SIGN:

ITEM NUMBER WELD NUMBER ISOMETRIC DWG NUMBER LINE NUMBER LINE CLASS MATERIAL

DATE: PREPARED BY:


GRADE SPOOL NUMBER WELD TYPE SCHEDULE DIAMETER WELD PROCESS FIT-UP DATE

NAME:

CONSTRUCTION REPRESENTITIVE

SIGN: VERIFIED BY: SIGN: REVIEWED AND APPROVED BY: MAIN CONTRACTOR OR LSTK QA REPRESENTITIVE SIGN: NAME: REVIEWED BY: PID REPRESENTITIVE NAME:

WELD SUMMARY, WELDER PERFORMANCE & SPECIAL PROCESS (NDE, etc) TRACKING SYSTEM

DATE: DATE: DATE:

NAME:

FIT-UP INSPECTIONQR NUMBER

ROOT A ROOT B FILL A FILL B CAP A CAP B

QC SUPERVISOR OR INSPECTOR

WELDERS SYMBOL DATE WELDED WPS NUMBER WPS PARAMETERS VERIFIED POST VISUAL RESULT POST VISUAL INSPECTION QR NO. PERCENTAGE OF NDE REQUIRED DATE NDE WAS REQUESTED NDE REQUEST QR NUMBER 1st RT REPORT NUMBER RESULT T1 10% 100% ACC REJ ACC REJ T2 2nd RT REPAIR 1 REPORT NUMBER RESULT 3rd RT REPAIR 2 REPORT NUMBER RESULT % REVIEWED OTHER NDE OTHER NDE TYPE PWHT PWHT REPORT NUMBER PMI TESTING DATE NDE WAS COMPLETED NDE BACKLOG FILM QUALITY WELD QUALITY SAUDI ARAMCO RT FILM EVALUATION OTHER NDE REPORT NUMBER HARDNESS TESTING TRACER WELDS HARDNESS TESTING REPORT NUMBER PMI REPORT NUMBER

Client:

SAUDI ARAMCO

Location: Project:
System No. :

KHURAIS (SAUDI ARABIA)


TP No. :

KHURAIS CRUDE CONTRACT (SATR-W-2008)

Job. No Date Unit : : 315900

Client:

Job. No Date Unit TP No. System No.

315900 :

SAUDI ARAMCO
Location:

KHURAIS (SAUDI ARABIA)


Project:

: : :

KHURAIS CRUDE CONTRACT

Service/Pipe Class Percentage RT Report


As per BE-653843

Client:

Job. No Date Unit TP No. System No.

315900 :

SAUDI ARAMCO
Location:

KHURAIS (SAUDI ARABIA)


Project:

: : :

KHURAIS CRUDE CONTRACT

VALVE TEST REPORT


MDT.TB.CDQ.0116
TAG/ITEM ENGINEERING DOCUMENT n. SUPPLIER DOCUMENT n. CODE/SPECIFICATION

IDENTIFICATION OF MONITORING AND MEASURING DEVICES: DATE: MANUFACTURER:

PAGE

OF

TYPE VALVE Gate


Size Trim Material Body Material For Cast Steel Valves Only

Globe

Ball

Check

Butterfly

Class (Rating) Tag No. / Symbol ID No. Body Heat # Bonnet Heat #

PRESSURE TEST
Valve Body Hydro Test Test Duration:..[min] Retest Test Duration:..[min] Test Pressure . Pass Fail

Test Pressure .

Pass

Fail

Upstream Valve Seat

Downstream Valve Seat

Low Pressure Test___________________ PSIG_______ Leakage Rate. __________# Drops, Bubbles/Minute

Pass

Fail

High Pressure Test__________________ PSIG_______ Leakage Rate __________# Drops, Bubbles/Minute

Pass Test Result


NOTES

Fail Accepted Rejected Test Duration___________ Minutes If rejected, see MER/NCR # _____
INSPECTION NOTIFICATION REFERENCE

RFI No. PREPARED BY: ISSUE DATE:

QC
NAME SIGNATURE Date NAME

SNAMPROGETTI
NAME SIGNATURE Date NAME SIGNATURE Date

CLIENT
SIGNATURE Date

Client:

Job. No Date Unit TP No.

315900 :

SAUDI ARAMCO
Location:

KHURAIS (SAUDI ARABIA)


Project:

: : System No. :

KHURAIS CRUDE CONTRACT

Flange Joint Inspection Report


MDT.TB.CDQ.0106
TAG/ITEM ENGINEERING DOCUMENT n. SUPPLIER DOCUMENT n. CODE/SPECIFICATION

IDENTIFICATION OF MONITORING AND MEASURING DEVICES:

PAGE INSTALLATION OF FINAL GASKETS Installed Checked by date

OF BOLTS TIGHTENING

JOINT REF.N -1

PIPING ISOMETRIC REF.DWG.N

REMOVAL OF TEMPORARY GASKETS Removed Checked by date

Completed

Checked by

date

NOTES Notes: 1-Construction Contractor shall identify on QA/QC copy of piping isometric dwgs. the joint reference number using an alfa numeric code, copy of this isometric shall be attached

INSPECTION NOTIFICATION REFERENCE RFI No.

PREPARED BY: ISSUE DATE:

QC
NAME SIGNATURE Date NAME

SNAMPROGETTI
NAME SIGNATURE Date NAME SIGNATURE Date SIGNATURE Date

COMPANY

Client:

Job. No Date Unit TP No. System No.

315900 :

SAUDI ARAMCO
Location:

KHURAIS (SAUDI ARABIA)


Project:

: : :

KHURAIS CRUDE CONTRACT

VISUAL CHECKS OF ORIFICE FLANGES


MDT.TB.CDQ.0105
TAG/ITEM ENGINEERING DOCUMENT n. SUPPLIER DOCUMENT n. CODE/SPECIFICATION

IDENTIFICATION OF MONITORING AND MEASURING DEVICES

PAGE

OF

ORIFICE FLANGE N.

SKETCH N. / LINE N.

INTERNAL GRINDING OF WELD ROOT

SEAL WELD OF ORIF. FLANGE ORIENT. PRESSURE THREADED HOLES JOINTS

NOTES

INSPECTION NOTIFICATION REFERENCE RFI No. ISSUE DATE:

PREPARED BY:

QC
NAME SIGNATURE Date NAME

SNAMPROGETTI
NAME SIGNATURE Date NAME SIGNATURE Date SIGNATURE Date

COMPANY

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA
EQUIPMENT ID NUMBER(S)

Piping/Equipment Internal Cleaning Inspection Report (SATR-A-2008 Rev.2)


EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No.

PIPE CLEANING DIAGRAM (If applicable)

LOCATION

WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

SAUDI ARAMCO TIP (SATIP) NUMBER

SATIP Activity No.

TEST IN ACCORDANCE WITH:

a) Procedure No.

b) Supporting SAIC No.

System Description:
Service Fluid: MAOP: System Material Type:

Internal Cleanliness Report for On-Plot Piping & Equipment (See Remarks)
Method of internal cleaning
piping systems and equipment) (For

Limits of internal cleaning


(State Partial or Full and terminating ends)

Type Of Debris
(sand, mill scale, electrodes, debris, etc.)

Valve Cavities & Other Low Point System Components

Internal Cleanliness Report for Pipelines (Note 2)


Pipeline Description : ____________________________________________ Pipe Internal Diameter(s): _________________
Drawing No: Section No: From KM: Scraper Type Location / Date Test No: To KM:

RUN 1
DATE
Cleaning Start Cleaning End Cleaning Duration

RUN 2
TIME DATE TIME

RUN 3
DATE TIME

REMARKS

OBSERVATIONS:
1. Indicate Amount and/or type of debris 2. Scraper

RESULT (ACC/REJ) REMARKS: Note 1: Items in italics above are for guidance in completion of forms prior to pressure testing.

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA
EQUIPMENT ID NUMBER(S)

Piping / Equipment Internal Cleaning Inspection


EQUIPMENT DESCRIPTION

SAIC-L-2017

1-Dec-06
EQPT CODE

MECHSYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

General Requirements (Note: Use SATR-A-2008 to document findings using this checklist ) Method of cleaning & flushing of piping spools & systems applicable for every individual system category was approved/agreed upon by PMT, Proponent and Inspection. (SAES-A-004, Para. 7.1.2 ) Visual verification of end limits covered by this inspection conformed with the QR (Quality Request for inspection) Method 1: Progressive Internal inspection (DURING ASSEMBLY) Spools are visually inspected for internal cleanliness (no presence of loose particles/flakes or debris) prior to welding/bolting to the preceeding and/or succeeding spools. (Follow Notes Below) A) Visual inspection includes use of video inspection techniques, visual, scraping & positioning in vertical position. B) Fine dusts are acceptable, unless specified for critical systems Ends of Piping spools or partially completed piping system passed visual inspection for internal cleanliness, were covered & sealed to prevent entry of debris (moisture, water or other foreign materials). Note: Each section of cleaned spools or system shall be recorded End covers were not and cannot be removed by unauthorized personnel prior to making the joint of succeeding sections of piping. A) QA/QC and/or Aramco Project Inspection shall be notified prior to removal of the end covers. B) End covers removed without authorization shall make the internal cleanliness null and void. Partial cleanliness inspection certificates for each section of a completed system are accounted for. Method 2: Internal Cleaning by Water Flushing Equipment sensitive to damage during water flushing are identified and isolated. (Ex: Flow meter, sight glass, soft-seated valves ) Equipment and in-line instruments that may interfere with the flow of water and debris are removed. (Ex: check valve, control valve, sight glasses,orifice plates, venturies, positive displacement and turbine meters and other in-line equipment., etc. ) Full bore valves (ball & gate valves) are in full open position. Flushing medium used are any of the following: A) Plant/process water B) Raw water (Fire water OK when process water is not available) Note: Sea water is not acceptable For stainless steel lines, flushing medium chloride ion content is less than 50 mg/L. (NOTE: After flushing, the piping systems shall be completely drained, dried to a dew point below -1C ) SAES-L-350, Para. 15.1 SAES-L-350, Para. 15.3

A1

A2 B

B1

SAES-L-350, Para. 15.3.2

B2

SAES-L-350, Para 15.2.3

B3

SAES-L-350, Para 15.2.3

B4 C C1

SAES-L-350, Para. 14.2 SAES-L-350, Appendix A SAES-A-004, Para. 7.1.4 SAES-L-350, Appendix A SAES-L-350, Appendix A

C2

C3

C4

C5

SAES-L-350, Appendix A

C6 C7 D D1

For lines below 4" dia., minimum velocity of water fushing is 3 m/s. For lines 4" dia. and above, high pressure jet (rotating hose or nozzle) at a minimum pressure of 60.8 mPa (8.8 psi) is used. Method 3: Pneumatic Flushing Medium used for pneumatic flushing is dry air (dew point -1C or less) or steam with a minimum exit velocity of 15 m/s. Flushing is repeated until cleanliness is verified by observing the absence of any solids impact on a polished metal target at the exit. Method 4: Pressurized Air Shock Blowing (PASB) PASB method is used for the following conditions: a. For initial cleaning of instrument air, plant air b. As an alternative method for initial cleaning of small bore pipe (less than 2 inch). c. Presence of trapped liquid in the piping, or if verification of cleanliness using video inspection is not possible. The air shocking pressure shall never exceed the working pressure of the system and shall never be more than 810 kPa (115 psi). Safety precautions are considered in consultation with Area Loss Prevention Division. PASB is repeated until cleanliness is verified by observing the absence of any solids impact on a polished metal target at the exit. Method 5: Mechanical Scrapers

SAES-L-350, Appendix A SAES-L-350, Appendix A

SAES-L-350, Appendix A SAES-L-350, Appendix A

D2 E

E1

SAES-L-350, Appendix A

E2

SAES-L-350, Appendix A SAES-L-350, Appendix A SAES-L-350, Appendix A

E3

E4 F F1

Mechanical scrapers are used on piping system that will not cause damage to the pipe interior surface (ie: piping with internal coating). Degree of cleanliness conforms with the approved internal cleaning procedure. Internal scrapers have full bore contact with the pipe diameter. Additional checkpoints or Acceptance Criteria shall be added upon approval of Piping Internal Cleaning Procedure by scraping.

SAES-L-350, Appendix A SAES-L-450, Para. 18.2 Procedure detail Procedure detail

F2 F3 F4

REMARKS: ATTACHMENT: 1. SATR-A-2008, Piping / Equipment Internal Cleaning Inspection NOTES FOR SATR-A-2008 USE: Note 1: Method of internal cleaning states in detail the cleaning methods used (reference Company approved procedure) Note 2: Limits of internal cleaning state whether cleaning was full or partial and details the system limits for cleaning (specific line #) and/or equipment details/limits "as inspected" Note 3: Type of Debris found states what was found during cleaning and any other unusual findings that could affect system integrity "as inspected" Note 4: Valve Cavity & other system low point component cleaning states exactly how low points remaining in line or the equipment were cleaned. methods are adequate for removal of debris (sample selected by Company to witness shall demonstrate this). See Explanation below. Explanation: Valves should be installed in systems AFTER pressure testing when possible during system reinstatement. THE ABOVE STATEMENT IS CLEARLY STATED AND INTENDED IN SAUDI ARAMCO STDS TO PREVENT VALVE SEAT DAMAGE. Code fabricated test implements can easily replace valves during system hydrotests. Cavities & other low points in the line where debris can accumulate require special attention during cleaning. Typical flushing with air or water is inadequate in the removal of debris from valve cavities and low points. This accumulated debris (sand, scale, metal shavings, slag, etc) creates serious corrosion and operational problems for COMPANY. Cleaning methods shall demonstrate adequate cleaning for all piping system components and equipment. Where items such as valve cavities exhibit an inadequate level of cleanliness, adequate cleaning & inspection shall be performed at earliest opportunity and addressed no later than immediately after hydrotest. Avoid flushing lines through valves & install field hydrotested valves "after" system testing where possible. Preservation checks of valves utilizing "AMBIENT" Lay-up methods is required. REFERENCE DOCUMENTS: 1. SAES-A-004, General Requirements for Pressure Testing, (30 march, 2005) 2. SAES-L-350, Construction of Plant Piping, (30 September, 2003) 3. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Inspection of Filling & Pressurization (Hydrotest)


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

SAIC-A-2013

1-Dec-06
EQPT CODE

MECH.
SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A A1

ACCEPTANCE CRITERIA General Requirements Pressure Test Procedure is approved and all safety precautions per GI0002.102 & SAES-A-007 (Chemical Handling) have been taken. All in-line valves (if not test isolation) are open*. Note: A fully open valve can leak at stem packing. Items that interfere with filling & Sensitive equipment have been removed from the piping system. System test limits are checked during Inspection walk down Inject oxygen scavenger, biocide and other treatment chemicals continuously at a rate that will provide the specified concentration while filling the system for the hydrostatic test. See Attachment 1 Ensure safe filling of systems with properly proportioned chemical treatments. See Attachment 1 for these details.

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

SAES-A-004, Section 5.1

A2

SAES-A-004 Para 8.1.3

A3

SAES-A-007 Section 8

A4

Filling & pressurization is done upstream of check valves in system. Test fluid enters (shall be drained) at the lowest point in the system. All vents are open during filling. Minimize Trapped air. See Attachment 1 (Hydrotest Filling & Venting Practices) Quality Manager & Inspection Action Required for Efficiency

SAES-A-004 Para 8.1.1

A5

Remove air during filling by the following measures: A) Design/Plan Tests. Provide high point vents. B) Mechanically (Use scrapers as needed to remove air). C) Follow Attachment 1 regarding Efficiency Note: Venting may be accomplished by vent valves or blind flanges with properly attached test implements (welded couplings, etc) that are located at the highest point in the flange to minimize trapped air. After venting, valves used for venting are placed in the partially open position and plugged or blinded as applicable.

GI-002.102, Para. 5.15

A6

SAES-A-004 Para 8.1.3

A7

Procedure requirements are followed step by step: A) Test Medium is applied as per approved test package B) Test sequence is controlled. Maximum test pressure is per approved test package SIS sheet & Pressure Test Report Form. C) Pressure rise is staged (Adequate* hold time between stages) D) Inspection & Test Crew follow safety responsibilities during test E) Safeguards (clearance, barricade, signs, permits) are in effect *10-minute equalization time is an approximate value used in the GI.

GI-002.102, Attachment 1, Section 2

A8

Preliminary check for leaks at 50% of the strength test pressure was performed. Test crews were efficient in filling practices. See Attachment 1 regarding Testing Efficiency

GI-002.102, Para. 5.16

A9

Temperature of the water during hydrostatic testing was maintained well above 60 degrees F (16 C) due to Brittle Fracture consideration A 17C Value is listed in 32-SAMSS-004 (tanks). This equals 62.6 F. Note:This should never be a problem in Saudi. However, air temps can drop to below 10 C & water temperatures will drop as well. Water temps for Pipeline & Plant Piping testing should also follow this minimum reqmt. Document the "actual" test temps when low. Note: On the other end, solar heating can create problems when testing small diameter piping sections, with difficulty in achieving successful test results. However, when efficient filling practices are utilized & tests are well coordinated, this is NEVER a problem. See Attachment 2.

32-SAMSS-004 Para 16.3.10

REMARKS:

ATTACHMENTS: Attachment 1 - SAES-A-007 Hydrostatic Test Water Preparation, & Hydrotest Filling & Venting Practices (Efficiency) Attachment 2 - Efficient Practice For Acceptance of Pressure Tests REFERENCE DOCUMENTS: 1. SA General Instruction Manual GI-002.102, Pressure Testing Safely, (July 22, 2001) 2. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 3. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (5 October, 2005) 4. 32-SAMSS-004, Manufacture of Pressure Vessels, (30 March, 2005)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Visual Inspection at Test Pressure


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION LAYOUT DRAWING NUMBER REV. NO.

SAIC-A-2015

1-Dec-06
EQPT CODE

PIPESYSTEM ID. PLANT NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A

ACCEPTANCE CRITERIA General Requirements ... Use SATR-A-2001 with this checklist

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A1

After the test pressure is reached and before commencement of inspection of the system, the isolation valve between the temporary test manifold/piping SAES-A-004, and the piping/equipment under pressure test shall be closed and the test Para. 8.1.2 pump disconnected. See Attachments 1 & 2.

A2

All joints including welded shall be left exposed for visual leak detection during the strength test. External coating & priming of such joints is not allowed unless approved by the Manager of Inspection Department and the proponent Organization representative. The pipe itself can be externally primed and coated to a final coat. See Attachment 3 (Walkdown Inspection Technique). The test pressure shall be maintained for a sufficient time, but shall not be less than 30* minutes, to determine that there are no leaks. *Large systems (Plant Piping) can take longer to complete. Exceptions to Item A3 above, Plant Piping Pressure Testing & Visual Inspection Requirements. See Attachment 4. Visual Inspection & Testing meets SAES-L-150 reqmts. Exceptions to Item A3 above, Pipeline Pressure Testing & Visual Inspection Requirements. See Attachment 4. Visual Inspection & Testing meets SAES-L-150 reqmts. Test procedures, pressures, durations, & leakage acceptance criteria shall be equal to those that the valves were originally purchased to. All resilient (soft) seated isolation valves shall have zero leakage. Valve Testing details are included in separate Procedure Test Records for each test are entered on a Pressure Test Report Form 2642-ENG. Test duration & Acceptance is shown in Comment section of report. (Tape has test pressure & test start/finish time) Remove tape from gage & press into Test Report. Attachment 2.

SAES-L-150, Para. 7.3

A3

SAES-L-150, Para. 7.2

A4

SAES-L-150, Section 7 Plant Piping

A5

SAES-L-150, Section 8 Pipelines

A6

SAES- L-108, Para. 4.7.6

A7

SAES-A-004, Para. 8.3

REMARKS:

ATTACHMENTS: Attachment 1 - Pressure Testing Details --------- Attachment 2 - Efficient Practice For Acceptance of Pressure Tests Attachment 3 - Walkdown Inspection Techniques ----------- Attachment 4 - SAES-L-150 Pressure Testing Application & Insp REFERENCE DOCUMENTS: 1. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 2. SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)

3. SAES-L-108, Selection of Valves, (30 March, 2005)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA
EQUIPMENT ID NUMBER(S)

Pressure/Leak Test Report (SATR-A-2001 Rev.2)


EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No.

PRESSURE TEST DIAGRAM

NATURE OF TEST

WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER

SATIP Activity No.

TEST IN ACCORDANCE WITH:

a) Procedure No.

b) Supporting SAIC No.

System Description: Test/Service Fluid: Flushing Cleaning Method Used: Lay-Up Method: None: Ambient: Wet: Pressure Gages/Recorder PGPGPGPGMAOP:

Test Details (Type): Sys Mat'l Type: Limiting Factor: Accepted: Dry: Other : Temp Gage/Recorder PRTGTRRelief Valve RV # Rejected:

Test Instruments Serial No/Tag No. Make Range Certificate No. Date Calibrated Set Pressure Re-Calibration Due Date ITEM No. 1 2 3 4 5 6 7

Description of Test Parameters (Complete Applicable Data Entry Prior to Test) Test Medium Type/Quality (Indicate method of treatment if req'd in
Remarks, i.e., Fluid type, ph, SRB count, O2 Scavenger, etc).

Actual

Pass

Fail

Remarks

SystemTemperature at test: Test Pressure: Strength Test: ___________ Service Test/Others:________ Valve Body: ______________

Preliminary Test Conducted at __________Psig Area of interest (Indicate flange joints, weld joints, threaded, socket, body) Method of leak detection (direct visual/remote)

Test Duration : a. 30 minutes min for Plant Piping b. 2 hrs. Pipeline strength test/ ______ Tightness Test REPAIRS DURING TEST:

TEST RESULTS:
REMARKS:

Test Accepted. No leak or loss in pressure observed.


AFFIX ANY TEST TAPE TO THIS REPORT (TEST EVIDENCE)

Rejected

State reasons in Remarks Section.

Contractor / Third-Party
Construction Representative /Piping Engineering
Name, Title, Department, Company, Initials and Date: Test is ready for inspection:

Saudi Aramco
PMT Representative
Name, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Witnessed Test Name, Initials and Date: Work / Rework May Proceed

PID Representative
Name, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others (Optional)


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA Verify Test Equipment (Safety Assessment)


EQUIPMENT ID NUMBER(S)

SAIC-A-2009

1-Dec-06
EQPT CODE

MECHSYSTEM ID. PLANT NO.

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

Note TEST EQUIPMENT SAFETY ASSESSMENT (Notes 1-7) ... Perform along with SAIC-A-2011. 1 On New & Existing Projects, Test Equipment shall be thoroughly inspected & certified for safety (new & existing test equipment). Responsible persons shall be Project QA/QC Mgr and designated Hydrotest Engineer and Mechanical Inspector(s). Regular inspection/maintenance of appropriate test equipment is mandatory to assure Safety on SA Projects. Use of existing equipment is permitted if equipment does not exhibit signs of deterioration & is regularly inspected (Per Note 7) and meets GI-2.102 Safety Requirements. Recommended is use of corrosion inhibitor when equipment is not in use for long periods. Check component corrosion & wear (especially small fittings, nipples, etc) on existing equipment, especially test pumps. A thorough visual exam includes accessible internal components (use mirror & sunlight technique), a UT exam or hammer test (never hammer pressurized piping). Perform this exam in presence of COMPANY Inspection for new projects just prior to testing existing manifolds. Fittings and components found with heavy corrosion or thinning (verified wall loss) shall be replaced. Heavily Corroded fittings give a dull sound when hammer tested (new steel = ringing sound). Perform UT on suspect fittings or replace ASAP. Existing Manifolds proposed for use on projects without detailed code construction documents (Engineering calcs & Inspection) must be certified for fitness and safety. Existing test reports alone are not acceptable support documents. Code construction detail, calculations (SIS sheet), appropriate Inspection and NDE are necessary for Safety. Unknown piping schedules can be determined by using a UT Thickness meter. Ratings for most fittings are stamped/visible. Weld quality is verified by VT or RT. Test manifolds frequently used, older than two years and stored in ambient conditions are highly susceptible to accelerated internal corrosion and thinning of components due to corrosive nature of test waters used in many locations. Detail Manifold Arrangement Dwgs. Fabricated test components (blinds, spools, welded couplings, etc) are of proper code construction, receive inspection and are properly identification/marked for their pressure rating, inspection acceptance/fitness (Insp Ok, initial, date). Never allow uninspected non-code test component use. Components found unfit for testing (non-code, under thickness or schedule & without calculations, deteriorated, damaged, corroded) are reported and removed ASAP from Company Projects. Manifold design shall include limiting factor for all components (isolation valves, piping, fittings, tubing, etc). that are calculated (by design) to provide a PRESSURE RATING of 20% above the maximum expected system for test. Isolation valves shall be one Class higher than systems tested. Example: Project's greatest System Class = Class 900, CS (Normal), pressure rating 2,220 psi (test pressure = 3,350 psi). A manifold is needed to meet COMPANY safety requirements. Step 1: Maximum test pressure for Class 900 systems = 2,220 x 1.5 = 3,330, round up to nearest increment of 25 = 3,350 psi. Step 2: Manifold minimum design pressure (manifold test pressure) SHALL = 3,350 x 1.2 = 4,020 psi. Step 3: Manifold isolation valve must be Class 1500 minimum (one class above Class 900) See ASME B16.34 Tables & Para 7.2 = a 110% pressurization rule for valve seat closure tests. Step 5: Components (piping, fitting, tubing, etc) are rated for 4,020 psi minimum and have engineering calcs to support their use. Manifolds without construction details (arrangement drawings) are not accepted until CERTIFIED & RATED for Safety. Perform safety checks for Notes 1-6 at least yearly* & before the start-up of pressure testing on projects. *Observation: The Diving Industry requires appropriate test equipment maintenance inspections on an annual basis. Scuba Tanks are pressurized frequently to 3,200 psi, often on a daily basis. Annual inspections use remote visual means (fiberscope). Corroded Tanks are replaced before they fail. Pressure Testing equipment sees similar and even greater pressures and service use. Safety of Test Crews, Inspectors & personnel on Projects deserve similar consideration. Keep Test equipment in good condition (Coated as needed, clean, legibly rated for pressure, legibly marked "as inspected, and regularly inspected).

Test Manifold & Appurtanances (Piping, Fittings, Hoses) - Verify Test Package Content before Testing

A1

Manifold Arrangement Drawing(s) attests to equipment safety: A) Fabrication is per code construction with component details listed such (Class, size, schedule piping, type isolation valve, etc). B) Maximum Safe Test Pressure Rating based on limiting factor. C) Each test manifold is identified with a unique number (certificate) D) Shows actual arrangement including hose configuration used Note 1: Manifold permanent marking (unique ID #, pressure rating) is legible, traceable & certified for safety (Support documenation). Manifold Design Pressure Rating (Compare SIS for manifold & the system to be tested) exceeds system test pressure by 20%. Verification of Actual Test Equipment Set-up (Manifold Arrangement) Test Set-up* matches actual Test Manifold Arrangement. Note 1: *Pressure Test Diagram with an appropriate Legend for symbols, Test Manifold Arrangement (& pressure hoses/piping) show all high points (vents), low points (drains), gage locations & provide documentation that attests to the actual test as performed. In event of testing accident, Loss Prevention Dept must be able to use diagrams & sketches to recreate actual test set-up/conditions. Blow down valve is adequately rated at higher class than system under test, and is installed to depressurize the system safely and is easily accessible to operator. (Safety Note 6, Isolation valve) Temporary Test Piping, spools, fittings to equipment and hose connections have adequate* pressure ratings, as marked, stamped or documented in test pkg. (*Match/exceed test pressure) Hoses are adequately rated, in good condition, safely arranged (tripping hazards) and protected from Heavy equipment traffic. Paddles or spectacle blinds & other fabricated test items for isolation are at least the same code class rating of systems under test or have code calcs to support them. Safety Note 5 Test Relief Valve(s) Relief valve is located in the system under test and near the test pump with Isolation valves on the inlet and outlet of the relief valve sealed open during the test. (SAEP-1160, Bullet Item # 3) Relief valve(s) of adequate capacity (*SIS Sheet & Calcs available) are set to relieve at 5%* above the hydrotest pressure. *Note: Test pressures less than 85% of SMYS can have relief valves set at 10% above test pressure. Verify SIS sheets/calcs.

G.I.-2.102, Para. 5.5

A2 B

G.I.-2.102, Para. 5.5, Safety Note 6

B1

G.I.-2.102, Para. 5.2 b, SAEP-1160, Section 8

B2

G.I.-2.102, Para. 5.5

B3

G.I.-2.102, Section 4 G.I.-2.102, Section 4 SAES-A-004 Para. 7.3

B4

B5 C C1

G.I.-2.102, Para. 5.5

C2

SAES-A-004 Para 5.5

C3

Tested relief valve(s) with a tag stamped with the word "TEST", the set pressure, and date is checked. Stamp date validity is a period of one week for project pressure tests. Stickers are legible & valid. A roster is kept for Pressure Relief Valves (M&TE) on projects. Pressure Gages and Recorders A minimum of two pressure gages are required for test systems, with accuracy within 5% of one another. Note 1: When large systems are tested, Inspection personnel will determine the need for additional gages. Note 2: Elevation changes (hydrostatic head considerations) & hot weather create pressure testing problems with frequent popping of relief valves. For this reason, gage accuracy within 2% is best. Note 3: Careful handling of delicate instruments as test gages is practiced by test crews. No gage damage or mishandling is found. Pressure gages and pressure recorders are calibrated within (1) month prior to test. Stickers applied indicate latest calibration date. Test gauge is located at bottom of any equipment/system under test to enable reading test pressures inclusive of hydrostatic head. Note: Locate test manifold (with gage) at low points in systems under test. One foot of water (30 cm) @ ambient temperature = pressure increase of .433 psi. (1-meter = 1.42, 10-meter = 14 psi).

SAES-A-004 Para 5.5

D1

SAES-A-004 Para 7.1.5

D2

SAES-A-004 Para 7.1.5

D3

G.I.-2.102, Sec.4 & SAES-A-004, Para 5.3

D4 E

All gages have a range such that the test pressure is within 30% to 80% of the full range.

SAES-A-004 Para 7.1.5

Temperature Gages and Recorders (When Required, ie: 24-hr Recorded Tests) Bubble Leak Test (associated with Pneumatic strength/service test) surface metal temperatures shall be recorded and compatible with test methods (including test solution used to detect leaks). Note: ASME V, Art 10, Man. App. 1, Table 1-1021 requires surface metal temp measurements during testing (detailed in procedure). Record maximum (direct sun) & minimum test temperatures. Thermocouples are installed to obtain accurate pipe metal temperature measurements and to determine the acceptance of the pressure test where pressure variations due to test water temperature changes occur, such as in cross-country pipelines.

E1

SAES-A-004 Para 5.6.1

E2

SAES-L-150, Para. 11.3

REMARKS:

REFERENCE DOCUMENTS: 1. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 2. GI-2.102, Saudi Aramco General Instruction-Pressure Testing Safely, (22 July, 2001) 3. SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003) 4. Pro Forma Contract Schedule Q (Nov 2003) 5. SAEP-1160 (First Edition June 7, 2006)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Depressurization & Disposal of Hydrotest Water


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

SAIC-A-2017

1-Dec-06
EQPT CODE

MECH.
SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A A1

ACCEPTANCE CRITERIA General Requirements Depressurization is done slowly and safely after completion of test or on discovery of leaks. Bleed off the system slowly to an approved safe discharge area and monitor discharge. Inspection ensures written procedures approved prior to testing are followed upon disposal of any test medium containing chemical additives for control of corrosion and bacteria. Disposal methods follow SAEP-327, Section 3 requirements. Specific Disposal Requirements New pipelines, and pipelines in gas service do not require oil/water separation prior to wastewater discharge/disposal Do not discharge wastewater to local wadi environments. Discharge separated wastewater to non-sabkhah areas into approved pits or to lined evaporation ponds constructed. As far as possible locate the disposal site within the existing pipeline corridor while ensuring adequate pipeline access and without causing damage to the existing roadways, pipelines, private entities or other structures Do not dispose wastewater within or adjacent to wetland or sensitive environments, including specified conservation areas Disposal to Sabkhah Discharge separated wastewater directly to the sabkhah for evaporation provided that the wastewater remains on land, and does not flow directly to the marine environment. An oil/water Separator Pond is required before wastewater is discharged to sabkhah to ensure retention of residual hydrocarbon for subsequent collection and proper handling. Separator pond site is downwind to minimize exposure risk to nearby facilities personnel. Disposal to an Evaporation Pond Oil/water separator ponds are required upstream of evaporation ponds to collect residual hydrocarbon and improve evaporation in the evaporation ponds. Disposal to Industrial Wastewater Treatment Plant Discharge wastewater directly to the local industrial wastewater treatment plant if disposal does not affect the normal operations of the plant. Obtain concurrence from the operators of the treatment plant prior to selection of this disposal option. Disposal to Injection Well Dispose wastewater into injection wells if it does not affect the well operation. Obtain concurrence from the operators of the well prior to selection of this disposal option. Injection well operators will provide water quality criteria for any wastewater that will be introduced to their system for disposal

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

GI-002.102, Section 5.17

A2

GI-002.102, Section 5.20

B B1

SAEP-327, Section 3 SAEP-327, Section 3

B2

B3

SAEP-327, Section 3 SAEP-327, Section 3

B4

B5

SAEP-327, Section 3

B6

SAEP-327, Section 3

B7

SAEP-327, Section 3

B8

SAEP-327, Section 3

B9

Disposal Offshore Dispose wastewater offshore to the Arabian Gulf or Red Sea per SAEP327 Table 1 (See Excel Sh # 2 Att'd). Adequate dispersal of wastewater in marine environment by diffuser or similar method or transfer wastewater onshore for treatment/disposal. Biocides other than Troskil-1 (Polyhexamethylene biguanide hydrochloride or PHMB) require evaluation & approval by EPD/EED prior to disposal to the Arabian Gulf or the Red Sea. Water Disposal Approval Form has been submitted Dispose wastewater with Rhodamine B and TROS (fluorescent) dyes into deep water, shallow water and embayment systems per SAEP-327 Table 1 (See Excel Sh # 2 Attached). For other dyes provide toxicity data, submit Water Disposal Approval Form. Notify Frontier Force of any discharges of dyes to sea to prevent alarm. Use a spray nozzle to allow maximum oxygenation of discharge of waters containing oxygen scavenger added Submit Water Disposal Approval Form and obtain approval from EPD/EED before discharge of any wastewater to embayments and/or conservation areas in the Arabian Gulf Discharge of contaminated wastewaters follows SAES-A-103. A) Discharge locations are where water columns are deepest. B) Discharge there is as close to the water surface as practicable. C) If only oxygen scavenger is used, discharge is into the air and discharge rate is less than five cubic meters per minute D) Alternatively, SAES-A-104 allows injection of wastewater into any petroleum reservoir producing hydrocarbons. Submit Water Disposal Approval Form and obtain approval from EPD/EED before disposal of wastewater to the Red Sea For pipelines, dewatering is performed by scraping. If sea water was used for testing a pipeline, remove salt deposits by scraping with slugs of water containing less than 4500 mg/L total dissolved solids until the water soluble sulfates and chlorides on the steel surface at the drain or outlet end are reduced to <80 mg/m.

SAEP-327, Section 3

B10

SAEP-327, Section 3

B11

SAEP-327, Section 3

B12

SAEP-327, Section 3 SAEP-327, Section 3

B13

B14

SAEP-327, Section 3

B15

SAEP-327, Section 3

B16

SAES-A-007 Para 5.2.3.1

REMARKS: REFERENCE DOCUMENTS: 1. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (5 October 2005) 2. 3. SAEP-327, Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels (31 May, 2003) SA General Instruction Manual GI-002.102 (July 22, 2001) Pressure Testing Safely

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

System Lay Verification Report and Certificate (SATR-A-2009 Rev.2)


Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Certificate No. Equipment: System Lay-up Duration: Hydro Test Medium: METHOD OF LAY-UP Wet Lay-Up Minimum residual oxygen scavenger concetration in water shall be 20 ppm & maximum O2 concentration of 10 ppb Maintain the system under a positive pressure between 30 to 50 psig using nitrogen, sweet hydrocarbon gas or hydraulic pressure of the treated water Use gages to monitor the positive pressure in the system during lay-up with a scale range not exceeding three times the target pressure. (Gages must withstand MAOP) Use gages to monitor the positive pressure in the system during lay-up with a scale range not exceeding three times the target pressure. (Gages must withstand MAOP) Dry Lay-Up Test water drained from the system until no visible water or moisture is present. If sea water was used for testing, remove salt deposits until sulfates and chlorides on the steel surface reduced to less than 80 mg/msquare. Dry the system to a dew point of -1C Shut in system (positive pressure) not less than 12 hours Measure Dew Point Temp -1C or less after Shut-In Period Shut in system, maintain & monitor during lay-up period. Inert Gas Lay-Up Displace the hydrostatic test water with nitrogen or sweet gas until no water drains out of the system. Shut in the system at 2-10% of operating pressure but not exceeding 50 psig with nitrogen or hydrocarbon gas. Ambient Lay-Up Test water drained completely until no visible water or moisture is present. Valves (400 SS or 13CR trim, etc) tested in-line having cavities were removed, dried & relubricated per procedure Cover pipe to prevent ingress of dirt and moisture Vapor-Phase Corrosion Inhibitor (VCI) Test water drained completely until no visible water or moisture Volume of System: _______ is present. Amount of VCI Applied: _______ System shut-in to prevent ingress of moisture and debris Date: Service Fluid: Start - End Date: Type of Lay-up: Actual Pass Fail Remarks

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Review Procedure - Lay-up of Piping Systems or Vessels


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

SAIC-A-2007

1-Dec-06
EQPT CODE SYSTEM ID.

0
PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A

ACCEPTANCE CRITERIA General Requirements Lay-Up Procedure or Method Statement shall be project specific and identified in Project Quality Plan. (SPECIAL CONSTR. PROCESS). Note Significant changes to SAES-A-007 (Oct 2005 Revision) As SAES-A-007 is intended to be a procedure guide, the Contractor shall cut and paste as much of the document as applicable into any procedures to be submmited to Saudi Aramco for review/approval. Procedure covers SAES-A-007 General Reqmts regarding: Water Quality Planning & System Design for Lay Up A) B)

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A1

Sch Q, Para. 3.1

A2

SAES-A-007, Section 1 (Scope) SAES-A-007, Section 4

A3

CARBON STEEL & LOW ALLOY (P-No. 3/4/5) PRESSURE PIPING SYSTEM LAY-UP (See Section C for Specific Applications)

B1

Procedure details Treatment of Hydrostatic Test Water: When the CS equipment contact time with hydrotest water may exceed 14 days (14-day rule), approved oxygen scavenger (App. 1) shall be added to the hydrostatic test water. Treat water before it enters the system. Use batching scrapers and/or a slug of nitrogen to separate the air in the system from coming in contact with treated water, then fill systems with water injecting sufficient oxygen scavenger to maintain its residual concentration at greater than 20 ppm & an oxygen concentration of less than 10 ppb.

SAES-A-007, Para. 5.1

B2

Procedure meets/addresses/details the following requirements: A) Equipment must be laid-up after hydrotesting unless it can be ensured that it will be returned to service within 30 days from the first introduction of hydrotest water to the system. B) One of the lay-up methods in Item B3 shall then be selected. C) Section C of this checklist (Specific system & equipment reqmts) D) Lay-up procedures for pipelines under the responsibility of Pipelines Dept shall be approved prior to hydrotest by the General Supervisor, Pipelines Technical Services Division (PTSD), & by the Mgr of the concerned area. Approval of lay-up procedure for other equipment shall be the responsibility of SA Eng Suptd. or designate.

SAES-A-007, Para. 5.2.1

B3

Procedure identifies different lay-up methods selected: A) Wet Lay-up (Attachment 2) Procedure states step by step for implementation of Lay-up method: A) Verify the appropriate steps cover specific lay-up procedure in attachments 2, 3, & 4 and refer to SAIC-A-2018 (Application). B) SAIC-A-2018 & SATR-A-2009 may be used as a supplementary Layup Procedure.

SAES-A-007, Para. 5.2.1

B4

SAES-A-007, Sec. 5.2.1

B5

At end of lay-up, commission & start up heat exchangers shall be within 14 days, & other equipment within 60 days. This statement is included in Procedure for Carbon Steel Equip. SPECIFIC & SPECIAL LAY-UP REQUIREMENTS (Specific Applications) Tank requirements are listed in applicable procedures: Carbon steel open-roof, floating-roof, or API atmospheric cone roof tanks not designed for service above atmospheric pressure, do not require treatment of of hydrostatic water. Immediately after completion of the hydrostatic test, drain and remove all traces of visible water. Cleaning shall consider any coating operations.

SAES-A-007, Para. 5.3

C1

SAES-A-007, Para 7.1

C2

Utility System requirements are listed in applicable procedures: A) Utility and potable water systems shall be tested in accordance with SAES-S-060 or SAES-S-070, as appropriate. B) Potable water systems shall be tested with fresh potable water only following the requirements of SAES-S-070, Para 18.2. Oxygen scavengers and biocides shall not be used in potable systems. C) For potable water systems, use Dry lay-up per Para. 5.2.3, Inert gas lay-up using nitrogen per Para. 5.2.4, or Ambient lay-up per Para. 5.2.5. See Attachments 3 & 4. D) For Dry-up (moisture removal), sweet gas shall not be used. Methanol or other dehydrating chemicals shall not be used. Procedure details dry-up methods used & means of verification Dry Gas & Refined Hydrocarbon Product Pipelines & Piping. See Attachment 5. Sour Gas & Sour Oil Pipelines. See Attachment 5.

SAES-A-007, Para 7.2

C3

SAES-A-007, Section 7.3 SAES-A-007, Section 7.4 SAES-A-007, Section 7.4

C4

C5 D

PLANT SYSTEMS (PIPING & EQUIPMENT) SHALL BE LAYED UP PER ATTACHMENT 6. Inspectors are familiar with these reqmts.

STAINLESS STEEL PRESSURE PIPING SYSTEM & EQUIPMENT (P-No. 6 & above) LAY-UP (INCLUDING NEW VALVE REQMTS) Type 300-series stainless steel systems* shall be tested only with water having maximum allowable chloride concentration of 50 ppm. Quality of water shall be per Attachment 1. Para. 4.2 in entirety. CS system with 300 Series SS trim valve is not a SS "system". WATER QUALITY IS TESTED & CERTIFIED (SATR-A-2014)

D1

SAES-A-007, Para. 6.1

D2

Type-400-series stainless steels are highly prone to atmospheric corrosion. This includes valves with trim designated 13Cr*. *Note: Trims # 1, 4, 6, 7, 8, and 8A are affected by new rule. Corrosion Controls shall be implemented in procedures as follows: A) Type 400-series stainless steel trimmed valves shall be removed from pipelines before hydrotest. (In-line spools are used for testing) B) Option B: If it impossible to remove such valves from the line, then written hydrotest procedures must be prepared and approved ahead of time allowing the valves to remain in place. See Attachment 7 (Special Notes for 13Cr Trim Valves) Quality Managers & Inspectors are aware of the new reqmt

SAES-A-007, Para. 6.2 & SAES-L-105 Valve Trim Table

D3

When equipment containing any Type-400 series stainless steels is left in place (Option B above), it shall be hydrotested per reqmts of Paragraph 6.3, 6.4, and 6.5 of SAES-A-007. See Attachment 7. Hydrotest procedure shall carefully detail measures to prevent corrosion including lay-up of the equipment. See Attachment 7. Do not use ambient lay-up for equipment of 400-series SS.

SAES-A-007, Para. 6.2

D4

SAES-A-007, Para. 6.2

REMARKS:

NOTES: 1. Utilize SAIC-A-2018 and SATR-A-2014 in conjunction with this checklist. 2. Quality Managers shall ensure Procedures address the new revisions of SAES-A-007 & Valve Lay-up Considerations.

ATTACHMENTS: Attachment 1 - SAES-A-007 (Oct 2005 Rev) GENERAL SYSTEM REQMTS Attachment 2 - LAY-UP FOR CARBON STEEL SYSTEMS (WET METHOD) Attachment 3 - LAY-UP FOR CARBON STEEL SYSTEMS (DRY METHOD) Attachment 4 - LAY-UP FOR CARBON STEEL SYSTEMS (INERT GAS, AMBIENT & OTHER METHODS) Attachment 5 - SPECIAL LAY UP PROCEDURES (Dry Gas & Refined Hydrocarbon Product Pipelines & Piping, Sour Gas & Sour Oil Pipelines) Attachment 6 - SPECIAL LAY UP PROCEDURES (Plant Applications, Piping Systems & Equipment) Attachment 7 - LAY UP PROCEDURE (STAINLESS STEEL SYSTEMS & EQUIPMENT) Attachment 8 - SAES-A-007 Appendix 1, Approved Oxygen Scavengers REFERENCE DOCUMENTS: 1. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (5 October 2005)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Review Procedure - Post Test Reinstatement & Checklist


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

SAIC-A-2006

1-Dec-06
EQPT CODE

PipingSYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No. A

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A1

A2

General Requirements (Complete SATR-A-2007, listed as Attachment 5 & use SATR-A-2011 & SATR-A-6133) Post Test Reinstatement Procedure & Checklist is required to be developed in accordance with & as part of pressure testing. SAEP-1160, This is a pressure testing procedure & test package component to be Section 8 developed during package creation as based on workscope & specific "system" requirements. Comment: A standard post-test checklist does not provide a Inspection strategies & plans shall be prepared and agreed on prior to SAES-L-350, commencing of testing. This is in common with Pipelines. Para. 17.2 Pipelines simply follow their reinstatement procedure.

A3

Specifically, Procedure shall detail PLAN or STRATEGY to reach "SYSTEM" COMPLETION (Quality Certification) as efficiently as possible while accomplishing critical goals of: A) Effective Water Removal, Disposal & Lay-Up (Post Test) No test fluid shall remain in low spots. Specifically, valve cavities. B) Test Vents and Drains (plugged, seal welded & PT'd) C) Removal & reconnection of components All temporary items installed for testing (e.g., manifolds, valves, blinds, spacers, supports) shall be removed. Valves Installed. Items that were removed from testing shall be reinstalled. Items, such as instrument air tubing, check valve discs reconnected (witnessed). Valve line-up & gasket installations meet specifications.

SAES-L-350, Para. 17.2 & SAES-A-004, Section 9

A4

Effective Corrosion Control & Preservation Measures Inspection Coverage and Responsibilities (Package Clearance) Clearly detailed provisions for Retesting after reinstatement Evaluations by Inspection. Construction related provisions.

SAES-L-350, Para. 17.2

Note: The Pre-Test Checklist & Attachments 1-4 were left in this checklist. Many apply to post-test requirements and shall help Contractor Note develop this procedure & checklist. Further assistance can be provided upon request. A5 A6 Seal welding of threaded connections and NDT associated Welding of attachment welds for non-pressure containing parts such as wear pads. Completion of open-ended Piping such as drains, vents and piping downstream of pressure relieving devices that discharge directly to the atmosphere (excluded from in-situ pressure testing). Installation of valves not tested in the line (field test and cert req'd) Instrument impulse line testing and completion (tested with sytem) Coating & insulation, steam tracing & final inspection (Clearances)

info only

info only info only

A7 A8 A9 A10

info only info only info only info only

A11 C

Support Installations & Reinspection of Systems for Plant Piping Alignment, clearances, fabrication tolerances and workmanship.

info only

SAIC-A-2010 Checklist (Reinstatement Procedure & Checklist item required (when bold.

SPEC CHECK SHALL BE UTILIZED BY SAUDI ARAMCO INSPECTORS FOR FIELD WALK-DOWNS (See E-Library, Folder 25) All joints (flange, threaded, welded or mechanical seals) are left exposed for visual leak detection during the strength test. A) External coating & priming of joints is allowed only if approved by Insp Dept Mgr & proponent Organization Representative. B) The pipe itself can be externally primed & coated to a final coat . All permanent flange joints were inspected, gasket mat'l verified & properly torqued. (Review Flange joint report, SAIC-L-2014) Drains shall be provided at all low points of the piping system. Note: Exceptions are submarine & buried* pipelines (*pump-outs) Vents and drain valves, both temporary and permanent, conforms with the piping class or rating. ( Refer SAES-L-108) Supports are installed. Additional temporary support may be installed as required. Expansion joints and spring hangers or spring supports are provided with temporary restraints. Arc strikes, gouges, and other indications of careless workmanship (such as surface porosity, uneven weld profiles, and undercut) shall be removed by grinding and inspected by magnetic particle or liquid penetrant method. Temporary welded attachments to the pipe were ground off and inspected by magnetic particle or liquid penetrant method All threaded joints and faying surfaces shall be seal welded by a continuous fillet weld (required weep holes shall be left unwelded). Isolation valves are verified to have been body and seat tested prior to installation through verification of field test certificates. All in line valves that are not used as test isolation valves are in open position. During water filling, Permanent vent and drain valves are in open position and plugged, after water filling and air venting. Drains are provided immediately above check valves (vertical lines). Disc of check valve is removed, unless check valve has by-pass. Method for storage (plastic bag & tie) allows visual verification. Spare taps of orifice flanges are plugged and seal welded. All threaded joints up to the first block valve of hydrocarbon pipeline are seal welded. Thread engagement has been verified & accepted. Process instruments and equipment that may be damaged by the strength test pressure are disconnected. The pressure testing manifold is separately pressure tested to at least 1.2 times the system test pressure but not less than the discharge pressure of the pump used for the pressure testing. Buried pipeline are adequately bermed or covered to anchor the line during pressure test. Pressure gages and pressure recorders are calibrated within one (1) month before the test. Check stickers at the time of the test. Paddle or spectacle blinds shall be used to isolate test sections. Safety of test "implements" has been checked (SAIC-A-2009) A bleed valve readily accessible is provided in case immediate depressurization is required. SAES-L-150, Para. 7.3 System clearance (Controls) SAES-L-450, Para. 9.4 SAES-L-150, Para. 6.2 SAES-L-105, Para. 5.9 SAES-L-150, Para. 6.3 SAES-L-150, Para. 6.4 SAES-W-011, Para. 11.6 SAES-W-011, Para. 11.7 SAES-W-011, Para. 11.15.1 SAES-L-108, Section 4.7 SAES-A-004, Para. 7.3.2 SAES-A-004, Para 8.1.1 SAES-A-004, Para. 7.4.2 SAES-A-004, Para. 7.4.3 SAES-L-110, Para. 8.2 SAES-L-110, Para. 8.2 SAES-A-004, Para. 7.2 SAES-A-004, Para. 5.5.4 SAES-L-450 Appendix C SAES-A-004, Para. 7.1.5 (a) SAES-A-004, Para. 7.3.1 SAES-A-004, Para. 5.5.2 Repairs water removal WITNESS POINT Final Coating & Insulation Protection Controls Plan/Strategy Final & Perm Gasket Install Water removal Lay-up Plug, cap seal welding, PT Tolerances, specs Final alignment, specs rework provisions, Controls, retesting N/A pack heavy grease Valve Installation Valve Line-up

C1

C2

C3 C4 C5 C6

C7

C8 C9 C10 C11 C12 C13 C14 C15

C16

C17

Reconnect

C18

Preservation

C19

Inspection

C20

M&TE

C21

P&ID Line-up

C22

C23

EVALUATE CLEANING (PROCEDURES) & PROPOSED LAY-UPS: For pipe up to 12-inch NPS - flushed clean of loose scale/debris or scraped prior to commencement of pressure testing per procedure Note 1: If flushing was done with valves in line, cavity cleanliness is highly suspect where no low point drains exist. Verify post-test removal of scale/debris/water in low points (Check valve cavities). Random verification involves Inspection of valve cavities. This is a standard comment or addition to the punchlist. Note 2: Internal Cleaning procedure for pipe size larger than 14 inch shall be submited for review and approval) See SATIP-L-108. Flushing Cert is available in the test package for review

SAES-A-004, Para. 7.1.2

Water removal & Preservation & LAY-UP (Follow-up)

C24

All pressure containing components of pipeline, except instruments that may be damaged by the test pressure, were physically verified to be included in test using P&ID, ISOs (Pressure Test Diagram)

SAES-A-004, Para. 5.6.1

Reconnect

C25

PRE-TEST SPEC CHECK SEE ATTACHMENT 4.


Use SAIC-A-2011 along with this checklist (inspection efficiency) whenever walkdown is done on the same day as press. testing

Inspection Excellence

Verify correct specs all special processes

C26

As Referenced

REMARKS:

REFERENCE DOCUMENTS: 1. 2. 3. 4. 5. 6. 7. 8. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) SAES-L-105, Piping Material Specifications, (30 March, 2005) SAES-L-108, Selection of Valves, (30 March, 2005) SAES-L-110, Limitations on Pipe Joints and Components, (30 March, 2005) SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003) SAES-L-350, Construction of Plant Piping, (30 September, 2003) SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003) SAES-W-011, Welding Requirements for On-Plot Piping, (30 March, 2005)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Re-instatement Checklist (Form)


PROJECT TITLE

SATR-A-2011
WBS / BI / JO NUMBER

25-May-05

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

TEST SYSTEM No./Test Pack No.

PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No.

PRESSURE TEST DIAGRAM

NATURE OF TEST

WORK PERMIT REQD?

SAUDI ARAMCO TIP (SATIP) NUMBER

SATIP Activity No.

SUPPORTING SAIC Number

SAIC QR No.

Notes: 1) This Form shall be used in conjunction with an applicable Reinstatement Procedure for all Test Packages (SAEP-1160). 2) "B" items from PreTest Checklist are cleared after testing during re-instatement to close & certify Test Pkgs. 3) Any items not completed during the reinstatement shall be added to Mechanical Completion Punchlists and submitted to Saudi Aramco (FEIL). ETC = Estimated Time of Completion (Affects lay-up selections)
Item #

Description
(Use with applicable Re-Instatement Procedure)

Reference

Originator

ETC (Note 3)

Verified complete by QC

Concur (PID)

Certify Test Package Complete

All above items have been completed on Reinstatement per procedure and test package is certified complete: BK 1/2/2005 Remarks: Contractor / Third-Party
Technician Performing Test*
Name, Title, Department, Company, Initials and Date: Test Performed Successfully and Results are Acceptable: T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

Saudi Aramco
PMT Representative

QC Inspector
Witnessed Test Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Client: SAUDI ARAMCO Location: KHURAIS (SAUDI ARABIA)

Job. No : 315900 Date Unit TP No. System No. : : : :

Snamprogetti

Project: KHURAIS CRUDE CONTRACT

SA

Final Piping Punchlisting (Piping Re-Instatement)


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

SAIC-L-2022

1-Dec-06
EQPT CODE

PIPESYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER

REV. NO.

PURCHASE ORDER NUMBER

EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM No.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A Y/N RE-INSP DATE

NOTE: See " REMARKS" for instruction of use of this checklist. A A1 Documentation: Mechanical Scope of Works are complete. Any exceptions were identified and listed in the Sytem punchlist. Test and Inspection Plan (SATIPs) and Inspection Checklists for field installation as detailed in SATIP-L-350-01 have been verified to be complete and accepted. All non-conformance reports and worksheets have been resolved to the satisfaction of Inspection Department. All log book entries have been resolved to the satisfaction of Inspection Department. All piping fabrication documents, inspection record books and are available for review. P&ID Check/Walkthrough: All piping components are installed in their respective locations as shown in the P&ID. (i.e: piping, removable pipe spools, valves, vents, drains, spectacle plates, blinds, flange spacers, etc) All in-line equipment & Instruments are installed in their respective locations as shown in the P&ID. (i.e: Strainer, meter tube, straightening vanes, flow meter, orifice fitting, Pressure Indicators, Temperature, temperature indicators, sample probes, etc) Header pipe are stenciled with the following: a. Flow directional arrows and fluid service b. Line designation number, size, class and specification Identication are stencilled on major components of the PIPING such as but not limited to : (Note: Identification shall follow Equipment identification number designated on the P&ID) a. Identification number for metering skid b. Identification number for prover when installed b. Strainer c. Flow element/flow meter d. Control Valves e. MOV's f. Relief Valves Installed Relief Valves were verified and the corresponding Form 3099A signed. Pressure gages installed are of the same range as shown in the P&ID. Pressure gages are installed with block and bleed valves. (The bleed valve shall be plugged.) Temperature Gages installed are of the same range as shown in the P&ID. GI-2.710 Para. 4.1.1.2 GI-2.710 Para. 4.1.1.2 GI-2.710 Para. 4.1.1.4 GI-2.710 Para. 4.1.1.4 GI-2.710 Para. 4.1.1.6 Y

A2

A3 A4 A5 B B1

Y Y/N Y

P&ID # ____________

B2

P&ID # ____________

B3

SAES-L-350 Sec. 20 a & b

B4

SAES-L-350, Sec. 20

B5 B6 B7

SAES-J-600, Sec. 10 P&ID # ____________ SAES-J-200' Para. 6.1 & 6.4 P&ID #

Y Y Y Delete if covered by Instrumentation Delete if covered by Instrumentation Delete if covered by Instrumentation

B8

Y ____________

B9

Thermowells are provided with chained plug and plug installed where temperature indicators are not provided. (Std.Dwg. AB-36019) Flow direction of Control valves and globe valves follow the process flow direction. Flow direction of check valves follow the process flow direction. Piping: Pipe are resting fully on pipe supports. Shims are installed and seal welded to pipe supports to maintain contact where required. Pipe clamps are tightened and in full contact with the pipe. Weld attachments to the pipe are seal welded. Jack screw bolts installed in flanges with spectacle plates. A 6 mm weep hole shall be drilled for all dummy supports and shall be located near the base plate for all vertical dummy supports, and near the run pipe at 6 o'clock position for all horizontal dummy supports. Atmospheric drain and vent valves shall be provided with a plug or blind on the discharge side. Pressure test of field installed piping and components are complete. All nuts and bolts of flange connections are fully engaged. Flange joints for piping Class ANSI 600# and above were verified to be tightened using the applicablr Torque procedure. A minimum clearance of 50 mm shall be provided for inspection and freedom of pipe movement between above ground piping crossing with any structure (including pipe support structure). This clearance is also required for above ground piping crossing with another pipe. Branch connections, 4 inch and smaller, including drain and vent valves and drip legs of all sizes, are not located at a horizontal distance less than 610 mm (24 inches) from any fixed obstruction. Pipe Supports Pipe guides are installed at locations as shown in the AFC isometric drawings. Details of the installed pipe supports conforms with the Pipe Support Detail per project specification. Intermediate anchors or axial line stops are provided for above-ground unrestrained piping between and/or at the center of expansion loops or offsets. Axial line stops and guides shall be provided for above ground unrestrained lines subject to slug forces in services listed below. Two-phase flow lines Liquid intermittent lines, such those used to control liquid level in the drums Pressurized drain lines Relief and blow-down lines Flare lines High-pressure gas lines All pipe supports are in full contact with the support and carries the load.

SAES-J-400, Para. 5.2.5 P&ID # ____________ P&ID # ____________

Delete if covered by Instrumentation

B10

B11 C C1

SAES-L-350, Para. 14.2.2 SAES-L-350, Para. 14.2.2 SAES-L-350, Para. 11.4 SAES-L-350, Para. 10.5 SAES-L-350, Para. 13.2.3 SAES-L-108, Para. 7.7 GI-2.710-6, Item 4a GI-2.710-6, Item 1.j. GI-2.710-6, Item 1.j.

C2 C3 C5

Y Y Y/N

C6

C7

C8 C9

Y Y

C10

C11

SAES-L-310, Para. 12.4

C12 D D1

SAES-L-310, Para. 12.5

SAES-L-310, Para. 15.2.1 AFC Drawings SAES-L-310, Para. 15.2.2

D2

D3

D4

SAES-L-310, Para. 15.2.3

D5

SAES-L-310, Para. 14.2.2 SAES-L-310, Para. 14.4.4 SAES-L-310, Para. 16.1.2

D6

Travel stops of spring supports are removed after hydrotest. The pipe shall not be used to support other pipes and structures without an appropriate analysis. Structural Items:

D7 E

E1

Access is provided for equipment regularly operated or maintained or operated in an emergency, such as valve hand wheels, instrumentation, controls, and their associated manifolds, Edges of all tightly contacting surfaces of steel structures are seal welded. Access gratings are firmly anchored with a minimum of 2 fasteners at each support with a minimum of 4 fasteners per panel. (Note: Non-compliance shall be identified as "YES" item in the Facility Exception Item List for the MCC.) Lifting equipment were tested and sticker issued by ID Crane Inspection Rep. Painting: External coating on piping is complete and conforms with the project coating requirements. (Note: Pipes, vessels, valves, and related structural supports shall be painted a neutral background color such as aluminum, gray, or black per SAES-B-067, Para.4.1.1) Coating on structural items is complete and conforms with the project coating requirements. Safety yellow-and-black stripes are painted on obstructions that present bump hazards. (concrete supports at the base of stairways or ladders, passageway pinch points, unguarded edges, tripping hazards). Stripes shall be 100 mm wide. Lifting equipment and devices shall be painted safety yellow and clearly marked with the rated capacity of the equipment in Arabic and English in metric tons. Insulation is complete per applicable SATIP-N-001-01 or SATIP-N-00102

SAES-B-054, Para. 4.2 SAES-M-001, Para. 7.1.3.3

E2

E3

12-SAMSS-007, Para. 6.1.16

E4 F

G.I-2.710-6 Item 1.i.

F1

SAES-L-350 Para. 21.1

Y/N

F2

Scope of Work

F3

SAES-B-067, Para. 4.2.3 a

F4

SAES-B-067, Para. 4.4 Scope of Work

F5

General Notes:
1. Any Item marked as "Fail" requires to be identified with the specific description and location of the descripancy/violation and shall be listed in the Re-Instatement Punchlist Form (SATR-A-2011). 2. Column "Y/N" is used to pre-determine each respective item as required for start-up (Y), or not required for start-up (N). Final designation of "Y/N" items will be at the Mechanical Completion Punchlisting by Saudi Aramco Inspection. 3. This Checklist along with the Re-Instatement Punchlist Form (SATR-A-2011), with or with out cleared items, shall be submitted to Saudi Aramco on or before the requested time for Mechanical Completion Punchlisting. 4. Where blank lines are provided, please indicate the applicable requirements or actual data/information required for verification. REMARKS:

REFERENCE DOCUMENTS: 1. G.I.-2.710, Mechanical Completion and Performance Acceptance of Facilities, (13 July, 2004) 2. SAES-L-310, Design of Plant Piping, (30 September, 2003) 3. SAES-L-108, Selection of Valves, (21 December 2005) 4. SAES-M-001, Structural Design Criteria for Non-Building Structures, (30 June, 2004) 5. SAES-L-350, Construction of Plant Piping, (30 September, 2003) 6. SAES-J-200, Pressure, (31 May, 2003) 7. SAES-J-400, Temperature, (31 May, 2004) 8. SAES-J-600, Pressure Relief Devices, (30 March, 2005) 9. SAES-B-054, Access, Egress, and Materials Handling for Plant Facilities, (15 March 2006) 10. SAES-B-067, Safety Identification and Safety Colors, (30 November, 2003)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date:

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified