NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

ACTIVITY Mobilization Perimeter Fence Storage Sheds Workshops Bank house for workers and facilities Clearing and Grubbing Laying out and staking Excavation Fabrication of Reinforcements (Footing) Installation of Reinforcements (Footing) Fabrication of Reinforcements (Ground Floor Column) Installation of Reinforcements (Ground Floor Column) Pouring of Concrete (Footing) Curing of Concrete (Footing) Backfilling of Footing Fabrication of Forms (Ground Floor Columns) Installation of Forms (Ground Floor Columns) Securing a place for Electrical and Plumbing in Columns Pouring of Concrete (Ground Floor Column) Curing of Concrete (Ground Floor Column) Removal of Forms (Ground Floor Column) Fabrication of Reinforcements ( 2nd floor Beams and Slabs) Fabrication of Forms (2nd Floor Beams and Slabs) Installation of Scaffoldings ( Ground Floor) Installation of Reinforcements (2nd Floor Beam and Slabs) Installation of Forms ( 2nd Floor Beam and Slabs) Securing a place for Electrical and Plumbing in 2nd Floor Beams and Slabs Pouring of Concrete ( 2nd Floor Beams and Slabs) Curing of Concrete (2nd Floor Beams and Slabs) Removal of Forms ( 2nd Floor Beams and Slabs) Fabrication of Reinforcements (Ground Floor Stairs) Installation of Reinforcements (Ground Floor Stairs) Fabrication and Installation of Forms (Ground Floor Stairs) Pouring of Concrete (Ground Floor Stairs) Curing of Concrete (Ground Floor Stairs) Removal of Forms (Ground Floor Stairs) Fabrication of Reinforcements ( 2nd Floor Columns) Fabrication of Forms ( 2nd Floor Columns) Installation of Reinforcements (2nd Floor Columns) Installation of Forms (2nd Floor Columns) Securing a place for Electrical and Plumbing in 2nd Floor Columns Pouring of Concrete (2nd Floor Column) Curing of Concrete (2nd Floor Column) Removal of Forms (2nd Floor Column) Fabrication of Reinforcements (Roof Beams) Fabrication of Forms (Roof Beams) Installation of Scaffoldings ( Second Floor) Installation of Reinforcements (Roof Beams)

AW AY AZ BA CM CN CO CP CU CV CW CX CY CZ DC DD DE DF DG DL DM DN DO DQ DR DS DT DU DV DW DX DY EA EB

49 51 52 53 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

Installation of Forms ( Roof Beams) Pouring of Concrete (Roof Beams) Curing of Concrete (Roof Beams) Removal of Forms (Roof Beams) Installation of Roof Trusses Installation of Purlins Installation of Roofs Installation of Roof Accessories Installation of Reinforcements (Second Floor Wall) Placing of CHB (Second Floor Wall) Excavation of Wall Footing Fabrication of Reinforcements (Wall Footing) Placing of CHB (Ground Floor Wall Footing) Backfilling of Wall Footing Plastering of Wall (2nd Floor) Plastering of Wall (Ground Floor) Installation of Doors and Windows (Second Floor) Installation of Doors and Windows (Ground Floor) Installation of Plumbing Fixtures Installation of Electrical Accessories Placing of Concrete Topping (2nd Floor) Tile Lay out (2nd Floor) Placing of Concrete Topping (Ground Floor) Tile Lay out (Ground Floor) Installation of Ceiling Insulators Installation of Wood Ceiling Painting Excavation for Septic Tank Installation of Reinforcements for Septic Tank Placing of CHB for Septic Tank Plastering and covering of Septic Tank Septic pipes fix Backfilling of Septic Tank Cleaning of Site and Structure Demobilization

PRECEDING none none none none none 1,2,3,4,5 6 6 6 8,9 6 11 10 13 14 14 16 15,17 18 17 20 19 18 20 24 25 26 27 28 29 27 31 32 33 34 35 30 30 37 38 39 41 42 43 42 41 44 47

46 49 51 52 53 60 61 62 63 64 65 64 67 68 65 68 70 71 70 70 75 76 76 78 79 80 81 75 83 84 85 86 87 88 89