Sei sulla pagina 1di 6

Road Projects Saudi Arabia the Saudi Ministry of Transport has set out an extensive road construction programme

e to address both capacity and safety issues and which includes sophisticated traffic management and ITS technologies to improve both traffic flow and safety. Netherlands based Royal HaskoningDHV has been awarded the task of identifying 30 traffic bottlenecks within Riyadh and also to find solutions that will improve traffic flow at these various locations. The upgrade to the King Abdullah Road for example has involved a capacity increase from 190,000 520,000 vehicles/day, by increasing the width of the route and improving the layout of the junctions. The construction work has been carried out in themiddle of the city and with traffic flowing alongside Riyadhs first ring road, the north-south King Fahd Road and the eastwest Makah Road have been the priority projects for improvements, with a focus on boosting safety and providing more on and off ramps. These are being improved through the construction of new tunnels and bridges at a series of intersections, while new traffic corridors will run across the city. For this four-phase programme, new exit and entry points will be built between service roads and the main carriageways along freeways, while the road designs are being standardised. There is also a move to separate parking areas from the carriageways as well as building new pedestrian ways. The first of the four infrastructure improvement phases planned for Riyadh is costing US$2.74 billion and is focussing on completing construction of Riyadhs 2nd and 3rd ring roads, including building 38 tunnels and 15 bridges. Some 100km of existing roads will be improved while 244km of new roads will be built.

Riyadh's population growth has been rapid and while its infrastructure has been added to almost continuously, the authorities have a huge programme of works planned to satisfy both current and future transport demands Costing a further $2.96 billion, the second phase of Riyadhs road transport upgrade will see improvements to 199km of existing links and building 71km of new roads. In all work will be completed on 11 major routes while 30 new tunnel and 50 bridges of various sizes will be constructed. For the $2.74 billion third phase, 58km of new roads will be built while 158km of existing links will be improved. This will see work being finished on 14 major roads as well as the construction of 40 tunnels and 29 bridges. Largest of all is the fourth phase, which is costing $4.9 billion and requires 118km of new roads as well as improvements to 322km of existing roads. Work is being carried out on 41 major routes while 46 new tunnels and 86 bridges are being constructed. One of the major portions of work has been the $186 million project to construct a tunnel under the six-lane King Fahd Flyover. This cut and cover work was carried out while the very busy road remained in use, making it very challenging for the firms involved, contractor Saudi Oger and designer Buro Happold. The flyover features 15 spans, constructed in segments using post-tensioning and the design called for the tunnel walls to be built within 100mm of its comparatively shallow foundations.

Innovative bridge design is a feature of many of Saudi Arabia's crossings Buro Happold developed a novel design for the contractor featuring a special load transfer structure alongside the bridge piers. Extensive modelling was required to ensure the movement of the rock would not cause problems for tunnel excavation. The cut and cover tunnel layout was excavated to a depth of 13m, with sections 180-700m long. The tunnel roof sections were precast while the reinforced concrete sections lie on pad foundations. As part of its plan to improve road safety and reduce journey times, the Ministry of Transport in

Saudi Arabia commissioned a construction supervision package for the Riyadh Second Ring Road South East Leg and several roads and junctions in Northern Riyadh. The project includes the construction of main roads, service roads, bridges, street lighting, drainage system, and the relocation of existing utilities. The centrepiece of this package is the Riyadh Second Ring Road South East Leg, which includes three main junctions and five link roads. The package also includes street lighting for the three main roads, the Riyadh - Taef Expressway, the Riyadh - Kharj Expressway and Thumama Road.

Excavations will carry many of the new road sections through Riyadh The scope of work for this includes overall project management services including project scheduling, contract administration, progress control and reporting, documentation control and technical support. It also covers quality control and quality assurance related to the construction of roads and bridges including signage and marking, intersection signalling, street lighting and storm water drainage. Within this there will also be a review of the programme of works the contractors will use to comply with the contract requirements and major planning standards and techniques. And the supervision package also has to evaluate the contractors detailed plan, covering aspects such as equipment mobilisation, material procurement and delivery of drawings. Another aspect will be a review of the contractors method statements, personnel deployment schedule and allocation of duties, as well as monitoring of construction progress including the subcontractors and suppliers.

Saudi Companies
1. 2. 3. 4. 5. 6. 7. 8. 9. ABDULLAH AL-AJMI CO LTD ABDULLAH BIN JARALLAH CO. AL -MUHANDIS NIZAR KURDI CONSULTING ENGINEERS AL MASHRIK CONTRACTING COMPANY AL-HARBI & CONTRACTING CO. AL-OMAIER COMPANY FOR TRADING & CONTRACTING AL-ROSAN ESTABLISHMENT FOR CONTRACTING AL-TURUQ CO. FOR TRADING AND CONTRACTING LTD. BIN JARALLAH EST TRADING & GENERAL CONTRACTING

10. Honorary Life Member 11. MANWA TRADING 12. MOHAMMED ALI AL-SWAILEM COMPANY 13. NASSIS HAZZA AND BROS. LLC 14. REDA NATIONAL CO. FOR ROAD PAINT & HIGHWAY SAFETY 15. SAUDI CONSOLIDATED ENGINEERING COMPANY (KHATIB & ALAMI) 16. SAUDI CONSULTING SERVICES-SAUDCONSULT 17. SAUDI PAN KINGDOM CO LTD 18. SHIBH AL-JAZIRA CONTRACTING COMPANY 19. TAIWAN AREA NATIONAL FREEWAY BUREAU 20. UNITED MAINTENANCE & CONTRACTING CO

Abu Ali General Trans & Contracting (UAE) Ground Floor M - 40, Mussafah (M-40), Mussafah, Abu Dhabi Landmark: Near Heavy Vehicle Section P.O.Box: 7723, Abu Dhabi Tel: +971 2 5515111 Mobile Number: +971 50 4411814 Fax: +971 2 5516111 Frontline Building Materials Trading Co LLC Ground Floor, Al Jazeera Building, Yousuf Baker Road, Deira, Dubai Landmark: Behind Maktoum Hospital P.O.Box: 39364, Dubai Tel: +971 4 2246047 Fax: +971 4 2246048 Eurogulf Construction LLC Office # 240, 2nd Floor, Al Shafar Investment Building, Sheikh Zayed Road, Al Quoz, Dubai Landmark: Near Noor Islamic Metro Station P.O.Box: 86580, Dubai Tel: +971 4 3791447 Fax: +971 4 3791446 Eurogulf Construction LLC Single point of contact; Initial Concept, Pricing, Eurogulf Construction LLC Link to Display Ad of Eurogulf Construction LLC Eurogulf Construction LLC Keyword(s) : Building Construction | Building Maintenance | Construction | Category(s) : Building Maintenance, Repairs & Restoration | Construction Companies | Contractors - Turnkey Projects E Al Geemi & Partners Contracting Co LLC Mezzanine Floor, Union National Bank (Bin Hamoodah Bldg), Al Najda Street, Abu Dhabi Landmark: Beside Sultaco P.O.Box: 2877, Abu Dhabi Tel: +971 2 6328438 Fax: +971 2 6338135 Al Geemi & Partners Contracting Co LLC We Specialize in Infrastructure, Buildings Electro Al Geemi & Partners Contracting Co LLC Website Link of Eurogulf Construction LLC Email Link of Photo of Eurogulf Construction LLC

Special URL of Al Geemi & Partners Contracting Co LLC Co LLC Keyword(s) : Construction Companies | Contracting Category(s) : Construction Companies | Contractors - General F SEG Emirates Contracting LLC

Email Link of Al Geemi & Partners Contracting

Plot # 901/904, 9th Floor, Al Farra Building, Delma Street No.13, Al Nahyan Camp, Abu Dhabi Landmark: Behind Judicial Court P.O.Box: 109620, Abu Dhabi Tel: +971 2 6798384 Fax: +971 2 6798387 SEG Emirates Contracting LLC SEG emirates is the branch of SEG international. W SEG Emirates Contracting LLC Special URL of SEG Emirates Contracting LLC Emirates Contracting LLC Keyword(s) : Construction Companies Category(s) : Construction Companies | Contractors - General G Group 3 Engineers Contractors LLC 3rd Floor, First Gulf Bank Bldg, Sheikh Rashid Bin Saeed Al Maktoum Street, Al Markaziyah, Abu Dhabi City, Abu Dhabi Landmark: Opposite The Lake Garden P.O.Box: 4390, Abu Dhabi Tel: +971 2 6222760 Fax: +971 2 6222960 Group 3 Engineers Contractors LLC Special Grade General Contractors, Construction On Group 3 Engineers Contractors LLC Special URL of Group 3 Engineers Contractors LLC Keyword(s) : Construction Companies Category(s) : Building Contractors | Construction Companies | Contractors - General H Al Ain General Contracting Co LLC (ALGECO) Email Link of Group 3 Engineers Contractors LLC Email Link of SEG Emirates Contracting LLCPhoto of SEG

Ground Floor, Warehouse #419, Mina 20th Street, Mina Port, Abu Dhabi Landmark: Beside Mina Centre P.O.Box: 46397, Abu Dhabi Tel: +971 2 6733888 Fax: +971 2 6734512 Al Ain General Contracting Co LLC (ALGECO) Design, Construction Management, Electrical Mechan Al Ain General Contracting Co LLC (ALGECO) Special URL of Al Ain General Contracting Co LLC (ALGECO) Email Link of Al Ain General Contracting Co LLC (ALGECO) Keyword(s) : Construction Companies | Contracting Company | Contractor General Category(s) : Construction Companies | Contractors - General Dubai Walls Constructions Office #102, First Floor, Pharmacy Building, Al Nahda 2, Al Qusais, Dubai P.O.Box: 87917, Dubai Tel: +971 4 2207844 Fax: +971 4 2207843 Dubai Walls Constructions Complete Civil Works & MEP Works Link to Display Ad of Dubai Walls Constructions Keyword(s) : Civil Work | Construction Companies | MEP Work Category(s) : Construction Companies I Petron Emirates Contg & Mfg Co. LLC Plot No B318, 12th Street, Al Quoz Ind. Third, Al Quoz, Dubai Landmark: Opp Captain Marble P.O.Box: 52756, Dubai Tel: +971 4 3474724 Fax: +971 4 3474725 Petron Emirates Contg & Mfg Co. LLC Email Link of Petron Emirates Contg & Mfg Co. LLC Keyword(s) : Construction Companies | Steel Fabricator | Email Link of Dubai Walls Constructions

Tank Manufacturer Category(s) : Construction Companies | Steel Fabricators & Engineers J Able Middle East Gen Cont Co LLC 2nd Floor, Building # 200, Sector #10 Shabiya, Mussafah, Abu Dhabi Landmark: Behind Al Noor Pharmacy P.O.Box: 109708, Abu Dhabi Tel: +971 2 5522653 Fax: +971 2 5522753

Potrebbero piacerti anche