boundary Solarhart 2 panel roof mounted solar hot water system beyond

boundary photovoltaic panels, by others

boundary

boundary 1 off Daikin roof mounted condenser photovoltaic panels, by others C

5,100 B A
/Volumes/PPA Data/JOB FILES/12417 Bell:Tuzewski Residence 46 Mackinnon Parade /12417 Drawings/Cad Files/Model/Bell Residence 2013.09.26 C.pln

Solarhart 2 panel roof mounted solar hot water system

1 off A/C condenser to serve ground and first floor, Daikin model RMXS160EV1A

TDK new roofing


new barge capping TDK new roofing EXw EXw W1.7c EXw D1.7c

3,096

1,020 70x45 purlins at 600 max centres 170x45mm LVL rafters at 900 max centres W1.7c TCL

TDK

FOR CONSTRUCTION

TDK
neighbouring two storey residence W1.7e W1.7d

2 off Helioscreen HM 65-95, external shade blinds

EXB

EXB

EXT

Shadeform 'Shaderunner' retractable system beyond, refer detail 9- A700 FFL +2870 First Floor reinstate timber cladding new pergola framing and footings

EXw

EXw

TCL

TCL

TCL FYR

Retractable Shadeform 'Shaderunner' blind, stacking on northern facade

D1.7b

FG

D1.7a Link R1.06

W1.7a 2 off Helioscreen HM 65- 95 external shade blinds W1.6a

Courtyard glass balustrade, refer details A701

TCL

TCL

FFL +2870 First Floor

GF1 FFL +2870 First Floor FCL +2400 Ground Floor bulkhead for concealed wall spilt system Bedroom 3 RG.05 EXd ej W7a

EXR
FC1

OFC
open

EXR ej FC1 ej ej ej EXB

FYR
DP

existing wall

EXB G1 FE1

G1
W5a

EXcol

EXB

EXB

RWT

EXB

FE1
col

replace existing timber posts and battens

FFL +0 Ground Floor

EXw col

EXd col

EXw

EXw col

EXd

FFL +0 Ground Floor

EXd new Stratco 1000L 2 module Aqua- mod rainwater tank

FFL +0 Ground Floor

CP1

new gate

footings to engineers specifications

pad footing as per engineers specifications

NORTH ELEVATION 1:50

SOUTH ELEVATION 1:50


Solahart 2 panel roof mounted solar hot water system

NORTH ELEVATION/ SECTION 1:50


1 off A/C condenser to serve ground and first floor, Daikin model RMXS160EV1A roof line beyond
photovoltaic panels, by others

LEGEND:
EXB EXT TCL TDK CRS LL EXC FE1 Existing Brick Wall Existing Timber Cladding Timber Cladding

fire rated boundary wall, jointing and finishing of outer layer as per specification

TDK TDK

TDK

Lysaght Trimdek roof sheeting, zincalume


Lysaght Custom Orb Roof sheeting, galvanised

Lysaght Longline Roof Sheeting, galvanised Existing Off-form Concrete Hardwood slatted timber fencing/ screening, spanning vertically Hardwood slatted timber battens, spanning horizontally 6mm FC Sheet, Residential Expresswall CSR system 16mm Gyprock Fyrchek MR plasterboard hot- dip galvanised steel column, refer engineer

Issue

C5

ISSUED TO BUILDER FOR CONSTRUCTION

3/10/13

Revision

Date

new Lysaght Longline roof sheeting extend length of carport roof to match existing courtyard canopy extend length of existing slatted timber fence

Project North
PROJECT DIRECTORY
ARCHITECT: PHILLIPS/PILKINGTON ARCHITECTS PTY LTD STRUCTURAL ENGINEER: JOHN BOWLEY PRIVATE CERTIFIER: TECON ph: 8239 9000 ph: 8390 1332 ph: 8228 1688

TCL

FYR

FYR

EXB

FFL +2870 First Floor retain and protect existing olive tree

cj

cj

cj

Shadeform 'Shaderunner' retractable sail system, refer details A700 new pergola framing and footings

FE2 FC1 FYR col

LL

FYR

ex.col existing column

new raised garden bed by others surrounding existing olive tree timber post and hardwood cladding FFL +0 Ground Floor new post box, by others

WALL TYPES:
FE2 FE2
RWT

BUILDER MUST VERIFY ALL DIMENSIONS AT JOB BEFORE COMMENCING ANY WORK OR SHOP DRAWINGS. ALL DISCREPANCIES TO BE REPORTED TO ARCHITECT IMMEDIATELY.

EXB EXB

6mm wall tile, 6mm Villaboard, 70x35 studs, R2.0 insulation, 40mm air gap, existing brick wall externally
6mm wall tile, 10mm moisture resistant plasterboard, 90x45 studs, acoustic insulation, 10mm plasterboard finish

dp property boundary new Stratco 1000L Aqua Mod RWT beyond timber clad storage cupboard

10mm plasterboard, 90x45 studs, 10mm plasterboard finish 10mm plasterboard internally, 90x45 studs, R2.5 insulation, sarking, Timber cladding externally (spanning vertically) 90/90/90 FRL external wall1x16mm Gyprock Fyrchek MR plasterboard internally, 1 x 6mm CeminSeal Wallboard, 70x35 studs, 50 gap, 70x35 studs, R2.5 Insulation, sarking, 1 x 16mm Gyprock Fyrcheck MR plasterboard 1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, 10mm FC sheet, sarking, Timber cladding externally, spanning vertically 60/60/60 FRL external wall1x16mm Gyprock Fyrchek plasterboard internally, 90x45 studs, R2.5 Insulation, 1 x 16mm Gyprock Fyrcheck plasterboard, sarking, timber cladding externally, spanning vertically
glass balustrade, refer details A701 new Lysaght Longline roof sheeting neighbouring fence beyond retain and protect existing significant olive tree
copyright c PHILLIPS/PILKINGTON ARCHITECTS PTY LTD

EAST ELEVATON 1:50


Helioscreen HM 65-95, external shade blinds to W1.6a and W1.6b

TDK

TDK TDK

TDK
retain existing a/c cavity timber jambs; add fly screens and plywood louvres Shadeform 'Shaderunner' retractable sail system, refer details A700 new pergola framing and footings
ej W5a W5b W1.6a

W1.7b

Wendy Bell & Dave Tuzewski


Project

Client

TCL

1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, 40mm air gap, 90x 45 studs, 10mm FC sheet, sarking, Timber cladding externally, spanning vertically 1x 10mm plasterboard internally, 90x45 studs, R2.5 insulation, sarking, Timber cladding externally, spanning horizontally

Bell/ Tuzewski Residence

46 MacKinnon Parade North Adelaide South Australia 5006 Elevations


Drawing Title:

FC1

LL

EXB

EXB

EXB

RWT

new raised garden bed by others, surrounding existing olive tree new post box, by others timber post and hardwood cladding

Scale: 1:50@A1 Drawing By: Checked By:

Sheet No: Date: Date:

8 of 21
3/10/13 3/10/13

JO'R MP

Project No/Drawing No.:

Issue:

WEST ELEVATION 1:50

property boundary

12417- A200
Plot Date:

C5

3/10/13

70x45 purlins sarking roof pitch: 5 INS

3
CRS INS sarking

A 1
CRS TCL FC1 insulation as specified fence cap flashing to end of roof sheeting 90X45 studs SK2 +2870 FFL First Floor
225

C
16mm Gyprock Fyrcheck MR plasterboard 6mm CeminSeal Wallboard

BOUNDARY E2

Studio R1.07 PBD

W1.7a

/Volumes/PPA Data/JOB FILES/12417 Bell:Tuzewski Residence 46 Mackinnon Parade /12417 Drawings/Cad Files/Model/Bell Residence 2013.10.03 C6.pln

225

90/90/90 FRL external wall


16mm Gyprock Fyrcheck MR plasterboard INS +2870 FFL First Floor

SF STF
12

Rondo P50 shadowline SK2


12

FOR CONSTRUCTION

19

170x45mm roof beams Roof beam lintel 240x63 LVL GU1 +5270 AFL Top of Window W1.7b FG Rondo P50 shadow line typical, surrounding windows and doors and skirtings TCL packing to suit PBD 10mm plasterboard on 28mm furring channels Rondo P50 PBD PBD INS

200x63mm LVL TCL flashing to suit

170

170

170X45 LVL floor joists +2650 AFL TCL LL


259

19

70X35 studs FC sheet fixed to Expresswall top hats

NEIGHBORING PROPERTY

W1.7d

existing rafters providing blocking to suit retractable shaderunner system INS sarking existing gutter TDK

250X75 LVL beyond +2400 FCL Ground Floor +2360 AFL Existing Brick Wall

FC1
225

INS MRPB Bathroom RG.07 WT1 VBD Laundry RG.06

INS MRPB WT1 VBD 90x45 stud wall, fixed to existing brickwork 4 A300 SECTION DETAIL 4 1:10

+2400 FCL Ground Floor +2360 AFL Existing Brick Wall EXB

EXTERNAL EXB PBD timber panel to match existing 3 A300

PBD D1.7c 200 RHS +5070 AFL Ceiling Level- Link W1.6a PBD EXB

SECTION DETAIL 3 1:10

Balustrade, refer details A800 Link R1.06

infill timber jamb surround to match existing adjoining window Studio R1.07 Studio R1.07 SK2 SF SF STF
12 70

COL

FG1 SK2 SF STF Timber packing to suit +2870 FFL First Floor
220 170

COL beyond timber cladding SK2 SF STF +2870 FFL First Floor 200 PFC 170X45 LVL floor joists 250x75 LVL W1.6a

120

W1.7a

caulk 10mm gap between recycled solid timber floor boards


TFL
385

infill timber tread fixed to existing concrete beam


10

STF

C6

ISSUED TO BUILDER FOR CONSTRUCTION

17/10/13

19

170 19

apron flashing to suit

existing flooring and structure

+2870 FFL First Floor


170

12

70

60

200 PFC

TIM1 TDK

open

16 A701

17 A701

+2650 AFL EXC 70x35 studs INS 250x75 LVL 170X45 LVL TCL EXTERNAL COL 100 UC
70

Issue

C5

70

ISSUED TO BUILDER FOR CONSTRUCTION

03/10/13

Revision

Date

+2650 AFL TIM1 existing canopy roof beyond +2400 FCL Laundry +2360 AFL Existing Brick Wall MRPB FC1 COL 100 UC 180x75 PFC helioscreen model no. HM 65-95, helio 93 fabric, natural anodised and charcoal fabric pelmet box reversed fixed +4970 AFL Ceiling Level- Link LL INS FC sheet fixed to Expresswall top hats LL INS +2520 FCL Bedroom 3 W5b COL beyond timber cladding 2 A300 SECTION DETAIL 2 1:10 W5a INS PBD

+2400 FCL Ground Floor

EXTERNAL PBD FC1 fixed to residential Expresswall top hats


15

Project North
PROJECT DIRECTORY
ARCHITECT: PHILLIPS/PILKINGTON ARCHITECTS PTY LTD STRUCTURAL ENGINEER: JOHN BOWLEY PRIVATE CERTIFIER: TECON ph: 8239 9000 ph: 8390 1332 ph: 8228 1688

Rondo P50 shadow line


Bedroom 3 RG.05

EXw

+2360 AFL Existing Brick Wall

COL 100 UC EXB 8 SECTION DETAIL 8 1:10

WT1 Bathroom RG.07 7 125x75 PFC VBD

SECTION DETAIL 7 1:10 TCL reinstate timber cladding cL timber beam as per engineers specifications 200x70 timber beam existing timber fascia
200

existing gutter beyond

BUILDER MUST VERIFY ALL DIMENSIONS AT JOB BEFORE COMMENCING ANY WORK OR SHOP DRAWINGS. ALL DISCREPANCIES TO BE REPORTED TO ARCHITECT IMMEDIATELY.

cL
100 50 75 50

sarking

EXB

180

helioscreen model no. HM 65-95, helio 93 fabric, natural anodised and charcoal fabric 95mm three piece aluminium headbox

existing stud wall and cladding

400

600

50

PBD

INS

40x40 aluminium channel, anodised existing floor joists

Shaderunner eyebolt

200x50 beam 50 galvanised CHS

12 copyright c PHILLIPS/PILKINGTON ARCHITECTS PTY LTD 200

W1.6a GL3 5 A300


50

hardwood timber column beyond retractable Shaderunner system

bulkhead beyond

EXw W1.6b

column size packer 100x100 hardwood timber column

SECTION DETAIL 5 1:10


990 50

EXd remove and replace existing coverboard to fix Shaderunner system and CHS

GL3

9 A300 GF1

SECTION DETAIL 9 1:10

B
DP1 50 galvanised downpipe
70 70

C
GF1 apron flashing, scribed to roof sheeting

Wendy Bell & Dave Tuzewski


Project

Client

TFL +0 FFL Ground Floor +2870 FFL First Floor

Link R1.06

LL roofing at 2 fall

boundary wall

W5a

Bell/ Tuzewski Residence

60

roof sarking
14 701 110

exterior paving as specified E2 16mm Gyprock Fyrcheck MR plasterboard +0 FFL Ground Floor FALL

50

CP1

46 MacKinnon Parade North Adelaide South Australia 5006 Section Details


Scale: 1:10@A1 Drawing By: Sheet No: Date: Date: Drawing Title:

+2520 FCL Ground Floor

GU2 custom Fielders gutter 50

PBD

PBD INS

EXw

INS

EXC beyond

DP1 W5a

plasterboard ceiling on direct fixed furring channels


Bedroom 3 RG.05

18 of 21
17/10/13 17/10/13

JO'R MP

DPM footings as per engineers specifications

Checked By:

Project No/Drawing No.:

Issue:

6 A300 1 A300 WALL SECTION DETAIL 1 1:10

SECTION DETAIL 6 1:10 7 A300 SECTION DETAIL 10 1:10

8 A300

SECTION DETAIL 11 1:10

12417- A700
Plot Date:

C6

17/10/13