Jetta Construction Sdn Bhd

Block 19 - Training SQN Classroom


Element : Pilecap - Conc, Fwk & Rebar

DEPTH = FORMW. 50MM REINFORCEMENT : MAIN BAR BINDER


REFERENCE NO DIMENSIONS EXCAVATION CON. LEAN Y10 Y12 Y16 Y20 Y12 Y10
LGTH WDTH DEPTH N.E 1.5M1.5 M- 3.0MGR 35+J10 CON.
[M] [M] [M] [M] [M3] [M3] [M3] [M2] [M2] [M] [M] [M] [M] [M] [M]

1SP -4T16 x 2 8 1.35 0.65 0.65 0.60 2.03 - 2.03 12.48 3.38 -- ; LINK 94.08 67.39
- 3T10 7 1.25 0.65 0.65 0.60 1.77 - 1.77 10.92 2.96 82.32 58.97

2SP - 5T16 16 1.45 0.65 1.40 0.70 10.19 - 10.19 45.92 14.56 ; 160.32
- 6T16 16 1.45 0.65 1.40 0.70 -- 193.60
- 4T10 16 1.45 0.65 1.40 0.70 LINK 275.71

TOTAL 13.99 - 13.99 69.32 20.90 - - 530.32 - - 402.07


0.617 0.888 1.578 2.466 0.888 0.617
- - 836.84 - - ###
Summary

Excavation : < 1.5m3 = 14 m3 Rebar Reinf. Ratio= 78 /m3


1.5 - 3.0m3 = - m3
Concrete G35 = 14 m3 Main bar Y16 = 837 kg
Blinding G15 = 21 m2 Link Y12 = - kg
Formwork = 70 m2 Y10 = 249 kg