".T* "*RV.&*" /ND T*)P0R/R1 20R3" a. It is assumed to obtain free of charge a suitable area for mobilisation adjacent to or on the site for the temporary site offices, facilities and material lay-down area during the whole construction period. b. It is considered that the site shall be free from any obstruction temporary ! permanent structures" prior to the site mobili#ation wor$s. c. The temporary site facilities considered comprise of installation of containerised office, sanitary facilities, and storage container including the site hoarding and project signboard complete with the necessary temporary power and water supply installations.
#.$.$
*/RT420R3" /ND G*N*R/5 ".T* 20R3" a. %rayland has allowed for wor$ing space in e&ca'ation (uantity and has considered the e&ca'ated material for bac$filling. %or additional (uantity re(uired imported fill material considered. b. Contra 4)* T!C Termite protection or e(ui'alent ha'e been considered appro'ed material by +ubai ,unicipality" and applied to underside of all foundations and around the building area.
#.$.3
&0N&R*T* /ND R*.N60R&*)*NT a. b. c. d. e. Substructure Concrete shall be -rade C./!0*, using S1C, without ,icrosilica. Superstructure Concrete shall be -rade C4*!0*, using 23C, without ,icrosilica. 3lain concrete for blinding and protection screed shall be C0*!0*, using S1C, without ,icrosilica. 1einforcement bars shall be 4igh Tensile +eformed 5ars conforming to 5S 4446 -rade 7*, Tur$ish !Saudi! 8mirates origin, non- 8po&y Coated. -rade slab reinforcement shall be 90/0 mesh, non-epo&y coated.
#.$.#
)/"0NR1
Pa7e 1 o, 8
Project:
a. b.
8&ternal :all, 0/*mm thic$ Thermal insulated bloc$. Internal walls of 0**mm!;/*mm!;**mm thic$ shall be non-load bearing 4ollow Concrete 5loc$s, normal weight <./=!mm0", 23C, as per 9ST, C 6* or 5S 7*<. fi&ed with sand!cement mortar and grout. .**mm and ./*mm thic$ walls, if any are considered composite bloc$wall from 0**!;/*!;**mm thic$ normal weight hollow bloc$s.
c.
d. %i&ing accessories metal ties, anchors and joint reinforcement" shall be hot dipped gal'ani#ed as per 9ST, 9 ;/., Class 5-0 or 5S <06. e. +amp proof Course +3C" ha'e been considered applied only to first layer of bloc$ walls between reinforced concrete slab - to e&ternal bloc$ walls and to internal!perimeter walls of wet areas only. #.$.9 T4*R)/5 /ND )0."T:R* PR0T*&T.0N ; R006.NG "1"T*) a. b. c. d. e. *0 layers of appro'ed S5S waterproof membrane to the basement !water tan$ base and wall. *0 coats of 5itumen emulsion paint to the hori#ontal and 'ertical faces of isolated footing concrete surface below ground". 3olyethylene sheet ;***g shall be laid below blinding concrete. :aterproofing to wet areas and balcony shall be single component polyurethane waterproofing membrane applied to achie'e a thic$ness of ;-;./mm. 1oof waterproofing system comprising of: >ight weight foam concrete laid to slope </mm thic$ness 5ituminous concrete cold primer 2ne layer of 4mm th$ torch applied waterproofing membrane including s$irting. 8&truded polystyrene rigid insulation board /*mm th$. +ensity .0$g!m? =on-wo'en polypropylene mesh as a separation layer 1oof surface co'ered with .**&.**&.*mm white cement tiles for wal$way and the balance areas with gra'el 21 1oof Combo System by appro'ed specialist sub-contractor
#.$.8
)*T/5 20R3" The metal wor$s include the supply and fi&ing of the following items: Cast 9luminium 1ailings to balcony ,ild Steel Cat ladder from -round floor to 1oof" D00R" /ND 2.ND02"
#.$.7
Pa7e $ o, 8
Project:
Pa7e 3 o, 8
Project:
Project:
Pa7e 9 o, 8
Project:
#.$.1$ *>&5:".0N" a. 9ny wor$s outside the plot limit b. 1emo'al and!or relocation of e&isting acti'e underground and!or abo'eground ser'ices i.e. drainage pipes, water supply pipes, electrical cables, etc.", structures etc., c. 3lastering and wall cladding abo'e false ceiling d. Ceiling plaster abo'e false ceiling e. %%B8 wor$s f. Constructing ! fit-out of moc$ up and supply of spare materials upon completion
g. 4eat soa$ for glass h. %ire rating for aluminium and glass wor$s i. j. 9ny hard landscape around the 'illa, boundary wall gates and complete soft landscape B irrigation including pumps". S,9TF !+IS4 9ntenna system only containment allowed"
$. >ighting control, +imming, 4ome automation system l. +rainage water recycling system
m. 9cti'e components for structural cabling ! telecom system wiring and conduits has been allowed" n. CCTF system
Pa7e 8 o, 8