PIONEER CEMENT INDUSTRIES LLC, RAK, UAE KEY PERFORMANCE INDICATORS - Maintenance Dept.

THIRD WEEK OF 2014 MECHANICAL DEPT. Labour Utilisation Sl.No DESCRIPTION Available Labour Hours 104.0 128.0 304.0 Efficiency Productivity Plan Attainment Estmiated Hours of Estimated completed time of all jobs(excluding jobs unplanned) PMR Preventive Available Maintenanc Labour e Routine Hours Hours Un Planned Actual hours Estimated on completed hours on all unplanned completed work orders work orders

Actual Hours

Estimated Hours

Actual Hours

Lab.Utilisation X Effi. 100

1 2 3 4 5

RAW MILLS & STACKER RECLAIMER SECTION PYRO & COAL MILL, HANDLING SECTION CEMENT MILLS & PACKING PLANT SECTION WORKSHOP & WATER WORKS AUTO GARAGE

104.0 128.0 304.0

100.00 100.00 100.00 100.00 100.00

536.0

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014

Labour Utilization(%)
Sl. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Names

Actual Labour Hours on work orders/Available Labour Hours X 100 Available Labour hours 32.0 32.0 0.0 32.0 32.0 24.0 32.0 24.0 40.0 32.0 32.0 0.0 84.0 32.0 Actual Labour Hours(Work Orders)

Labour Utilization(%)

Sandeep singh Firoz Khan Hanumath Reddy Jalaluddin


Abu Backer

Jose Moinuddin Bukya Seenu


Johnson

Dhanesh Gupta
Anil

Salim
Mahendra Naresh rawat Paswan

100.00

Ramesh
Suru Kumar

Murthy Kesar Dev Rajesh Yadav

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT. KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014

Efficiency (%) = Estimated Time of completed Jobs / Actual Time of Completed Jobs
Sl No. 1 2 3 4 5 6 Job RAW MILLS & STACKER RECLAIMER SECTION RM-1 Pressing side torsion shaft couplings inspection & greasing Rawmill-1 grease barrel top up,oil top up works RM-2 O-sepa outer casing wornout area patch work,Vent bagfilter i/L duct bend area patch work RM-2 Additive weigh feeders calibration work BC-12 worn out impact idlers replacement with normal idlers Rawmill area checklist & general maintenance works Type PM PM PM PM PM Repair Estimated Hours 37.0 8.0 21.0 9.0 6.0 16.0 Actual Hours 40.0 8.0 24.0 9.0 6.0 16.0 Job Completed Yes Yes Yes Yes Yes Yes

97.0
1 2 3 4 5 6

103.0

PYRO & COAL MILL SECTION Repair Yes valve and Coal mill Preparatory jobs for patching the worn out areas of Coal mill Apron Feeder pans , Dynamic seperator casing ,Rawcaol Hopper Inlet Double falp 22.0,Coal Mill 24.0 Repair Yes seperator casing , Coal Mill Drying diaphragm Centre mesh protection plates 2 nos fixed and Patch Work done for worn out areas of Coal mill Apron Feeder 15.0 16.0 pans , Dynamic Repair Yes PC Simplex bin aeration pad area coal leakages arrested 6.0 8.0 Repair Yes Compressor No: Unloader valve removed , dismantled , cleaned inspected the Piston rings, spring . 8.0 10.0 PM Yes 6.0 6.0 Cooler CFG Compartment new Grate plates Tapping work done General Maintenance:PM Yes 4.0 4.0 1. Kiln all Tyres lubricated PM Yes 4.0 4.0 2. Cooler Drives Chain lubricated PM refixed. 4.0 Yes 4.0 3. DDPC-1 Chain ,Roolers Inspected & En-mass conveyors chain condition inspected & missed chain pins circlips PM Yes 4.0 4.0 4. Compressors Suction Filters cleaning PM Yes 4.0 4.0 5.Silo Bottom & PreHeater Top Blowers filter cleaned Repair Yes 6.0 6.0 6.PC Simplex bin aeration pad area coal leakages arrested PM Yes 24.0 24.0 7.Pyosection Check List PM Yes 8. K.C. & P.C. Roots Blowers Suction Filters cleaned 4.0 4.0 PM Yes 9.DDPC-1 Damaged pan roller Replaced by reconditioned one 4.0 4.0 PM Yes 10.Kiln supporting roller shaft seals & Dynamic seperator Bearings Lubricated. 6.0 6.0

121.0
CEMENT MILLS & PACKING PLANT SECTION 1 2 3 4 5 6 7 1 2

128.0
8 16 28 28 4 56 32 8 8 yes yes yes yes yes yes yes yes yes yes yes

Cement mills section check list. BC-29 feed chute skirt rubbers replacing work Cement mill-1 Pressing side pinion bearings inspection & greasing Cement mill-1 Lifting side pinion bearings inspection & greasing CM-1 silofed area auto sampler cleaning work
CM-2 lifting side and pressing side pinion bearings grease replacing work CM-2 pressing side main drive gear box oil replacing work Packing plant Auto &Roto packer weekly maintenance. Roto packer spare filling tubes brazzing work

PM PM PM PM Repair PM PM PM Repair PM PM PM

8 14 26 26 4 52 30 8 8

3 Bc-28, Rotary screen and bulk loading elevator -1 gear box oil replaced 4 Bulk loading -1 elevator belt joint condition and belt condition and boot gap inspection 5 Packing plant feeding operation WORKSHOP & WATER WORKS
1 2 3 4 5 6 7 8 9 10 11 12

16.0 22.0 76.0 290.0

16.0 24.0 76.0 304.0

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE ANICAL DEPT. KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014

Efficiency

94.17

94.53

95.39

90.13

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014

Productivity
Productivity(%) = Sl.No 1 2 3 4 5 Section RAW MILLS & STACKER RECLAIMER SECTION PYRO & COAL MILL, HANDLING SECTION CEMENT MILLS & PACKING PLANT SECTION WORKSHOP & WATER WORKS AUTO GARAGE Labour Utilisation X Efficiency 100 Labour Utilisation Efficiency 100.00 95.0 100.00 93.4 100.00 91.4 100.00 90.1 100.00 92.2

Productivity
95.0 93.4 91.4 90.1 92.2

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014

Plan Attainment (%) = Estimated Time of completed Jobs excluding unplanned works / Estimated Time of all Jobs
Sl No. 1 2 3 4 5 6 7 Estimated Hours 10.0 19.0 32.0 10.0 21.0 6.0 16.0 Job Actual Complet Hours ed 12.0 20.0 32.0 10.0 24.0 6.0 16.0 Yes Yes Yes Yes Yes Yes Yes

Job
RAW MILLS & STACKER RECLAIMER SECTION Brdige Reclaimer CRD torque adjustment work RM-1&2 Outlet airslides standby air line modification work RM-1 pressing side pinion brgs inspection & greasing BC-13 discharge chute patch work RM-1 O-sepa cyclone patch work RM-1 O-sepa O/L duct worn out draft point replacement work Rawmill area checklist & general maintenance works

Type PM Repair PM Repair Repair Repair PM

114.0
1 2 3 4 5 PYRO & COAL MILL SECTION PM Blending Silo Extraction Gate-3 Dosing valve replacement Work 21.0 PM 1)Pre-Calicner Bricks Retainer cutting work . 2)Clinker Breaker Hammers Fixing Spare Pins Tapping work. 30.0 Repair Blending Silo Extraction Gate Spare dosing valve reconditioning work 10.0 Repair TAD Top Expansion joint area Red spot castable box fixing 10.0 General Maintenance:PM 1. Kiln all Tyres lubricated 4.0 PM 2. Cooler Drives Chain lubricated 5.0 3. DDPC-1 Chain ,Roolers Inspected & En-mass conveyors chain condition inspected & missed chain PM pins circlips refixed. 4.0 PM 4. Compressors Suction Filters cleaning 4.0 PM 5.Silo Bottom & PreHeater Top Blowers filter cleaned 4.0 PM 6.Pyosection Check List 17.0 PM 7. K.C. & P.C. Roots Blowers Suction Filters cleaned 4.0 PM 8.DDPC-1 Damaged pan roller Replaced by reconditioned one 4.0 PM 9.Kiln supporting roller shaft seals & Dynamic seperator Bearings Lubricated. 6.0 PM 10.PC simplex bin aeration purpose sintered bronze silencers assemebled 4.0

120.0 24.0 32.0 12.0 12.0 4.0 5.0 4.0 4.0 4.0 17.0 4.0 4.0 6.0 4.0 136.0
17 28 32 4 28 40 6 8 9 8

Yes Yes 3)Sprocket fixing toCooler Dri Yes

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

127.0
CEMENT MILLS & PACKING PLANT SECTION 1 2 3 4 5 6 7 8 1 2 PM PM PM PM PM Repair CM-1 vent bag house inspection work PM CM-1 grease spray compressor line modification work Repair CM-1&2 1st chamber missing rubber plugs 25 nos replaced and CM-1 shell liner 2nos nuts replaced Packing plant PM Stationary packer weekly maintenance. PM Auto &Roto packer weekly maintenance. Repair Roto packer Bottom bearing grease replaced PM Silo-1 & Silo2 and bulk loading roots blower bearings grease replaced and oil PM Packing plant genaral check list work

Cement mills section check list. CM-2 o-sepa drive and vent fan bearings grease replacing work CM-2 gypsum weigh feeder belt replacing work CM-2 grease spray strainers cleaning work CM-1 o-sepa drive and vent fan bearings grease replacing work

17 26 30 4 26 26 6 8 9 8

yes yes yes yes yes yes yes yes yes yes yes yes

3 4 5

8.0 32.0 13.0 213.0 8.0 21.0 7.0 8.0 16.0 14.0 14.0 4.0 15.0 10.0 14.0 22.0 137.0 38.0 4.0 4.0 5.0 8.0 59.0

8.0 32.0 13.0 233.0 8.0 24.0 8.0 8.0 8.0 16.0 16.0 4.0 16.0 12.0 16.0 24.0 152.0 43.0 4.0 4.0 5.0 8.0 64.0

1 2 3 4 5 6 7 8 9 10 11 12

WORKSHOP & WATER WORKS Hydax 38 coupling m/c for utility pump no -1 Stacker bogie wheel m/c(6th ) m/c Packing plant stationery packer impeller hub m/c Hydax 38 coupling m/c for utility pump no -3 Clinker breaker hammer pins washers cutting QC lab overhead water tank cleaned CCR overhead tank cleaned STP chemical shifted to STP Plumbing works at SB 4 & 5 Workshop overhead water tank cleaned Workers wash room overhead water tank cleaned Utility pump no -1 coupling replaced and alligned AUTO GARAGE

Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned

Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes

1 2 3 4 5

Autogarage general maintenance 21476 Man truck intercooler hose replaced Nissan sunny inspected and reported Cat telehandler alternator repaired Store inventory auditing has been done

PM Repair PM Repair PM

Yes Yes Yes Yes Yes

DUSTRIES LLC, RAK, UAE RFORMANCE INDICATORS - KPI EEK OF 2014

Plan Attainment

100.00

100.00

114 127 213 59

114 127 213 59

100 100 100 100

100.00

100.00

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014 PMR Preventive Maint. Routine Hrs PMR = Available Labour Hours Sl No. 1 2 3 4 5 6 7 Estimated Hours 10.0 19.0 32.0 10.0 21.0 6.0 16.0 Actual Hours 12.0 20.0 32.0 10.0 24.0 6.0 16.0

x 100 Job Complet ed Yes Yes Yes Yes Yes Yes Yes

Job RAW MILLS & STACKER RECLAIMER SECTION Brdige Reclaimer CRD torque adjustment work RM-1&2 Outlet airslides standby air line modification work RM-1 pressing side pinion brgs inspection & greasing BC-13 discharge chute patch work RM-1 O-sepa cyclone patch work RM-1 O-sepa O/L duct worn out draft point replacement work Rawmill area checklist & general maintenance works

Type PM Repair PM Repair Repair Repair PM

P.M.R(%)

50.00

114.0
1 2 3 4 5 PYRO & COAL MILL SECTION PM Blending Silo Extraction Gate-3 Dosing valve replacement Work 21.0 PM 1)Pre-Calicner Bricks Retainer cutting work . 2)Clinker Breaker Hammers Fixing Spare Pins Tapping work. 30.0 Repair Blending Silo Extraction Gate Spare dosing valve reconditioning work 10.0 Repair TAD Top Expansion joint area Red spot castable box fixing 10.0 General Maintenance:PM 1. Kiln all Tyres lubricated 4.0 PM 2. Cooler Drives Chain lubricated 5.0 3. DDPC-1 Chain ,Roolers Inspected & En-mass conveyors chain condition inspected & missed chain PM pins circlips refixed. 4.0 PM 4. Compressors Suction Filters cleaning 4.0 PM 5.Silo Bottom & PreHeater Top Blowers filter cleaned 4.0 PM 6.Pyosection Check List 17.0 PM 7. K.C. & P.C. Roots Blowers Suction Filters cleaned 4.0 PM 8.DDPC-1 Damaged pan roller Replaced by reconditioned one 4.0 PM 9.Kiln supporting roller shaft seals & Dynamic seperator Bearings Lubricated. 6.0 PM 10.PC simplex bin aeration purpose sintered bronze silencers assemebled 4.0

120.0 24.0 32.0 12.0 12.0 4.0 5.0 4.0 4.0 4.0 17.0 4.0 4.0 6.0 4.0 136.0
17 28 32 4 28 40 6 8 9 8

Yes 82.35 Yes 3)Sprocket fixing toCooler Drive spare Yes

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

127.0
CEMENT MILLS & PACKING PLANT SECTION 1 2 3 4 5 6 7 8 1 2 PM PM PM PM PM Repair CM-1 vent bag house inspection work PM CM-1 grease spray compressor line modification work Repair CM-1&2 1st chamber missing rubber plugs 25 nos replaced and CM-1 shell liner 2nos nuts replaced Packing plant PM Stationary packer weekly maintenance. PM Auto &Roto packer weekly maintenance. Repair Roto packer Bottom bearing grease replaced PM Silo-1 & Silo2 and bulk loading roots blower bearings grease replaced and oil PM Packing plant genaral check list work

Cement mills section check list. CM-2 o-sepa drive and vent fan bearings grease replacing work CM-2 gypsum weigh feeder belt replacing work CM-2 grease spray strainers cleaning work CM-1 o-sepa drive and vent fan bearings grease replacing work

17 26 30 4 26 26 6 8 9 8

yes yes yes yes yes yes yes yes yes yes yes yes

75.97

3 4 5

8.0 32.0 13.0 213.0 8.0 21.0 7.0 8.0 16.0 14.0 14.0 4.0 15.0 10.0 14.0 22.0 137.0 38.0 4.0 4.0 5.0 8.0 59.0

8.0 32.0 13.0 233.0 8.0 24.0 8.0 8.0 8.0 16.0 16.0 4.0 16.0 12.0 16.0 24.0 152.0 43.0 4.0 4.0 5.0 8.0 64.0

1 2 3 4 5 6 7 8 9 10 11 12

WORKSHOP & WATER WORKS Hydax 38 coupling m/c for utility pump no -1 Stacker bogie wheel m/c(6th ) m/c Packing plant stationery packer impeller hub m/c Hydax 38 coupling m/c for utility pump no -3 Clinker breaker hammer pins washers cutting QC lab overhead water tank cleaned CCR overhead tank cleaned STP chemical shifted to STP Plumbing works at SB 4 & 5 Workshop overhead water tank cleaned Workers wash room overhead water tank cleaned Utility pump no -1 coupling replaced and alligned AUTO GARAGE

Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned

Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes

1 2 3 4 5

Autogarage general maintenance 21476 Man truck intercooler hose replaced Nissan sunny inspected and reported Cat telehandler alternator repaired Store inventory auditing has been done

PM Repair PM Repair PM

Yes Yes Yes Yes Yes

85.94

60 112 177 55

120.0 136.0 233.0 64.0

50 82.35294 75.96567 85.9375

PIONEER CEMENT INDUSTRIES LLC, RAK, UAE MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI THIRD WEEK OF 2014 UNPLANNED Unplanned % = Sl No. 1 2 3 4 5 6 7
Actual hours on completed unplanned work orders

X 100

Estimated hours on all completed work orders

Job RAW MILLS & STACKER RECLAIMER SECTION Brdige Reclaimer CRD torque adjustment work RM-1&2 Outlet airslides standby air line modification work RM-1 pressing side pinion brgs inspection & greasing BC-13 discharge chute patch work RM-1 O-sepa cyclone patch work RM-1 O-sepa O/L duct worn out draft point replacement work Rawmill area checklist & general maintenance works

Type PM Repair PM Repair Repair Repair PM

Estimated Actual Hours Hours 10.0 19.0 32.0 10.0 21.0 6.0 16.0 12.0 20.0 32.0 10.0 24.0 6.0 16.0

Job Completed Yes Yes Yes Yes Yes Yes Yes

Unplanned(%)

0.00

114.0
1 2 3 4 5 PYRO & COAL MILL SECTION PM Blending Silo Extraction Gate-3 Dosing valve replacement Work 21.0 PM 1)Pre-Calicner Bricks Retainer cutting work . 2)Clinker Breaker Hammers Fixing Spare Pins Tapping work. 30.0 Repair Blending Silo Extraction Gate Spare dosing valve reconditioning work 10.0 Repair TAD Top Expansion joint area Red spot castable box fixing 10.0 General Maintenance:PM 1. Kiln all Tyres lubricated 4.0 PM 2. Cooler Drives Chain lubricated 5.0 PM pins circlips4.0 3. DDPC-1 Chain ,Roolers Inspected & En-mass conveyors chain condition inspected & missed chain refixed. PM 4. Compressors Suction Filters cleaning 4.0 PM 5.Silo Bottom & PreHeater Top Blowers filter cleaned 4.0 PM 6.Pyosection Check List 17.0 PM 7. K.C. & P.C. Roots Blowers Suction Filters cleaned 4.0 PM 8.DDPC-1 Damaged pan roller Replaced by reconditioned one 4.0 PM 9.Kiln supporting roller shaft seals & Dynamic seperator Bearings Lubricated. 6.0 PM 10.PC simplex bin aeration purpose sintered bronze silencers assemebled 4.0

120.0 24.0 32.0 12.0 12.0 4.0 5.0 4.0 4.0 4.0 17.0 4.0 4.0 6.0 4.0 136.0
17 28 32 4 28 40 6 8 9 8

Yes 0.00 Yes 3)Sprocket fixing toCooler Drive spare Yes

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

127.0
CEMENT MILLS & PACKING PLANT SECTION 1 2 3 4 5 6 7 8 1 2 PM PM PM PM PM Repair CM-1 vent bag house inspection work PM CM-1 grease spray compressor line modification work Repair CM-1&2 1st chamber missing rubber plugs 25 nos replaced and CM-1 shell liner 2nos nuts replaced Packing plant PM Stationary packer weekly maintenance. PM Auto &Roto packer weekly maintenance. Repair Roto packer Bottom bearing grease replaced PM Silo-1 & Silo2 and bulk loading roots blower bearings grease replaced and oil PM Packing plant genaral check list work

Cement mills section check list. CM-2 o-sepa drive and vent fan bearings grease replacing work CM-2 gypsum weigh feeder belt replacing work CM-2 grease spray strainers cleaning work CM-1 o-sepa drive and vent fan bearings grease replacing work

17 26 30 4 26 26 6 8 9 8

yes yes yes yes yes yes yes yes yes yes yes yes

0.00

3 4 5

8.0 32.0 13.0 213.0 8.0 21.0 7.0 8.0 16.0 14.0 14.0 4.0 15.0 10.0 14.0 22.0 137.0 38.0 4.0 4.0 5.0 8.0 59.0

8.0 32.0 13.0 233.0 8.0 24.0 8.0 8.0 8.0 16.0 16.0 4.0 16.0 12.0 16.0 24.0 152.0 43.0 4.0 4.0 5.0 8.0 64.0

1 2 3 4 5 6 7 8 9 10 11 12

WORKSHOP & WATER WORKS Hydax 38 coupling m/c for utility pump no -1 Stacker bogie wheel m/c(6th ) m/c Packing plant stationery packer impeller hub m/c Hydax 38 coupling m/c for utility pump no -3 Clinker breaker hammer pins washers cutting QC lab overhead water tank cleaned CCR overhead tank cleaned STP chemical shifted to STP Plumbing works at SB 4 & 5 Workshop overhead water tank cleaned Workers wash room overhead water tank cleaned Utility pump no -1 coupling replaced and alligned AUTO GARAGE

Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned

Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes

1 2 3 4 5

Autogarage general maintenance 21476 Man truck intercooler hose replaced Nissan sunny inspected and reported Cat telehandler alternator repaired Store inventory auditing has been done

PM Repair PM Repair PM

Yes Yes Yes Yes Yes

0.00

0 0 0 0

114 127 213 59

0 0 0 0