October
2012
Village Organization (VO) formation session being carried out by RDP in Buner
LACIP
INFRASTRUCTURE PROJECT
News
LACIP PMU member Taimur Jehangir , filling out an Institutional development checklist of a CO called Al Khair Wefare Org in Buner.
1 Million EUR have been allocated tor Disaster Preparedness and Mitigation (DPM) activities . The MIS system and database is being developed and will be fully operational soon. The Quarterly Progress Report for the period of (July-September) has been shared with KfW. A Quarterly Field Visit schedule has been developed by the PMU LACIP. Preparation of the CPI Manual on the Modern Surface Irrigation System Design and Channel improvement is under process.
36 CPI Schemes initiated this month, cumulative CPI schemes initiated are 117. 8 CPI Projects have been completed this month, cumulative CPI Projects completed are 21. 47 new Community Organizations have been formed this month, cumulative new formed COs are 398. 14 Community Organizations have been revitalized in October, total number is 173. 396 Livelihood Investment Plans have been completed this month, total number of LIPs completed is 1,130.