Sei sulla pagina 1di 3

InfoMile Solutions

Client: Project: Job Title: Building: S.V.POWER PVT LTD 500 TPH CFBC BOILER Design of Footing COMPRESSOR BUILDING Date: Done by: Checked by: 15.09.2008 AKV Rev: M25 Fe500 f ck fy 25.00 500.00 18.00 600.00 0.60 0.30 2.70 1.50 1.20 1.80 0.40 0.06 0.34 0.45 0.36 78.73 18.00 0 MPa MPa kN 2 kN/m m m m m m 2 m m m m 3 m 3 m kN kN

Reference

Description of Problem
Grade of Concrete Grade of Steel Unit Weight of Soil Safe Bearing Capacity of soil, SBC Depth of Pedestal Width of Pedestal Length of Pedestal above footing Length of Footing Width of Footing Area of Footing Depth of Footing Effective Cover to Steel Effective depth Moment of inertia about x, Moment of inertia about z, Weight of soil above footing Weight of Footing GOVERNING LOAD CASES NORMAL LOADS(DL+IL) Pi Mxi Mzi DL+IL+EQX Pii Mxii Mzii DL+IL+EQZ Piii Mxiii Mziii NORMAL LOADS(DL+IL) Pi/A Mxi/Zxx Mzi/Zzz Pmaxi Pmini SINCE Pmaxi<SBC, SIZE PROVIDED IS SAFE DL+IL+EQX Pii/A Mxii/Zxx Mzii/Zzz Pmaxii Pminii SINCE Pmaxii<1.25SBC, SIZE PROVIDED IS SAFE DL+IL+EQZ Piii/A Mxiii/Zxx Mziii/Zzz Pmaxiii Pminiii SINCE Pmaxiii<1.25SBC, SIZE PROVIDED IS SAFE

Values Units

X Z

l pz b px hp Lz Bx A D cc d Z xx Z zz Ws Wf

369.82 kN 8.53 kNm 5.88 kNm 392.16 kN 7.94 kNm 36.04 kNm 388.82 kN 8.02 kNm 30.50 kNm

259.20 kN/m2 18.96 kN/m2 16.33 kN/m2 294.49 kN/m2 223.91 kN/m2

271.61 kN/m2 17.64 kN/m2 100.10 kN/m2 389.35 kN/m2 153.86 kN/m2

269.75 kN/m2 17.82 kN/m2 84.73 kN/m2 372.30 kN/m2 167.20 kN/m2

\\vboxsrv\conversion_tmp\scratch_3\208422518.xls.ms_office

InfoMile Solutions
Client: Project: Job Title: Building: S.V.POWER PVT LTD 500 TPH CFBC BOILER Design of Footing COMPRESSOR BUILDING Date: Done by: Checked by: 15.09.2008 AKV Rev: 0

Reference

Description of Problem

Values Units

371.71 Mx X Mz Z 1.50 0.30 0.6 311.65

1.20 171.50

251.93

287.57

274.21

SP16, Design aids to IS:456-2000

cl. 26.3.3.b.1 & 2 of IS:456-2000

Moments at the face of Pedestal: Moment about X-direction 2 Mxu/bd (Mxu = 1.5*Mx) Percent of Steel required Area of steel required/m Provided Diameter of bar # 12 Spacing required Check for max. spacing Provide #12mm bars @ 200mm

Mx pt A st

35.61 0.46 0.12 408.00 4.00 250.00 250.00

kNm MPa % mm 2 mm mm

SP16, Design aids to IS:456-2000

Cl. 26.3.3.b.1 & 2 of IS:456-2000

Table 19 of IS:456-2000

Moment about Z-direction Mz Mzu/bd2 (Mzu = 1.5*Mz) Percent of Steelrequired pt Area of steel required/m A st Provided Diameter of bar # 12 Spacing required Check for max. spacing Provide #12mm bars @ 200mm Check for Shear: 2 Pr. at d diatance from face 284.30 kN/m Shear For both directions 29.49 kN Maximum Shear Force V v = Vu/bd (Vu = 1.5*V) v Available steel Area Percent of steel provided For the above % of steel Design Shear strength c

28.67 0.37 0.12 408.00 4.00 250.00 250.00

kNm MPa % 2 mm mm mm

357.03 33.07 33.07 0.15 565.49 0.17

kN/m2 kN kN MPa mm 2 %

0.35 MPa

Since c > v, Safe One Way Shear

\\vboxsrv\conversion_tmp\scratch_3\208422518.xls.ms_office

InfoMile Solutions
Client: Project: Job Title: Building: S.V.POWER PVT LTD 500 TPH CFBC BOILER Design of Footing COMPRESSOR BUILDING Date: Done by: Checked by: 15.09.2008 AKV Rev: 0

Reference

Description of Problem
Punching Shear Punching Resistance Punching resistance is >

Values Units
895.33 kN 392.16 kN

Hence Safe in Punching Shear


Cl. 26.5.2.1 of IS:456-2000 Shrinkage reinforcement at top: Minimum Area of steel Provided Diameter of bar # 10 Spacing required Provide #10mm bars @ 250mm Final Results: Provide Size of the Footing: 1200 x 1500 x 400mm Bottom Main reinforcement about X-Direction: Provide #12mm bars @ 200 c/c Bottom Main reinforcementabout Z-Direction: Provide #12mm bars @ 200 c/c Shrinkage reinforcement at top: Provide #10mm bars @ 250 c/c 408.00 mm 2 78.54 mm 192.50 mm
2

\\vboxsrv\conversion_tmp\scratch_3\208422518.xls.ms_office