1. Antenna Fastness Key Points


The antenna must be installed in the right height and position and polarization

Details Description

The fixation of antenna and pole are reliable

Each screw should be fastness very well

RTN 600 MW Installation Standard

HCPT - HUAWEI

For the more than 1.2m antenna the side strut must be installed and fixed position is correct.

Antenna identifier !standard labeling"

#abeling Format$ #abel template $

ANTENNA TO !"E ID# "AR END NAME

Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel

RTN 600 MW Installation Standard

HCPT - HUAWEI

2. +,- Fastness Key Points


The +,-.s and hybrid coupler.s appearance are properly

Details Description
Tighten all screw / bolt from +,- to hybrid
OD$ "i%in&

0F connector from +,- should be waterproofed properly

Waterproo'in&

The 0F connector of +,should be waterproofed and face downward

Waterproo'in&

RTN 600 MW Installation Standard

HCPT - HUAWEI

The +,- grounding cable should be shortest length as possible and attached to bus bar

OD$ (ro)n*in&

(ro)n*in& connection to +)s +ar

RTN 600 MW Installation Standard

HCPT - HUAWEI

+,- 0dentifier !+,labeling"

#abeling Format$ #abel template $

OD$. TO !"E ID# "AR END NAME

For 131 mar& +,-1 for main +,- and +,-2 for stand by +,Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel

*. 0F ,istribution Key Points


0n general the 0F cable should be grounded to a minimum of one point

Details Description
0F grounding &it installed between concurrence 45T and 65T Tower

Reco,,en*e* point to install I" &ro)n*in& -it

RTN 600 MW Installation Standard

HCPT - HUAWEI

2 end are tidy with cable tie

Ti*y )p 1it/ ca+le tie

0F grounding &it should connect to lower 65T bus bar.

(ro)n*in& -it connect to +)s +ar

#eave enough slac& when connecting cables to the +,- to facilitate future maintenance

0F redundant no more than 2 meters

I" re*)n*ant no ,ore t/an 0,

RTN 600 MW Installation Standard

HCPT - HUAWEI

0F cable must be up tilted or have 'aterproof curve in the entrance of porthole

Ri&/t position 'or /ole I" ca+le ro)te

Port/ole connection s/o)l* +e 1aterproo'e*

5able 0nstallation and end to end labeling

Proper installation 'or I" ca+le an* separation 1it/ (ND ca+le

RTN 600 MW Installation Standard

HCPT - HUAWEI

0F cable labeling / identifier

0F cable should have identifier / labeling on top near connector of +,- and 0,+utdoor 0F #abeling 0ndoor 0F #abeling

O)t*oor la+elin&2

In*oor la+elin&2

#abeling Format$ #abel template $

I" . TO !"E ID# "AR END NAME

For 131 use mar& 0F1 for main 0F and 0F2 for stand by 0F Font $ %lac& %ac&ground $ 'hite

RTN 600 MW Installation Standard

HCPT - HUAWEI

(aterial $ )rint #abel #abel flag cable ties 0F cable label

1. 0ndoor E;uipment Fastness Key Points


The installation position of 0,accords to the engineering design document.

Details Description
+utdoor 0nstallation and 0,- placement !on %T< *=12AE"

+utdoor 0nstallation and 0,- placement !on %T< *:==A"

0ndoor 0nstallation and 0,- placement on 1:> rac&

RTN 600 MW Installation Standard

1=

HCPT - HUAWEI

0,- and ,5),% labeling standard

<tandard labeling and labeling format

0F %oard #abeling
#abeling Format$ #abel template $
TO : FE ID , FE NAME TX. xxxx MH , RX. xxxx MH

For 131 use mar& 0F1 for main 0F and 0F2 for stand by 0F Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel

)ower 5able #abeling


#abeling Format$ #abel template $
TO : POWER CA!"E

Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel Flag label tie

Tributary 5able #abeling


#abeling Format$ #abel template $

RTN 600 MW Installation Standard

11

HCPT - HUAWEI

TO : DDF

Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel Flag label tie

#abeling on rectifier power cable


#abeling Format$ #abel template $
TO : FAR END ID

Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel Flag label tie

#abeling on ,5),%
#abeling Format$ #abel template $
TO : FAR END ID

Font $ %lac& %ac&ground $ 'hite (aterial $ )rint #abel

,,F #abeling <tandard

<tandard labeling for outdoor ,,F !sample"

<tandard labeling for 0ndoor ,,F !sample"

RTN 600 MW Installation Standard

12

HCPT - HUAWEI

2. 5able distribution and routing Key Points


5able distribution and cable routing

Details Description 5able routing standard for outdoor %T<.

5able routing standard for indoor %T< !1".

RTN 600 MW Installation Standard

1*

HCPT - HUAWEI

5able routing standard for indoor %T< !2".

RTN 600 MW Installation Standard

11

HCPT - HUAWEI