13 2-Feb-13 2-Feb-13

Excavation Reinstatement Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Removal Reinstatement Reinstatement

E10 W7/01 E10 E16/02 E16/01 E16/01 E16/02 E16/01 E16/02 E16/02

10-Feb-13 12-Feb-13 10-Feb-13 4-Feb-13 4-Feb-13 23-Apr-13 8-Jul-13 4-Feb-13 19-Mar-13 19-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4583 4584 4585 4586 4587 4588 4589 4590 4591 4592 4593 4594 4595 Sub. Date 2-Feb-13 2-Feb-13 2-Feb-13 2-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 Activity Reinstatement Reinstatement Reinstatement supporting NDM Handing Over Excavation Excavation Excavation Excavation Excavation Excavation Backdrop Location ( Sector No ) E16/02 E16/02 E16/02 W7/01 E14 E16/01 E10 E15 E15 E15 E16 E16 E15 LINE No. Description for sewer line C24/29/1 to C24/29, reinstatement of asphalt 5.00 LM for sewer line C24/30/4 to C24/30/3, reinstatement of asphalt 26.20 LM for sewer line C24/30/2 to C24/30/3, reinstatement of asphalt 23.60 LM supporting of existing utilities ( Etisalat duct & storm water duct) between sewer line H7/28 to H7/5 Construction of NDM of OD 450 (DN 400), 19.20 LM, including Testing, grouting and removal of equipment initial inspection prior to hand over for sewer line C21A/24/1 to C21A/24, 225mm UPVC New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from E128/7/1/1A/N to E128/7N including MH connection Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 450mm Dia from C17/8 to C17/2/1 including MH connection Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from C16/8/2 to C16/8 including MH connection Replacement UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia from C16/8/1A to C16/8 including MH connection Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/15 including MH connection Replacement UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/20/1N to C19/20N including MH connection construction of two backdrops for M C16/8 coming from MH: C16/8/2 C16/8/1A for sewer line C19/11 to C19/10A, reinstatement of: Interlock tiles, 28.65 LM Curb stone, 15.0 LM for sewer line 123/6N to C14/120N/5, reinstatement of: Curb stone, 22.50 LM Interlock tiles, 13.8 LM hydrostatic and deflection test for sewer line E128/7/1/1A/N to E128/7N, 280mm UPVC Initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128/7N, 280mm UPVC Rehabilitation work at existing MH D25: 1. Remove, Cleaning and recoating of DI cover frame (900 Dia, L.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) Rehabilitation work at existing MH C21A/24/1: 1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.) 2. Removal of defective GRP sealing plate and replacing by new ( 750 x 600 mm) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) Rehabilitation work at existing MH C21A/24: 1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.) 2. Removal of defective GRP sealing plate and replacing by new ( 750 x 600 mm) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) 5. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (2 nos) Rehabilitation work at existing MH C14A/104: 1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia) ) 2. Casting of new cover slab and adjustable ring ( 750mm ) and installing 3. Installation of new DI cover frame ( 750mm, L.D. ) with sealing plate 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (20 nos) 5. Removal and renew of defective GRP joint in MH shaft (2 nos) 6. Removal of ladder and closing of holes by lamination (2.5 LM ) Rec'd Date 25-Mar-13 9-Feb-13 19-Mar-13 4-Feb-13 2-Feb-13 4-Feb-13 17-Feb-13 9-Feb-13 6-Feb-13 6-Feb-13 6-Feb-13 6-Feb-13 6-Feb-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4596

4-Feb-13

Reinstatement

E16

12-Feb-13

Approved

Approved

4597 4598 4599

4-Feb-13 4-Feb-13 4-Feb-13

Reinstatement Hydrostatic & Deflection Test Handing Over

E10 E10 E10

6-Mar-13 6-Mar-13

Approved Approved cancelled

Approved Approved Repeated RFI # 4856

4600

4-Feb-13

Rehabilitation

E19

6-Feb-13

Approved

Approved

4601

4-Feb-13

Rehabilitation

E16/01

20-Feb-13

Approved

Approved

4602

4-Feb-13

Rehabilitation

E16/01

19-Feb-13

Approved

Approved

4603

4-Feb-13

Rehabilitation

E14

6-Feb-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C21A/23: 1. Remove, Cleaning and recoating of DI cover frame (600 x 600, L.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (6 nos) 4. Removal of defective GRP sealing plate and replacing by new ( 600 x 600 mm) Rec'd Date Status

MACE
Remarks 19-Feb-13 Approved Approved

4604

4-Feb-13

Rehabilitation

E16/01

4605 4606 4607 4608 4609 4610 4611 4612 4613 4614 4615 4616

4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 4-Feb-13 5-Feb-13 5-Feb-13 5-Feb-13 5-Feb-13 5-Feb-13 5-Feb-13

Trial Pit concreting concreting concreting concreting Over pumping Excavation removal Hydrostatic & Deflection Test Handing Over Excavation Reinstatement

E10 E15 E10 E19 E19 E12 E14 E14 E14 E14 E15 E15

trail pit for sector E10 ( 2) Blinding and Concreting of Base and shaft for MH C17/2/1 Blinding and Concreting of Base and shaft for MH E128/7/1/1A/N Blinding and Concreting of Base and shaft for MH D26N/10/N Blinding and Concreting of Base and shaft for MH D26N/9/N sewer over pumping system for sector E12 line # 10 Rep.-NDM-New UPVC / Excavation up to formation & pipe laying G.B.S for 450mm Dia from C14A/7/1N to C14A/6A including MH connection for sewer line C14a/7/1N to C14A/6A, removal of: Asphalt,37.20 LM Interlock tiles, 3.00 LM hydrostatic and deflection test for sewer line C14A/7/1N to C14A/6A, 450mm UPVC initial inspection prior to hand over for sewer line C14A/7/1N to C14A/6A, 450mm UPVC Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm Dia from C16/7 to C16/8 reinstatement of asphalt for sewer line: Between MH C16/1 to C16/A, 40.9 LM Between MH C16/6A to C16/6, 33.50 LM reinstatement of asphalt for sewer line: Between MH C16/5 to C16/5A, 33.30 LM Between MH C16/5A to C16/2, 33.950 LM Sector W7/01 line # 6 existing site condition grouting for Abounded line: Between MH C3A/N to C3B, 300mm dia, 29.48 LM Between MH C3B/1 to C3B, 150mm dia, 6.64 LM Between MH C3B to Ex. MH, 350mm dia, 35.930 LM Between MH C4/1A to Ex MH, 150mm dia, 5.79 LM Between MH Ex MH to C5N, 350 mm dia, 29.05 LM Between MH C5N to C5, 350mm dia, 24.40 LM Between MH C4 to Ex MH, 150mm dia, 12.79 LM Sector E10 line # 5 existing site condition removal of light pole near MH E128/7/1/1A/N Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/15 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/2N including MH connections UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20N/1N to C19/20N New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20N/1N to C19/20N Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 315mm Dia from C21/4 to C21/3 including MH connections Concreting shaft for MH D26N/10/N removal asphalt for sewer line: H7/20 to H7/21, 23.50 LM H7/21 to H7/22, 27.0 LM for sewer line C19/5 to C19/14, Removal of asphalt 32.30 LM

10-Feb-13 6-Feb-13 10-Feb-13 9-Feb-13 15-Apr-13 10-Feb-13 10-Feb-13 10-Feb-13 12-Feb-13 12-Feb-13 10-Feb-13 12-Feb-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved P26-CLAIMED Approved Approved Approved Approved Approved Approved Approved

4617 4618

5-Feb-13 6-Feb-13

Excavation site condition

E15 W7/01

12-Feb-13 10-Feb-13

Approved Approved

Approved Approved

4619

6-Feb-13

Grouting

E14

10-Feb-13

Approved

Approved

4620 4621 4622 4623 4624 4625 4626 4627 4628 4629

6-Feb-13 6-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13 7-Feb-13

site condition removal Excavation Excavation Excavation Excavation Excavation concreting removal Removal

E10 E10 E16 E16 E16 E16 E16/01 E19 W7/01 E16

17-Feb-13 17-Feb-13 10-Feb-13 10-Feb-13 10-Feb-13

Approved Approved Approved Approved Approved CHECK

Approved Approved Approved Approved Approved waiting Consultant approval Approved Approved Approved Approved

10-Feb-13 10-Feb-13 10-Feb-13 11-Feb-13

Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. for sewer line, reinstatement of: C14A/8/1 to C14A/8/2, interlock tiles 5.69 LM C14A/8/1/1 to C14A/8/2, interlock tiles 9.84 LM C14A/9/1 to C14A/9/1/N, interlock tiles 8.33 LM C14/26 to C14/26N, Curbstone 8.00 LM C14A/7/2 to C14A/7/1, interlock tiles 25.87 LM for sewer line C14A/7/1 to C14A/7 reinstatement of: Interlock tiles, 7.00 LM Curbstone, 3.00 LM for sewer line C14/8A to C14A/8/1/1 reinstatement of: Interlock tiles, 7.70 LM Curbstone, 21.00 LM for sewer line C14A/9/1/N to C14A/8/1/1 reinstatement of: Interlock tiles, 41.27 LM Curbstone, 17.00 LM for sewer line C14/A9 to C14A/9/1/N reinstatement of: Interlock tiles, 4.360 LM Curbstone, 6.00 LM for sewer line C14/10/2N to C14/A9 reinstatement of: Interlock tiles, 5.00 LM Curbstone, 8.00 LM for sewer line C14/26N to C14/A9 reinstatement of: Interlock tiles, 13.00 LM Curbstone, 10.00 LM for sewer line C14/10/2 to C14/10/2N reinstatement of: Interlock tiles, 11.00 LM Curbstone, 5.00 LM for sewer line C19/3N to C19/2N reinstatement of: Curbstone, 6.40 LM for sewer line C19/10 to C19/3Nreinstatement of: Curbstone, 20.20 LM Interlock tiles, 6.00 LM Backdrop construction on existing MH C21A/22/3/4 coming from C21A/23 Backdrop construction on New MH E128/4N coming from E128 demolishing and removal of existing MH ICA176/A/1 : Rehabilitation work at existing MH C7/3: 1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia ) 2. Casting of new cover slab ( 750mm ) and installing 3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate 4. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination. 5. Removal of ladder and closing of holes by lamination (2.5 LM ) Rehabilitation work at existing MH C5A/1: 1. Demolishing of existing DI cover frame (600 x 600, L.D.) 2. Installation of new DI cover frame ( 600 x 600, L.D. ) with se ate 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) Rehabilitation work at existing MH Ex. CH: 1. Demolishing of existing DI cover frame (600 x 600, L.D.) 2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate Rehabilitation work at existing MH Ex. CH: 1. Demolishing of existing DI cover frame (600 x 600, L.D.) 2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20/1N to C19/20N Description Rec'd Date Status

MACE
Remarks 13-Feb-13 Approved Approved

4630

7-Feb-13

Reinstatement

E14

4631

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4632

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4633

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4634

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4635

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4636

7-Feb-13

Reinstatement

E14

12-Feb-13

Approved

Approved

4637

7-Feb-13

Reinstatement

E14

13-Feb-13

Approved

Approved

4638

7-Feb-13

Reinstatement

E14

23-Feb-13

Approved

Approved

4639 4640 4641 4642 4643

7-Feb-13 7-Feb-13 10-Feb-13 10-Feb-13 10-Feb-13

Reinstatement Reinstatement Backdrop Backdrop removal

E16 E16 E16/01 E10 E10

13-Mar-13

Approved cancelled Approved Approved Approved

Approved Superseeded Approved Approved Approved

10-Feb-13 17-Feb-13 10-Feb-13

4644

10-Feb-13

Rehabilitation

E13

13-Feb-13

Approved

Approved

4645

10-Feb-13

Rehabilitation

E14

13-Feb-13

Approved

Approved

4646

10-Feb-13

Rehabilitation

E14

13-Feb-13

Approved

Approved

4647 4648

10-Feb-13 11-Feb-13

Rehabilitation Excavation

E14 E16

13-Feb-13 11-Feb-13

Approved Approved

Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4649 4650 4651 4652 4653 4654 4655 4656 4657 4658 Sub. Date 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 11-Feb-13 Activity Excavation Excavation Excavation Excavation removal Hydrostatic & Deflection Test Handing Over removal removal removal Location ( Sector No ) E16 E16/01 E19 E14 E14 E14 E14 E12 E14 W7/01 LINE No. Description Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/15 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C21A/23 to C21A/22/3/4 including MH connections Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from IC247/4/11 to D26N/10/N including MH connections Rep. GRP / Excavation up to formation & pipe laying C.B.S for 150mm Dia from C5A to C5N/2 including MH connections for sewer line C5A to C5N/2, removal of: Asphalt, 13.80 LM Hydrostatic and deflection test for sewer line C5A to C5N/2, 150 GRP initial inspection prior to hand over for sewer line C5A to C5N/2, 150 GRP for sewer line C9/5 to C32B/47, removal of: Asphalt, 59.950 LM Interlock tiles, 23.00 LM Curb stone, 20.70 LM demolishing and removal of existing MH C5 between sewer line C5A to C5N/2 for sewer line H7/28 to H7/5, removal of: Asphalt, 49.51 LM Curbstone, 25.60 LM Interlock tiles, 30.60 LM for sewer line H7/3 to H7/2, removal of: Asphalt, 50.00 LM for sewer line 124/1B/N to E128/7/1/1A/N, removal of: Asphalt, 7.50 LM Interlock tiles, 60.5 LM for sewer MH D26N/8/3N, reinstatement of: Curbstone, 25.50 LM Interlock tiles, 21.00 LM for sewer MH D26N/8/2N, reinstatement of: Curbstone, 23.0LM Interlock tiles, 22.00 LM Hydrostatic and deflection test for sewer line C21/4 to C21/3, 3115mm UPVC initial inspection prior to hand over for sewer line C21/4 to C21/3, 3115mm UPVC Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from H7/28 to H7/5 including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from H7/3 to H7/2 including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7/1 to C16/7 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/8 to C16/7 Backdrop construction for existing MH C16/7 coming from MH C16/7/1 Future Backdrop construction for New MH E128/7/1/1A/N for sewer line C16/7 to C16/1A, removal of asphalt 26.00 LM for sewer line C16/5A to C16/2, reinstatement of: Interlock tiles, 7.20 LM for sewer line C16/6A to C16/1, reinstatement of: Interlock tiles, 7.50 LM Hydrostatic and deflection test for sewer line C21A/23 to C21A/22/3/4, 225mm UPVC initial inspection prior to hand over for sewer line C21A/23 to C21A/22/3/4, 225mm UPVC Blinding and Concreting of base and shaft for MH C13/1/2/N Blinding and Concreting of second shaft for MH C13/1/2/N Casting of cover slab & Adjustable ring for new MH C13/1/2/N installation of cover slab, adjustable ring Blinding and Concreting of base and shaft for MH C19/20/1N Concreting of shaft for MH C19/20/1N Casting of cover slab & Adjustable ring for new MH C19/20/1N Rec'd Date 11-Feb-13 11-Feb-13 12-Feb-13 13-Feb-13 13-Feb-13 23-Feb-13 23-Feb-13 23-Feb-13 13-Feb-13 12-Feb-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4659 4660

11-Feb-13 11-Feb-13

removal removal

W7/01 E10

12-Feb-13 6-Mar-13

Approved Approved

Approved Approved

4661

11-Feb-13

Reinstatement

E19

12-Feb-13

Approved

Approved

4662 4663 4664 4665 4666 4667 4668 4669 4670 4671 4672 4673 4674 4675 4676 4677 4678 4679 4680 4681 4682

11-Feb-13 11-Feb-13 11-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13

Reinstatement Hydrostatic & Deflection Test Handing Over Excavation Excavation Excavation Excavation Backdrop Backdrop removal Reinstatement Reinstatement Hydrostatic & Deflection Test Handing Over concreting concreting Concreting Installation concreting concreting Concreting

E19 E16/01 E16/01 W7/01 W7/01 E15 E15 E15 E10 E15 E15 E15 E16/01 E16/01 E13 E13 E13 E13 E16 E16 E16

12-Feb-13 13-Feb-13 8-Jun-13 6-Mar-13 23-Mar-13 12-Feb-13 12-Feb-13 12-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 18-Feb-13 23-Apr-13 23-Feb-13 23-Feb-13 25-Feb-13 11-Mar-13 12-Feb-13 12-Feb-13 12-Feb-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved CLAIMED/P27 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved P26-CLAIMED Approved Approved P26-CLAIMED Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4683 4684 4685 4686 4687 4688 Sub. Date 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 Activity Installation concreting Concreting Installation concreting concreting Location ( Sector No ) E16 E15 E15 E15 E10 E16 LINE No. Description installation of cover slab, adjustable ring and DI cover frame (750mm, H.D.) for MH C19/20/1N Concreting of second shaft for MH C17/2/1 Casting of cover slab & Adjustable ring for new MH C17/2/1 installation of cover slab, adjustable ring and DI cover frame (750mm, H.D.) for MH C17/2/1 Concreting of second shaft for MH E128/7/1/1A/N construction of backdrop for new MH C19/20/1N Rehabilitation work at existing MH H7/3: 1. Demolishing of existing cover slab ( 750mm, 1.5 internal dia ) 2. Casting of new cover slab ( 750mm ) and installing 3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate 4. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (I.D=1.5m, C.L=101.996, I.L=94.960) 5. Removal of ladder and closing of holes by lamination (6.5 LM ) 6. Sealing leaks in MH (18 Nos) Rehabilitation work at existing MH C21/2: 1. Removal, cleaning and recoating for DI cover frame (600 x 600, H.D.) 2. Supplying new GRP sealing plate (600 x 600) 3. Removal of Grab bar and closing of holes by lamination (0.8 LM ) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 5. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) Rehabilitation work at existing MH C19/3/1: 1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying new 2. Supplying new GRP sealing plate (600 Dia) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C19/2/1: 1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying new 2. Supplying new GRP sealing plate (600 Dia) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 5. Removal and renew of defective GRP joint in MH shaft (1 nos) 6. Repairing and relining of benching. 7. Removal of ladder and closing of holes by lamination (1.0 LM ) Rec'd Date 12-Feb-13 12-Feb-13 12-Feb-13 12-Feb-13 17-Feb-13 12-Feb-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4689

13-Feb-13

Rehabilitation

W7/01

16-Feb-13

Approved

Approved

4690

13-Feb-13

Rehabilitation

E16/01

CHECK

internal backdrop not done

4691

13-Feb-13

Rehabilitation

E16

5-Jun-13

Approved

Approved

4692

13-Feb-13

Rehabilitation

E16

6-Apr-13

Approved

Approved

4693

13-Feb-13

Rehabilitation

E15

Rehabilitation work at existing MH C16/2: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 3. Removals of defective lining inside MH full lower shaft, repairing of damaged concrete and renew GRP liner by full lamination (I.D=1.5m, C.L=99.847, I.L=97.607). 4. Removal of ladder and closing of holes by lamination (4.10 LM ) Rehabilitation work at existing MH C16/7: 1. Demolishing of existing shaft (1.80 LM) and cover slab ( 0.7 LM,750mm, 1.5 internal dia ) 2. Casting of new shaft, cover slab, and adjustable ring and installing 3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate 4. Removal of ladder and closing of holes by lamination (3.0 LM ) 5. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (I.D=1.5m, C.L=99.619, I.L=97.700) Rehabilitation work at existing MH C16/8: 1. Demolishing of existing shaft (1.60 LM) and cover slab ( 0.4 LM,750mm, 1.5 internal dia ) 2. Casting of new shaft, cover slab, and adjustable ring and installing 3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate 4. Removal of ladder and closing of holes by lamination (2.70 LM ) 5. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (I.D=1.5m, C.L=99.869, I.L=98.129)

cancelled

cancelled

4694

13-Feb-13

Rehabilitation

E15

23-Feb-13

Approved

Approved

4695

13-Feb-13

Rehabilitation

E15

17-Feb-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C14/10: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D) 2. Removal of ladder and closing of holes by lamination (2.50 LM) 3. Removal and renew of defective GRP joint in MH shaft (2 nos) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1nos) 5. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (27 nos) 6. Repairing and relining of benching Rec'd Date Status

MACE
Remarks

4696

13-Feb-13

Rehabilitation

E14

25-Feb-13

Approved

Approved

4697

13-Feb-13

Rehabilitation

E13

Rehabilitation work at existing MH C7/8: 1. Removal of ladder and closing of holes by lamination (1.50 LM) 2. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (7 nos 3. Repairing and relining of benching

25-Feb-13

Approved

Approved

4698

13-Feb-13

Rehabilitation

W7/01

Rehabilitation work at existing MH H7/5/1: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D) 2. Replacing defective GRP by new one (600 x 600) 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (8 nos) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 5. Sealing the leaks in MH

cancelled

MH to be replaced

4699

13-Feb-13

Rehabilitation

E16/01

Rehabilitation work at existing MH C24/30: 1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D) 2. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (5 nos) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) construction of backdrop for existing MH C21A/24 coming from C21A/24/1A New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from E128/4N to E128/4/1A/N including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 315mm Dia from C19/14 to C19/15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from D22/21N/A to D22/21N including MH connections Hydrostatic and deflection test for sewer line D22/21N/A to D22/21N, 315mm UPVC Hydrostatic and deflection test for sewer line E128/5N to E128/4N, 315mm UPVC Hydrostatic and deflection test for sewer line E128/4/1A/N to E128/4N, 315mm UPVC initial inspection prior to hand over for sewer line E128/5N to E128/4N, 315mm UPVC for sewer line E128/2N to E128/3N, removal and reinstatement of: Curb stone, 28.50 LM Interlock tiles, 15.00 LM for sewer line D22/16N to D22/17N, reinstatement of: Curb stone, 20.25 LM Interlock tiles, 21.00 LM for sewer line C17/1/N to C17/2A/1N removal of: Asphalt, 31.90 LM Interlock tiles, 50.40 LM Excavation condition between sewer line H7/20 to H7/21 to H7/22 line # 6 Supporting of Etisalat chamber and cables near MH H7/5 line # 3 existing utilities between sewer line E128/7/1/1A/N to E124/1B/N trial pits for sector E12 (1, 1A, 1B & 4) New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20/1N to C19/20N

19-Feb-13

Approved

Approved

4700 4701 4702 4704 4705 4706 4707 4708 4709

13-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13

Backdrop Excavation Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over

E16/01 E10 E16 E19 E19 E10 E10 E10 E10

18-Feb-13 17-Feb-13 17-Feb-13 23-Feb-13 17-Feb-13 6-Mar-13 6-Mar-13 7-Mar-13 25-Feb-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved

16-Feb-13 Removal & Reinstatment

4710

16-Feb-13

Reinstatement

E19

2-Mar-13

Approved

CLAIMED/P27

4711 4712 4713 4714 4715

16-Feb-13 16-Feb-13 16-Feb-13 16-Feb-13 17-Feb-13

removal site condition site condition Trial Pit Excavation

E15 W7/01 E10 E12 E16

23-Feb-13 17-Feb-13 6-Mar-13 25-Feb-13 17-Feb-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4716 4717 4718 4719 4720 4721 4722 4723 4724 4725 4726 4727 4728 4729 4730 4731 4732 4733 4734 4735 4736 4737 4738 4739 4740 4741 4742 4743 4744 4745 4746 Sub. Date 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 17-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 Activity Excavation Excavation concreting concreting Concreting Installation removal removal Excavation Excavation removal Hydrostatic & Deflection Test Handing Over removal Backdrop Backdrop Backdrop Excavation Excavation Excavation Excavation Excavation Excavation removal Hydrostatic & Deflection Test Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Excavation Location ( Sector No ) E16 W7/01 E10 E19 E19 E19 E19 E15 E12 E13 E13 E13 E13 E13 E13 E13 E13 E16 E16 E19 E15 E15 E13 E13 E13 E13 E13 E13 E13 E13 E14 LINE No. Description Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from H7/20 to H7/21 including MH connections Blinding and Concreting of Base and shaft for MH E128/4/1A/N Blinding and Concreting of Base and shaft for MH D22/22N/1 Casting of cover slab & Adjustable ring for MH D26N/10/N installation of cover slab, adjustable ring and DI cover frame (600 Dia, D400) with sealing plate demolishing and removal of existing MH D26N/9/N demolishing and removal of existing MH C17/2 Rep. GRP / Excavation up to formation & pipe laying G.B.S for 250mm Dia from C9/5 to C32B/47 including MH connections Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from C6B/1 to C6B including MH connections for sewer line C6B/1 to C6B, removal of asphalt 5.430 LM Hydrostatic and deflection test for sewer line C6B/1 to C6B, 160mm UPVC initial inspection prior to hand over for sewer line C6B/1 to C6B, 160mm UPVC for sewer line C13/N to C14/1/N, removal of interlock tiles 50.89 LM construction of backdrop for New MH C13/4/2/N coming from C13/1A/1 (160mm UPVC) construction of backdrop for New MH C13/1/2/N coming from C13/4/2/N (225mm UPVC) construction of backdrop for existing MH C6B coming from C6B/1 (160mm UPVC) Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/14 to C19/15 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20/1N to C19/20N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from D22/22N/1N to D22/22N including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7 to C16/1A including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7 to C16/8 including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from C13/1/N to C13/1/2/N including MH connections for sewer line C13/1/N to C13/1/2/N, removal of asphalt 11.06 LM hydrostatic and deflection test for sewer line C13/1/N to C13/1/2/N, 280mm UPVC initial inspection prior to hand over for sewer line C13/1/N to C13/1/2/N, 280mm UPVC New. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia from C13/4/2/N to C13/1/2/N including MH connections for sewer line C13/4/2/N to C13/1/2/N, removal of: Asphalt, 2.50 LM Interlock tiles, 30.510 LM hydrostatic and deflection test for sewer line C13/4/2/N to C13/1/2/N, 225mm UPVC initial inspection prior to hand over for sewer line C13/4/2/N to C13/1/2/N, 225mm UPVC New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from C3A/N to C3A/1 including MH connections for sewer line C3A/N to C3A/1, removal of: Asphalt, 6.94 LM Interlock tiles, 6.00 LM Curbstone, 8.00 LM Hydrostatic and deflection test for sewer line C3A/N to C3A/1, 315mm UPVC initial inspection prior to hand over for sewer line C3A/N to C3A/1, 315mm UPVC hydrostatic and deflection test for sewer line H7/21 to H7/20, 225mm UPVC for sewer line 119/1A to 119/1/1, removal of interlock tiles 27.91 LM construction of future backdrop for MH E128/4/1A/N Blinding and concreting of base and shaft for MH C13/1/N Rec'd Date 17-Feb-13 18-Feb-13 17-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 18-Feb-13 29-Mar-13 25-Feb-13 23-Feb-13 23-Feb-13 25-Feb-13 13-Mar-13 23-Feb-13 25-Feb-13 25-Feb-13 21-Feb-13 21-Feb-13 19-Feb-13 21-Feb-13 21-Feb-13 25-Feb-13 25-Feb-13 4-Mar-13 11-Mar-13 6-Mar-13 25-Feb-13 11-Mar-13 11-Mar-13 25-Feb-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4747

19-Feb-13

removal Hydrostatic & Deflection Test Handing Over Hydrostatic & Deflection Test removal Backdrop concreting

E14

25-Feb-13

Approved

Approved

4748 4749 4750 4751 4752 4753

19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13 19-Feb-13

E14 E14 W7/01 E10 E10 E13

25-Feb-13 25-Feb-13 3-Mar-13 25-Feb-13 25-Feb-13 25-Feb-13

Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4754 4755 4756 4757 4758 4759 4760 4761 4762 4763 4764 4765 4766 4767 4768 4769 4770 Sub. Date 19-Feb-13 19-Feb-13 19-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 Activity concreting Concreting Installation Excavation Excavation Excavation Excavation Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Location ( Sector No ) E13 E13 E13 W7/01 W7/01 E10 E15 E15 E10 W7/01 E15 E15 E10 E15 E15 E15 E15 LINE No. Description Concreting of second shaft for MH C13/1/N Casting of cover slab & Adjustable ring for new MH C13/1/N installation of Adjustable ring, cover slab and DI cover frame ( 750mm, D400) with sealing plate Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from H7/22 to H7/21 including MH connections Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia from H7/22/1 to H7/22 including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from E128/4/1A/N to E128/3N including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm Dia from C17/2/1 to C17/2A/1N including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7 to C16/1A Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from 119/1A to 119/1/1 including MH connections hydrostatic and deflection test for sewer line H7/22 to H7/21, 225mm UPVC hydrostatic and deflection test for sewer line C16/8/1A to C16/8, 160mm UPVC hydrostatic and deflection test for sewer line C16/9 to C16/8, 225mm UPVC hydrostatic and deflection test for sewer line 119/1A to 119/1/1, 160mm UPVC hydrostatic and deflection test for sewer line C16/8/2 to C16/8, 160mm UPVC initial inspection prior to hand over for sewer line C16/8/2 to C16/8, 160mm UPVC initial inspection prior to hand over for sewer line C16/9 to C16/8, 225mm UPVC initial inspection prior to hand over for sewer line C16/8/1A to C16/8, 160mm UPVC reinstatement of asphalt for sewer line: C17/9 to C17/8 line # 12, 2.00 LM C17/14 to C17/15 line # 7, 9.10 LM C17/10 to C17/9 line # 12, 7.00 LM C17/5 to C17/4A line # 12, 27.00 LM C17/8 to C17/2/1 line # 12, 32.00 LM reinstatement of asphalt for sewer line: C15/2 to C15/1, 13.70 LM C15/1 to C15/1A, 21.70 LM C15/1A to C15, 8.10 LM for sewer line C16/9 to C16/8, reinstatement of Interlock tiles 41.50 LM for sewer line D22/20N to D22/21N, reinstatement of Asphalt 21.15 LM for sewer line D22/16N to D22/17N, reinstatement of Asphalt 14.7 LM for sewer line C16/4 to C16/4A, removal of asphalt 37.00 LM for sewer line C21/1 to C21/2, Removal of asphalt 23.00 LM for sewer line C24/30/2 to C24/30/3, reinstatement of: Asphalt, 11.80 LM Curb stone, 11.6 LM Interlock tiles, 4.8 LM for sewer line C24/29/2 to C24/29/3, reinstatement of: Asphalt, 35.3 LM Curb stone, 13.2 LM Interlock tiles, 11.2 LM for sewer line C24/30/1 to C24/30, reinstatement of: Asphalt, 44.5 LM for sewer line C24/30/2 to C24/30/1, reinstatement of: Asphalt, 41.13 LM Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia from C21A/22/3/3 to C21A/22/3/4 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C10/2/N to C10/1/N including MH connections for sewer line C10/2/N to C10/1/N, removal of: Asphalt, 37.670 LM Rec'd Date 4-Mar-13 27-Feb-13 11-Mar-13 27-Feb-13 27-Feb-13 6-Mar-13 27-Feb-13 27-Feb-13 6-Mar-13 3-Mar-13 27-Feb-13 27-Feb-13 6-Mar-13 27-Feb-13 13-Mar-13 27-Feb-13 13-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4771

27-Feb-13

Reinstatement

E15

10-Mar-13

Approved

Approved

4772 4773 4774 4775 4776 4777 4778

27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13 27-Feb-13

Reinstatement Reinstatement Reinstatement Reinstatement removal Removal Reinstatement

E15 E15 E19 E19 E15 E16/01 E16/02

10-Mar-13 2-Apr-13 2-Mar-13 2-Mar-13 5-Mar-13 2-Mar-13 19-Mar-13

Approved Approved Approved Approved Approved Approved Approved

Approved CLAIMED/P27 Approved Approved Approved Approved Approved

4779

27-Feb-13

Reinstatement

E16/02

28-Apr-13

Approved

P26-CLAIMED

4780 4781 4782 4783 4784

27-Feb-13 27-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13

Reinstatement Reinstatement Excavation Excavation removal

E16/02 E16/02 E16/01 E13 E13

18-Mar-13 19-Mar-13 2-Apr-13 6-Mar-13 4-Mar-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4785 4786 4787 Sub. Date 28-Feb-13 28-Feb-13 28-Feb-13 Activity Hydrostatic & Deflection Test Handing Over NDM Location ( Sector No ) E13 E13 E15 LINE No. Description Hydrostatic and deflection test for sewer line C10/2/N to C10/1/N, 225mm UPVC Initial inspection prior to hand over for sewer line C10/2/N to C10/1/N, 225mm UPVC NDM # 9 driving pit fencing total fencing = 60.00 LM for MH C17/2A/1N NDM # 9 receiving pit fencing total fencing = 50.00 LM between MH C17/2A/1N to C17/1N for sewer line C24/29 to C24/29/1, reinstatement of : Asphalt, 10.75 LM Curb stone, 10.60 LM Interlock tiles, 6.30 LM for sewer line C24/29/4 to C24/29/2, reinstatement of : Asphalt, 6.80 LM for sewer line D22/15N to D22/20 N (road crossing), reinstatement of : Asphalt, 26.25 LM for sewer line D26N/10/N to D26N/9/N, reinstatement of : Interlock tiles, 50.00 LM Demolishing of existing abandoned light pole foundation near MH D26N/9/N for sewer line H7/22/2 to H7/ 22/1 to H7/22, removal of asphalt 22.00 LM Demolishing of existing MH C19/20 to be replaced by new Blinding and Concreting of base and shaft for MH E128/3N Concreting of shaft for MH E128/4/1A/N Blinding and Concreting of base and shaft for MH D22/22N/1N Concreting of shaft for MH D22/22N/1N Casting of cover slab & Adjustable ring for new MH D22/22N/1N installation of cover slab, adjustable ring, DI cover frame (D400, 750mm) with sealing plate for MH D22/22N/1N trail pits for sector E12 (7, 7A, 8) New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from E128/3/1A/N to E128/3N including MH connections construction of future backdrop for new MH E128/3N hydrostatic and deflection test for sewer line E128/3/1A/N to E128/3N, 280mm UPVC for sewer line H7/22/3 to H7/22/2, removal of asphalt 30.36 LM Rehabilitation work at existing MH C5/1: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (10 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH D22/21N/C: 1. Removal, cleaning and recoating of DI cover frame (600mm Dia, H.D.) 2. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C3A: 1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D.) 2. Replacing defective GRP sealing plate by new 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (10 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rec'd Date 14-Mar-13 3-Apr-13 3-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved

4788

28-Feb-13

Reinstatement

E16/02

30-Mar-13

Approved

Approved

4789 4790 4791 4792 4793 4794 4795 4796 4797 4798 4799 4800 4801 4802 4803 4804 4805

28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 28-Feb-13 2-Mar-13 2-Mar-13 2-Mar-13 2-Mar-13

Reinstatement Reinstatement Reinstatement removal removal Removal concreting concreting concreting concreting Concreting Installation Trial Pit Excavation Backdrop Hydrostatic & Deflection Test removal

E16/02 E19 E19 E19 W7/01 E16 E10 E10 E19 E19 E19 E19 E12 E10 E10 E10 W7/01

19-Mar-13 4-May-13 23-Apr-13 4-Mar-13 3-Mar-13 3-Mar-13 6-Mar-13 6-Mar-13 3-Mar-13 15-Apr-13 13-Apr-13 4-Mar-13 25-Mar-13 6-Mar-13 6-Mar-13 6-Mar-13 5-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved P26-CLAIMED Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4806

2-Mar-13

Rehabilitation

E14

25-Mar-13

Approved

Approved

4807

2-Mar-13

Rehabilitation

E19

29-Mar-13

Approved

Approved

4808

2-Mar-13

Rehabilitation

E14

25-Mar-13

Approved

Approved

4809

2-Mar-13

Rehabilitation

E16/01

Rehabilitation work at existing MH C21A/22/3/4: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.) 2. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 3. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C21A/22/3/3: 1. Removal, cleaning and recoating of DI cover frame (600 Dia, H.D.) 2. Replacing of Defective GRP sealing plate by new 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos)

6-Mar-13

Approved

Approved

4810

2-Mar-13

Rehabilitation

E16/01

6-Mar-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4811 Sub. Date 2-Mar-13 Activity Rehabilitation Location ( Sector No ) E16/01 LINE No. Description Rehabilitation work at existing MH C21A/22/3/5: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.) Rehabilitation work at existing MH D22/22N: 1. Removal, cleaning and recoating of DI cover frame (750 x 600, L.D.) 2. Replacing of Defective GRP sealing plate by new 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (4 nos) 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (6 nos) Rehabilitation work at existing MH C24/22: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 1 nos) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair (7 nos) 4. Removal and renew of defective GRP joint in MH shaft (2 nos) 5. Repairing of damaged benching Concreting of base and shaft for MH D26N/8/3N installation of cover slab, adjustable ring and DI cover frame (750mm, D400) with sealing plate for MH D26N/8/3N construction of future backdrop for new MH D22/22N/1N Excavation up to formation level for NDM # 9 Driving pit 5.00 x 4.00 x 6.10 m Excavation up to formation level for NDM # 9 Receiving pit 4.00 x 4.00 x 5.562 m removing of Driving and receiving pit as there is no provisional MH on location of pit Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/4 to C16/4A including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7 to C16/1A New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/15 to C19/14 including MH connections New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20N to C19/20/1N including MH connections New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/15 to C19/15/1 including MH connection New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia from H7/22/3 to H7/22/2 including MH connections New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia from H7/22/2 to H7/22/1 including MH connections for MH C19/10A removal of: Shaft Cover slab for MH C19/10A installation of: Shaft Cover slab Adjustable ring for MH C19/11 casting and installation : Shaft Cover slab Adjustable ring New UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 280mm Dia from C19 to C19/20/1N including MH connections for sewer line C19/15/1 to C19/15, Removal of: Asphalt; 5.30 LM Interlock tiles; 3.80 LM for sewer line C19/20N to C19/21N, Removal of: Asphalt; 51.77 LM for sewer line C19/15A to C19/15, Removal of: Asphalt; 57.71 LM for sewer line C16/4A to C16/3, removal of: Asphalt; 40.00 LM Rec'd Date 6-Mar-13 Status

MACE
Remarks Approved Approved

4812

2-Mar-13

Rehabilitation

E19

29-Mar-13

Approved

Approved

4813

2-Mar-13

Rehabilitation

E16/02

11-May-13

Approved

CLAIMED/P27

4814 4815 4816 4817 4818 4819 4820 4821 4822 4823 4824 4825 4826

2-Mar-13 2-Mar-13 2-Mar-13 28-Feb-13 28-Feb-13 3-Mar-13 3-Mar-13 3-Mar-13 3-Mar-13 3-Mar-13 3-Mar-13 3-Mar-13 3-Mar-13

concreting Installation Backdrop NDM NDM Excavation Excavation Excavation Excavation Excavation Excavation Excavation removal

E19 E19 E19 E15 E14 E15 E15 E16 E16 E16 W7/01 W7/01 E19

15-Apr-13 4-Mar-13 13-Apr-13 4-Mar-13 7-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 30-Mar-13 6-Mar-13 3-Mar-13 4-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4827

3-Mar-13

Installation

E19

4-Mar-13

Approved

Approved

4828

3-Mar-13

Installation

E19

4-Mar-13

Approved

Approved

4829 4830 4831 4832 4833

4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13

Excavation Removal Removal Removal removal

E16 E16 E16 E16 E15 4

4-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 5-Mar-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4834 4835 4836 4837 4838 4839 4840 4841 4842 4843 4844 4844A 4845 4846 4847 Sub. Date 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 4-Mar-13 5-Mar-13 5-Mar-13 5-Mar-13 Activity Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over removal removal Reinstatement Removal Removal Removal concreting Concreting Installation Location ( Sector No ) W7/01 W7/01 E15 E15 W7/01 W7/01 E19 E10 E19 E16/01 E16/01 E16/01 E13 E13 E13 LINE No. Description hydrostatic and deflection test for sewer line H7/28 to H7/5, 225mm UPVC hydrostatic and deflection test for sewer line H7/22/1 to H7/22, 225mm UPVC hydrostatic and deflection test for sewer line H7/22/2 to H7/22/1, 225mm UPVC Hydrostatic and deflection test for sewer line C16/8 to C16/7, 225mm UPVC initial inspection prior to hand over for sewer line C16/8 to C16/7, 225mm UPVC initial inspection prior to hand over for sewer line H7/28 to H7/5, 225mm UPVC initial inspection prior to hand over for sewer line H7/22/2 to H7/22/1, 225mm UPVC initial inspection prior to hand over for sewer line H7/22/1 to H7/22, 225mm UPVC initial inspection prior to hand over for sewer line H7/22 to H7/21, 225mm UPVC initial inspection prior to hand over for sewer line H7/21 to H7/20, 225mm UPVC Demolishing of existing MH to be replaced by new on MH D22/21N/B/1N Demolishing of existing MH on line near MH E124/1B/N between sewer line D26N/8/4N to D26N/8/5N to D25, reinstatement of: Curb stone; 22.80 LM Interlock tiles; 10.50 LM for sewer line C21A/22/3/1 to C21/a.5/2/1/4, Removal of Asphalt 11.50 LM for sewer line C21A/22/3/2 to C21A/22/3/1, Removal of: Interlock tiles; 5.00 LM Asphalt; 3.50 LM for sewer line C24/17 to C24/18, Removal of: Interlock tiles; 36.00 LM Blinding and Concreting of Base and shaft for MH C10/1/N Casting of cover slab & Adjustable ring for new MH C10/1/N installation of Cover slab, Adjustable ring and DI cover frame (D400, 750mm) with sealing plate C10/1/N Rehabilitation work at existing MH H7/21: 1. Removal, cleaning and recoating of DI cover frame (750 x 600 ) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 5 nos) 3. Removal and renew of defective GRP joint in MH shaft (2 nos) 4. Repairing of benching Rehabilitation work at existing MH H7/22/1: 1. Demolishing of existing cover slab 2. Casting of cover slab (internal dia 1.0 m) 3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing plate Rehabilitation work at existing MH H7/22/2: 1. Demolishing of existing cover slab 2. Casting of cover slab (internal dia 1.0 m) 3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing plate 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 5 nos) 5. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH H7/22/3: 1. Demolishing of existing cover slab 2. Casting of cover slab (internal dia 1.0 m) 3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing plate 4. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 3 nos) Rehabilitation work at existing MH C24/20: 1. Removal, cleaning and recoating of DI cover frame (600 x 600, B125) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 4 nos) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by patch repair ( 1 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) for sewer line H7/15 to H7/14, reinstatement of asphalt 24.4 LM Rec'd Date 4-Mar-13 4-Mar-13 5-Mar-13 13-Mar-13 5-Mar-13 4-Mar-13 6-Mar-13 6-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Superseeded Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Cancelled 6-Mar-13 7-Mar-13 7-Mar-13 6-Mar-13 13-Mar-13 11-Mar-13 Approved Approved Approved Approved Approved Approved

4848

5-Mar-13

Rehabilitation

W7/01

27-Mar-13

Approved

Approved

4848A

5-Mar-13

Rehabilitation

W7/01

27-Mar-13

Approved

Approved

4849

5-Mar-13

Rehabilitation

W7/01

27-Mar-13

Approved

Approved

4850

5-Mar-13

Rehabilitation

W7/01

27-Mar-13

Approved

Approved

4851

5-Mar-13

Rehabilitation

E16/02

11-May-13

Approved

CLAIMED/P27

4852

6-Mar-13

Reinstatement

W7/01

11-Mar-13

Approved

ECIL Approval

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4853 4854 4855 Sub. Date 6-Mar-13 6-Mar-13 6-Mar-13 Activity Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Location ( Sector No ) E10 W7/01 W7/01 LINE No. Description Hydrostatic and deflection test for sewer line 124/1B/N to E128/7/1/1A/N, 280mm UPVC Hydrostatic and deflection test for sewer line H7/22/3 to H7/22/2, 225mm UPVC initial inspection prior to hand over for sewer line H7/22/3 to H7/22/2, 225mm UPVC initial inspection prior to hand over for sewer line 119/1A to 119/1/1, 160mm UPVC initial inspection prior to hand over for sewer line E128/3/1A/N to E128/3N, 280mm UPVC initial inspection prior to hand over for sewer line E128/4N to E128/4/1A/N, 315mm UPVC initial inspection prior to hand over for sewer line E128/4/1A/N to E128/3N, 315mm UPVC initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128/7N,280mm UPVC New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from 124/1B/N to E128/7/1/1A/N including MH connections New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia from C13/1/1/N to C13/1/N including MH connections for sewer line C13/1/1/N to C13/1/N, removal of: 8 cm Interlock tiles, 49.86 LM 6 cm Interlock tiles, 5.00 LM Curb stone, 47.86 LM Asphalt, 47.860 LM Hydrostatic and deflection test for sewer line C13/1/1/N to C13/1/N, 280mm UPVC initial inspection prior to hand over for sewer line C13/1/1/N to C13/1/N, 280mm UPVC reinstatement of Curb stone total of 49 LM & interlock tiles total of 228.189 as per attached measurement sheets and drawing back filling for sector E14 Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from C10/5/2/C to C10/5/1 including MH connections for sewer line C10/5/2/C to C10/5/1, removal of interlock tiles 16.67 LM hydrostatic and deflection test for sewer line C10/5/2/C to C10/5/1, 160mm UPVC initial inspection prior to hand over for sewer line C10/5/2/C to C10/5/1, 160mm UPVC Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from C10/5/1 to C10/5 including MH connections for sewer line C10/5/1 to C10/5, removal of: Interlock tiles, 5.81 LM Curbstone, 2.00 LM hydrostatic and deflection test for sewer line C105/1 to C10/5, 160mm UPVC initial inspection prior to hand over for sewer line C10/5/1 to C10/5, 160mm UPVC Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from C10/4 to C10/3 including MH connections for sewer line C10/4 to C10/3, removal interlock tiles 14.380 LM hydrostatic and deflection test for sewer line C10/4 to C10/3, 160mm UPVC initial inspection prior to hand over for sewer line C10/4 to C10/3, 160mm UPVC Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from C10/5 to C10/4 including MH connections for sewer line C10/5 to C10/4, removal of interlock tiles 8.570 LM hydrostatic and deflection test for sewer line C10/5 to C10/4, 160mm UPVC initial inspection prior to hand over for sewer line C10/5 to C10/4, 160mm UPVC Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from D25/5B/N to D26N/9/N including MH connections hydrostatic and deflection test for sewer line C16/4 to C16/4A, 225mm UPVC hydrostatic and deflection test for sewer line D25/5B/N to D26N/9/N, 315mm UPVC initial inspection prior to hand over for sewer line C16/4 to C16/4A, 225mm UPVC Rec'd Date 18-Mar-13 11-Mar-13 11-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved

4856

6-Mar-13

Handing Over

E10

2-Apr-13

Approved

Approved

4857 4858

6-Mar-13 7-Mar-13

Excavation Excavation

E10 E13

18-Mar-13 26-Mar-13

Approved Approved

Approved Approved

4859

7-Mar-13

removal

E13

13-Mar-13

Approved

Approved

4860 4862 4863 4864 4865 4866 4867 4868 4869 4870 4871 4872 4874 4875 4876 4877 4878 4879 4880 4881 4882 4883 4884 4885

7-Mar-13 7-Mar-13 7-Mar-13 9-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13

Hydrostatic & Deflection Test Handing Over Reinstatement Backfilling Excavation removal Hydrostatic & Deflection Test Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over

E13 E13 E13 E14 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E19 E15 E19 E15

2-Apr-13 2-Apr-13

Approved Approved Cancelled

Approved Approved resubmited separately Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved P26-CLAIMED

13-Mar-13 14-Mar-13 25-Mar-13 14-Mar-13 14-Mar-13 14-Mar-13 13-Mar-13 14-Mar-13 14-Mar-13 14-Mar-13 14-Mar-13 14-Mar-13 14-Mar-13 25-Mar-13 25-Mar-13 25-Mar-13 25-Mar-13 11-Mar-13 13-Mar-13 11-Mar-13 17-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4886 4887 4888 4889 4890 4891 4892 4893 Sub. Date 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 10-Mar-13 11-Mar-13 Activity removal removal Removal Backdrop concreting Concreting concreting Rehabilitation Location ( Sector No ) E10 E10 E16/02 E19 E19 E19 E16 E12 LINE No. Description for sewer line 119/3 to 119, removal of: Interlock tiles, 12.25 LM for sewer line 119 to C14/122, removal of: Interlock tiles, 15.00 LM Tiles, 15.00 LM for sewer line C24/13 to C24/12A, Removal of: Asphalt, 25.80 LM construction of backdrop for new MH D26N/9/N coming from D26N/10/N Concreting shaft and reducer slab for MH D26N/9/N Casting of reducer shaf, cover slab & Adjustable ring for new D26N/9/N Concreting shaft for MH C19/20N Post CCTV Survey & deflection Test From C9/7 to C9/6 Post CCTV Survey & deflection Test From C9/6 to C9/5 initial inspection prior to hand over for rehabilitation line: 126A/1B to 126A/1A sector E10 126A/3 to 126A/2 sector E10 E121 to 120 sector E10 C9/7 to C9/6 sector E12 C9/6 to C9/5 sector E12 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia from C21A/22/3/2 to C21A/22/3/2 including MH connections Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from 119/3/1 to 119/3 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/15A to C19/15 including MH connection New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/20N to C19/20N including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/4A to C16/3 including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/4 to C16/4A including MH connection demolishing of existing MH IC125/9/A/1 to be replaced by new construction of future backdrop on new MH 124/1B/N construction of backdrop on existing MH for MH 119 coming from 119/3 reinstatement of asphalt for sewer line: C19/4N to C19/3N, 34.00 LM (2) C19/3N to C19/2N, 44.20 LM (2) C19/10 to C19/3N, 7.400 LM (5) C19/3/1 to C19/3N, 10.30 LM (2) C19/2N to C19/14, 35.40 LM (4) C19/2/1 to C19/2N, 5.00 LM (2) reinstatement of asphalt for sewer line: C15/1A to C15, 17.00 LM hydrostatic and deflection test for sewer line D26N/10/N to D26N/9/N, 225mm UPVC hydrostatic and deflection test for sewer line 119/3/1 to 119/3, 160mm UPVC hydrostatic and deflection test for sewer line 119/3 to 119, 160mm UPVC 17 26 initial inspection prior to hand over for sewer line D25/5B/N to D26N/9/N, 225mm UPVC initial inspection prior to hand over for sewer line D26N/10/N to D26N/9/N, 225mm UPVC Sewer over pumping system arrangement for sewer line 11 in sector E16/01 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 160mm Dia from C19/15/1 to C19/15 including MH connection Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C19/15A to C19/15 including MH connection Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia from C21A/22/3/1 to C21A/22/3/2 including MH connection Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C24/17 to C24/18 including MH connection Rec'd Date 18-Mar-13 18-Mar-13 23-Mar-13 15-Apr-13 11-Mar-13 13-Mar-13 11-Mar-13 13-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4894

11-Mar-13

Handing Over

E12 & E10

18-Mar-13

Approved

Approved

4895 4896 4897 4898 4899 4900 4901 4902 4903

12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13

Excavation Excavation Excavation Excavation Excavation Excavation removal Backdrop Backdrop

E16/01 E10 E16 E16 E15 E15 E10 E10 E10 4

23-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 13-Mar-13 13-Mar-13 26-Mar-13 18-Mar-13 26-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved

4905

12-Mar-13

Reinstatement

E16

18-Mar-13

Approved

Approved

4906 4907 4908 4909 4910A 4911A 4912 4913 4914 4915 4916

12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 12-Mar-13 14-Mar-13 16-Mar-13 16-Mar-13 16-Mar-13 16-Mar-13

Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Over pumping Excavation Excavation Excavation Excavation

E15 E19 E10 E10 E19 E19 E16/01 E16 E16 E16/01 E16/02 4

13-Mar-13 18-Mar-13 26-Mar-13 26-Mar-13 10-Jun-13 10-Jun-13 13-Mar-13 31-Mar-13 17-Mar-13 23-Mar-13 23-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4917 4918 4919 4920 4921 4922 4923 4924 4925 Sub. Date 16-Mar-13 16-Mar-13 16-Mar-13 16-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 Activity Excavation Excavation Hydrostatic & Deflection Test NDM Concreting Installation concreting concreting Concreting Location ( Sector No ) E16/02 E19 E19 E15 E10 E10 E10 E10 W7/01 LINE No. Description Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C24/20 to C24/13 including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from D22/21N/B/1N to D22/21N/A including MH connection Hydrostatic and deflection test for sewer line D22/21N/1B/1N to D22/21N/A, 315mm UPVC Concrete encasement for steel reinforced 500 GRP pipe SN 10000, 25.67 LM for NDM between MH C17/2A/1N to C17/1/N Casting of shaft for MHs E128/2N and MH E124/1B/N installation of shaft for MHs E128/2N and E124/1B/N Blinding and concreting of base and shaft for MH 124/1B/N and MH E128/2N Blinding and concreting of base for MH C17/2A/2N Casting of cover slab for MHs: H7/22/1 H7/22/2 H7/22/3 installation of cover slab for MHs H7/22/1 H7/22/2 H7/22/3 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/7 to C16/1A including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia from C16/4A to C16/3 Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia from H7/5/3 to H7/5/1 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia from C9/15a to C19/15 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia from C19/21N to C19/20N Hydrostatic and deflection test for sewer line C19/27 to C19/14, 160mm UPVC Hydrostatic and deflection test for sewer line C19/15 to C19/14, 225mm UPVC Hydrostatic and deflection test for sewer line C16/7 to C16/1A, 225mm UPVC Hydrostatic and deflection test for sewer line H7/5/3 to H7/5/1, 160mm UPVC Initial inspection prior to hand over for sewer line C16/7 to C16/1A, 160mm UPVC for sewer line E128/5/2N to E128/3/1A/N, reinstatement of asphalt 60.575 LM for sewer line E128/3/1A/N to E128/3N, reinstatement of asphalt 22.175 LM for sewer line E128/7N to E128/7/1/1A/N, reinstatement of asphalt 62.75 LM demolishing and removal of existing MH 125/1A to be replaced by new for sewer line E128/3N to E128/2N, removal of interlock tiles 64.64 LM removal of exiting 150mm VC pipe line between sewer line H19/1 to H19N to H19 New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia from E128/2N to E128/1N including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia from C24/16 to C24/17 including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia from C21A/5/2 to C21A/5/2/1/1 including MH connections Hydrostatic and deflection test for sewer line C24/16 to C24/17, 225mm UPVC Hydrostatic and deflection test for sewer line E128/1N to E128/2N, 315mm UPVC initial inspection prior to hand over for sewer line E128/1N to E128/2N, 315mm UPVC for sewer line H7/5 to H7/5/1, removal of Asphalt 7.00 LM for sewer line 123/N to 123/1A/N, removal of: Interlock tiles, 29.50 LM Asphalt, 3.60 LM for sewer line C24/22 to C24/20, Removal of Asphalt, 22.40 LM Rec'd Date 23-Mar-13 18-Mar-13 18-Mar-13 24-Mar-13 18-Mar-13 18-Mar-13 18-Mar-13 19-Mar-13 18-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

4926

18-Mar-13

Installation

W7/01

18-Mar-13

Approved

Approved

4927 4928 4929 4930 4931 4932 4933 4934 4935 4936 4937 4938 4939 4940 4941 4942 4943 4944 4945 4946 4947 4948 4949 4950

19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13

Excavation Excavation Excavation Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Reinstatement Reinstatement removal removal removal Excavation Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over removal removal Removal

E15 E15 W7/01 E16 E16 E16 E16 E15 W7/01 E15 E10 E10 E10 E10 W6 E10 E16/02 E16/01 E16/02 E10 E10 W7/01 E10 E16/02

20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 26-Mar-13 20-Mar-13 20-Mar-13 21-Mar-13 20-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 20-Mar-13 26-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 26-Mar-13 26-Mar-13 21-Mar-13 26-Mar-13 23-Mar-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4951 4952 4953 4954 Sub. Date 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 Activity Removal Removal Removal Removal Location ( Sector No ) E16/01 E16/01 E16/02 E16/02 LINE No. Description for sewer line C21A/5/2 to C21A/5/2/3, Removal of Asphalt, 12.75 LM for sewer line C21A/5/2/1/1 to C21A/5/1/2, Removal of Asphalt, 8.80 LM for sewer line C21A/5/1/4 to C21A/5/2/1/3, Removal of: Interlock tiles, 8.00 LM Curb stone, 22.00 LM for sewer line C24/17 to C24/18, Removal of: Asphalt, 5.00 LM for sewer line C24/17 to C24/16, Removal of: Asphalt, 19.60 LM for sewer line 119 to C14/122, removal of: Protection slab and VC pipe 150mm Dia Existing CBS PVC Duct Two sewer chambers for sewer line 119/3 to 119, reinstatement of interlock tiles, 16.80 LM for sewer line E128/7/1/1A/N to 124/1B/N, reinstatement of: interlock tiles, 25.00 LM Curb stone, 6.00 LM construction of backdrop for existing MH C19/15 coming from C19/15/1 supporting of existing utilities between sewer line H7/3 to H7/2 over pumping for rehabilitation line from MH C9/7 to C9/6 over pumping for rehabilitation line from MH C9/6 to C9/5 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 450mm Dia from C21A/5/2/1/4 to C21A/22/3/1 including MH connections Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia C13/1/3 to C13/1/2 including MH connections for sewer line C13/1/3 to C13/1/2, removal of: Interlock tiles, 37.60 LM Concrete obstruction, 13 x 2 x 0.8 m Hydrostatic and deflection test for sewer line C13/1/3 to C13/1/2, 225mm UPVC Initial inspection prior to hand over for sewer line C13/1/3 to C13/1/2, 225mm UPVC Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm Dia C13/1/2 to C13/1/1 including MH connections for sewer line C13/1/2 to C13/1/1, removal of: Interlock tiles, 37.00 LM Hydrostatic and deflection test for sewer line C13/1/2 to C13/1/1, 225mm UPVc Initial inspection prior to hand over for sewer line C13/1/2 to C13/1/1, 225mm UPVC hydrostatic and deflection test for sewer line C24/17 to C24/18, 225mm UPVC initial inspection prior to hand over for sewer line H7/5/3 to H7/5/1, 160mm UPVC initial inspection prior to hand over for sewer line 124/1B/N to E128/7/1/1A/N, 280mm UPVC initial inspection prior to hand over for sewer line 119/3/1 to 119/3, 160mm UPVC for sewer line H7/5/3 to H7/5/1, removal of: Curbstone, 5.15 LM Asphalt, 3.70 LM Tiles, 10.55 LM Interlock tiles, 2.65 LM for sewer line C19/11 to C19/10A, Reinstatement of: Asphalt, 12.50 LM for sewer line D25 to D26N/8/5N, reinstatement of: Asphalt, 35.3 LM supporting of existing Utilities (electrical cable & Etisalat cable) between sewer line H7/5 to H7/5/1 Reinstatement of interlock tiles for sewer line: C13/4/1/N to C13/4/2/N, Hydrostatic and deflection test for sewer lineC17/8 to C17/2/1, 450mm UPVC Hydrostatic and deflection test for sewer line C21/19 to C21/18, 225mm UPVC Rec'd Date 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved

4955 4956 4957 4958 4959 4960 4961 4962 4963 4964 4965 4966 4967 4968 4969 4970 4971 4972 4973

20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 20-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13

removal Reinstatement Reinstatement Backdrop supporting Over pumping Excavation Excavation removal Hydrostatic & Deflection Test Handing Over Excavation removal Hydrostatic & Deflection Test Handing Over Hydrostatic & Deflection Test Handing Over Handing Over Handing Over

E10 E10 E10 E16 W7/01 E12 E16/01 E13 E13 E13 E13 E13 E13 E13 E13 E16/02 W7/01 E10 E10

26-Mar-13 10-Apr-13 10-Apr-13 6-Apr-13 21-Mar-13 21-Mar-13 2-Apr-13 2-Apr-13 26-Mar-13 3-Apr-13 23-Apr-13 6-Apr-13 2-Apr-13 6-Apr-13 23-Apr-13 28-Apr-13 29-Mar-13 2-Apr-13 2-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved Approved Approved Approved Approved Approved P26-CLAIMED Approved Approved Approved P26-CLAIMED P26-CLAIMED Approved Approved Approved

4974

23-Mar-13

removal

W7/01

29-Mar-13

Approved

Approved

4975 4976 4977 4978 4979 4980

23-Mar-13 23-Mar-13 23-Mar-13 23-Mar-13 24-Mar-13 24-Mar-13

Reinstatement Reinstatement supporting Reinstatement Hydrostatic & Deflection Test Hydrostatic & Deflection Test

E16 E19 W7/01 E13 E15 E16/01

3-Apr-13

Approved Cancelled

Approved Superseeded Approved waiting Consultant approval Approved P26-CLAIMED

25-Mar-13

Approved CHECK

25-Mar-13 28-Apr-13

Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 4981 4982 4983 Sub. Date 24-Mar-13 24-Mar-13 24-Mar-13 Activity Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Location ( Sector No ) E16/02 E10 E15 LINE No. Description Hydrostatic and deflection test for sewer line C24/29/3 to C24/29/2, 225mm UPVC Hydrostatic and deflection test for sewer line E128/7N to E128/6N, 315mm UPVC Initial inspection prior to hand over for sewer line C17/8 to C17/2/1, 450mm UPVC Rehabilitation work at existing MH C13/1/3: 1. Removal, cleaning and recoating of DI cover Frame ( 750 x 600 D400) 2. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.81 m2, C.S Thickness = 0.3 m) 3. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (A= 12.0576 m2, Depth, 2.56 m, internal Dia= 1.5 m). 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C13/1/2: 1. Removal, cleaning and recoating of DI cover Frame ( 750 x 600 D400) 2. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.81 m2, C.S Thickness = 0.3 m) 3. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (A= 14.22 m2, Depth, 3.017 m, internal Dia= 1.5 m). 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C13/1/1: 1. Removal, cleaning and recoating of DI cover Frame ( 750 x 600 D400) 2. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.81 m2, C.S Thickness = 0.3 m) 3. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (A= 16.77 m2, Depth, 3.56 m, internal Dia= 1.5 m). 4. Removal and renew of defective GRP joint in MH shaft (1 nos) 5. Sealing leaks in MH (1 Nos) Rehabilitation work at existing MH C16/4A: 1. Removal, cleaning and recoating of DI cover Frame ( 600 x 600 D400) 2. Provide new sealing plate 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2) 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (10 nos) 5. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C7/2C/1: 1. Demolishing of existing cover slab ( 600x 600 D400) 2. Casting of new cover slab ( 750 D400) 3. Installation of cover slab, DI cover frame (750 mm D400) with sealing plate 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 5. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C8/1: 1. Demolishing of existing cover slab ( 600x 600 B125) 2. Casting of new cover slab ( 600 B125) 3. Installation of cover slab, DI cover frame (600 mm B125) with sealing pla 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rehabilitation work at existing MH C10/4: 1. Removal, clean and recoat of DI cover Frame (600 x 600 D400) 2. Provide new sealing plate (600 x 600 D400) 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) Rec'd Date 28-Apr-13 26-Mar-13 26-Mar-13 Status

MACE
Remarks P26-CLAIMED Approved Approved Approved Approved Approved

4984

25-Mar-13

Rehabilitation

E13

30-Apr-13

Approved

P26-CLAIMED

4985

25-Mar-13

Rehabilitation

E13

30-Apr-13

Approved

P26-CLAIMED

4986

25-Mar-13

Rehabilitation

E13

30-Apr-13

Approved

P26-CLAIMED

4987

25-Mar-13

Rehabilitation

E15

6-Apr-13

Approved

Approved

4988

25-Mar-13

Rehabilitation

E12

20-May-13

Approved

CLAIMED/P27

4989

25-Mar-13

Rehabilitation

E13

1-Apr-13

Test Req

Copression test to be submited

4990

25-Mar-13

Rehabilitation

E13

12-May-13

Approved

CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rec'd Date Status

MACE
Remarks

4991

25-Mar-13

Rehabilitation

E13

Rehabilitation work at existing MH C10/5: 1. Removal, clean and recoat of DI cover Frame (600 x 600 D400) 2. Provide new sealing plate (600 x 600 D400) 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (6 nos) 5. Removal and renew of defective GRP joint in MH shaft (2 nos)

9-May-13

Approved

CLAIMED/P27

4992

25-Mar-13

Rehabilitation

E16/02

Rehabilitation work at existing MH C24/18: 1. Removal, clean and recoat of DI cover Frame (600 x 600 D400) 2. Provide new sealing plate (600 x 600 D400) 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 4. Removal and renew of defective GRP joint in MH shaft (1 nos)

8-Apr-13

Approved

Approved

4993

25-Mar-13

Rehabilitation

E16/02

Rehabilitation work at existing MH C24/17: 1. Removal, clean and recoat of DI cover Frame (600 x 600 D400) 2. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (3 nos) 4. Removal and renew of defective GRP joint in MH shaft (3 nos) Rehabilitation work at existing MH C24/16: 1. Removal, clean and recoat of DI cover Frame (600 x 600 D400) 2. Removal and renew of defective GRP joint in MH shaft (2 nos) Rehabilitation work at existing MH H7/5: 1. Demolishing of existing cover slab 2. Casting of new cover slab 3. Installation of cover slab, Di cover frame (750 D400) with sealing plate 4. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (A= 29.014 m2, Depth, 6.16m, internal Dia= 1.5 m) Rehabilitation work at existing MH C6B: 1. Demolishing of existing DI cover frame and replacing by new 600 x 600 D400 Rehabilitation work at existing MH C6B/1: 1. Removal, cleaning and recoating of DI cover frame ( 600 x 600 D400) 2. Replacing defective sealing plate by new 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 4. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (1 nos) 5. Removal and renew of defective GRP joint in MH shaft (3 nos) Rehabilitation work at existing MH C14A/6A: 1. Removal, cleaning and recoating of DI cover frame ( 600 x 600 D400) 2. Replacing defective sealing plate by new 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) 4. Removals of defective lining inside MH full shaft, repairing of damaged concrete and renew GRP liner by full lamination (A= 4.71 m2, Depth, 1.00 m, internal Dia= 1.5 m) 5. Removal of ladder (3.5 LM) Rehabilitation work at existing MH H7/22: 1. Removal, cleaning and recoating of DI cover frame ( 750 x 600 D400) 2. Replacing defective sealing plate by new 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (6 nos)

8-Apr-13

Approved

Approved

4994

25-Mar-13

Rehabilitation

E16/02

8-Apr-13

Approved

Approved

4995

25-Mar-13

Rehabilitation

W7/01

9-Jun-13

Approved

Approved

4996

25-Mar-13

Rehabilitation

E13

2-May-13

Approved

P26-CLAIMED

4997

25-Mar-13

Rehabilitation

E13

5-May-13

Approved

P26-CLAIMED

4998

25-Mar-13

Rehabilitation

E14

9-May-13

Approved

CLAIMED/P27

4999

25-Mar-13

Rehabilitation

W7/01

28-Apr-13

Approved

item # 2 not applicable

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C16/4: 1. Removal, cleaning and recoating of DI cover frame and sealing plate ( 600 x 600 D400) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (7nos) 3. Removal and renew of defective GRP joint in MH shaft (1 nos) 4. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) Rehabilitation work at existing MH C19/15: 1. Removal, cleaning and recoating of DI cover frame ( 600 x 600 D400) 2. Replacing defective sealing place by new 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (5 nos) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) 5. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by patch repair (A= 0.72 m2, C.S thickness = 0.3 m) NDM from MH C17/2A/1N to C17/1/N Set up, arrangement & Mobilization for the NDM ( including the construction of thrust wall & entrance rings New. UPVC / Excavation up to formation & pipe laying G.B.S for 500mm Dia C17/1/N to C17/2A/1N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia C16/4A to C16/3 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C21A/5/2/1/1 to C21A/5/2/1/2 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C24/22 to C24/20 including MH connections Hydrostatic and deflection test for sewer line C24/22 to C24/20, 225mm UPVC Hydrostatic and deflection test for sewer line C21A/5/2/1/1 to C21A/5/2/1/2, 225mm UPVC 4 Hydrostatic and deflection test for sewer line C19/15A to C19/15, 225mm UPVC Hydrostatic and deflection test for sewer line C19/14 to C19/2N, 225mm UPVC initial inspection prior to hand over for sewer line 119/3 to 119, 160mm UPVC Grouting of Abounded lines between MHs: D53/13/26 to D53/13/25, 37.35 LM, 150mm Dia D53/13/25 to D53/13/20, 27.18 150mm Dia D53/13/20 to D53/13/20N, 7.49 LM, 150mm Dia D53/13/20 to D53/13/19, 40.17 LM, 150mm Dia D53/13/25 to D53/13/26N, 2.72 LM, 150mm Dia Demolishing of existing line between MH D22/21N/B/1N to D22/22N, 9.50 LM 600 mm Dia Blinding and Concreting of base and shaft for MH C13/1/1/N and C14/1/N Concreting of second shaft for C14/1/N Concreting of third shaft and C14/1/N Casting of intermediate slab for MH C14/1/N Casting of adjustable ring and cover slab for MH C13/1/1/N and C14/1/N installation of Adjustable ring, cover slab, and DI cover frame (750mm Dia) for MH C14/1/N and C13/1/1/N NDM from MH C17/2A/1N to C17/1/N Checking of laser target level for the NDM driving Establishing of monitoring points for the NDM from MH C17/2A/1N to C17/1/N ( before drilling) Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia 119/3 to 119 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C17/2A/2N to C17/3A/1N including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia H7/3 to H7/2 Hydrostatic and deflection test for sewer line C9/5 to C32B/47, 250mm GRP initial inspection prior to hand over for sewer line C9/5 to C32B/47, 250mm GRP construction of backdrop for MH E128/2N coming from MH 125/8, 160mm UPVC construction of future backdrop for MH E128/2N, 160mm UPVC 23-Apr-13 2-Apr-13 1-Apr-13 13-Apr-13 3-Apr-13 3-Apr-13 28-Apr-13 13-Apr-13 Rec'd Date Status

MACE
Remarks 6-Apr-13 Approved Approved

5000

25-Mar-13

Rehabilitation

E15

5001

25-Mar-13

Rehabilitation

E16

6-Apr-13

Approved

Approved

5002 5003 5004 5005 5006 5007 5008 5009 5010 5011

25-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13

NDM Excavation Excavation Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over

E15 E15 E15 E16/01 E16/02 E16/02 E16/01 E16 E16 E10

21-Apr-13 1-Apr-13 2-Jun-13 2-Apr-13 2-Apr-13 28-Apr-13 28-Apr-13

Approved Approved Approved Approved Approved Approved Approved CHECK Approved Approved

Approved Approved Approved Approved Approved P26-CLAIMED P26-CLAIMED waiting Consultant approval APPROVED AS 5601 P26-CLAIMED

5012

26-Mar-13

grouting

W4

29-Mar-13

Approved

Approved

5013 5014 5015 5016 5017 5018 5019 5020 5021 5022 5023 5024 5025 5026

26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 26-Mar-13 27-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13

removal concreting concreting concreting Concreting Concreting Installation NDM Excavation Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Backdrop

E19 E13 E13 E13 E13 E13 E13 E15 E10 E15 W7/01 E12 E12 E10

29-Mar-13 13-Apr-13 8-Jul-13 27-Apr-13 13-Apr-13 13-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved CLAIMED/P27 Approved Approved Approved P26-CLAIMED Approved Approved P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) E13 E13 E13 LINE No. Description For sewer line C11/5/2/N to C11/5/1/N reinstatement of : Curbstone, 21.00 LM Interlock tiles, 13.00 LM For sewer line C11/4/1/N to C11/4/N reinstatement of : Interlock tiles, 10.31 LM For sewer line C11/3/2 to C11/5/2/N reinstatement of : Interlock tiles, 17.21 LM For sewer line C7/8 to C7/4/2/N reinstatement of : Interlock tiles, 30.60 LM (6 cm) Curbstone, 6.00 LM Interlock tiles, 6.00 LM (8 cm) For sewer line C7/4/4 to C7/4/2/N reinstatement of : Interlock tiles, 6.816 LM Blinding and concreting of base & shaft for MH 123/1A/N Concreting of second shaft for MH 123/1A/N Concreting of second & third shaft for MH C17/2A/2N Concreting of shaft for MH E122/N Casting of Adjustable ring and cover slab for MH D22/21N/B/1N installation of Adjustable ring, cover slab and DI cover frame (750mm, D400) with sealing plate for MH D22/21N/B/1N reinstatement of interlock tiles for sewer line: C13/4/1/N to C13/4/2/N, 37.25 LM C13/4/2/N to C13/1/2/N, 26.35 LM over pumping arrangement for line 6, 11 & 12 sector E16/01 Rehabilitation work at existing MH 119/3: 1. Cleaning and recoating of DI cover frame ( 600 Dia, B125) (9.35) 2. Replacing defective sealing place by new (9.51) 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by Lamination (A= 1.00 m2, , internal Dia = 1.00 m) Rehabilitation work at existing MH 119: 1. Demolishing of existing cover slab (9.10) 2. Casting of new cover slab (9.11) 3. Installation of cover slab, Di cover frame (750 D400) with sealing plate (9.23) 4. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by Lamination (A= 8.998 m2, internal Dia = 1.2 m) 5. Repairing of benching and channel and GRP Lamination (9.48) Rehabilitation work at existing MH 119/1/1: 1. Removal of existing DI cover frame 600 x 600 B125 2. Supply and installation of new DI cover frame 600 x 600 B-125 with sealing plate (3.26) 3. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by Lamination (A= 4.2 m2, internal Dimension = 0.7 x 0.7 m, Depth= 1.5m) 4. Repairing of benching and channel and GRP Lamination (9.49) Removal of existing backdrop and replacing by new for MH H7/5 coming from H7/5/1 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia for sewer line C19/21N to C19/20N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia for sewer line C16/3/3 to C16/3/2 New. GRP / Excavation up to formation & pipe laying G.B.S for 500mm Dia for sewer line C17/1/N to C17/2A/1N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line 119 to C14/122 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line D22/22N to D22/21N/C including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line D22/21N/C to D22/21N/B/1N including MH connections for sewer line E128/4N to E128/4/1A/N, reinstatement of interlock tiles 18.50 LM Rec'd Date Status

MACE
Remarks 2-Apr-13 2-Apr-13 2-Apr-13 Approved Approved Approved Approved Approved Approved

5027 5028 5029

30-Mar-13 30-Mar-13 30-Mar-13

Reinstatement Reinstatement Reinstatement

5030

30-Mar-13

Reinstatement

E13

2-Apr-13

Approved

Approved

5031 5032 5033 5034 5035 5036 5037 5038 5039

30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 30-Mar-13 1-Apr-13

Reinstatement concreting concreting concreting concreting Concreting Installation Reinstatement over pumping

E13 E10 E10 E15 E10 E19 E19 E13 E16/02

2-Apr-13 23-Apr-13 4-May-13 14-Apr-13 23-Apr-13 13-Apr-13 13-Apr-13 2-Apr-13 13-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved P26-CLAIMED P26-CLAIMED Approved P26-CLAIMED Approved P26-CLAIMED Approved full reposiblity lies on contractor

5040

3-Apr-13

Rehabilitation

E10

17-Apr-13

Approved

P26-CLAIMED

5041

3-Apr-13

Rehabilitation

E10

17-Apr-13

Approved

P26-CLAIMED

5042

3-Apr-13

Rehabilitation

E10

17-Apr-13

Approved

P26-CLAIMED

5043 5044 5045 5046 5047 5048 5049 5050

3-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13

removal Excavation Excavation Excavation Excavation Excavation Excavation Reinstatement

W7/01 E16 E15 E15 E10 E19 E19 E10

27-Apr-13 6-Apr-13 6-Apr-13 6-Apr-13 13-Apr-13 15-Apr-13 15-Apr-13 10-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) W7/01 W7/01 W7/01 W7/01 E10 E15 E10 E19 E19 E19 E16 E19 E19 E19 E19 E19 E15 E13 E12 E12 E12 E13 LINE No. for sewer line H7/28 to H7/5, reinstatement of: Curb stone, 25.60 LM Interlock tiles, 30.60 LM for sewer line H7/22 to H7/21, reinstatement of: Asphalt, 27.27 LM for sewer line H7/28 to H7/5, reinstatement of: Asphalt, 44.2 LM for sewer line H7/20 to H7/21, reinstatement of: Asphalt, 30.5 LM for sewer line 119/1A to 119/1/1, reinstatement of: Interlock tiles, 27.91 LM Hydrostatic and deflection test for sewer line C16/4A to C16/3, 225mm UPVC Hydrostatic and deflection test for sewer line 119 to C14/122, 315mm UPVC Hydrostatic and deflection test for sewer line D22/22N/1N to D22/22N, 315mm UPVC Hydrostatic and deflection test for sewer line D22/22N to D22/21N/C, 315mm UPVC Hydrostatic and deflection test for sewer line D22/21N/C to D22/21N/B/1N, 315mm UPVC Hydrostatic and deflection test for sewer line C19/15/1 to C19/15, 160mm UPVC Initial inspection prior to hand over for sewer line D22/21N/C to D22/21N/B/1N, 315mm UPVC Initial inspection prior to hand over for sewer line D22/21N/B/1N to D22/21N/A, 315mm UPVC . Initial inspection prior to hand over for sewer line D22/22N to D22/21N/C, 315mm UPVC Initial inspection prior to hand over for sewer line D22/22N/1N to D22/22N, 315mm UPVC Initial inspection prior to hand over for sewer line C16/4A to C16/3, 225mm UPVC trial pits for sector E13 ( 1, 2, 3, 4 & 5) trial pits for sector E12 ( 1, 2 & 3) New. GRP / Excavation up to formation & pipe laying G.B.S for 200mm Dia for sewer line C7/2C/1 to C32B/51 including MH connections hydrostatic and deflection test for sewer line C7/2C/1 to C32B/51, 200mm GRP New. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia for sewer line C11/4/N to C6B/N including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia for sewer line C7/2/N to C7/1/1/N including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia for sewer line C10/1/N to C10/1/1 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia for sewer line C8/1 to C8A/N including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia for sewer line C10/1/N to C10/N including MH connections existing site condition between sewer line C17/2A/2N to C17/3A/1N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line H7/3 to H7/2 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia for sewer line C16/3/3 to C16/3/2 Including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia for sewer line C16/3/2 to C16/3/1 Including MH connections New. GRP / Excavation up to formation & pipe laying G.B.S for 500mm Dia for sewer line C17/1/N to C17/2A/1N 6-Apr-13 6-Apr-13 Description Rec'd Date Status

MACE
Remarks 15-Apr-13 10-Apr-13 10-Apr-13 10-Apr-13 10-Apr-13 6-Apr-13 15-Apr-13 13-Apr-13 13-Apr-13 6-Apr-13 6-Apr-13 6-Apr-13 28-Apr-13 5-Jun-13 28-Apr-13 28-Apr-13 11-May-13 6-Apr-13 6-Apr-13 6-Apr-13 15-Apr-13 6-Apr-13 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED CLAIMED/P27 P26-CLAIMED P26-CLAIMED CLAIMED/P27 Approved Approved Approved P26-CLAIMED Approved

5052 5053 5054 5055 5056 5057 5058 5059 5060 5061 5062 5063 5064 5065 5066 5067 5068 5069 5070 5071 5072 5073

4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13 4-Apr-13

Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Handing Over Handing Over Handing Over Trial Pit Trial Pit Excavation Hydrostatic & Deflection Test Excavation

5074 5075 5076

4-Apr-13 4-Apr-13 4-Apr-13

Excavation Excavation Excavation

E13 E13 E13

Cancelled Approved Approved

Cancelled P26-CLAIMED P26-CLAIMED

5077 5078 5079 5080

4-Apr-13 6-Apr-13 8-Apr-13 9-Apr-13

Excavation site condition Excavation Excavation

E13 E15 W7/01 E15

6-Apr-13 17-Apr-13 17-Apr-13 10-Apr-13

Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5081 5082

9-Apr-13 9-Apr-13

Excavation Excavation

E15 E15

10-Apr-13 10-Apr-13

Approved Approved

P26-CLAIMED P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) E16 LINE No. Description New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia for sewer line C19/18A/1N to C19/18/1N including MH connection 4 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia for sewer line C19/15A to C19/15 including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia for sewer line C19/21N to C19/20N Hydrostatic and deflection test for sewer line C24/20 to C24/13, 225mm UPVC Hydrostatic and deflection test for sewer line C16/3/2 to C16/3/1, 160mm UPVC Hydrostatic and deflection test for sewer line C16/3/3 to C16/3/2, 160mm UPVC initial inspection prior to hand over for sewer line C16/3/3 to C16/3/2, 160mm UPVC initial inspection prior to hand over for sewer line C16/3/2 to C16/3/1, 160mm UPVC initial inspection prior to hand over for sewer line 119 to C14/122, 315mm UPVC for sewer line C7/2C/1 to C32B/1, removal of Asphalt 10.50 LM for sewer line C24/15/2N to C24/19N Removal of: Asphalt, 47.00 LM Interlock tiles,47.00 LM Curbstone, 47.00 LM for sewer line C21A/5/2/1/3 to C21A/5/2/1/2 Removal of: Asphalt, 37.00 LM for sewer line E128N to 127/4B/N removal of: Asphalt, 5.75 LM Interlock tiles, 5.77 LM for sewer line C17/2A/2N to C17/3A/1N removal of: Asphalt, 74.00 LM for sewer line C19/18A/1N to C19/18/1N Removal of Asphalt, 29.61 LM for sewer line C19/18/1N to C19/17A/1N Removal of Asphalt, 68.330 LM for sewer line H7/28/2 to H7/28 reinstatement of Asphalt, 7.29 LM for sewer line H7/28 to H7/28/1 reinstatement of Asphalt, 6.78 LM for sewer line H7/28 to H7/29 reinstatement of Asphalt, 47.58 LM for sewer line H7/3 to H7/14 reinstatement of asphalt, 11.05 LM Demolishing and removal of existing MH H7/5/1 to be replaced by new Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia for sewer line C21A/19/2A to C21A/19/2 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia for sewer line C21A/19/2 to C21A/19/1 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia for sewer line C21A/5/2/1/2 to C21A/5/2/1/3 including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line D22/22N/1N to D22/22N/2N including MH connection Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia for sewer line D26N/9/N to D26N/8/N including MH connection Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia for sewer line C10/2/3 to C10/2/2 including MH connection For sewer line C10/2/3 to C10/2/2, removal of: Interlock tiles, 16.51 LM Hydrostatic and deflection test for sewer line C10/2/3 to C10/2/2, 160mm UPVC 22 initial inspection prior to hand over for sewer line C10/2/3 to C10/2/2, 160mm UPVC Backfilling up to final layer for sewer line C10/2/3 to C10/2/2 Rec'd Date Status

MACE
Remarks 10-Apr-13 Approved P26-CLAIMED

5083

9-Apr-13

Excavation

5084

9-Apr-13

Excavation

E16

14-Apr-13

Approved

P26-CLAIMED

5085 5086 5087 5088 5089 5090 5091 5092 5093

9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13

Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over removal Removal

E16 E16/01 E15 E15 E15 E15 E10 E12 E16/02

10-Apr-13 23-Apr-13 10-Apr-13 10-Apr-13 11-May-13 17-Apr-13 14-Apr-13 14-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED CLAIMED/P27 CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED

5094 5095 5096 5097 5098 5099 5100 5101

9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 9-Apr-13 13-Apr-13

Removal removal removal Removal Reinstatement Reinstatement removal Excavation

E16/01 E10 E15 E16 W7/01 W7/01 W7/01 E16/01

10-Apr-13 15-Apr-13 10-Apr-13 10-Apr-13 14-Apr-13 14-Apr-13 17-Apr-13 28-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5102

13-Apr-13

Excavation

E16/01

28-Apr-13

Approved

P26-CLAIMED

5103

13-Apr-13

Excavation

E16/01

28-Apr-13

Approved

P26-CLAIMED

5104 5105 5106 5107 5108 5109 5110

13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13

Excavation Excavation Excavation removal Hydrostatic & Deflection Test Handing Over Backfilling

E19 E19 E13 E13 E13 E13 E13

14-Apr-13 14-Apr-13 17-Apr-13 15-Apr-13 17-Jun-13 23-Jun-13 30-Apr-13

Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved Approved P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5111 5112 5113 5114 5115 5116 Sub. Date 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 Activity Excavation removal Hydrostatic & Deflection Test Handing Over Backfilling Excavation Location ( Sector No ) E13 E13 E13 E13 E13 E13 LINE No. Description New. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia for sewer line C10/3 to C10/3/1/N including MH connection for sewer line C10/3 to C10/3/1/N, removal of: Interlock tiles, 5.32 LM Hydrostatic and deflection test for sewer line C10/3 to C10/3/1/N, 160mm UPVC Initial inspection prior to hand over for sewer line C10/3 to C10/3/1/N, 160mm UPVC Backfilling up to final layer for sewer line C10/3 to C10/3/1/N New. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm Dia for sewer line C10/3/1/N to C10/2/N including MH connection for sewer line C10/3/1/N to C10/2/N, removal of: Asphalt, 1.37 LM Interlock tiles, 6.79 LM Curbstone, 3.80 LM hydrostatic and deflection test for sewer line C10/3/1/N to C10/2/N, 160mm UPVC initial inspection prior to hand over for sewer line C10/3/1/N to C10/2/N, 160mm UPVC Backfilling up to final layer for sewer line C10/3/1/N to C10/2/N Removal of existing backdrop and construction of new for MH C21A/5/2/1/3 coming from MH C21A/5/2/1/2 for sewer line E122/N to E123/N removal of: Interlock tiles, 24.36 LM for sewer line IC to E121/2 removal of: Interlock tiles, 24.04 LM for sewer line C21A/19/1 to C21A/19 Removal of: Asphalt, 5.10 LM for sewer line C21A/19/2A to C21A/19/2 Removal of: Asphalt, 10.40 LM for sewer line C21A/17 to C21A/18 Removal of: Asphalt, 26.20 LM for sewer line C21A/19/2 to C21A/19/1 Removal of: Asphalt, 13.30 LM Interlock tiles, 3.80 LM Curbstone, 6.00 LM Hydrostatic and deflection test for sewer line C21A/19/2A to C21A/19/2, 225mm UPV Hydrostatic and deflection test for sewer line C21A/19/2 to C21A/19/.1, 225mm UPVC Hydrostatic and deflection test for sewer line C21A/5/2/1/2 to C21A/5/2/1/3 , 225mm UPVC Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia C16/3/1 to C16/3 including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C17/2A/2N to C17/3A/1N Removal of existing backdrop and construction of new for MH C16/3 coming from C16/3/1 Construction of new backdrop on MH E122/N coming from MH E122/1/1D for sewer line C16/3/1 to C16/3, removal of asphalt 1.00 LM for sewer line C24/18 to C24/15/1N, Removal of : Asphalt, 13.00 LM Interlock tiles, 6.00 LM for sewer line C16/3/2 to C16/3/1, removal of : Pasco tiles, 1.00 LM Hydrostatic and deflection test for sewer line C16/3/1 to C16/3, 160mm UPVC initial inspection prior to hand over for sewer line C16/3/1 to C16/3, 160mm UPVC initial inspection prior to hand over for sewer line C24/16 to C24/17, 225mm UPVC initial inspection prior to hand over for sewer line C24/17 to C24/18, 225mm UPVC initial inspection prior to hand over for sewer line C24/20 to C24/13, 225mm UPVC initial inspection prior to hand over for sewer line C24/22 to C24/20, 225mm UPVC Rec'd Date 17-Apr-13 15-Apr-13 5-May-13 6-May-13 Status

MACE
Remarks P26-CLAIMED P26-CLAIMED CLAIMED/P27 P26-CLAIMED waiting Consultant approval P26-CLAIMED Approved Approved Approved Approved CHECK Approved

17-Apr-13

5117

13-Apr-13

removal Hydrostatic & Deflection Test Handing Over Backfilling removal removal removal Removal Removal Removal

E13

15-Apr-13

Approved

P26-CLAIMED

5118 5119 5120 5121 5122 5123 5124 5125 5126

13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13 13-Apr-13

E13 E13 E13 E16/01 E10 E10 E16/01 E16/01 E16/01

5-May-13 6-May-13 28-Apr-13 17-Apr-13 23-Apr-13 28-Apr-13 28-Apr-13 28-Apr-13

Approved Approved CHECK Repeated Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED waiting Consultant approval Superseeded rfi # 5163 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5127

13-Apr-13

Removal Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Excavation Excavation Backdrop Backdrop removal Removal removal Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Handing Over Handing Over

E16/01

28-Apr-13

Approved

P26-CLAIMED

5128 5129 5130 5131 5132 5133 5134 5135 5136 5137 5138 5139 5140 5141 5142 5143

13-Apr-13 13-Apr-13 13-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13

E16/01 E16/01 E16/01 E15 E15 E15 E10 E15 E16/02 E15 E15 E15 E16/02 E16/02 E16/02 E16/02

28-Apr-13 28-Apr-13 28-Apr-13 17-Apr-13 17-Apr-13 17-Apr-13 23-Apr-13 17-Apr-13 28-Apr-13 17-Apr-13 11-May-13 11-May-13 20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED CLAIMED/P27 CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5144 Sub. Date 15-Apr-13 Activity Reinstatement Location ( Sector No ) E15 LINE No. Description for sewer line C16/8 to C16/7, reinstatement of interlock tiles 5.00 LM for sewer line C17/10 to C17/9, reinstatement of Asphalt 21.30 LM (12) for sewer line C17/11 to C17/10, reinstatement of Asphalt 30.60 LM (12) for sewer line C17/9 to C17/8, reinstatement of Asphalt 15.00 LM (12) for sewer line C127/5A to C17/5, reinstatement of Asphalt 12.30 LM (12) for sewer line C17/8A to C17/8, reinstatement of Asphalt 7.70 LM (4) for sewer line E128/4N to E128/4/1A/N, reinstatement of interlock tiles 19.50 LM for sewer line E128/2N to E128/1N, reinstatement of interlock tiles 30.00 LM for sewer line C17/2A/2N to C17/3A/1N, removal of : Interlock tiles, 25.50 LM Curbstone, 19.00 LM for sewer line C16/8 to C16/7, reinstatement of : Pasco tiles, 14.00 LM Trial pit for sector E12 near MH C32B/57 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia H7/3 to H7/2 ST. 42.2 to ST. 48.00 For sewer line C7/3 to C7/2/N, removal of: Asphalt, 44.81 LM For sewer line C7/1/1/N to C7/2/N, removal of: Asphalt, 40.90 LM For sewer line C10/2/N to C10/1/N, reinstatement of: Asphalt, 37.67 LM For sewer line D25 to D26N/8/5N, reinstatement of: o Asphalt; 8.80 LM o Curb stone; 6.10 LM For sewer line D26N/8/5N to D26N/8/4N, reinstatement of; o Asphalt; 23.30 LM o Interlock tiles; 4.80 LM o Curbstone, 12.70 LM site condition between sewer line IC to E121/2 supporting of existing utilities ( etisalat chamber & water line) between sewer line IC to E121/2 supporting of existing utilities near MH D26N/8/N for sewer line E128/7/1/1A/N to 124/1B/N, reinstatement of interlock tiles 1.80 LM for sewer line C6B/1 to C6B, reinstatement of Asphalt 4.10 LM for sewer line C7/2/N to C7/1/1/N, reinstatement of Asphalt 30.08 LM for sewer line E121/2 to E121, removal of interlock tiles 24.00 LM Casting of shafts for MH E128/7/2N & E123/N Removal of existing Backdrop and construction of new B.D for MH C21A/5/2/1/3 coming from C21A/5/2/1/2 Blinding and Concreting of base for MH E122/N Blinding and Concreting of base for MH C19/18A/1N Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C21A/19/1 to C21/19 including MH connections Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 315mm Dia C21/2 to C21/1 including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia E128/N to 127/4B/N including MH connections Hydrostatic and deflection test for sewer line C21A/19/1to C21A/19, 225mm UPVC Hydrostatic and deflection test for sewer line C21/2 to C21/1, 315mm UPVC initial inspection prior to hand over for sewer line C21/2 to C21/1, 315mm UPVC initial inspection prior to hand over for sewer line C21A/19/1 to C21A/19, 225mm UPVC for sewer line 123/1A/N to E128/7/2N, removal of asphalt 35.8 LM for sewer line C7/3 to C7/2/N, reinstatement of asphalt 50.05 LM Demolishing of existing MH 127/4N to be replaced by new Rec'd Date 21-Apr-13 Status

MACE
Remarks CLAIMED/P27 Approved 21-Apr-13 Approved P26-CLAIMED

5145

15-Apr-13

Reinstatement

E15

5146 5147 5148 5149 5150 5151 5152 5153

15-Apr-13 15-Apr-13 15-Apr-13 15-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13

Reinstatement Removal Reinstatement Trial Pit Excavation removal removal Reinstatement

E10 E15 E15 E12 W7/01 E13 E13 E13

28-Apr-13 24-Apr-13 21-Apr-13 21-Apr-13 5-Jun-13 11-May-13 30-Apr-13 23-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED CLAIMED/P27 Approved CLAIMED/P27 Approved P26-CLAIMED P26-CLAIMED

5154

18-Apr-13

Reinstatement

E19

30-Apr-13

Approved

P26-CLAIMED

5155 5156 5157 5158 5159 5160 5161 5162 5163 5164 5165 5166

18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 18-Apr-13 20-Apr-13

site condition supporting supporting Reinstatement Reinstatement Reinstatement removal Concreting Backdrop concreting concreting Excavation

E10 E10 E19 E10 E13 E13 E10 E10 E16/01 E10 E16 E16/01

21-Apr-13 21-Apr-13 23-Apr-13 2-Jun-13 23-Apr-13 23-Apr-13 23-Apr-13 21-Apr-13 28-Apr-13 28-Apr-13 28-Apr-13 30-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5167

20-Apr-13

Excavation

E16/01

30-Apr-13

Approved

P26-CLAIMED

5168 5169 5170 5171 5172 5173 5174 5175

20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13 20-Apr-13

Excavation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over removal Reinstatement removal

E10 E16/01 E16/01 E16/01 E16/01 E10 E13 E10

21-Apr-13 28-Apr-13 28-Apr-13 8-Jun-13 28-Apr-13 23-Apr-13 23-Apr-13 21-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C21A/5/2: 1. Cleaning and recoating of DI cover frame ( 600 x 600 D400) 2. Replacing damaged sealing plate by new (9.51) 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (1nos) (9.44) 4. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.59) 5. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 0.1884 m2, C.S thickness = 0.3 m) 6. Provide plug & chain and end plug (160mm) Rehabilitation work at existing MH C19/15A: 1. Cleaning and recoating of DI cover frame ( 600 x 600 D400) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by patch repair (8nos) (9.44) 3. Removal and renew of defective GRP joint in MH shaft (3 nos) (9.60) 4. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 0.81012 m2, C.S thickness = 0.3 m) Rehabilitation work at existing MH D22/21N: 1. Cleaning and recoating of DI cover frame ( 750 x 600 B125) 2. Replacing damaged sealing plate by new (9.52) 3. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.60) 4. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 0.27 m2, C.S thickness = 0.3 m) Rehabilitation work at existing MH D22/21N/A: 1. Cleaning and recoating of DI cover frame (600 Dia, B125) 2. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.60) Rehabilitation work at existing MH D22/21N/B/1N: 1. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.60) Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C24/18 to C24/15 including MH connections New. GRP / Excavation up to formation & pipe laying G.B.S for 700mm Dia C13/N to C14/1/N (24.4 LM) Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia C10/1/1 to C10/1/N (25.5 LM) Hydrostatic and deflection test for sewer line C24/18 to C24/15, 225mm UPVC initial inspection prior to hand over for sewer line C24/18 to C24/15, 225mm UPVC for sewer line D26N/9/N to D26N/8/N, removal of interlock tiles 80.0 LM for sewer line D22/22N/1N to D22/22N/2N, removal of asphalt 9.07 LM for sewer line C10/1/1 to C10/1/N, removal of asphalt 25.60 LM for sewer line C21/20 to C21/19, reinstatement of asphalt 39.20 LM installation of adjustable ring, cover slab, and DI cover and frame (750mm, D-400) for MHs D26N/8/4N and D26N/8/5N Backfilling up to final layer between sewer line D22/21N/B/1N to D22/21N/A Backfilling up to final layer between sewer line D22/22N/1N to D22/22N Backfilling up to final layer between sewer line D22/21N/A to D22/21N Backfilling up to final layer between sewer line D22/22N to D22/21N/C Backfilling up to final layer between sewer line C21/2 to C21/1 Backfilling up to final layer between sewer line C21A/19/1 to C21A/19 Backfilling up to final layer between sewer line C24/18 to C24/15 Backfilling up to final layer between sewer line C24/20 to C24/13 Backfilling up to final layer between sewer line C24/22 to C24/20 Backfilling up to final layer between sewer line C16/4A to C16/3 Backfilling up to final layer between sewer line C16/3/3 toC16/3/2 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C19/21N to C19/20N including MH connection (3.46 LM) New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C19/18/1N to C19/17A/1N including MH connection (7.00 LM) Rec'd Date Status

MACE
Remarks

5176

20-Apr-13

Rehabilitation

E16/01

11-May-13

Approved

CLAIMED/P27

5177

20-Apr-13

Rehabilitation

E16

28-Apr-13

Approved

P26-CLAIMED

5179

20-Apr-13

Rehabilitation

E19

5-Jun-13

Approved

CLAIMED/P27

5180 5181 5182 5183 5184 5185 5186 5187 5188 5189 5190 5191

20-Apr-13 20-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13 21-Apr-13

Rehabilitation Rehabilitation Excavation Excavation Excavation Hydrostatic & Deflection Test Handing Over removal removal removal Reinstatement Installation

E19 E19 E16/02 E13 E13 E16/02 E16/02 E19 E19 E13 E16/01 E19

23-Apr-13 23-Apr-13 28-Apr-13 23-May-13 30-Apr-13 28-Apr-13 28-Apr-13 24-Apr-13 28-Apr-13 24-Apr-13 4-May-13 30-Apr-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5192

22-Apr-13

Backfilling

E19

24-Apr-13

Approved

P26-CLAIMED

5193 5194 5195 5196

22-Apr-13 22-Apr-13 22-Apr-13 23-Apr-13

Backfilling Backfilling Backfilling Excavation

E16/01 E16/02 E15 E16

2-Jun-13 28-Apr-13 24-Apr-13 24-Apr-13

Approved Approved Approved Approved

CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED

5197

23-Apr-13

Excavation

E16

24-Apr-13

Approved

P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5198 5199 5200 Sub. Date 23-Apr-13 23-Apr-13 23-Apr-13 Activity Excavation removal removal Location ( Sector No ) E15 E10 E15 LINE No. Description New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C17/2A/2N to C17/3A/1N (12.00LM) Demolishing of existing chamber between sewer line IC to E121/2 Removal of existing AC pipe, 100mm Dia, between sewer line IC to E121/2 For sewer line C16/3/3 to C16/3/2, removal of Curbstone 36.00 LM For sewer line C16/9 to C16/8, removal of Curbstone 17.00LM For sewer line C9/4 to C32B/47, reinstatement of: Interlock tiles, 23.00LM Asphalt, 59.95 LM Curb stone, 20.70 LM For sewer line C16/8 to C16/7, reinstatement of asphalt 13.95 LM For sewer line C16/7 to C16/1A, reinstatement of asphalt 22.40 LM For sewer line C16/7 to C16/7/1, reinstatement of asphalt 14.20 LM Installation of Adjustable ring, cover slab and DI cover and frame ( 750mm, D400 ) with sealing plate for MHs: E128/4N E128/4/1A/N E128/1N E128/2N E128/3N 124/1B/N E128N E128/7/1/1A/N Rehabilitation work at existing MH C16/3/1: 1. Demolishing of existing DI cover frame and installing new (600 Dia, B-125) with sealing plate (9.51, 3.26) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 5.181 m2, internal Dia= 1.00 m) 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 0.1884 m2, C.S thickness = 0.3 m) 4. Repairing of benching ( A= 0.957 m2, internal Dia =1.00 m) 5. Repairing and lamination of soffit area ( A = 0.5024 m2) Rec'd Date 24-Apr-13 28-Apr-13 28-Apr-13 Status

MACE
Remarks P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved Approved Approved

5201

23-Apr-13

Reinstatement

E12

30-May-13

Approved

CLAIMED/P27

5202

23-Apr-13

Reinstatement

E15

28-Apr-13

Approved

CLAIMED/P27

5203

23-Apr-13

Installation

E10

28-Apr-13

Approved

P26-CLAIMED

5204

23-Apr-13

Rehabilitation

E15

12-May-13

Approved

Approved

5205

23-Apr-13

Rehabilitation

E15

Rehabilitation work at existing MH C16/3/3: 1. Demolishing of existing DI cover frame and installing new (600 Dia, B-125) with sealing plate (9.51, 3.26) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 4.082 m2, internal Dia= 1.00 m) 3. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 1.1304 m2, C.S thickness = 0.6 m) 4. Repairing of benching ( A= 0.957 m2, internal Dia =1.00 m) 5. Repairing and lamination of soffit area ( A = 0.5024 m2)

12-May-13

Approved

Approved

5206

23-Apr-13

Rehabilitation

E10

Rehabilitation work at existing MH C14/122: 1. Demolishing of existing cover slab, Thickness= 0.6 m (9.01) 2. Demolishing of existing upper shaft, Length = 0.9 m internal Dia = 1.00 m (9.02) 3. Casting of new shaft, cover slab and adjustable ring with internal Dia = 1.5 m (9.08, 9.15, 9.63) 4. Installation of shaft, cover slab, adjustable ring and DI cover frame (750, B-125) with sealing plate (9.08, 9.27, 9.06, 9.52) 5. Removal of defective lining inside MH Base chamber, repairing of damaged concrete and renew GRP by full lamination (9.45) 6. Repairing of benching ( A= 2.115 m2, internal Dia =1.50 m) 7. Sealing leaks in MH. 3 Nos (9.46) 8. Removal and renew of defective GRP joint in MH shaft (2 nos) (9.60)

4-May-13

Approved

P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at existing MH C16/3: 1. Cleaning and recoating of DI cover frame and sealing plate, 600 x 600 B-125 2. Removal of ladder (9.55) 3. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 5.2752 m2, internal Dia= 1.20 m) 4. Removal of defective lining inside MH Raising area, repairing of damaged concrete and renew GRP by Re-lining (A= 0.7536 m2, C.S thickness = 0.3 m) For sewer line C13/1/N to C13/1/1/N, reinstatement of asphalt 23.35 LM For sewer line C13/1/2/N to C13/1/N, reinstatement of asphalt 9.170 LM Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C21A/18 to C21A/17 including MH connections Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia E121/2 to E121 including MH connections Hydrostatic and deflection test for sewer line C21A/22/3/1 to C21A/22/3/2, 450mm UPVC Hydrostatic and deflection test for sewer line C21A/5/2/1/4 to C21A/22/3/1, 450mm UPVC Hydrostatic and deflection test for sewer line C21A/22/3/3 to C21A/22/3/4, 450mm UPVC Hydrostatic and deflection test for sewer line C21A/5/2 to C21A/5/2/1/1, 225mm UPVC Hydrostatic and deflection test for sewer line C10/1/1 to C10/1/N, 160mm UPVC Hydrostatic and deflection test for sewer line E121/2 to E121, 160mm UPVC Initial inspection prior to hand over for sewer line E121/2 to E121, 160mm UPVC Initial inspection prior to hand over for sewer line C10/1/1 to C10/1/N, 160mm UPVC Initial inspection prior to hand over for sewer line C21A/19/2 to C21A/19/1, 225mm UPVC Initial inspection prior to hand over for sewer line C21A/5/2 to C21A/5/2/1/1, 225mm UPVC Initial inspection prior to hand over for sewer line C21A/5/2/1/2 to C21A/5/2/1/3, 225mm UPVC Initial inspection prior to hand over for sewer line C21A/5/2/1/1 to C21A/5/2/1/2, 225mm UPVC Initial inspection prior to hand over for sewer line C21A/22/3/2 to C21A/22/3/3, 450mm UPVC Initial inspection prior to hand over for sewer line C21A/5/2/1/4 to C21A/22/3/1,450mm UPVC Initial inspection prior to hand over for sewer line C21A/22/3/1 to C21A/22/3/2, 450mm UPVC Initial inspection prior to hand over for sewer line C21A/22/3/3 to C21A/22/3/4, 450mm UPVC Hydrostatic and deflection test for sewer line D26N/8/5N to D25, 315mm UPVC Blinding and Concreting of base C19/21N Blinding and Concreting of base C24/15/2N Blinding and Concreting of base C19/18/1N Blinding and Concreting of base C19/17A/1N Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C21A/19 to C21A/18 including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C19/21N to C19/20N (48.5 LM) Hydrostatic and deflection test for sewer line C21A/19 to C21A/18, 225mm UPVC For sewer line C21/1 to C21, Removal of: Interlock tiles, 34.30 LM Curbstone, 34.00 LM Asphalt, 34.00 LM For sewer line C21A/22/3/5 to C21A/22/3/6, Removal of: Interlock tiles, 32.58 LM For sewer line C21A/22/3/4 to C21A/22/3/5, Removal of: Interlock tiles, 14.75 LM For sewer line C19 to C19/20/1N, reinstatement of: o Asphalt, 6.70 LM For sewer line C19/20/1N to C19/20N, reinstatement of: o Asphalt, 29.800 LM 28-Apr-13 28-Apr-13 28-Apr-13 28-Apr-13 Rec'd Date Status

MACE
Remarks 12-May-13 Approved CLAIMED/P27

5207

23-Apr-13

Rehabilitation

E15

5208

23-Apr-13

Reinstatement

E13

28-Apr-13

Approved

P26-CLAIMED

5209

27-Apr-13

Excavation

E16/01

30-Apr-13

Approved

P26-CLAIMED

5210

27-Apr-13

Excavation

E10

28-Apr-13

Approved

P26-CLAIMED

5211

27-Apr-13

Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Handing Over

E16/01

28-Apr-13

Approved

P26-CLAIMED

5212 5213 5214 5215 5216 5217

27-Apr-13 27-Apr-13 27-Apr-13 27-Apr-13 27-Apr-13 27-Apr-13

E13 E10 E10 E13 E16/01 E16/01

Cancelled Approved Approved CHECK Approved Approved

Need Over Pumping (Aneesh) P26-CLAIMED P26-CLAIMED Resubmit 05.06.2013 P26-CLAIMED P26-CLAIMED

5218

27-Apr-13

Handing Over Hydrostatic & Deflection Test concreting concreting concreting concreting Excavation Excavation Hydrostatic & Deflection Test Removal

E16/01

28-Apr-13

Approved

CLAIMED/P27

5219 5220 5221 5222 5223 5224 5225 5226

27-Apr-13 27-Apr-13 27-Apr-13 27-Apr-13 27-Apr-13 28-Apr-13 28-Apr-13 28-Apr-13

E19 E16 E16/02 E16 E16 E16/01 E16 E16/01

4-May-13 1-May-13 5-May-13 1-May-13 1-May-13 28-Apr-13 28-Apr-13 4-May-13

Approved Approved Approved Approved Approved Approved Approved Approved

Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5227

28-Apr-13

E16/01

4-May-13

Approved

P26-CLAIMED

5228 5229

28-Apr-13 28-Apr-13

Removal Removal

E16/01 E16/01

4-May-13 4-May-13

Approved Approved

P26-CLAIMED P26-CLAIMED

5230

28-Apr-13

Reinstatement

E16

29-Apr-13

Approved

P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. For sewer line C19/2N to C19/14, reinstatement of: o Asphalt, 19.400 LM For sewer line C19/14 to C19/15, reinstatement of: o Asphalt, 61.100 LM For sewer line C19/15 to C19/15A, reinstatement of: o Asphalt, 57.50 LM For sewer line C19/27 to C19/14, reinstatement of: o Asphalt, 6.45 LM o Interlock tiles, 4.50 LM For sewer line C19/15/1 to C19/15, reinstatement of: o Asphalt, 5.800 LM o Interlock tiles, 3.60 LM For sewer line C13/1/N to C13/1/1/N, reinstatement of: o Asphalt, 25.06 LM o Interlock tiles, 4.80 LM o Curbstone, 8.20 LM For sewer line C10/3 to C10/3/1/N, reinstatement of: o Interlock tiles, 6.32 LM For sewer line C10/3/1/N to C10/2/N, reinstatement of: o Interlock tiles, 7.10 LM o Curbstone, 4.20 LM o Asphalt, 4.00 LM For sewer line C8/1 to C8A/N, reinstatement of: o Interlock tiles, 32.70 LM o Curbstone, 4.40 LM For sewer line C16/3/3 to C16/3/2, reinstatement of: o Curbstone, 36.00LM Demolishing of existing MH D26N/8/N to be replaced by new Blinding and Concreting of base for MH D26N/8/N Concreting of intermediate slab for MH D26N/8/N Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 160mm Dia IC to E121/2 including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C24/15 to C24/15/2N including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 225mm Dia C19/18A/1N to C19/18/1N including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 225mm Dia C19/18A/1 to C19/18/1N including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C19/18/1N to C19/17A/1N including MH connections (28.80 LM ) For sewer line D22/26N to D22/25N, removal o asphalt 50.04 LM For sewer line C21A/19 to C21A/18, Removal of: Asphalt, 25.70 LM Interlock tiles, 4.90 LM Curbstone, 9.00 LM For sewer line C24/16 to C24/17, reinstatement of asphalt 19.60 LM For sewer line C24/18 to C24/17, reinstatement of asphalt 5.08 LM For sewer line C24/20 to C24/13, reinstatement of asphalt 46.50 LM For sewer line C24/22 to C24/20, reinstatement of asphalt 10.00 LM For sewer line 119 to C14/122, reinstatement of Curbstone 28.8 LM For sewer line 124/1B/N to E128/7/1/1A/N, reinstatement of Curbstone 4.60 LM For sewer line 119 to C14/122, reinstatement of : o Interlock tiles, 31.7 LM o Ceramic tiles, 12.00 LM Hydrostatic and deflection test for sewer line IC to E121/2, 160mm UPVC Hydrostatic and deflection test for sewer line C24/15 to C24/15/2N, 280mm UPVC 10-Jun-13 9-Jul-13 30-Apr-13 14-May-13 28-May-13 2-May-13 4-May-13 1-May-13 Description Rec'd Date Status

MACE
Remarks 29-Apr-13 Approved CLAIMED/P27

5231

28-Apr-13

Reinstatement

E16

5232

28-Apr-13

Reinstatement

E16

5-Jun-13

Approved

CLAIMED/P27

5233

28-Apr-13

Reinstatement

E16

5-Jun-13

Approved

CLAIMED/P27

5234

28-Apr-13

Reinstatement

E13

28-Apr-13

Approved

P26-CLAIMED

5235

28-Apr-13

Reinstatement

E13

CHECK

waiting Consultant approval

5236 5237 5238 5239 5240 5241 5242 5243

28-Apr-13 28-Apr-13 29-Apr-13 29-Apr-13 29-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

Reinstatement Reinstatement removal concreting concreting Excavation Excavation Excavation

E13 E15 E19 E19 E19 E10 E16/02 E16

Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved P26-CLAIMED Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED

5244 5245 5246 5247

30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

Excavation Excavation removal Removal

E16 E16 E19 E16/01

6-May-13 1-May-13 9-May-13 4-May-13

Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED CLAIMED/P27 P26-CLAIMED

5248

30-Apr-13

Reinstatement

E16/02

4-May-13

Approved

P26-CLAIMED

5249 5250 5251 5252

30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

Reinstatement Reinstatement Hydrostatic & Deflection Test Hydrostatic & Deflection Test

E10 E10 E10 E16/02

2-May-13 2-May-13 2-May-13 4-May-13

Approved Approved Approved Approved

P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5253 5254 5255 5256 Sub. Date 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 Activity Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Reinstatement Location ( Sector No ) E16/02 E10 E10 E10 LINE No. Description Hydrostatic and deflection test for sewer line C21A/18 to C21A/17, 225mm UPVC Hydrostatic and deflection test for sewer line E128/N to 127/4B/N, 315mm UPVC initial inspection prior to hand over for sewer line E128/N to 127/4B/N, 315mm UPVC initial inspection prior to hand over for sewer line E121/2 to IC, 160mm UPVC reinstatement of light pole sector E10 line # 3 between sewer line E122/N to E123/ removal of fiber optic cable between sewer line: C14/17/1/2 to C14/13N/1/1 C14/13N/1/1 to C14/13N/1 C14/13N/1 to C14/14N/3 C14A/3 to C14A/3A to C14A/3AN to C14A/3B to C14A/3C C14A/3C to C14A/3D to C14A/3E to C14A/1/1 to C14A Concreting of shaft for MHs C19/17A/1N, C19/18/1N and C19/21N Blinding and concreting of base and shaft for MH C10/N New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C24/15/2N to C24/19N including MH connection (51.10 LM ) New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm Dia E128/3N to E128/2N including MH connection New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C17/2A/2N to C17/3A/1N (12.00 LM) New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C13/1/1 to C13/1/1/N including MH connections for sewer line C13/1/1 to C13/1/1/N, removal of: Interlock tiles, 3.68 LM Hydrostatic and deflection test for sewer line C13/1/1 to C13/1/1/N, 280mm UPVC Initial inspection prior to hand over for sewer line C13/1/1 to C13/1/1/N, 280mm UPVC New. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia C10/1/N to C10/N including MH connections for sewer line C10/1/N to C10/N, removal of: Asphalt; 18.67 LM Curbstone; 5.50 LM Interlock tiles, 16.31 LM Hydrostatic and deflection test for sewer line C10/1/N to C10/N, 225mm UPVC Initial inspection prior to hand over for sewer line C10/1/N to C10/N, 225mm UPVC For sewer line C21A/22/3/3 to C21A/22/3/4, reinstatement of interlock tiles 36.80 LM For sewer line C21A/22/3/2 to C21A/22/3/3, reinstatement of interlock tiles 21.90 LM For sewer line C21A/23 to C21A/22/3/4, reinstatement of interlock tiles 31.62 LM For sewer line C24/17 to C24/18, reinstatement of interlock tiles 31.20 LM Hydrostatic and deflection test for sewer line E128/3N to E128/2N, 315mm UPVC Initial inspection prior to hand over for sewer line E128/3N to E128/2N, 315mm UPVC Setting out and over pumping arrangement for sewer line # 20 sector E16/02 construction of Backdrops for new MH: C19/17A/1N, 1 nos C19/18/1N, 3 nos C19/18A/1N, 1nos installation of adjustable ring, cover slab and DI cover frame with sealing plate for MH: C7/4/2N C11/5/N C11/5/1/N C11/5/2/N C13/1/1/N Rec'd Date 4-May-13 2-May-13 2-May-13 2-May-13 Status

MACE
Remarks P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved Approved Approved Approved Approved

5257

30-Apr-13

removal

E13

29-May-13

Approved

Approved

5258 5259 5260 5261 5262 5263 5264 5265 5266 5267

30-Apr-13 30-Apr-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13

concreting concreting Excavation Excavation Excavation Excavation removal Hydrostatic & Deflection Test Handing Over Excavation

E16 E13 E16/02 E10 E15 E13 E13 E13 E13 E13

2-May-13 14-May-13 8-May-13 4-May-13 6-May-13 4-May-13 4-May-13 5-May-13 5-May-13 4-May-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED Approved P26-CLAIMED P26-CLAIMED P26-CLAIMED P26-CLAIMED

5268

2-May-13

removal Hydrostatic & Deflection Test Handing Over Reinstatement Reinstatement Reinstatement Hydrostatic & Deflection Test Handing Over over pumping Backdrop

E13

4-May-13

Approved

P26-CLAIMED

5269 5270 5271 5272 5273 5274 5275 5276 5277

2-May-13 16-Jun-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13

E13 E13 E16/01 E16/01 E16/02 E10 E10 E16/02 E16

10-Jun-13 26-Jun-13 8-Jun-13 28-May-13 28-May-13 12-May-13 12-May-13 8-May-13 9-May-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Approved P26-CLAIMED

5278

2-May-13

Installation

E13

5-May-13

Approved

P26-CLAIMED

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description installation of adjustable ring, cover slab and DI cover frame with sealing plate for MH: C9/17A/1N, 750 Dia D-400 C19/18/1N, 750 Dia D-400 C18/18A/1N, 600 Dia D-400 Blinding and Concreting of base for MH 127/4B/N Concreting of Shaft for MH 127/4B/N Concreting of Shaft for MH C10/N For sewer line E121 to E121/1A, removal of interlock tiles 21.25 LM Construction of new backdrop for MH C10/N coming from C10/1/N Construction of backdrop for MH 127/4B/N coming from 127/4B/1A Construction of backdrop for MH 127/4B/N coming from 128/1/2A Trial pit sector E12 ( 1, 2, 9 & 10 ) Rehabilitation work at existing MH C24/15: 1. Clean and coating for DI cover frame ( 600 x 600, D-400 ) with sealing plate 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by full lamination (A= 00.0942 m2, internal Dia= 1.20 m) 3. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.60) Rehabilitation work at existing MH C21A/19: 1. Clean and coating for DI cover frame ( 750 x 600, D-400 ) 2. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by full lamination (A= 00.27 m2, internal Dia= 1.50 m) Rehabilitation work at existing MH C21A/18: 1. Clean and coating for DI cover frame ( 750 x 600, D-400 ) 2. installation of 160mm dia plug with chain (1 no.) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by full lamination (A= 0.675 m2, internal Dia= 1.50 m) 4. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 3.297 m2, internal Dia= 1.50 m) : Rehabilitation work at existing MH C21A/19/2: 1. Clean and coating for DI cover frame ( 750 x 600, D-400 ) 2. Provide new sealing plate. (9.52) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by full lamination (A= 0.405 m2, internal Dia= 1.00 m) 4. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 1.727 m2, internal Dia= 1.00 m) Rehabilitation work at existing MH C21A/17: 1. Clean and coating for DI cover frame ( 600 x 600, D-400 ) 2. Provide new sealing plate. (9.51) 3. Removal of defective lining inside MH raising area, repairing of damaged concrete and renew GRP by full lamination (A= 0.25 m2, internal Dia= 1.00 m) 4. Removal of defective lining inside MH Shaft area, repairing of damaged concrete and renew GRP by Patch repair (2 Nos) (9.44) 5. Removal and renew of defective GRP joint in MH shaft (1 nos) (9.60) Rehabilitation work at existing MH C21A/19/1: 1. Clean and coating for DI cover frame ( 750 x 600, D-400 ) 2. Removal of defective lining inside MH shaft area, repairing of damaged concrete and renew GRP by full lamination (A= 3.14 m2, internal Dia= 1.00 m) Flow control, cleaning of sewer & inspection survey (Pre-CCTV) & deflection before the rehabilitation works of the sewer lines: C14A/3C to C14A/3D C14A/3D to C14A/3E C14A/3E to C14A/1 C14A/1 to C14A Rep. uPVC/Excavation to Formation & Pipelaying G.B.S. for 225mm Dia E121 & E121/1A including MH Connection New. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 160mm Dia C19/17A/1 to C19/17A/1N including MH connections New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia C19/18/1N to C19/17A/1N (30LM) Rec'd Date Status

MACE
Remarks 9-May-13 2-Jun-13 4-May-13 14-May-13 4-May-13 8-Jul-13 4-May-13 4-May-13 Approved Approved Approved Approved Approved Approved Approved Approved Approved CLAIMED/P27 CLAIMED/P27 P26-CLAIMED P26-CLAIMED Approved P26-CLAIMED Approved

5278A 5279 5280 5281 5282 5283 5284 5285

4-May-13 4-May-13 4-May-13 4-May-13 4-May-13 4-May-13 4-May-13 4-May-13

Installation concreting concreting concreting removal Backdrop Backdrop Trial Pit

E16 E10 E10 E10 E10 E13 E10 E12

5286

9-May-13

Rehabilitation

E16/02

20-May-13

Approved

CLAIMED/P27

5287

9-May-13

Rehabilitation

E16/01

20-May-13

Approved

Approved

5288

9-May-13

Rehabilitation

E16/01

20-May-13

Approved

Approved

5289

9-May-13

Rehabilitation

E16/01

20-May-13

Approved

CLAIMED/P27

5290

9-May-13

Rehabilitation

E16/01

20-May-13

Approved

CLAIMED/P27

5291

9-May-13

Rehabilitation

E16/01

20-May-13

Approved

Approved

5292

13-May-13

Rehabilitation

E13

3-Jul-13

Approved

Approved

5293 5294 5295

13-May-13 13-May-13 13-May-13

Excavation Excavation Excavation

E10 E16 E16

22-May-13 16-May-13 16-May-13

Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) E16 E15 E15 E13 E13 E13 E13 E10 E16/01 E10 E16/01 25 LINE No. Description Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.S for 160mm Dia C19/18/1 to C19/18/1N including MH connections New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm Dia C17/2A/2N to C17/2A/3N (6.00 LM) New. GRP / Excavation up to formation & pipe laying G.B.S for 500mm Dia C17/1N to C17/2A/1N (6.00 LM) New. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm Dia C11/2/N to C11/6/N including MH connections for sewer line C11/2/N to C11/6/N, removal of asphalt 42.76 LM Hydrostatic and deflection test for sewer line C11/2/N to C11/6/N, 225mm UPVC initial inspection prior to hand over for sewer line C11/2/N to C11/6/N, 225mm UPVC Hydrostatic and deflection test for sewer line E121/1A to E121, 225mm UPVC hydrostatic and deflection test for sewer line C21A/22/3/2 to C21A/22/3/3, 450mm UPVC initial inspection prior to hand over for sewer line 576/1/1 to 5761/1 160mm, UPVC for sewer line C21/3 to C21/2, reinstatement of: Asphalt, 55.5 LM Curbstone, 55.56 LM for sewer line C21/4 to C21/3, reinstatement of: Asphalt, 22.23 LM Curbstone, 32.08 LM for sewer line C21A/5/2/1/4 to C21A/22/3/1, reinstatement of: Asphalt, 12.35 LM for sewer line C21A/22/3/1 to C21A/22/3/2, reinstatement of: Asphalt, 3.55 LM Interlock tiles, 4.70 LM Curbstone, 4.00 LM Removing of Existing AC pipe between sewerline IC to E121/2 to E121 for sewer line C16/4A to C16/3, reinstatement of Asphalt 41.00 LM for sewer line C16/4A to C16/4, reinstatement of Asphalt 37.20 LM Road markings between sewer line C21/4 to C21/3 to C21/2, total area 12.98 m2 Rep. uPVC/Excavation to Formation & Pipelaying C.B.S. for 160mm Dia MH C10/2/2 to C10/2/1 including MH Connection For Sewer Line C10/2/2 to C10/2/1, Removal of interlock tiles, 9.39 LM Hydrostatic and Deflection Test for Sewer Line C10/2/2 to C10/2/1, 160mm uPVC 21 initial inspection prior to hand over for sewer line C10/2/2 to C10/2/1, 160mm UPVC initial inspection prior to hand over for sewer line C24/15 to C24/15/2N, 280mm UPVC For Sewerline 128/7/1/1A/N to 124/1B/N, Reinstatement of Interlock Tiles: 21.00 LM For Sewerline 123/6/2 to 123/6N Reinstatement Asphalt : 4.54 LM Interlock Tiles: 2.5 LM For Sewer Line 123/5/1 to C14/120N/3, reinstatement of interlocks tile 2.00 LM For Sewer Line C14/120N/4 to E128/7/3, reinstatement of interlocks tile 2.00 LM For Sewer Line 123/6N to C14/120N/5, reinstatement of interlocks tile 2.00 LM For Sewer Line 125/5/3/1A to 125/5/3, reinstatement of interlocks tile 7.80 LM For Sewer Line 125/5/3/1A to 125/5/3, reinstatement of interlocks tile 2.00 LM For Sewerline E127/2/1 to 127/2/1/A, reinstatement of : Pasco Tiles, 3.60 LM Interlock Tiles, 12.50 LM For Sewerline 123/1/3/2 to E128/7/3, reinstatement of : Asphalt, 4.80 LM Interlock Tiles, 2.00 LM For sewer line C3A/N to C3A/1, reinstatement of: o Asphalt, 6.940 LM o Interlock tiles 6.00 LM. o Curbstone, 8.00 LM Rec'd Date Status

MACE
Remarks 16-May-13 16-May-13 16-May-13 13-May-13 16-May-13 23-Jun-13 24-Jun-13 22-May-13 20-May-13 22-May-13 20-May-13 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Approved CLAIMED/P27 Approved Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

5296 5297 5298 5299 5300 5301 5302 5303 5304 5305 5306

13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 13-May-13

Excavation Excavation Excavation Excavation Removal Hydrostatic & Deflection Test Handing Over Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Reinstatement

5307 5308

13-May-13 13-May-13

Reinstatement Reinstatement

E16/01 E16/01

28-May-13 28-May-13

Approved Approved

CLAIMED/P27 CLAIMED/P27

5309 5310 5311 5312 5313 5314 5315 5316 5317 5318 5319

13-May-13 13-May-13 13-May-13 13-May-13 13-May-13 15-May-13 15-May-13 15-May-13 15-May-13 15-May-13 15-May-13

Reinstatement removal Reinstatement Road Marking Excavation removal Hydrostatic & Deflection Test Handing Over Handing Over Reinstatement Reinstatement

E16/01 E10 E15 E16/01 E13 E13 E13 E13 E16/02 E10 E10

28-May-13 22-May-13 2-Jun-13 18-Jun-13 23-May-13 26-May-13 26-May-13 2-Jun-13 5-Jun-13 22-May-13 22-May-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 Approved CLAIMED/P27 Approved Approved Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

5320

15-May-13

Reinstatement

E10

22-May-13

Approved

CLAIMED/P27

5321

15-May-13

Reinstatement

E10

22-May-13

Approved

CLAIMED/P27

5322

15-May-13

Reinstatement

E10

22-May-13

Approved

CLAIMED/P27

5323

15-May-13

Reinstatement

E14

30-May-13

Approved

CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) E14 LINE No. Description For sewer line C14A/7/1N to C14A/6A, reinstatement of: o Asphalt, 37.20 LM o Interlock tiles 3.00 LM. For sewer line C14A/7 toC14A/7/1N, reinstatement of: o Asphalt, 11.90 LM o Interlock tiles 6.00 LM. For sewer line C14A/7N toC14A/7/1N, reinstatement of: o Asphalt, 13.35 LM o Interlock tiles 14.20 LM. o Curbstone, 16.00 LM For Sewerline C14/26 to C14/26/N, reinstatement of: Asphalt, 5.77 LM, For sewer line C5A/2 to C5B/01, reinstatement of: o Asphalt, 3.50 LM o Interlock tiles 35.12 LM. o Curbstone, 32.62 LM Rec'd Date Status

MACE
Remarks 30-May-13 Approved CLAIMED/P27

5324

15-May-13

Reinstatement

5325

15-May-13

Reinstatement

E14

CHECK

5326 5327 5328

15-May-13 15-May-13 15-May-13

Reinstatement Reinstatement Reinstatement

E14 E14 E14

30-May-13 Interlock Tiles, 3.00 LM 2-Jun-13 30-May-13

Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

5329

15-May-13

Reinstatement

E14

For sewer line C14/10/3N to C14/10/2N, reinstatement of curb stone 12.00 LM For sewer line C5N/2 to C5N/3, reinstatement of curb stone 8.00 LM For sewer line C5B/01 to C5C/01, reinstatement of curb stone 7.00 LM For sewer line C14/10 to C14/10/1, reinstatement of: o interlock tiles, 4.18 LM For sewer line C14A/8/2 to C14A/7N reinstatement of: o Interlock tiles, 24.18 LM o Curbstone, 29.65 LM For sewer line C4 to T4/1, reinstatement of: o Interlock tiles 1.00 LM o Curbstone, 4.00 LM For sewer line C5B/1/1N to C5B/01, reinstatement of: o Interlock tiles 5.74 LM Demolishing of existing MH C24/19N to be replaced by new Asphalt Reinstatement of sewer line: o MH D26N/14/N to D26N/14/B, 3.16 LM o MH D26N/14/N to D26N/14/1, 6.10 LM o MH D26N/14/N to 571/N, 86.42 LM Hydrostatic and Deflection Test for Sewer Line H7/5/1 to H7/5, 200mm GRP Hydrostatic test for sewer line E128/7/2N to E123/1A/N, 280mm UPVC Excavation up to formation & Pipelaying G.B.S for 200mm Dia GRP H7/5/1 to H7/5 including MH Connection Repair /Replacement uPVC/Excavation up to formation & Pipelaying 160mm Dia GRP H7/5/1 to H7/5/2A connection to existing VC pipe including connection /Exacavation up to formation & Pipelaying G.B.S. for 160mm Dia for Sewerline 123/1A/N to E128/7/2N including MH connection Installation of 500mm GRP Pipe 10,000 Stiffness by NDM Method from MH C17/2A/1N to MH C17/1/N - 27 Meters [including Grouting] Removal of NDM Equipment between MH C17/2A/1N to MH C17/1/N (Line 14) Asphalt Reinstatement of sewer line: o MH C21/2 to MH C21/1, 47 LM o Asphalt Reinstatement of sewer line: MH C21A/19/1 to MH C21A/19, 6.10 LM o Asphalt Reinstatement of sewer line: MH C21A/19/2A to MH C21A/19/2, 14.76 LM o Asphalt Reinstatement of sewer line: MH C21A/19/2 to MH C21A/19/1, 12.90 LM o Footpath Tiles Reinstatement of sewer line: MH C21A/19/2 to MH C21A/19/1, 3.5 LM o Kerbstone Reinstatement of sewer line: MH C21A/19/2 to MH C21A/19/1, 6.5 LM o Asphalt Reinstatement of sewer line: MH C21A/5/2/1/1 to MH C21A/5/2/1/2, 9.10 LM o Asphalt Reinstatement of sewer line: MH C21A/5/2 to MH C21A/5/2/1/1, 13.25 LM o Asphalt Reinstatement of sewer line: MH C21A/5/2/1/2 to MH C21A/5/2/1/3, 35.50 LM o Kerbstone Reinstatement of sewer line: MH C21A/5/2/1/2 to MH C21A/5/2/1/3, 5.0 LM Concreting of Base for MH H7/5/1 Concreting of Cover Slab and Adj. Ring for MH H7/5/1 Concreting of Cover Slab & Adj. Ring for MH C21A/22/3/7 Concreting of Cover Slab & Adj. Ring for MH C17/1/N

30-May-13

Approved

CLAIMED/P27

5331

15-May-13

Reinstatement

E14

30-May-13

Approved

CLAIMED/P27

5332 5335

15-May-13 20-May-13

Removal Reinstatement

E16/02 E19

21-May-13 4-Jun-13

Approved Approved

CLAIMED/P27 CLAIMED/P27

5336 5337 5338 5339 5340 5341 5342 5343

Hydrostatic & Deflection Test 20-May-13 Hydrostatic Test 20-May-13 20-May-13 20-May-13 20-May-13 23-May-13 20-May-13 20-May-13 Excavation Excavation Excavation NDM Removal Reinstatement

W7/01 E10 W7/01 W7/01 E10 E15 E15 E16/01

2-Jun-13 22-May-13 21-May-13 21-May-13 22-May-13 25-May-13 22-May-13 28-May-13

Approved Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

5344

20-May-13

Reinstatement

E16/01

8-Jun-13

Approved

CLAIMED/P27

5345 5346 5347 5348 5349

20-May-13 20-May-13 20-May-13 15-Jun-13 21-May-13

Reinstatement Concreting Concreting Concreting Concreting

E16/01 W7/01 W7/01 E16/01 E15

2-Jun-13 21-May-13 21-May-13 1-Jul-13 2-Jun-13

Approved Approved Approved Test Req Approved

CLAIMED/P27 35.5 and 5.0 LM approved on 30 Jul 2013 CLAIMED/P27 CLAIMED/P27 Need Cube Test Result CLAIMED/P27

10

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5350 5351 5352 5353 5354 5355 5356 5357 5358 Sub. Date 21-May-13 21-May-13 21-May-13 21-May-13 21-May-13 21-May-13 21-May-13 21-May-13 21-May-13 Activity Concreting Concreting Concreting Concreting Concreting Concreting Concreting Concreting Concreting Location ( Sector No ) E13 E13 E16/02 E16/02 E16/02 E10 E15 E13 E16 LINE No. Description Concreting of Concrete Pipe Surround 160mm Dia uPVC from MH C10/2/2 to MH C10/2/1 Concreting of Blinding for MH C13/N Concreting of MH Base for MH C24/19N Concreting of Cover Slab & Adj. Ring for MH C10A/2/1/N at Precast Yard Concreting of Cover Slab & Adj. Ring for MH C24/19N at Precast Yard Concreting of Blinding for MH E128/7/2N Concreting of MH Base for MH E128/7/2N Concreting of N.D.M. Concreting of Blinding for MH C13/1/N Concreting of Blinding for MH C10/2/N Concreting of MH Shaft for MH C19/21N + Backdrop Concreting of Backdrop for MH C19/20N Road markings between sewer line, , total area 27.040 m2 Line 14: C13/1/3 to C13/1/3 Line 15: C13/1/1/N to C13/1/N Line 17: C13/4/2//N to C13/1/2N Line 15: C13/4/1/N to C13/4/2/N Road markings between sewer line, , total area 6.675 m2 Line 20: C10/4 to C10/3 Line 30: C8/1 to C8A/N Line 35: C7/4/2//N to C7/4/N Road markings between sewer line, , total area 23.90 m2 Line 01: C14A/7N to C14A/7/1N Line 04: C14/A9 to C14A/8/1/1 Line 14: C14/26N to C14A/A9 Line 14: C14A/8/1/1 to C14A/7N Line 14: C14A/8/1/1 to C14A/7N Deflection test for sewer line E128/7/2N to 123/1A/N, 280mm UPVC Removal of Interlock Tiles: MH 128/5/2N to IC, 21.10 LM o Tiles Reinstatement of sewer line #24 : MH 125/2/4/N to 125/2, 14.72 LM o Kerbstone Reinstatement of sewer line #27: MH E121 to E121/1A, 15.20 LM o Interlock Tiles Reinstatement of sewer line #32: MH E128/3N to E128/2N, 15.00 LM o Interlock Tiles Reinstatement of sewer line #32: MH E128/3N to E128/2N, 14.00 LM o Kerbstone Reinstatement of sewer line #32: MH E128/3N to E128/2/N, 35.70 LM o Tiles Reinstatement of sewer line #40: MH 127/2/2 to 127/2/3, 7.5 LM o Interlock Tiles Reinstatement of sewer line #40: MH 127/2/1 to 127/2/2, 12.00 LM o Interlock Tiles Reinstatement of sewer line #41: MH C32B/25 to 15/2, 18.70 LM o Interlock Tiles Reinstatement of sewer line #43: MH C32B/34 to 127/1, 13.00 LM Initial inspection prior to hand over for sewer line E128/7/2N to 123/1A/N, 280mm UPVC Initial inspection prior to hand over for sewer line MH H7/5/1 to MH H7/5, 200mm GRP Initial inspection prior to hand over for sewer line MH H7/5/3 to MH H7/5/1, 160mm uPVC o Interlock Tiles Removal of sewer line #22: MH C10/2/2 to MH C10/2/1, 9.59 LM o Interlock Tiles Removal of sewer line #30: MH C8/1 to MH C8A/N, 47.00 LM o Kerbstone Removal of sewer line #30: MH C8/1 to MH C8A/N, 9.40 LM o Interlock Tiles Removal of sewer line #33: MH C7/6 to MH C7/1/1/N, 38.64 LM o Asphalt Removal of sewer line #33: MH C7/6 to MH C7/1/1/N, 8.80 LM o Reinstatement- Asphalt of sewer line: MH D22/22N/1N to MH D22/22N, 15.57 LM o Reinstatement- Asphalt of sewer line: MH D22/22N to MH D22/21N/C, 3.55 LM Road markings between sewer line, Line 25: C24/20 to C24/13 , total area 85.0 m2 Asphalt Reinstatement of sewer line #28: MH C3/4N to C3/3/2N ; 3.50 LM Asphalt Reinstatement of sewer line #8: MH C14/10/3N to C14/10/2 ; 3.25 LM Asphalt Reinstatement of sewer line #11: MH C14/26/1 to C14/26N ; 3.61 LM Asphalt Reinstatement of sewer line #26: MH C3A to C3A/N ; 8.84 LM Asphalt Reinstatement of sewer line #22: MH C5/1 to C5N/3 ; 6.00 LM Asphalt Reinstatement of sewer line #22: MH C5A to C5N/2 ; 13.80 LM Kerb stone Reinstatement of sewer line #4: MH C14A/8/2 to C14A/7N ; 29.65 LM Interlock Tiles Reinstatement of sewer line #4: MH C14A/8/2 to C14A/7N ; 1.0 LM New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia for sewer line C24/15/2N to C24/19/N including MH connection, 52.75 LM Hydrostatic and Deflection Test for sewer line C24/15/2N to C24/19N, 280mm uPVC Rec'd Date 17-Jun-13 28-May-13 2-Jun-13 10-Jun-13 8-Jun-13 8-Jun-13 Status

MACE
Remarks Approved Approved CLAIMED/P27 Approved CLAIMED/P27 CLAIMED/P27 Repeated Approved CLAIMED/P27 Approved Approved Approved Approved Approved Approved Cancelled 28-May-13 5-Jun-13 Approved Approved

5359

21-May-13

Road Marking

E13

28-May-13

Approved

Approved

5360

21-May-13

Road Marking

E13

28-May-13

Approved

Approved

5361

21-May-13

Road Marking

E14

29-May-13

Approved

Approved

5362 5363

21-May-13 21-May-13

Deflection Test removal

E10 E10

22-May-13 22-May-13

Approved Approved

CLAIMED/P27 CLAIMED/P27

5364

21-May-13

Reinstatement

E10

22-May-13

Approved

CLAIMED/P27

5365 5366 5367

21-May-13 21-May-13 21-May-13

Handing Over Handing Over Handing Over

E10 W7/01 W7/01

12-May-13 28-May-13 28-May-13

Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 Approved

5368

22-May-13

Removal

E13

28-May-13

Approved

CLAIMED/P27

5370 5371

15-Jun-13 22-May-13

Reinstatement Road Marking

E19

8-Jul-13 28-May-13

Approved Approved

Approved Approved

5372

26-May-13

Reinstatement

E14

2-Jun-13

Approved

CLAIMED/P27

5373 5374

Excavation & Pipe Laying Hydrostatic & Deflection 26-May-13 Test 26-May-13

E16/02 E16/01

28-May-13 28-May-13

Approved Approved

CLAIMED/P27 CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5375 5376 5377 5378 5379 5380 5381 5382 5383 5384 5385 5386 5387 Sub. Date 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 26-May-13 Activity Handing Over Concreting Concreting Concreting Concreting Grouting Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Removal Location ( Sector No ) E10 E13 E13 E13 E13 E10 E16 E13 E13 E13 E13 E13 E13 LINE No. 21 Description Initial inspection prior to Handover for Sewer Line MH C24/15/2N to MH C24/19N , 280mm uPVC Concreting of MH Shaft and Reducer Slab for MH C13/N Concreting of MH Shaft for MH C11/2/N Concreting of MH 1st Shaft for MH C13/N Concreting of MH Base for MH C17/2A/1N Grouting for MH C21/4 to C21/3 Grouting for Abandoned Line E128 to Ex. MH; E128/4/2 to E128/7/3 123/6N to Ex. MH Ex. MH to IC Ex. MH MH 139 to MH 125/6 Excavation up to formation & Excavation & Pipe Laying G.B.S for 280mm Dia uPVC for MH C19/18/1N to C19/17A/1N including MH connection, 66.83 LM Excavation up to formation & Pipe laying G.B.S for 700mm Dia GRP for MH C13/N to C14/1/N including MH connection, 43.77 LM Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC for MH C11/2/N to C11/6/N including MH connection, 41.26 LM Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC for MH C14/22 to C14/21 including MH connection, 18.64 LM Hydrostatic and Deflection Test for sewer line C13/N to C14/1/N, 700mm GRP Hydrostatic and Deflection Test for sewer line C11/2/N to C11/6/N, 225mm uPVC Hydrostatic and Deflection Test for sewer line C14/22 to C14/21, 225mm uPVC Between Sewer Line MH C14/22 to C14/21 o Asphalt Removal ; 5.35 LM o Interlock Tile Removal ; 16.00 LM o Kerbstone Removal; 15.50 LM Between Sewer line MH C13/N to C14/1/N, Interlock Tiles Removal; 50.17 LM , Kerbstone Removal; 30.00 LM Trial Pit E-16/02 (C/24/12A) Line 20 Between Sewer Line MH C11/2/N to C11/6/N o Asphalt Removal ; 42.76 LM Initial inspection prior to Handover for Sewer Line MH C11/2/N to MH C11/6/N , 225mm uPVC Initial inspection prior to Handover for Sewer Line MH C14/22 to MH C14/21 , 225mm uPVC Excavation up to formation & Pipe laying G.B.S for 450mm Dia uPVC for MH C17/2A/1N to C17/2/1 including MH connection, 11.10 LM NDM Pipe laying for 500mm Dia GRP for MH C17/1N to C17/2A/1N including MH connection, 26 LM Demolishing & Removal of MH C17/2A Asphalt Reinstatement at Line#12 Between MH C17/2A/2N to C17/3A/1N; 302.412 m Interlock Tiles Reinstatement at Line#12 Between MH C17/2A/2N to C17/3A/1N; 5.50 LM Kerbstone Reinstatement at Line#12 Between MH C17/2A/2N to C17/3A/1N; 19.00 LM Interlock Tiles Reinstatement at Line#3 Between MH 16/9 to 16/8; 20.00 LM Kerbstone Reinstatement at Line#3 Between MH 16/9 to 16/8; 17.00 LM Interlock Tiles Reinstatement at Line#2 Between MH C16/3/3 to C16/3/2; 36.00 LM Excavation up to formation & Excavation & Pipe Laying G.B.S for 315mm Dia uPVC for MH C21/1 to C21 including MH connection, 37.37 LM Excavation up to formation & Excavation & Pipe Laying G.B.S for 450mm Dia uPVC for MH C21A/22/3/4 to C21A/22/3/5 including MH connection, 13.35 LM Hydrostatic and Deflection Test for sewer line C21A/22/3/4 to C21A/22/3/5, 450 mm uPVC 6 Initial inspection prior to Handover for Sewer Line MH C21A/19/2A to MH C21A/19/2 , 225mm uPVC Initial inspection prior to Handover for Sewer Line MH C21A/18 to MH C21A/17 , 225mm uPVC Initial inspection prior to Handover for Sewer Line MH C21A/19 to MH C21A/18 , 225mm uPVC Initial inspection prior to Handover for Sewer Line MH C21A/22/3/4 to MH C21A/22/3/5 , 450mm uPVC Asphalt Reinstatement at Line#1 Between MH C21/5 to C21/4; 87.43 m Interlock Tiles Reinstatement at Line#1 Between MH C21/3 to C21/2; 48.50 LM Kerbstone Painting at Line#1 Between MH C21/3 to C21/2; 48.50 LM Interlock Tiles Reinstatement at Line#1 Between MH C21/4 to C21/3; 32.08 LM Kerbstone Painting at Line#1 Between MH C21/4 to C21/3; 32.08 LM Demolishing & Removal of MH E128/5/2N Rec'd Date 5-Jun-13 27-May-13 10-Jun-13 6-Jul-13 28-May-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 5-Jun-13 11-Jul-13 Status

MACE
Remarks CLAIMED/P27 CLAIMED/P27 Approved Approved Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

5388

26-May-13

E13

30-May-13

Approved

CLAIMED/P27

5389 5389A 5390 5391 5392 5393 5394 5395

27-May-13 27-May-13 26-May-13 26-May-13 26-May-13 27-May-13 27-May-13 27-May-13

Removal Trial Pit Removal Handing Over Handing Over Excavation & Pipe Laying Pipe Laying Demolishing

E13 E19 E13 E13 E13 E15 E15 E15

30-May-13 30-May-13 30-May-13 12-Sep-13 11-Jul-13 2-Jun-13 2-Jun-13

Approved Approved Approved Approved Approved Approved Cancelled Approved

CLAIMED/P27 Approved Approved Approved Approved CLAIMED/P27 Duplicate CLAIMED/P27

5396

27-May-13

Reinstatement

E15

3-Jun-13

Approved

CLAIMED/P27

5397 5398 5399 5400 5401 5402 5403

27-May-13 27-May-13 27-May-13 27-May-13 27-May-13 27-May-13 27-May-13

Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Handing Over

E16/01 E16/01 E16/01 E16/01 E16/01 E16/01 E16/01

2-Jun-13 8-Jun-13 2-Jun-13 28-May-13 30-May-13 30-May-13 30-May-13

Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27

5404

27-May-13

Reinstatement

E16/01

2-Jun-13

Approved

Approved

5405

27-May-13

Demolishing

E10

2-Jun-13

Approved

CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Asphalt Reinstatement at Line#8 Between MH C14/10/2N to MH C14/10/2; 3.25 LM Asphalt Reinstatement at Line#11 Between MH C14/26/1 to MH C14/26/N; 3.61 LM Asphalt Reinstatement at Line#22 Between MH C5/1 to MH C5N/3; 6.00 LM Asphalt Reinstatement at Line#22 Between MH C5A to MH C5N/2; 13.80 LM Asphalt Reinstatement at Line#26 Between MH C3A to MH C3A/N; 8.84 LM Asphalt Reinstatement at Line#28 Between MH C3/4N to MH C3/3/2N; 6.00 LM Asphalt Reinstatement at Line#6 Between MH H7/22/2 to MH H7/22/1; 11.20 LM Asphalt Reinstatement at Line#6 Between MH H7/22/1 to MH H7/22; 10.74 LM Asphalt Reinstatement Between MH C24/27/7 to C24/27/2; 11.00 LM Asphalt Reinstatement Between MH C24/29/3 to C24/29/2; 33.50 LM Asphalt Reinstatement Between MH C24/20 to C24/13; 13.30 LM Asphalt Reinstatement Between MH C24/22 to C24/20; 12.40 LM Interlock Tiles Reinstatement Between MH C24/17 to C24/18; 31.68 LM Asphalt Reinstatement Between MH H11/1 to H11/2; 25.56 LM Asphalt Reinstatement Between MH H11/1 to H11; 58.59 LM Asphalt Reinstatement Between MH H8/2 to H8/2/2; 2.20 LM Asphalt Reinstatement Between MH H7/22/2 to H7/22/1; 11.26 LM Asphalt Reinstatement Between MH H7/22/1 to H7/22; 10.74 LM Interlock Tiles Reinstatement Between MH H7/20/9 to H7/20/6; 13.38 LM Interlock Tiles Reinstatement Between MH H7/28/1A to H7/28/1; 8.00 LM Curb Stone Reinstatement Between MH H7/28/1C to H7/28/1B; 2.80 LM Curb Stone Reinstatement Between MH H7/28/1B to H7/28/1A; 3.40 LM Curb Stone Reinstatement Between MH H7/28/2A to H7/28/2; 5.50 LM Asphalt Reinstatement Asphalt Reinstatement Asphalt Reinstatement Asphalt Reinstatement Asphalt Reinstatement Between MH D26N/14B to D26N/14N; 3.16 LM Between MH D26N/14/1 to D26N/14N; 6.10 LM Between IC to MH 571/1; 19.20 LM Between MH D22/22N/1N to D22/22N; 15.00 LM Between MH D22/22N/1N to D22/22N/2N; 7.57 LM Rec'd Date Status

MACE
Remarks 2-Jun-13 Approved Approved

5406

27-May-13

Reinstatement

E14

5407

27-May-13

Reinstatement

W7/01

28-May-13

Approved

CLAIMED/P27

5408

27-May-13

Reinstatement

E16/02

Approved

Partial Approved, Item #2 & #4 not ready for inspection

5409

27-May-13

Reinstatement

W7/01

5-Jun-13

Approved

CLAIMED/P27

5410

28-May-13

Reinstatement

E19

3-Jun-13

Approved

CLAIMED/P27

5411

28-May-13

Reinstatement

E19

5412

28-May-13

Reinstatement

E19

26

Curb Stone Reinstatement Between MH D26N/14B to D26N/14N; 2.00 LM Curb Stone Reinstatement Between IC to MH 571/1; 3.65 LM Curb Stone Reinstatement Between MH D25/5B/ to D26N/9/N; 5.30 LM Interlock Tiles Reinstatement Between MH D25/5B/N to D26N/9/N; 7.35 LM Interlock Tiles Reinstatement Between MH D26N/9/N to D26N/8/N; 80.00 LM Interlock Tiles Reinstatement (6cm) Between IC to MH 571/1; 1.82 LM Asphalt Reinstatement Between MH C9/5 to C32B/47; 59.95 LM Asphalt Reinstatement Between MH C7/2C/1 to C32B/51; 10.50 LM Interlock Tiles Reinstatement (6cm) Between MH C9/5 to C32B/47; 23.00 LM Curb Stone Reinstatement Between MH C9/5 to C32B/47; 20.70 LM Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Between MH C6B/1 to C6B; 1.30 LM Between MH C13/4/2/N to C13/1/2/N; 2.50 LM Between MH C10/2/N to C10/1/N; 3.37 LM Between MH C11/5/1/N to C11/5/2/N; 8.90 LM Between MH C10/3/1/N to C10/2/N; 1.37 LM Between MH C10/1/N to C10/1/1; 25.60 LM Between MH C10/1/N to C10/N; 18.67 LM Between MH C7/4/N to C7/3; 3.00 LM Between MH C11/5/N to C11/5/2/N; 42.61 LM Between MH C11/5/1A to C11/5/N; 7.57 LM Between MH C11/4/1/1 to C11/5/1/N; 4.00 LM Between MH C10/4 to C10/3; 14.38 LM Between MH C10/5 to C10/4; 8.57 LM Between MH C10/3 to C10/3/1/N; 5.32 LM Between MH C10/3/1/N to C10/2/N; 6.79 LM Between MH C13/1/3 to C13/1/2; 37.00 LM Between MH C13/1/1/N to Ex. C13/1/1; 3.68 LM

3-Jun-13

Approved

CLAIMED/P27

13-Aug-13

Approved

Approved

5413

28-May-13

Reinstatement

E12

5-Jun-13

Approved

CLAIMED/P27

5414

28-May-13

Reinstatement

E13

5-Jun-13

Approved

CLAIMED/P27

5415

28-May-13

Reinstatement

E13

Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement Interlock Tiles (8cm) Reinstatement

5-Jun-13

Approved

CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Interlock Tiles (6cm) Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Curb Stone Reinstatement Description Between MH C7/4/2/N to C7/4/N; 5.00 LM Between MH C7/4/2 to C7/4/2/N; 6.82 LM Between MH C7/4/N to C7/3; 2.90 LM Between MH C10/1/N to C10/N; 10.31 LM Between MH C10/5/1 to C10/5; 5.81 LM Between MH C10/5/2/C to C10/5/1/; 16.67 LM Between MH C11/5/1A to C11/5/N; 7.57 LM Between MH Ex CH to C11/4/1/N ; 10.31 LM Between MH C13/1/3 to C13/1/2; 37.60 LM Rec'd Date Status

MACE
Remarks

5416

28-May-13

Reinstatement

E13

5-Jun-13

Approved

CLAIMED/P27

5417

28-May-13

Reinstatement

E13

Between MH C7/5 to C7/4/N; 27.22 LM Between MH C7/4/2/N to C7/4/N; 10.00 LM Between MH C7/4/4 to C7/4/2/N ; 2.00 LM Between MH C7/4/N to C7/3; 2.00 LM Between MH C10/5/1 to C10/5; 5.81 LM Between MH C10/5/1 to C10/5; 2.00 LM Between MH C10/3/1/N to C10/2/N; 3.80 LM Between MH C10/1/N to C10/N; 5.50 LM Between MH C11/5/N to C11/5/2/N; 8.00 LM Between MH C13/1/1/N to C13/1/N; 39.66 LM Between MH C13/1/3 to C13/1/2; 37.60 LM

5-Jun-13

Approved

CLAIMED/P27

5418 5419

29-May-13 29-May-13

Reinstatement Removal

E10 E10

Interlock Tiles Reinstatement Between MH E123/N to E123/1A/N; 22.00 LM Interlock Tiles Removal Between MH E121/1A to E121/1; 5.0 LM Asphalt Removal Between MH E121/1A to E121/1; 7.70 LM Interlock Tiles Removal Between MH E121/1A to E121/1; 12.50 LM Excavation up to formation & Excavation & Pipe Laying for 150mm Dia uPVC with special rubber adaptor for: MH C19/21A to C19/21N including MH connection, 0.58 LM MH C19/20A to C19/20N including MH connection, 2.05 LM Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC for: MH D22/26N to D22/25N including MH connection, 30.80 LM Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC for: MH D26N/9N to D26N/8N including MH connection, 61.50 LM Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC for: MH H7/5 to H7/2 including MH connection, 66.14 LM Excavation up to formation & Pipe laying G.B.S. for 160mm Dia uPVC for: MH IC to E128/5/2N including MH connection, 29.20 LM Excavation up to formation & Pipe laying G.B.S. for 160mm Dia uPVC for: MH E128/7/2N to MH 123/1/1 including MH connection, 23.31 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH c7/6 to MH C7/1/1/N including MH connection, 46.49 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH C8/1 to MH C8A/N including MH connection, 46.00 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH C10/2/2 to MH C10/2/1 including MH connection, 9.59 LM Hydrostatic and Deflection Test for sewer line MH IC to E128/5/2N , 160mm uPVC Hydrostatic and Deflection Test for sewer line MH C10/2/2 to C10/2/1, 160mm uPVC Hydrostatic and Deflection Test for sewer line MH 123/1/1 to E128/7/2N, 225mm uPVC Hydrostatic and Deflection Test for sewer line MH C7/6 to C7/1/1/N, 225mm uPVC 15C 23 Initial inspection prior to Handover for Sewer Line MH 123/1/1 to MH E128/7/2N , 225mm uPVC Initial inspection prior to Handover for Sewer Line MH IC to MH E128/5/2N , 160mm uPVC Initial inspection prior to Handover for Sewer Line MH C10/2/2 to MH C10/2/1 , 160mm uPVC For MH 123/1/1 to MH E128/7/2N o Interlock Tiles Removal, 5.30 LM o Interlock Tiles Removal, 8.00 LM o Interlock Tiles Removal, 10.00 LM o Curbstone Removal, 9.00 LM

2-Jun-13 2-Jun-13

Approved Approved

Approved CLAIMED/P27

5420

29-May-13

Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over

E16

2-Jun-13

Approved

CLAIMED/P27

5421 5422 5423 5424 5425 5426 5427 5428 5429 5430 5431 5432 5434 5435 5436

29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13 29-May-13

E19 E19 W7/01 E10 E10 E13 E13 E13 E10 E13 E10 E13 E10 E10 E13

1-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 5-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13

Approved Approved Approved Approved approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Approved CLAIMED/P27 Approved CLAIMED/P27 Approved Approved CLAIMED/P27 CLAIMED/P27

5437

29-May-13

Removal

E10

2-Jun-13

Approved

CLAIMED/P27

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Asphalt Reinstatement for: o MH E128/6N to E128/7N, 16.20 LM o MH 128/3/1A/N to E128/3N, 13.27 LM o MH 127/4B/N to E128N, 5.75 LM o MH 125/2 to 125/2/1, 10.00 LM o MH 124/1B/N to E128/7/1/1A/N, 7.50 LM o MH 123/N to 123/1A/N, 3.60 LM o MH 123/1A/N to E128/7/2N, 32.40 LM : Interlock Tiles (8cm) Reinstatement for: o MH 119/3 to MH 119/3/1, 0.75 LM o MH 125/2 to 125/2/1, 10.00 LM o MH 124/1B/N to E128/7/1/1A/N, 14.50 LM o MH 123/N to 123/1A/N, 29.50 LM o MH E122/N to E123/N, 20.36 LM o MH IC to E121/2, 11.54 LM o MH E121/2 to E121, 24.00 LM o MH E121 to E121/1A, 20.00 LM Interlock Tiles (6cm) Reinstatement for: o MH E125/2 to MH E128/5/2N, 25.90 LM o MH E127/4B/N to MH E128/N, 5.77 LM o MH E122/N to E123/N, 4.00 LM o MH IC to E121/2, 11.54 LM o MH E121 to E121/1A, 1.25 LM o MH 119 to MH 119/1/1, 0.50 LM Concrete Reinstatement for: o MH C21/7 to C21/6, 6.00 LM Asphalt Reinstatement for: o MH C22/7/3 to MH C22/7/2, 2.00 LM o MH C21/3 to MH C21/2, 53.50 LM o MH C21/4 to MH C21/3, 30.58 LM Asphalt Reinstatement for: o MH C19/1N to C19/1A, 6.91 LM o MH C19/20/1N to C19/20N, 14.19 LM o MH C19/15/1 to C19/15, 5.30 LM : Interlock Tiles Reinstatement for: o MH C19/1N to C19/1A, 3.00 LM o MH C19/2/1 to C19/2N, 2.70 LM Interlock Tiles Reinstatement for: o MH Ex. C16/8/2 to C16/8, 12.00 LM o MH Ex. C16/7/1 to Ex. C16/7, 2.00 LM o MH Ex. C16/8/1A to Ex. C16/8, 9.00 LM o MH Ex. C16/3/2 to Ex. C16/3/1, 1.00 LM o MH Ex. C15/1A to Ex. C15/1, 4.30 LM o MH Ex. C16/8 to Ex. C16/9 , 8.50 LM Curbstone Reinstatement for: o MH Ex. C16/3/3 to Ex. C16/3/2, 36.00 LM o MH Ex. C16/8 to Ex. C16/9 , 21.00 LM Concreting of Blinding for MH C11/6/N and MH C11/N Concreting of Shaft for MH C17/2A/1N Concreting of MH Base for MH C11/6/N Concreting of MH Base for MH C11/N & C11/4/1/N Concreting of Backdrop for MH C21A/22/3/4 Casting of Coverslab & Adj. Ring for MH C17/2A/2N Backfilling of Receiving Pit For NDM Backfilling for Rep. sewer line C16/7 to C16/7/1, 225mm uPVC Backfilling for Rep. sewer line C16/3/2 to C16/3/1 , 160mm uPVC Backfilling for Rep. sewer line C16/3/1 to C16/3, 160mm uPVC o Reinstatement- Kerbstone of sewer line: MH D22/22N/1N to MH D22/22N, 4.25 LM o Reinstatement- Kerbstone of sewer line: MH D22/22N to MH D22/21N/C, 4.40 LM o Reinstatement- Kerbstone of sewer line: MH D22/21N/C to MH D22/21N/B/1N, 8.20 LM 18-Jun-13 Description Rec'd Date Status

MACE
Remarks Cancelled Item 1,2 & 3 already raised and approved, Item 4, 6 & 7 ongoing, Item 5 - ready

5438

29-May-13

Reinstatement

E10

5439

29-May-13

Reinstatement

E10

Cancelled

Cancelled

5440

29-May-13

Reinstatement

E10

Cancelled

RFI CANCLED

5441

29-May-13

Reinstatement

E16/01

Approved

Approved

5442

29-May-13

Reinstatement

E16/01

cancelled

Cancelled, Claimed

5444

29-May-13

Reinstatement

E16

5-Jun-13

Approved

CLAIMED/P27

5445

29-May-13

Reinstatement

E16

5-Jun-13

Approved

CLAIMED/P27

5447

30-May-13

Reinstatement

E16

5-Jun-13

Approved

Approved

5448 5449 5450 5451 5452 5454 5455 5457 5459 5461 5462

30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13 30-May-13

Concreting Concreting Concreting Concreting Concreting Concreting Backfilling Backfilling Backfilling Backfilling Backfilling

E13 E15 E13 E13 E16/01 E15 E15 E15 E15 E15 E19

5-Jun-13 2-Jun-13 8-Jun-13 9-Jun-13 2-Jun-13 2-Jun-13 Claimed 5-Jun-13 5-Jun-13 10-Sep-13 14-Sep-13

Approved Approved Approved Approved Approved Approved Test Req Approved Approved Approved Approved

Approved CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Need Compaction Test Result CLAIMED/P27 CLAIMED/P27 Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5463 5464 5465 5466 5467 Sub. Date 30-Jun-13 15-Jun-13 30-May-13 30-Jun-13 1-Jun-13 Activity Reinstatement Handing Over Monitoring Points Reinstatement over pumping Location ( Sector No ) E19 E10 E15 E19 E16/02 LINE No. Description o Reinstatement- Interlock Tiles of sewer line: MH D22/22N/1N to MH D22/22N, 5.80 LM o Reinstatement- Conc. Tiles of sewer line: MH D22/21N/C to MH D22/21N/B/1N, 8.20 LM Initial inspection prior to Handover for New. Sewer Line E128/1N to E128/N , 315mm uPVC Monitoring Asphalt Surface movement point (during and after jacking) for NMD between MH C17/2A/1N to MH C17/1/N. Reinstatement- Asphalt of sewer line: MH D22/21N/C to MH D22/21N/B/1N , 4.47 LM Reinstatement- Asphalt of sewer line: MH D22/21N/B/1N to MH D22/21N/A, 23.64 LM Setup of Over pumping for Line#16, Line#17 & Line#18 Rehabilitation work at existing MH H7/5: 1. Demolishing existing coverslab, 1.5m Dia Internal Diameter, (750x600, D400) 2. Casting of New Coverslab 1.5m Dia, 25cm 3. Installation of New Coverslab, Sealing Plate & D.I. Cover & Frame 750 Dia D400 4. Removal of defective lining inside MH Shaft area, and renew GRP by Lamination (A= 26.86 m2, Depth= 6.16m) 5. Re-fix Clamp for FOC Cable (4-Nos) : Rehabilitation work at existing MH IC: 1. Demolishing existing D.I. Cover & Frame, (750x600, B125) 2. Install New D.I. Cover & Frame (750x600, B125) and Sealing Plate 3. Remove 2-step Iron, 20cm 4. GRP Lamination for Raising Area (A= 1.800 m2 ) 5. GRP Lamination for Soffit Area (A= 0.576 m2 ) 6. GRP Lamination for Shaft Area (A= 0.739 m2 ) 7. GRP Lamination for Benching Area (A= 1.260 m2 ) Rehabilitation work at existing MH E121/2: 1. Demolishing existing D.I. Cover & Frame, (600 Dia, D400) 2. Install New D.I. Cover & Frame (600 Dia, D400) and Sealing Plate 3. GRP Lamination for Raising Area (A= 1.54 m2 ) 4. GRP Lamination for Soffit Area (A= 0.705 m2 ) 5. GRP Lamination for Shaft Area (A= 4.24 m2 ) 6. GRP Lamination for Benching Area (A= 1.149 m2 ) Initial inspection prior to Handover for New. Sewer Line D22/21N/A to D22/1N , 315mm uPVC Initial inspection prior to Handover for New. Sewer Line D25/5B/N to D26N/9/N , 315mm uPVC Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC for: MH D26N/8/N to MH D26N/8/1N including MH connection, 17.39 LM Casting and Installation of Shaft for MH C19/2N including Backdrop Construction 160 uPVC @ IL 100.628 Installation of Cover slab, Adj. Ring & Cover and Frame 750 Dia / D400 Casting and Installation of Base & Shaft for MH C19/3N Installation of Cover slab, Adj. Ring & Cover and Frame 750 Dia / D400 for MH C19/21N, Installation of Cover slab, Adj. Ring & Cover and Frame 750 Dia / D400 Casting and Installation of Base for MH C19/20N Installation of Cover slab, Adj. Ring & Cover and Frame 750 Dia / D400 Casting and Installation of Shaft for MH C19/18A/1N Grouting of Existing 250mm Dia AC Pipe for Abandoned Line D26N/8/N to MH 577, 75.70 LM MH 577 to MH 578, 91.75 LM MH 578 to D25/1, 104.35 LM Initial inspection prior to Handover for. Sewer Line H7/3 to H7/2 , 315mm uPVC Hydrostatic and Deflection for New. Sewer Line H7/3 to H7/2 , 315mm uPVC Hydrostatic and Deflection for New. Sewer Line E121/1 to E121/1A , 255mm uPVC 27 Initial inspection prior to Handover for. Sewer Line E121/1 to E121/1A , 225mm uPVC : Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: E121/1A to E121/1 including MH connection, 25.50 LM Excavation up to formation & Pipe laying G.B.S. for 280mm Dia uPVC for: E121/1A/N to E123/N including MH connection, 31.16 LM 5-Jun-13 5-Jun-13 30-Jul-13 8-Jun-13 9-Jun-13 Rec'd Date 8-Jul-13 18-Jun-13 15-Jul-13 8-Jul-13 5-Jun-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

5468

30-May-13

Rehabilitation

W7/01

2-Jun-13

Approved

CLAIMED/P27

5469

30-May-13

Rehabilitation

E10

8-Jun-13

Approved

Approved

5470

30-May-13

Rehabilitation

E10

8-Jun-13

Approved

Approved

5471 5472 5473 5475 5476 5477 5478 5479

30-May-13 30-May-13 30-May-13

Handing Over Handing Over Excavation & Pipe Laying

E19 E19 E19 E16/01 E16 E16 E16/01 E16/01 26

cancelled cancelled CHECK Approved Approved Approved Approved Approved

Duplicate with 5064 Duplicate with 4910 C/o Romell CLAIMED/P27 CLAIMED/P27 approved CLAIMED/P27 CLAIMED/P27

30-May-13 Concreting & Installation 30-May-13 Concreting & Installation 30-May-13 Concreting & Installation 30-May-13 Concreting & Installation 30-May-13 Concreting & Installation

5480 5481 5482 5483 5484 5485 5486

30-May-13 4-Jun-13 4-Jun-13 2-Jun-13 2-Jun-13 2-Jun-13 3-Jun-13

Grouting Handing Over Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Excavation & Pipe Laying Excavation & Pipe Laying

E16/01 W7/01 W7/01 E10 E10 E10 E10

26 10

5-Jun-13 5-Jun-13 5-Jun-13 8-Jun-13 8-Jun-13 8-Jun-13 8-Jun-13

Approved Approved Approved Approved Approved Approved Approved

CLAIMED/P27 CLAIMED/P27 CLAIMED/P27 Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5487 5489 5490 5492 5493 5494 5495 5496 5497 5498 5499 5500 5501 5502 5503 5504 5505 5506 5507 5508 5509 5510 5511 Sub. Date 3-Jun-13 15-Jun-13 4-Jun-13 15-Jun-13 15-Jun-13 15-Jun-13 4-Jun-13 15-Jun-13 4-Jun-13 15-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 4-Jun-13 24-Jun-13 4-Jun-13 15-Jun-13 4-Jun-13 4-Jun-13 Activity Excavation & Pipe Laying Removal Reinstatement Concreting & Installation Concreting & Installation Concreting & Installation Concreting & Installation Concreting & Installation Excavation & Pipe Laying Excavation & Pipe Laying Concreting & Installation Reinstatement Reinstatement Concreting Concreting Hydrostatic & Deflection Test Handing Over Excavation & Pipe Laying Concreting Reinstatement Reinstatement Reinstatement Concreting Location ( Sector No ) E10 E16/01 E16/01 E15 E13 E13 E13 E13 E15 E15 E15 E15 E15 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 21 LINE No. Description Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: E122/N to E123/N including MH connection, 23.00 LM Asphalt Removal of sewer line C21A/11/1E to C21A/11/1F, 52.30 LM Foot Path Tile Removal of sewer line C21A/11/1E to C21A/11/1F, 5.30 LM Foot Path Tile reinstatement of Sewer Line C21/15/1/1B to C21/15/1, 1.90 LM Casting and Installation of Shaft 2 Nos. for MH C17/2A/1N Casting and Installation of MH 2nd Shaft for MH C11/N. Casting and Installation of MH 2nd Shaft for MH C11/6/N. Casting of Shaft for MH C11/N Casting and Installation of Reducer and Cover Slab, Adj. Ring and Cover & Frame for MH C11/N. Excavation up to formation & Pipe laying G.B.S. for 280mm Dia uPVC for: C17/2A/2N to C17/2A/1N including MH connection, 7.22 LM Excavation up to formation & Pipe laying G.B.S. for 500mm Dia GRP for: C17/2A/1N to C17/1N including MH connection, 6.00 LM For MH C17/2A/1N Installation of 250mm Concrete Ring, 250mm Concrete Slab, D.I. Cover & Frame with GRP Sealing Plate. Interlock Tiles Reinstatement For Sewer Line MH C16/8/1A to C16/8, 9.00 LM Reinstatement for: Asphalt Reinstatement for MH C16/3/1 to C16/3, 1.00 LM Interlock Tiles Reinstatement for MH C16/3/2 to C16/3/1, 1.00 LM Concreting for Blinding MH C24/15/2N Concreting for MH Base for MH C24/15/2N Casting of MH Base for MH C24/19N Hydrostatic and Deflection Test for sewer line C24/13 to C24/12A , 315mm uPVC, 52.75 LM Initial inspection prior to Handover for Sewer Line MH C24/13 to MH C24/12A , 315mm Upvc Excavation up to formation & Excavation & Pipe Laying G.B.S. for 315mm Dia uPVC for: C24/13 to C24/12A including MH connection, 52.75 LM Demolishing & removal of 150mm Dia VC Pipe from MH C24/15 to C24/15/2N, 7.4 LM Grouting for abandoned 150mm VC Pipe from C24/15/2N to C24/19N, 50.00 LM Asphalt Reinstatement for MH C24/22 to C24/20, 21.60 LM Concrete Reinstatement for Sewer Line MH C24/16 to C24/17, 1.2 LM Asphalt Reinstatement for MH C24/18 to C24/15, 13.30 LM Foot Path Tiles Reinstatement for MH C24/18 to C24/15, 5.90 LM Casting of Cover Slab and adj. ring for MH C24/19N at precast Yard Rehabilitation work at existing MH C21/1: 1. Clean and Coat D.I. Cover & Frame, (600x600, D400) 2. Removal of Ladder, 4.5m 3. GRP Lamination for Raising Area, 0.378m 4. GRP Patch Repair for Shaft Area, (2 Nos.) 5. GRP Lamination for Shaft Area, 10.838 m Rehabilitation work at existing MH C21/1: 1. Demolishing Existing D.I. Cover & Frame, (600 Dia, D400) 2. Installation of New D.I. Cover & Frame 600 Dia D400 and GRP Sealing Plate 3. GRP Lamination for Raising Area, 3.770m 4. GRP Lamination for Shaft Area, 10.838 m 5. GRP Lamination for Soffit Area, 0.503 m 6. GRP Lamination for Benching Area, 3.142 m Casting and Installation of Cover Slab, Adj. Ring and Cover/Frame for Sector E12, MH CA/5 Hydrostatic and Deflection Test for sewer line C17/2N/1N to C17/2/1, 450mm uPVC Hydrostatic and Deflection Test for sewer line C17/2A/2N to C17/2A/1N, 280mm uPVC 12 Initial inspection prior to Handover for Sewer Line C17/2N/1N to C17/2/1, 450mm uPVC 1-Jul-13 10-Jun-13 10-Jun-13 10-Jun-13 Rec'd Date 8-Jun-13 18-Jun-13 Status

MACE
Remarks Approved Approved Cancelled, S/S 5443 Approved Claimed Approved CLAIMED/P27 Approved CLAIMED/P27 Approved CLAIMED/P27 Cancelled S/S 5447 CLAIMED/P27 Approved Cancelled , Calimed in 5352 Approved Approved Approved Approved Approved Approved Approved Cancelled , Calimed in 5354 Approved Approved cancelled 22-Aug-13 Claimed 17-Jun-13 9-Jun-13 17-Jun-13 5-Jun-13 20-Jun-13 5-Jun-13 Approved Claimed Approved Approved Approved Approved Approved Approved cancelled 5-Jun-13 8-Jun-13 Approved Approved cancelled 18-Jun-13 18-Jun-13 9-Jun-13 1-Jul-13 1-Jul-13 18-Jun-13 8-Jul-13 Approved Approved Approved Approved Approved Approved Approved cancelled

5512

30-May-13

Rehabilitation

E16/01

9-Jun-13

Approved

CLAIMED/P27

5513

30-May-13

Rehabilitation

E16/01

cancelled

Cancelled - Duplicate 5512

5514 5515 5516 5517

29-Jun-13 9-Jun-13 9-Jun-13 9-Jun-13

Concreting & Installation Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over

E12 E15 E15 E15

Approved Approved Approved Approved

Approved Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5518 5519 5520 5521 5522 5523 5524 5525 5526 5527 Sub. Date 9-Jun-13 16-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 Activity Handing Over Concreting Excavation & Pipe Laying Request for Information Concreting Concreting Concreting Removal Removal Road Marking Location ( Sector No ) E15 E13 E16/01 E16/01 E16 E10 E16 E19 E16 E16 LINE No. 12 Description Initial inspection prior to Handover for Sewer Line C17/2A/2N to C17/2A/1N, 280mm uPVC For MH C11/4/1/N, Casting and Installation of Cover Slab, Cover & Frame, 600mm Dia / B125 Excavation up to formation & Excavation & Pipe Laying G.B.S. for 450mm Dia uPVC for: C21A/22/3/5 to C21A/22/3/6 including MH connection, 31.08 LM Request for Information Obstruction (2.5 Meter) in Line No. 13A between MH C21A/11/1F to C21A/11/1E Casting Concrete Surround for Line 3B, MH C19/18/A to C19/18/1N. Casting Concrete Surround for Sewer line, MH E121/1 to E121/1A. Concreting of MH Base for MH C18/1A. Asphalt Removal, For sewer line, MH D22/25N to MH D22/24N, 27.41 LM Asphalt Removal, For sewer line, MH C19/17A to MH C19/1N, 46.65 LM Road Marking Reinstatement for, Line No.4, 9.734 m Line No.2, 15.025 m Line No.1, 21.600 m Reinstatement between Sewer line MH C21A/19 to C21A/18, Asphalt, 25.80 LM Curb Stone, 10.30 LM Footpath Tiles, 3.50 LM Asphalt Reinstatement between Sewer line MH C21A/18 to C21A/17, 26.50 LM Concrete Reinstatement of existing waterline house connection near MH D26N/8/N, 2.50 LM Rehabilitation work at Existing MH 123/1/1: 1. Removed Existing D.I. Cover and frame (750 x 600 / B125) 2. Installed new D.I. Cover and frame (750 x 600 / D400) and GRP Sealing Plate 3. Removed Step Iron ( 3-Nos), 20cm 4. GRP lamination for raising area, 0.936 m 5. GRP lamination for Soffit area, 0.540 m 6. GRP lamination for Shaft area, 4.000 m 7. GRP lamination for Benching area, 1.671 m Rehabilitation work at Existing MH 121/1: 1. Removed Existing D.I. Cover and frame (750 x 600 / D400) 2. Installed new D.I. Cover and frame (750 x 600 / D400) and GRP Sealing Plate 3. Removed Step Iron ( 2-Nos), 20cm 4. GRP lamination for raising area, 1.755 m 5. GRP lamination for Soffit area, 0.540 m 6. GRP lamination for Shaft area, 1.800 m 7. GRP lamination for Benching area, 1.496 m Rehabilitation work at Existing MH 121/1A: 1. Removed Existing D.I. Cover and frame ( 600 Dia / B125) 2. Installed new D.I. Cover and frame (600 x 600 / B125) and GRP Sealing Plate 3. GRP lamination for raising area, 1.825 m 4. GRP lamination for Soffit area, 0.720 m 5. GRP lamination for Shaft area, 2.730 m 6. GRP lamination for Benching area, 1.082 m Rehabilitation work at Existing MH IC / 125/3: 1. Removed Existing D.I. Cover and frame ( 750 x 600 / B125) 2. Installed new D.I. Cover and frame (600 x 600 / D400) and GRP Sealing Plate 3. Removed Step Iron (3-Nos), 20cm 4. GRP lamination for raising area, 1.215 m 5. GRP lamination for Soffit area, 0.540 m 6. GRP lamination for Shaft area, 4.000 m 7. GRP lamination for Benching area, 1.841 m For Sewer line MH E121/1A/1 to E121/1A, Removal of Asphalt, 7.30 LM Removal of Interlock Tiles, 5.05 LM Removal of Existing 150mm Dia VC Pipeline, 12.58 LM Rec'd Date 10-Jun-13 23-Jun-13 18-Jun-13 18-Jun-13 Claimed 18-Jun-13 2-Oct-13 15-Jun-13 22-Jun-13 22-Jun-13 Status

MACE
Remarks Approved Approved Approved Approved Claimed Approved approved Approved Approved Approved Approved Approved Approved Approved Claimed Approved Approved Approved Approved Approved

5528 5529 5530

12-Jun-13 12-Jun-13 12-Jun-13

Reinstatement Reinstatement Reinstatement

E16/01 E16/01 E19

18-Jun-13 18-Jun-13 17-Jun-13

Approved Approved Approved

Approved Approved Approved

26

5531

12-Jun-13

Rehabilitation

E10

19-Jun-13

Approved

Approved

5532

12-Jun-13

Rehabilitation

E10

19-Jun-13

Approved

Approved

5533

12-Jun-13

Rehabilitation

E10

24-Jun-13

Approved

Approved

5534

12-Jun-13

Rehabilitation

E10

19-Jun-13

Approved

Approved

5535

12-Jun-13

Removal

E10

18-Jun-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. For Sewer line MH 123/1/1 to MH 123/1/1A, Removal of Interlock Tiles, 13.25 LM Removal of Curb stones, 4.60 LM Removal of Existing 150mm Dia VC Pipeline, 13.35 LM For Sewer line MH E122/N to MH E123/N, Reinstatement of Interlock Tiles, 15.30 LM Reinstatement of Curb stones, 4.60 LM For Sewer line MH H7/2 to H7/1, Removal of Asphalt, 21.22 LM For Sewer line MH C17/3A/1N to C17/4A/1N, Removal of Asphalt, 38.40 LM Removal of Interlock Tiles, 11.50 LM Removal of Curbstone, 21.40 LM Excavation up to formation & Excavation & Pipe Laying G.B.S. for 225mm Dia uPVC for: C18/1A to C18 including MH connection, 13.75 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH 123/1/1A to MH 123/1/1 including MH connection, 13.55 LM Excavation up to formation & Pipe laying C.B.S. for 160mm Dia uPVC for: MH E121/1A/1 to E121/1A including MH connection, 12.58 LM Hydrostatic and Deflection Test for sewer line MH 123/1/1A to MH 123/1/1, 225mm Upvc Hydrostatic and Deflection Test for sewer line MH E121/1A to E121/1A/1, 160mm Upvc Initial inspection prior to Handover for Sewer Line E121/1A to E121/1A/1, 160mm uPVC Initial inspection prior to Handover for Sewer Line MH 123/1/1A to 123/1/1, 225mm uPVC For Sewer line MH C7/1/1/N to C7N, Removal of Asphalt, 31.10 LM Removal of Interlock Tiles, 8.90 LM Removal of Curbstone, 21.20 LM For Sewer line MH C14/21 to C14/20, Removal of Asphalt, 24.00 LM Removal of Interlock Tiles, 6.48 LM Removal of Curbstone, 9.00 LM Interlock Tiles Removal in between sewer line MH C10A/1 to C11/N, 5.00 LM For Sewer line MH C11/6/N to C10A/2/1/N, Removal of Asphalt, 51.72 LM Removal of Ceramics Tiles, 3.40 LM Removal of Curbstones, 7.60 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH C14/21 to C14/20 including MH connection, 40.95 LM Excavation up to formation & Pipe laying C.B.S. for 160mm Dia uPVC for: MH C10A/1 to C11/N including MH connection, 5.17 LM Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH C11/6/N to C10A/2/1/N including MH connection, 54.32 LM Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC for: MH D22/26N to D22/25N including MH connection, 48.54 LM Hydrostatic and Deflection Test for sewer line MH C14/21 to C14/20, 225mm Upvc Hydrostatic and Deflection Test for sewer line MH C10A/1 to C11/N, 160mm Upvc Hydrostatic and Deflection Test for sewer line MH C11/6/N to C10A/2/1/N, 225mm Upvc Initial inspection prior to Handover for Sewer Line MH C14/21to C14/20, 225mm uPVC Initial inspection prior to Handover for Sewer Line MH C10A/1 to C11/N, 160mm uPVC Initial inspection prior to Handover for Sewer Line MH C11/6/N to C10A/2/1/N, 225mm uPVC Casting of Cover Slab and Adj. Ring for: MH C18/1A Removal of Existing Manhole, MH E120/1 Casting and Installation of MH Base for MH C7/1/1/N and Backdrop for MH C11/N 3-Jul-13 18-Jun-13 17-Jun-13 11-Jul-13 11-Jul-13 Description Rec'd Date Status

MACE
Remarks 18-Jun-13 Approved Approved

5536

12-Jun-13

Removal

E10

5537 5538

12-Jun-13 12-Jun-13

Reinstatement Removal

E10 W7/01

18-Jun-13 19-Jun-13

Approved Approved

Approved Approved

5539

12-Jun-13

Removal Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Removal

E15

10-Sep-13

Approved

Approved

5540 5541 5542 5543 5544 5545 5546 5547

12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13

E16 E10 E10 E10 E10 E10 E10 E13

22-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 17-Jun-13

Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved

5548 5549 5550

12-Jun-13 12-Jun-13 12-Jun-13

Removal Removal Removal Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Handing Over Concreting Removal Concreting

E13 E13 E13

17-Jun-13

Approved cancelled

Approved No removal done yet Approved

23-Jun-13

Approved

5551 5552 5553 5554 5555 5556 5557 5558 5559 5560 5561 5562 5563

12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 23-Jun-13 12-Jun-13 12-Jun-13

E13 E13 E13 E19 E13 E13 E13 E13 E13 E13 E16 E10 E13

1-Jul-13

Approved cancelled

Approved Tiles not yet removed 45.00 Lm Approved - Approved Approved Approved No work Conducted Yet Approved Approved Cancelled Not Ready for Inspection - Work Inprogress Approved Approved Approved

1-Jul-13 17-Jun-13 11-Jul-13

Approved Approved Approved cancelled Approved Approved cancelled Pending Approved Approved Approved

31

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5564 5565 Sub. Date 12-Jun-13 12-Jun-13 Activity Request for Information Concreting Location ( Sector No ) E12 E13 LINE No. Request for Information - Existing Services Crossing Construction of backdrop for MH C11/N coming from MH C10A/1. For Sewer Line MH C11/N to MH C10A/2/1/N, Asphalt Removal, 4.80 LM Curbstone Removal, 10.10 LM Interlock Tile Removal (6cm), 26.50 LM Interlock Tile Removal (8cm), 1.50 LM For Sewer Line MH C10/N to MH C11/N, Asphalt Removal, 2.80 LM Hydrostatic and Deflection Test for sewer line MH C19/18/1N to C19/17A/1N, 280mm Upvc Hydrostatic and Deflection Test for sewer line MH C19/18/A to C19/18/1N, 160mm uPVC Hydrostatic and Deflection Test for sewer line MH C19/21N to C19/20N, 280mm Upvc Hydrostatic and Deflection Test for sewer line MH C19/20N to C19/20/1N, 280mm Upvc Hydrostatic and Deflection Test for sewer line MH C19/18A/1N to C19/18/1N, 225mm uPVC Rehabilitation work at Existing MH C19/17A/1: 1. Demolished Existing D.I. Cover and frame ( 600 Dia / B125) 2. Installed new D.I. Cover and frame (600 Dia / B125) and GRP Sealing Plate 3. GRP lamination for raising area, 0.188 m 4. Removed Ladder, 50 cm 5. GRP lamination for Shaft area, 0.628 m 6. GRP lamination for Joint, (1-No) Rehabilitation work at Existing MH C19/18A/1: 1. Demolished Existing D.I. Cover and frame ( 600 Dia / D400) 2. Installed new D.I. Cover and frame (600 Dia / D400) and GRP Sealing Plate 3. GRP lamination for raising area, 0.245 m 4. GRP lamination for Soffit area, 0.927 m 5. GRP lamination for Shaft area, 4.840 m 6. GRP lamination for Benching area, 1.340 m Rehabilitation work at Existing MH C19/18/A: 1. Clean and Coat Existing D.I. Cover and frame ( 600 x 600 / D400) 2. GRP lamination for Joint, (1-No) Rehabilitation work at Existing MH C10/1/1: 1. Clean and Coat D.I. Cover and frame ( 600 x 600 / D400), Clean & coat SOP. 2. Remove ladder (45 cm) 3. GRP lamination for raising area, 0.565 m 4. GRP lamination for shaft area, 1.9468 m Rehabilitation work at Existing MH C7/6: 1. Clean and Coat D.I. Cover and frame ( 600 x 600 / D400) 2. Provide new sealing plate for 600 x 600 GRP 3. Remove Ladder, 2.1 m 4. GRP lamination for raising area, 0.188 m 5. GRP lamination for shaft area, 9.048 m Rehabilitation work at Existing MH C10/2/3: 1. Demolish existing D.I. Cover and frame ( 600 dia / D400) 2. Installation of New D.I. Cover and Frame (600 Dia / D400) and GRP Sealing Plate. 3. GRP lamination for shaft area, 1.536 m 4. GRP lamination for Benching area, 0.543 m Rehabilitation work at Existing MH C10/2/2: 1. Demolish existing D.I. Cover and frame ( 600 dia / D400) 2. Installation of New D.I. Cover and Frame (600 Dia / D400) and GRP Sealing Plate. 3. GRP lamination for shaft area, 1.776 m 4. GRP lamination for Benching area, 0.562 m Description Rec'd Date 17-Jun-13 17-Jun-13 Status

MACE
Remarks Approved Approved Approved Approved

5566

12-Jun-13

Removal

E13

23-Jun-13

Approved

Approved

5567 5568 5569 5570 5571

12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13

Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test

E16 E16 E16 E16 E16

20-Jun-13 3-Jul-13 3-Jul-13 3-Jul-13 20-Jun-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved

5572

13-Jun-13

Rehabilitation

E16

3B

6-Jul-13

Approved

Approved

5573

13-Jun-13

Rehabilitation

E16

6-Jul-13

Approved

Approved

5574

13-Jun-13

Rehabilitation

E16

22-Jun-13

Approved

Approved

5575

13-Jun-13

Rehabilitation

E13

23-Jun-13

Approved

Approved

5576

13-Jun-13

Rehabilitation

E13

19-Jun-13

Approved

Approved

5577

13-Jun-13

Rehabilitation

E13

20-Jun-13

Approved

Approved

5578

13-Jun-13

Rehabilitation

E13

20-Jun-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO Sub. Date Activity Location ( Sector No ) LINE No. Description Rehabilitation work at Existing MH C10/2/1: 1. Demolish existing D.I. Cover and frame ( 600 dia / D400) 2. Installation of New D.I. Cover and Frame (600 Dia / D400) and GRP Sealing Plate. 3. GRP lamination for Raising area, 0.377 m 4. GRP lamination for shaft area, 1.414 m 5. GRP lamination for Soffit area, 0.773 m 6. GRP lamination for Benching area, 1.776 m Rehabilitation work at Existing MH C16/3/2: 1. Demolish existing D.I. Cover and frame ( 600 dia / B125) 2. Installation of New D.I. Cover and Frame (600 Dia / B125) and GRP Sealing Plate. 3. GRP lamination for Raising area, 0.1884 m 4. GRP lamination for shaft area, 5.498 m 5. GRP lamination for Soffit area, 0.502 m 6. GRP lamination for Benching area, 1.776 m Rehabilitation work at Existing MH H7/2: 1. Demolish existing Cover slab, 1.50m Dia (32 cm) 2. Casting New Cover slab, 1.50m Dia (25 cm) 3. Installation of New Cover Slab D.I. Cover and Frame (750 Dia / D400) and GRP Sealing Plate. 4. GRP lamination for shaft area, 32.751 m 5. GRP lamination for Soffit area, 1.098 m 6. Removal of Ladder, 6m Rehabilitation work at Existing MH C19/18/1: 1. Demolish existing D.I. Cover and frame, ( 600 Dia / D400) 2. Installation of New Cover Slab D.I. Cover and Frame (600 Dia / D400) and GRP Sealing Plate. 3. GRP lamination for Raising area, 0.283 m 4. GRP Patch repair for Shaft Area (1-No) 5. GRP Lamination for Joint (1-No) 31 31 7 19 Casting of 2nd Shaft and 2-nos of Backdrops for MH C7/1/1/N Concreting of MH Blinding for MH C7/1/1/N Concreting of Pipe Surround for Sewer line MH 9A/1A to MH 9A/2 Concreting of MH Blinding for MH C21A/11/1F Concreting of MH Blinding for MH C23/9A Reinstatement between sewer line MH C24/15/2N to MH C24/19N Kerbstone, 52.30 LM Foot Path Tiles, 50.10 LM Hydrostatic and Deflection Test for sewer line MH D22/26N to D22/25N, 315mm uPVC 19 Exposing and Supporting existing Electrical cable between MH D22/25N to D22/24N, 27.41 LM Asphalt Removal between Sewer line MH C23/9A to C23/8, 22.70 LM Hydrostatic and Deflection Test for Sewer line C21A/22/3/5 to C21A/22/3/6, 450mm uPVC Initial inspection prior to Hand Over for Sewer line C21A/22/3/5 to C21A/22/3/6, 450mm uPVC For Sewer Line C21/17 to C21, Asphalt Removal, 12.50 LM Foot Path Tiles Removal, 11.10 LM Curbstone Removal, 15.20 LM Rehabilitation work at Existing MH D22/25N: 1. Clean and Coat D.I. Cover and frame, (750 x 600 / D400) 2. Replace New GRP Sealing Plate, 750 x 600. 3. GRP lamination for Raising area, 0.105 m Rehabilitation work at Existing MH D22/26N: 1. Clean and Coat D.I. Cover and frame, (750 x 600 / D400) 2. GRP lamination for Raising area, 0.105 m 3. GRP patch repair around Backdrop, 3-Nos. 4. GRP patch repair shaft area, 2-Nos. 5. Provide 3 nos plug and Chain, 160mm Dia. 6 Excavation up to formation & Pipe laying G.B.S. for 225mm Dia uPVC for: MH C18/1A to MH C18 , 6.00 LM Rec'd Date Status

MACE
Remarks Approved Approved

5579

13-Jun-13

Rehabilitation

E13

5580

13-Jun-13

Rehabilitation

E15

3-Jul-13

Approved

Approved

5581

13-Jun-13

Rehabilitation

W7/01

12-Oct-13

Approved

approved

5582

13-Jun-13

Rehabilitation

E16

6-Jul-13

Approved

Approved

5583 5584 5585 5586 5587a 5587 5588 5590 5591 5592 5593 5594

13-Jun-13 13-Jun-13 13-Jun-13 13-Jun-13 13-Jun-13 13-Jun-13 15-Jun-13 15-Jun-13 15-Jun-13 16-Jun-13 16-Jun-13 16-Jun-13

Concreting Concreting Concreting Blinding Blinding Reinstatement Hydrostatic & Deflection Test Supporting Removal Hydrostatic & Deflection Test Handing Over Removal

E13 E13 E13 E16/01 E16/02 E16/02 E19 E19 E16/02 E16/01 E16/01 E16/01

24-Jun-13 17-Jun-13 17-Jun-13 6-Oct-13 1-Jul-13 28-Oct-13 17-Jun-13 17-Jun-13 18-Jun-13 18-Jun-13

Test Req Approved Approved Approved Approved Approved Approved Approved Approved Approved cancelled

Need to submit cube test result Approved Approved approved approved APPROVED Approved Approved Approved Approved S/S with 5698 Approved

18-Jun-13

Approved

5595

16-Jun-13

Rehabilitation

E19

Approved

Approved

5596

16-Jun-13

Rehabilitation

E19

18-Jun-13

Approved

Approved

5597

18-Jun-13

Excavation & Pipe Laying

E16

20-Jun-13

Approved

Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5598 5599 5600 5601 5602 5603 5604 5605 5606 Sub. Date 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 Activity Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Reinstatement Removal Location ( Sector No ) E10 E15 E15 E16 E10 E16 E10 E10 E16 LINE No. 5 12 14 4 5 7 5 25 6 Description Excavation up to formation & Pipe laying G.B.S. for 280mm Dia uPVC for: MH 123/1A/N to MH E128/7/1/1A/N including MH connection, 5.11 LM Excavation up to formation & Pipe laying G.B.S. for 280mm Dia uPVC for: MH C17/2A/2N to MH C17/3A/1N , 12.00 LM Excavation up to formation & Pipe laying G.B.S. for 500mm Dia GRP for: MH C17/2A/1N to MH C17/1/N , 6.00 LM Hydrostatic and Deflection Test for Sewer line C19/14 to C19/2N, 225mm uPVC Hydrostatic and Deflection Test for Sewer line MH 123/1A/N to E128/7/1/1A/N, 280mm uPVC Hydrostatic and Deflection Test for Sewer line C19/20/1N to C19, 280mm uPVC Initial inspection prior to Hand Over for Sewer line 123/1A/N to E128/7/1/1A/N, 280mm uPVC Reinstatement of Grass in between sewer line MH 119 to MH C14/122, 11.00 LM For Sewer line MH C18/1A to C18, Removal of Interlock Tiles, 12.00 LM Removal of Asphalt, 22.90 LM Removal of Curbstone, 7.50 LM For Sector E10, Casting and Installation Cover Slab, Adj. Ring and Cover/Frame for MH E120/1/1N & MH E120/1/3N. 6 19 13A 1 1 5 26 26 31 42 31 For Sector E10, Casting and Installation Cover Slab for MH E120/1/3N. Concreting and installation of MH Shaft for MH C18/1A. Concreting and installation of MH Shaft for MH C23/9A. Concreting of MH Base for MH C21A/11/1F. Concreting of MH Base for MH E120/1/1N. Concrete Blinding for MH E120/1/1N. Installation of Cover Slab, Adj. Ring and Cover/Frame (600mm Dia/D400) for MH H7/5/1. Hydrostatic and Deflection Test for Sewer line IC 247/4/11 to D26N/10/N, 160mm uPVC Initial inspection prior to Handover for Rep. Sewer Line IC 247/4/11 to D26N/10/N , 160mm uPVC Asphalt Removal between Sewer Line C7/2/N to C7/1/1/N , 40.90 LM Interlock Tiles (6cm) Removal between Sewer Line MH 9A/1A to MH 9A/1 , 6.57 LM Between Sewer Line MH C7/1/1/N to C7N Asphalt Removal, 44.55 LM Kerbstone Removal, 33.20 LM Interlock Tiles (6cm) Removal, 6.57 LM Obstruction Removal Between Sewer Line MH C7/1/1/N to C7N, Removed Concrete Duct for Road Crossing near C7/1/1/N, 3.50 LM Removed Concrete Surround for Pressure Pipeline, 2.00 LM Removed Concrete Duct for Road Crossing near C7N, 3.50 LM Demolished existing Manhole MH C7/1/1/N. C.L.; 102.380 , I.L.; 97.508 Reinstate Road Markings, 95.64 m Removal of Existing Manhole, MH E128/7/2. Reinstatement of Foot Path Tiles between MH C24/15 to C24/15/2N, 2.00 LM Excavation up to formation & Pipe laying G.B.S for 315mm Dia uPVC , MH C7/1/1/N to C7N including MH connection, 56.60 LM (36.80) APPROVED Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , MH C7/2/N to C7/1/1/N including MH connection, 39.40 LM Excavation up to formation & Pipe laying C.B.S for 160mm Dia uPVC , MH 9A/1A to MH 9A/1 including MH connection, 5.97 LM Hydrostatic Test and Deflection Test for Sewer line MH 9A/1A to MH 9A/1, 160mm uPVC. Hydrostatic Test and Deflection Test for Sewer line MH C7/1/1/N to MH C7N, 315mm uPVC. Hydrostatic Test and Deflection Test for Sewer line MH C7/2/N to MH C7/1/1/N, 280mm uPVC. Initial Inspection prior to Handing Over for Sewer line MH C7/2/N to MH C7/1/1/N, 280mm uPVC. Initial Inspection prior to Handing Over for Sewer line MH C7/1/1/N to MH C7N, 315mm uPVC. 1-Jul-13 30-Jun-13 Rec'd Date 22-Jun-13 20-Jun-13 20-Jun-13 20-Jun-13 22-Jun-13 9-Jul-13 22-Jun-13 22-Jun-13 22-Jun-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

5607 5608 5609 5610 5611 5612 5613 5614 5615 5616 5617 5618 5619

18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 18-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13

Concreting Concreting Concreting Concreting Concreting Concreting Concreting Installation Hydrostatic & Deflection Test Handing Over Removal Removal Removal

E10 E10 E16 E16/02 E16/01 E10 E10 W7/01 E19 E19 E13 E13 E13

22-Jun-13 1-Jul-13 9-Jul-13 1-Jul-13 1-Jul-13 22-Jun-13 22-Jun-13 11-Jul-13 30-Jun-13 1-Jul-13 24-Jun-13 24-Jun-13 24-Jun-13

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved CLAIMED/P26 Approved Approved

5620

19-Jun-13

obstruction

E13

31

24-Jun-13

Approved

Approved

5621 5622 5623 5624 5625 5626 5627 5628 5629 5630 5631 5632

19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13 19-Jun-13

Demolishing Reinstatement Removal Reinstatement Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over

E13 E19 E10 E16/02 E13 E13 E13 E13 E13 E13 E13 E13

31 4,26,17,31 15C 21 31 31 42 42 31 31 31 31

24-Jun-13 30-Jun-13 22-Jun-13 1-Jul-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13

Approved Approved Approved Approved Approved Approved Approved Approved Pending Approved Approved Pending

Approved Approved Approved Approved Approved Approved Approved Approved Not Ready for Inspection - Work Inprogress Approved Not Ready for Inspection - Work Inprogress

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5633 5634 5635 5636 5637 5638 5640 Sub. Date 19-Jun-13 19-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 27-Jun-13 Activity Handing Over Concreting Reinstatement Reinstatement Reinstatement Reinstatement Backdrop Location ( Sector No ) E13 E16/02 E16/02 E10 E10 E10 E13 LINE No. 42 19 21 32 5 33 32 Description Initial Inspection prior to Handing Over for Sewer line MH 9A/1A to MH 9A/1, 160mm uPVC. Casting and installation of Cover Slab, Adj. Ring and Cover/Frame for Sector E16/02, MH C23/9A. Reinstatement of Asphalt between Sewer line MH C24/15/2N to C24/19N, 56.65 LM Reinstatement of Asphalt between Sewer lines: MH E128/4/1A/N to E128/3N, 10.85 LM MH E128/5N to E128/4N, 10.00 LM MH E128N to E128/4B/N, 12.70 LM Reinstatement of Asphalt between Sewer lines: MH E128/7/1/1A/N to 124/1B/N, 7.30 LM Reinstatement of Asphalt between Sewer lines: MH E128/3/1A/N to E128/3N, 10.00 LM Construction of Backdrop for : MH C11/5/1/N coming from MH C11/4/1/1, 160mm Dia uPVC @ IL: 99.307 MH C11/5/2/N coming from MH C11/3/2, 160mm Dia uPVC @ IL: 99.515 MH C11/4/N coming from MH C11/4/1/N, 160mm Dia uPVC @ IL: 99.102 Rehabilitation work at existing MH C24/12A: 1. Clean and Coat D.I. Cover & Frame, (600x600, D400) 2. Install new GRP Sealing Plate, 600mm Dia. Rehabilitation work at existing MH C24/13: 1. Clean and Coat D.I. Cover & Frame, (600x600, D400) 2. Install new GRP Sealing Plate, 600mm Dia. 3. Removal of Ladder, 2.50m 4. GRP Lamination for Raising Area, 1.080 m 5. Patch repair on Shaft, 5 Nos. 6. Renew of Joints 1.20m Dia, 2 Nos. Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC , MH C23/9 to C23/9A including MH connection, 8.14 LM Excavation up to formation & Pipe laying G.B.S for 500mm Dia GRP including connection , MH C17/1N to C17/2A/1N, 6.00 LM MH C17/2A/1N to C17/1N, 9.89 LM Excavation up to formation & Pipe laying G.B.S for 200mm Dia GRP including connection to existing port on manhole, MH C32B/56 to CA/5, 6.90 LM Concreting of Manhole 2nd Shaft for MH C7/1/1/N. Concreting of Manhole 2nd Shaft for MH C21A/11/1F. Concrete Blinding for MH C17/3A/1N. Asphalt Removal between sewer line, MH C23/9 to MH C23/9A, 10.70 LM Between sewer line, MH E128/7/2N to MH 123/1A Removal of Interlock Tiles, 21.90 LM Removal of Asphalt, 5.65 LM Removal of Curbstone, 10.50 LM Removal of Existing AC Pipe 150mm Dia, 26.26 LM Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC including connection , MH E128/7/2N to MH 123/1A, 29.01 LM Hydrostatic and Deflection Test for sewer line MH 123/1A to E128/7/2N, 225mm uPVC Initial Inspection prior to Handover for sewer line MH E128/7/2N to MH 123/1A, 225mm uPVC Installation of Cover Slab, Adj. ring and Cover/frame, 750mm Dia./B125 For MH E122/N Installation of Manhole Shaft for MH E122/N. Installation of Cover Slab, Adj. ring and Cover/frame, 750mm Dia./D400 For MH 123/1A/N Installation of Cover Slab, Adj. ring and Cover/frame, 750mm Dia./D400 For MH E128/7/2N Installation of Manhole Shaft for MH E128/7/2N. Casting & Installation of Cover Slab, Adj. ring and Cover/frame, 750mm Dia./B125 For MH 127/4B/N Casting of MH Base for MH C13/N Casting & Installation of Cover Slab, Adj. ring and Cover/frame, 750mm Dia./B125 For MH C13/N Casting & Installation of Cover Slab, Adj. ring, Reducer slab and Cover/frame, 750mm Dia./D400 For MH C10/N Concrete Blinding for MH C10/2/N. Construction of Manhole Base for MH C10/2/N. 1-Jul-13 29-Jun-13 29-Jun-13 1-Jul-13 30-Jun-13 30-Jun-13 29-Jun-13 Rec'd Date 24-Jun-13 1-Jul-13 1-Jul-13 30-Jun-13 30-Jun-13 30-Jun-13 1-Jul-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

5641

24-Jun-13

Rehabilitation

E16/02

20

1-Jul-13

Approved

Approved

5642

24-Jun-13

Rehabilitation

E16/02

20

1-Jul-13

Approved

Approved

5643 5644 5645 5646 5647 5648 5649

24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13

Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Concreting Concreting Concreting Removal

E16/02 E15 E12 E13 E16/01 E15 E16/02

19 14 2 31 13A 12 19

1-Jul-13 25-Jun-13 3-Jul-13 29-Jun-13 25-Jul-13 25-Jun-13 1-Jul-13

Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved

5650

24-Jun-13

Removal

E10

15C

30-Jun-13

Approved

Approved

5651 5652 5653 5654 5655 5656 5657 5658 5659 5660 5661 5662 5663 5664

24-Jun-13 24-Jun-13 24-Jun-13 27-Jun-13 27-Jun-13 24-Jun-13 27-Jun-13 27-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 27-Jun-13 24-Jun-13 24-Jun-13

Excavation & Pipe Laying Hydrostatic & Deflection Test Handing Over Installation Installation Installation Installation Installation Concreting & Installation Concreting Concreting & Installation Concreting & Installation Concreting & Installation Concreting

E10 E10 E10 E10 E10 E10 E10 E10 E10 E13 E13 E13 E13 E13

15C 15C 15C

30-Jun-13 30-Jun-13 30-Jun-13 1-Jul-13 30-Jun-13

Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Not Submitted - Need Attachment

Approved Approved Approved Approved

Approved Approved Approved Approved Not Submitted - Need Attachment

Approved Approved Approved

Approved Approved Approved

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5665 5666 5667 5668 5669 5670 5671 5672 5673 5674 Sub. Date 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 27-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 Activity Concreting Concreting Blinding Concreting Concreting Concreting Cleaning Concreting Concreting Concreting Location ( Sector No ) E13 E13 E13 E13 E13 E19 E16 E19 E19 E19 LINE No. Description Construction of Manhole Shaft for MH C10/2/N. Casting & Installation of Cover Slab, Adj. ring and Cover/frame, 600mm Dia./D400 For MH C10/2/N Concrete Blinding for MH C10/3/1/N. Construction of Manhole Base for MH C10/3/1/N.. Construction of Manhole Shaft for MH C10/3/1/N.. Construction of Manhole Shaft for MH D22/23N/1N Site Cleaning for Sewer line: From MH C20/11/2A to C20/11/2A/1N From MH C20/11/2A/1N to C20/11/2 Construction of Manhole Shaft for MH D22/22N/2N Construction of Manhole Shaft for MH D22/23N/2N Rehabilitation work at existing MH C14/22: 1. Clean and Coat D.I. Cover & Frame and Sealing Plate, (600x600, D400) 2. Remove the Ladder, 1.50m 3. Provide 160mm Dia. GRP end plug with Chain & 1-patch repair for Backdrop. (NOT INCLUDED) 4. GRP Lamination for Raising area, 0.376m 5. GRP Lamination for Shaft area, 5.278m 6. GRP Lamination for Joint, 1-No. 7. Remove all defective liner from benching and relining, 1.20m dia. 1 26A 26 26A 26A 26 19 1 1 Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC including connection for: MH D26/8/N to MH D26/8/1N , 17.89 LM Excavation up to formation & Pipe laying G.B.S. for 315mm Dia uPVC including connection for: MH D26N/9/N to MH D26/8/N , 83.01 LM Hydrostatic Test and Deflection Test for Sewer line MH D26N/9/N to D26N/8/N, 315mm uPVC. Hydrostatic and Deflection Test for Sewer line D26N/8/N to D26N/8/1N, 315mm uPVC Initial inspection prior to Hand Over for Sewer line D26N/9/N to D26N/8/1N, 315mm uPVC Initial inspection prior to Hand Over for Sewer line D26N/9/N to D26N/8/N, 315mm uPVC Construction of Manhole Shaft for MH C24/19. Construction of Manhole Base & Shaft for MH C17/1/N. Installation of Cover Slab, Adj. Ring and Cover/frame for MH c17/2A/2N Installation of Cover Slab, Adj. Ring and Cover/frame for MH C24/19N. Installation of Cover Slab, Adj. Ring and Cover/frame for MH C24/15/2N. Installation of Cover Slab, Adj. Ring and Cover/frame for MH C17/1/N. Construction of Manhole Base for MH C17/3A/1N. Construction of Manhole Shaft for MH C17/3A/1N. Excavation up to formation & Pipe laying C.B.S for 160mm Dia uPVC , Sewer line MH C7/1/1/1 to C7/1/1/N including MH connection, 11.72 LM Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , Sewer line MH C17/3A/1N to C17/4A/1N including MH connection, 7.10 LM Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , Sewer line MH C17/2A/2N to C17/3A/1N including MH connection, 8.18 LM Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , Sewer line MH C19/17A/1N to C19/17A including MH connection, 4.45 LM Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , Sewer line MH C19/17A to C19/1N including MH connection, 7.00 LM Construction of Backdrop for MH E120/1/1N coming from MH E120/1B, IL:99.114 Hydrostatic and Deflection Test for sewer line MH C7/1/1/1 to MH C7/1/1/N , 160mm uPVC Initial Inspection prior to Handover for sewer line MH C7/1/1/1 to MH C7/1/1/N , 160mm uPVC Initial Inspection prior to Handover for sewer line MH C21A/22/3/5 to MH C21A/22/3/6 , 450mm uPVC Casting and Installation of Cover Slab and Adj. Ring for: Sector E12, MH CA/6 Request for Information for Excavation of manhole & Gas line near MH CA5/1. Excavation up to formation & Pipe laying G.B.S for 280mm Dia uPVC , Sewer line MH CA2/1/N to CA2/B/N including MH connection, 17.46LM Removal of Asphalt between Sewer line MH C7/1/1/1 to MH C7/1/1/N, 12.47 LM 3-Jul-13 1-Jul-13 1-Jul-13 28-Aug-13 6-Jul-13 13-Aug-13 1-Jul-13 3-Jul-13 3-Jul-13 6-Jul-13 3-Jul-13 8-Jul-13 1-Jul-13 1-Jul-13 1-Jul-13 7/1/2013 8-Jul-13 7/1/2013 1-Jul-13 Rec'd Date 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 9-Jul-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved cancelled Approved Approved Approved Approved Approved Approved Approved 9-Jul-13 6-Jul-13 Approved Approved cancelled

21

5675

24-Jun-13

Rehabilitation

E13

2-Jul-13

Approved

Approved

5676 5677 5678 5679 5680 5681 5682 5683 5684 5685 5686 5687 5688 5689 5690 5691 5692 5693 5694 5695 5696 5697 5698 5699 5700 5701 5702

24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 24-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 30-Jun-13 29-Jun-13

Rehabilitation Excavation & Pipe Laying Hydrostatic & Deflection Test Hydrostatic & Deflection Test Handing Over Handing Over Concreting Concreting Installation Installation Installation Installation Concreting Concreting Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying Concreting Hydrostatic & Deflection Test Handing Over Handing Over Concreting Request for Information Excavation & Pipe Laying Removal

E13 E19 E19 E19 E19 E19 E16/02 E15 E10 E16/02 E16/02 E15 E15 E15 E13 E15 E15 E16 E16 E10 E13 E13 E16/01 E12 E12 E12 E13

30-Jun-13 25-Jun-13 30-Jun-13 30-Jun-13 1-Jul-13 1-Jul-13 1-Jul-13

Approved Approved Approved Approved Approved Approved Approved CHECK Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

Approved Approved Approved Approved Approved Approved Approved Not Submitted - Need Attachment Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

1 12 12 33 12 12 3A 3 1 33 33 8 2 6 33

CLIENT : Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dhabi Island Area-Category D

CONT. START DATE DATE

3-Jan-11 7-Feb-14 CONTRACTOR :

RFI STATUS SUMMARY


AS OF - August / 2013 RFI NO 5703 5704 5705 5706 5707 5708 5709 5710 5711 5712 5713 5714 5715 5716 Sub. Date 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 29-Jun-13 Activity Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Reinstatement Concreting Concreting Handing Over Handing Over Handing Over Handing Over Handing Over Handing Over Location ( Sector No ) E13 E13 E13 E13 E13 E13 E10 E10 E16 E16 E16 E16 E16 E16 LINE No. 32 32 32 27 27 27 1 3B 3A 7 7 7 3A Description Reinstatement between Sewer line MH E128/1N to MH E128N, Interlock Tiles, 5.00 LM, Kerbstone, 17.80 LM Interlock Tiles Reinstatement between Sewer line MH E128/2N to MH E128/3N, 31.50 LM Interlock Tiles Reinstatement between Sewer line MH E128/1N to MH E128/2N, 12.70 LM Interlock Tiles Reinstatement between Sewer line MH E121 to MH E121/1A, 19.75 LM Interlock Tiles Reinstatement between Sewer line MH E121/2 to MH E121, 22.50 LM Interlock Tiles Reinstatement between Sewer line MH IC to MH E121/2, 18.90 LM Concrete Blinding for MH E120/1/2N. Construction of Manhole Base for MH E120/1/2N. Initial Inspection prior to Handover for Sewer line MH C19/18/A to MH C19/18/1N, 160mm uPVC Initial Inspection prior to Handover for Sewer line MH C19/18A/1N to MH C19/18/1N, 225mm uPVC Initial Inspection prior to Handover for Sewer line MH C19/20/1N to MH C19, 280mm uPVC Initial Inspection prior to Handover for Sewer line MH C19/20N to MH C19/20/1N, 280mm uPVC Initial Inspection prior to Handover for Sewer line MH C19/21N to MH C19/20N, 280mm uPVC Initial Inspection prior to Handover for Sewer line MH C19/17A/1N to MH C19/17A, 280mm uPVC Rec'd Date 1-Jul-13 1-Jul-13 1-Jul-13 1-Jul-13 1-Jul-13 1-Jul-13 1-Jul-13 31-Jul-13 9-Jul-13 3-Jul-13 9-Jul-13 3-Jul-13 3-Jul-13 9-Jul-13 Status

MACE
Remarks Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

RFI NO 6193 6370 6727 7019 7023 7031 7035 7041 7051 7052 7072 7074A 7078 6544 6746 6879

Sub. Date 17-Sep-13 7-Oct-13 14-Nov-13 17-Dec-13 17-Dec-13 18-Dec-13 18-Dec-13 19-Dec-13 22-Dec-13 22-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 29-Oct-13 16-Nov-13 28-Nov-13

Activity Handing Over Hydrostatic & Deflection Test Reinstatement Removal Removal Installation Lamination Excavation & Pipe Laying Hydrostatic & Deflection Test Handing Over Demolishing Concreting Excavation & Pipe Laying Handing Over Removal Lamination

Location ( Sector No ) E10 E10 E10 E10 E10 E10 E10 E10 E10 E10 E10 E10 E10 E12 E12 E12

LINE No. 1B 3 15C 6 35B 35B 35B 6 6 6 35B 35B 35B 2 8 1,1A

Description Initial Inspection prior to Handover for 160mm Dia uPVC from E120/1/1A to E120/1/3N, 8.05 LM c/c Hydrostatic and Deflection Test for 450mm Dia uPVC from MH C21A/22/3/6 TO C21A/22/3/7, length 17.840 LM c/c REINSTATEMENT OF ASPHALT LENGTH, 5.650 LM BETWEEN MANHOLE E128/7/2N TO MH 123/1A Removal of Asphalt 3.60 LM, and Interlock Tiles 27.10 LM between 128/5/1/1N to 126/3/1/1N Removal of Asphalt (12.30+3.60) 15.90 LM, Interlock tiles (3.60+12.30) 15.90 LM, Kerbstone 29.00 LM And removal of existing sewer line with CBS 150 VC 16.00 LM between MH 126/2N to 126/3/1/1N Installation of Base, Shaft, Adjustment Ring and Cover Slab with cover frame and sealing plate for MH 126/3/1/1N Lamination of Joints for MH 126/3/1/1N Excavation up to formation & Pipe laying G.B.S for 160mm Dia uPVC, 28.090 LM c/c with Manhole Connections between MH E128/5/1/1N to 126/3/1/1N Hydrostatic and Deflection Test for 160mm Dia uPVC from E128/5/1/1N to 126/3/1/1N, length 28.090 LM c/c Initial Inspection prior to Handover for 160mm Dia uPVC from E128/5/1/1N to 126/3/1/1N, length 28.090 LM c/c Demolishing and Removal of existing MH 126/2 Casting of 2 Back Drops for MH 126/2N Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC 16.120 LM between MH 126/3/1/1N to 126/2N Initial Inspection prior to Handover for 200mm Dia GRP from CA/5 to C32B/56, length 14.340 LM c/c Removal of Asphalt, Length 6.500 LM, between MH C32B/60/1 to C32/60 Lamination for Joints of Manhole CA3/1/1/N C32B/60/1 Installation of Adjustment Ring, Cover Slab, Cover Frame and Sealing plate for MH CA3/1/1/N MH C32B/60/1 Casting of 2 precast Manhole Shafts for C14/15/N and C14/15A/N Casting of Manhole Base for MH C7N Casting of Manhole Back Drop for MH C14/15A/N (LINE 07) Base for MH C13D/N (LINE 15) Lamination of Manhole Joints for MH C7B/N Casting of C12/2/N LINE 19, BASE AND FIRST SHAFT C13D/N LINE 15, SHAFT Installation for Adjustment Ring and Cover Slab 750mm dia Cover+Frame (D400) with Sealing Plate for MH C14/19N Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC, 4.30+0.75+0.25 = 5.300 LM and with connection towards C14/15/1/N, between MH C14/15A/N to C14/15/1/N Excavation up to formation & Pipe laying G.B.S for 160mm Dia uPVC, 12.020 c/c LM between MH C12A to C12/N Installation of Base, Shafts, Adjustment Ring, Cover Slab, Cover Frame and Sealing Plate for MH C14/15/N Lamination for joint of Manhole C14/15/N & C14/15/1/N Casting of 2 Shafts for MH C6B/1/N and 1 Shaft for MH C13C/3/N Casting of Shaft for MH C13C/4/N Casting of 4 Shafts for MH C13C/3/N (1 Shaft), C13C/2/N (2 Shafts) and C9/1/1 (1 Shaft) Installation of Base, Cover Slab, Adjustment Ring and Cover Slab with cover frame and sealing plate for MH C11/2/N

Rec'd Date

Status Pending Pending pending pending pending pending pending pending pending pending pending pending pending Pending pending pending

Remarks pending with consultant Pending RFI with Consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant Pending RFI with Consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant

6911 6589 6679 6729 6796 6820 6875A 6901 6903 6948 6949 7008 7009 7030 7033

5-Dec-13 4-Nov-13 12-Nov-13 16-Nov-13 17-Nov-13 23-Nov-13 28-Nov-13 4-Dec-13 4-Dec-13 8-Dec-13 8-Dec-13 15-Dec-13 15-Dec-13 18-Dec-13 18-Dec-13

Installation Concreting Concreting Concreting Lamination Concreting Installation Excavation & Pipe Laying Excavation & Pipe Laying Installation Lamination Concreting Concreting Concreting Installation

E12 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13 E13

1A,1 YARD 29 7 29 YARD 2 7 18 6 6 6,29 6 6,18 25

pending Pending pending pending 24-Nov-13 pending pending pending pending pending pending pending pending pending pending pending

7034

18-Dec-13

Installation

E13

2,6,18

INSTALLATION OF BASE, COVER SLAB, ADJUSTMENT RING AND COVER SLAB WITH COVER FRAME AND SEALING PLATE FOR MH C14/18/N MH C13C/3/N MH C9/1/2 Lamination of Joints for MH C11/2/N LAMINATION OF JOINTS FOR MH C14/18/N MH C13C/3/N MH C9/1/2 Casting of 1 Base and 2 Shafts for MH C6/N Demolishing and Removal of existing MH C5C ( Line 29 ) Abandoning of existing Manhole MH C3/3/1, Filling with single sized aggregate (step1) Abandoning of existing Manhole MH C3/3, Filling with single sized aggregate (step1) Abandoning of existing Manhole MH C3A/3, Filling with single sized aggregate (step1) Abandoning of existing Manhole MH C3/B, Filling with single sized aggregate (step1) Abandoning of existing Manhole MH C5/N, Filling with single sized aggregate (step1) Abandoning of existing Manhole near MH C14/26, Filling with single sized aggregate (step1) Site Cleaning of Line 4,5 and 13 from MH C17/8A/4/1 to C17/8A/4 (Line 5), C17/8A/4 to C17/8A/3/1 (Line 13) and MH C17/8A/3 to C17/8A/1 (Line 4) Casting of Shaft for MH C16/1 for Existing Manhole Inspection for Existing Manhole No. C17/17A/2 at Sector E15 for manhole rehabilitation (Report attached) Removal of Asphalt 4.00M, Interlock tiles (5.30+2.30) 7.600 M between MH C17/1/1/N to C17 Removal of Asphalt 7.00M, Interlock tiles 6.60 M between MH C17/17A/2/A to C17/7A/2 Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC 15.050 LM between MH C17/7A/2/A TO C17/7A/2 Excavation up to formation & Pipe laying G.B.S for 225mm Dia uPVC MANHOLE CONNECTIONS 0.35+0.75 on C17/7A/2/1C and 0.75+0.35 LM on C17/7A/2/A between MH C17/7A/2/1C TO C17/7A/2/A Excavation up to formation & Pipe laying G.B.S for 450mm Dia uPVC 0.35+0.75+6.00 towards C16/1 between MH C16/1 to C16/1A NDM from MH C17/1/1/N to C17 Set up, arrangement & Mobilization for the NDM Monitoring of Levels of Asphalt Surface, prior to NDM works from MH C17/1/1/N to C17 Installation of Fence around Driving pit (98.40m) and Receiving Pit (60.80m) work area for MH C17/1/1/N to C17 Construction of Driving pit (6.00 X 1.80), Receiving Pit (2.50 X 4.00), including thrust block, entrance & exit rings from MH C17/1/1/N to C17 Construction of Sleeve 1000mm dia, length 21.500 LM for 500mm uPVC NDM line, from MH C17/1/1/N to C17 Monitoring of Levels of Asphalt Surface, after NDM construction from MH C17/1/1/N to C17 Hydrostatic and Deflection Test for 160mm Dia uPVC from MH C21A/11/1F TO C21A/9/A/N, length 23.25 LM c/c Hydrostatic and Deflection Test for 315mm Dia uPVC from C21/1 to C21, length 34.870 LM c/c Casting of Manhole Base for MH C21A/22/3/9

pending

pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant Pending RFI with Consultant Pending RFI with Consultant Pending RFI with Consultant Pending RFI with Consultant Pending RFI with Consultant Pending RFI with Consultant Pending with Consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant Pending RFI with Consultant pending with consultant pending with consultant

7037

18-Dec-13

Lamination

E13

25

pending

7038

18-Dec-13

Lamination

E13

2,6,18

pending

7081 7088 6528 6529 6531 6532 6534 6535 5947 7040 7069 7075 7076 7080 7082 7083 7089 7090 7091 7092 7093 7094 6369 6782 6822

23-Dec-13 24-Dec-13 28-Oct-13 28-Oct-13 28-Oct-13 28-Oct-13 28-Oct-13 28-Oct-13 7-Aug-13 19-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 25-Dec-13 25-Dec-13 25-Dec-13 25-Dec-13 25-Dec-13 25-Dec-13 7-Oct-13 17-Nov-13 23-Nov-13

Concreting Removal Abandoned Abandoned Abandoned Abandoned Abandoned Abandoned Cleaning Concreting inspection for rehablitaion Removal Removal Excavation & Pipe Laying Excavation & Pipe Laying Excavation & Pipe Laying NDM NDM NDM NDM NDM NDM Hydrostatic & Deflection Test Hydrostatic & Deflection Test Concreting

E13 E13 E14 E14 E14 E14 E14 E14 E15 E15 E15 E15 E15 E15 E15 E15 E15 E15 E15 E15 E15 E15 E16/01 E16/01 E16/01

29 29 27 27 26 21 23 11 4,5,13 11 15 14 15 15 15 11 14 14 14 14 14 14 7 1 10

pending pending Pending Pending Pending Pending Pending Pending Pending pending pending pending pending pending pending pending pending pending pending pending pending pending Pending pending pending

6892

4-Dec-13

Rehabilitation

E16/01

16

Rehabilitation work at existing MH C21A/14 1. Removal of existing Cover/Frame 2. Installation of new Cover/Frame 750 x 600 (L.D.) with new grp sealing plate (L.D.)

pending

With consultant ( As per ramzeen building construction in progress MH not found ) inspection done 1 year before pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant pending with consultant

7056 7057 7058 7059 7060 7061 7070 7021 7022 7024 7066 7067 7068 6663

22-Dec-13 22-Dec-13 22-Dec-13 22-Dec-13 22-Dec-13 22-Dec-13 23-Dec-13 17-Dec-13 17-Dec-13 17-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 11-Nov-13

Hydrostatic & Deflection Test Handing Over Hydrostatic & Deflection Test Handing Over Hydrostatic & Deflection Test Handing Over inspection for rehablitaion Removal Removal Removal inspection for rehablitaion inspection for rehablitaion inspection for rehablitaion Hydrostatic & Deflection Test

E16/01 E16/01 E16/01 E16/01 E16/01 E16/01 E16/01 E16/02 E16/02 E16/02 E16/02 E16/02 E16/02 E19

10B 10B 10 10 10 10 10B 14 13 14 14 13 13 3

Hydrostatic and Deflection Test for 225mm Dia uPVC from C21A/1 to C21A/22/3/9, length 5.890 LM c/c Initial Inspection prior to Handover for 225mm Dia uPVC from C21A/1 to C21A/22/3/9, length 5.890 LM c/c Hydrostatic and Deflection Test for 450mm Dia uPVC from C21A/22/3/8 to C21A/22/3/9, length 7.580 LM c/c Initial Inspection prior to Handover for 450mm Dia uPVC from C21A/22/3/8 to C21A/22/3/9, length 7.580 LM c/c Hydrostatic and Deflection Test for 450mm Dia uPVC from C21A/22/3/7 to C21A/22/3/8, length 32.690 LM c/c Initial Inspection prior to Handover for 450mm Dia uPVC from C21A/22/3/7 to C21A/22/3/8, length 32.690 LM c/c Inspection for Existing Manhole No. C21A/1 at Sector E16/01 for manhole rehabilitation (Report attached) Removal of FOC Cable 37.290M between C23/7/1 to C23/6A Removal of FOC Cable 11.02M between C23/1B to C23/1A Removal of Interlock tiles 3.00 LM and Kerbstone 7.40 LM for detour between MH C23/6A to C23/7/1 Inspection for Existing Manhole No. C23/6A at Sector E16/02 for manhole rehabilitation (Report attached) Inspection for Existing Manhole No. C23/1A at Sector E16/02 for manhole rehabilitation (Report attached) Inspection for Existing Manhole No. C23/1B at Sector E16/02 for manhole rehabilitation (Report attached) Hydrostatic and Deflection Test for 315mm Dia uPVC from D22/22N/2N to D22/22N/1N, length 9.07 LM c/c Cleaning and Grouting of Abandoned Sewer Lines from D25/15A/1/3 to D25/15A/1/4 ( Line 05 ) 27.86 LM (150mm dia) D22/8N/A4A to 565 ( Line 08 ) 10.45 LM (150mm dia) 565 to EX. MH STADIUM AREA ( Line 08 ) 19.36 LM (150mm dia) 566 to 566/1 ( Line 10 ) 8.68 LM (150mm dia) 567 to D22/9N ( Line 10 ) 10.82 LM (150mm dia) Cleaning and Grouting of Abandoned Sewer Lines from 569 to 569/1B/N ( Line 12 ) 52.31 LM (150mm dia) 569/1B/N to 569/1 ( Line 12 ) 32.81 LM (150mm dia) D26N/17B/2N/2 to 570/2 ( Line 20 ) 15.84 LM (150mm dia) 570/2 to D26/17B/1N ( Line 20 ) 48.71 LM (150mm dia) 571/4 to 571/3 ( Line 21 ) 51.82 LM (150mm dia) 571/3 to 571/5 ( Line 21 ) 29.20 LM (150mm dia) Cleaning and Grouting of Abandoned Sewer Lines from 571/3 to IC 246/13/9 ( Line 22 ) 60.72 LM (150mm dia) 571/2 to IC ( Line 23 ) 33.00 LM (150mm dia) 573/1 to Ex. MH ( Line 25 ) 54.00 LM (150mm dia) 573/1 to 573/1 (other) ( Line 25 ) 52.97 LM (150mm dia) 573/1 to D26N/10/N ( Line 25 ) 33.43 LM (150mm dia) Cleaning and Grouting of Abandoned Sewer Lines from D25/20A/2 to D25/20A/3 ( Line 08 ) 32.63 LM (150mm dia) D25/20A/3 to D25/20A/4 ( Line 08 ) 9.80 LM (150mm dia) D25/20A/A to D22/8N/A7N ( Line 08 ) 6.43 LM (150mm dia) 568 to D25/12A ( Line 13 ) 36.11 LM (300mm dia) D25/12A to 569 ( Line 13 ) 23.22 LM (300mm dia) D25/12A to D25/12A/1 ( Line 13 ) 20.66 LM (150mm dia) D26N/8N to 577 ( Line 31A ) 75.70 LM (250mm dia) Cleaning and Grouting of Abandoned Sewer Lines from 566A to 566 ( Line 10 ) 8.68 LM (150mm dia) D22/13N/1A to D22/13N/1 ( Line 10 ) 9.07 LM (150mm dia) D26N/14B/N to D26N/14B ( Line 18 ) 27.34 LM (150mm dia) D26N/14B/N to D26N/14A/N( Line 18 ) 3.98 LM (150mm dia) 576/1/1 to D26N/8N ( Line 30 ) 44.63 LM (150mm dia)

pending pending pending pending pending pending pending pending pending pending pending pending pending pending

7001

11-Dec-13

Abandoned

E19

5,8,10

pending

pending with consultant

7002

11-Dec-13

Abandoned

E19

12,20,21

pending

pending with consultant

7003

11-Dec-13

Abandoned

E19

22,23,25

pending

pending with consultant

7004

11-Dec-13

Abandoned

E19

8,13,31A

pending

pending with consultant

7005

11-Dec-13

Abandoned

E19

10,18,30

pending

pending with consultant