Step1.

Create Field Catalogues

T Code: MC18, MC19 A. Create Characteristic catalogue

Enter 1. Field Catalogue name 2. Description 3. Application and Select Characteristic Catalogue, Press Enter. Click on Characteristics, in the popup screen click Switch Display under Source Table and select the characteristics suitable for the Info structure from fields for Source Table.

Click

then click

Click Save.

Press enter to save the configuration in the popup. B. Create Key Figure catalogue

Enter 1. Field Catalogue name (S501 to S999) 2. Description 3. Application and Select Key Figure Catalogue, Press Enter. Click on Key Figuress, in the popup screen click Switch Display under Source Table and select the characteristics suitable for the Info structure from fields for Source Table.

Click

then click

Click Save.

Press enter to save the configuration in the popup.

Step2.
T Code: MC21, MC22

Create Info Structure

Enter 1. Info Structure name (S501 to S999) 2. Description 3. Select Planning possible and Press Enter.

Click

and select the Field Catalogue created for Characteristics.

Select all the fields

Click

then click

Click

Click

and select the Field Catalogue created for Key Figures.

Select the field

Click

then click

Click

Click

to Generate Info Structure. Select a Package in the popup and save.

Info Structure is Generated, Saved and is Active for use.

Go to Easy Access screen

Step3.
T Code: MC7F

Create Info Structure planning parameters

Confirm the warning by selecting Enter.

Select the Info Structure

Select the line and click on

Maintain the Values as highlighted.

Click

Press enter to save the configuration in the popup.

Step4.
T Code: MC8A, MC8B

Create Planning Type

Enter a Name for planning type, press Enter. In the popup enter info structure created.

Press Enter. In the popup screen enter description and select the highlighted.

In the Define Planning type: Characteristic View

Select the line and click on

In the popup select the key figure and press enter.

Click

Step5.
T Code: MC61, MC62

Create Planning Hierarchy

Press Enter, Enter Plant in the popup and press Enter.

1. Enter DC and proportion as per your planning

Select one DC

And click on

, in the next screen

2. Enter Division and proportion, select and click on

, in the next screen

3. Enter Product Groups and Proportion, Select a PG and click on next screen

, in the

4. Enter the Material, Click back

Select

in the popup.

5. In the next screen select next PG and click on

, in the next screen

Enter the Material, Click back

select

in the popup.

Continue with the other PGs. Click back till reaching DC input screen. Select next DC and repeat steps 1 thru 5 and Click

Step6.
T Code: MC93, MC94

Create Plan

Enter Planning type and press enter.

Enter only Plant and press enter.

Enter Version Description, press enter.

Enter plan quantity and click on

1. Select a line and click on

a. Select a line and click on

b. Change the quantities manually to update in planning hierarchy, to enable future disaggregation.

c. Click

. Select the next line and click on

d. Change the quantities

e. Click

. Select the next line and click on

f.

Change the quantities. Click

. Select the next line and click on

g. Change the quantities. Click

. Select the next line and click on

h. Change the quantities. Click

twice.

2. Repeat a thru h for the next Distribution channel PGs

Click on

to save the plan

Step7. Run Planning Hierarchy update 1. Check Planning hierarchy before Update.
Go to T Code: MC62

Enter Info structure, press enter

Enter Plant in the popup and press enter,

Select DC and click next level,

Select Division and click next level

Select PG and click next level

2. Run Planning Hierarchy update


T Code: MC8U

Enter Info Structure, Select

. Press enter

Enter Version select from search help

Enter Version select from search help, From and To dates. Press enter

Select Field Label. Press enter.

3. Check Planning hierarchy after Update.


Go to T Code: MC62

Enter Info structure, press enter

Enter Plant in the popup and press enter,

Select DC and click next level,

Select Division and click next level

Select PG and click next level

You can see all the levels are updated till material level and the proportions are recalculated.

4. Check plan after Planning hierarchy Update.


T Code: MC94

Press enter

Enter Plant and click on Inactive Version

Select your Version and press enter.

Change the quantity planned

Select line and Click on

Select line and click on

Select line and click on

Click on

. You can see the plan is disaggregated as per the updated planning hierarchy. Save the plan.

Step8.
T Code: MC81

Copy Flexible Plan to Standard for capacity planning

Plan should be copied for each PG separately. Press enter

Enter Description and press enter. In theCreate Rough-Cut plan screen go to Extras Copy data

Enter Info structure, Version, From and To dates.

Press enter. In the next popup select Order Quantity and click

In the next popup

Select Production and click

. In the next screen click on

In the next popup

Enter Assignment Profile (Free text) and click on

. Click on

In the next popup click on

The plan is copied.

To verify the capacity situation for PG w.r.t bottleneck work centre Click on: Views Capacity Situation Rough-cut Planning Show

The Capacity is shown at the capacity category level.

Follow the copying steps explained above

Follow the steps for Capacity situation explained above.

System displays a warning if any overload is found. If required adjust the Production figures as below to keep production as per the available capacity.

Repeat the steps for all the product groups.

Step9.
T Code: MC75

Transfer Plan to Demand Management

Enter Product group and plant. Select info structure Version by search help. Deselect invisible transfer and Active check boxes. Input version number manually in independent requirement specifications tab.

Click on message

. Since the version to be transferred need to be inactive. Ignore the warning .

The material plan transferred is 810 EA which is for both the DCs 01 and 10. Save to continue with the next material in PG .

Save to continue with the next material in PG

Save

. All the material in PG are transferred to demand in inactive version.

Click on transfer now

Note: For capacity levelling we have split the quantity in to March and April months, hence the quantities are transferred accordingly. Save

Save

Save Repeat the same with all the product groups and save.

Display the plan in Demand Management