Sei sulla pagina 1di 4

S.

No 1 2 3

Manhour Estimate for IGCC Sulfur Recovery Unit Scope of Work General Collection of Inputs and study

Site Visit to Gathering data's/Inputs Review and validate the Feed document prepared by compa Line Sizing calculation check and Line classification Carry out detailed hydraulic analysis to verify pumps data, equipment elevations, taking into account applicable over-design for operational flexibility. Updating and completing the required process data for all instrumentation and cause and effect diagrams Carry out detailed hydraulic analysis for Air blowers Interface engineering includes the sizing checking of utilites/consumptions and effluents Preparation of Utility consumption list Review and update relief scenarios, relief loads, and de-pressuring loads Flare minimising plan accodiance with SAEP 400 PFD conversion and updation in Smart plant P&ID P&ID conversion and Updation in Smart plant P&ID Process Datasheet review and updation Review the PHA report and ensure that all actions continue to be incorporated throughout the detailed design. HAZOP and SIL report review, action points shall be incorporated into the detailed designs. Preparing and/or providing all the Project documentation as As-Built documentation and design calculation record book in accordance with COMPANY standards Detailed Design HAZOP and SIL Study Interdecipline co-ordination

5 6 7 8 9 10 11 12 13

14

15

14 15 16

Total Grand Total

Notes: 1. Client shall need to provide us with all the necessary informati Catalogues, Drawings, rated loads, name plate details, design parameters, drawings, test, installation & efficiency certificates e the purpose of evaluation.

2. Client requires to float the enquiry & follow up the offers. 3. HSC, Noise are not included 4. Detailed Design Hazop and SIL required for this project will be out this estimation 5. Dynamic Study of Interconnecting Systems

Sulfur Recovery Unit Manhours l 200

Remarks

All travel lordging and boarding is excluded Aramco standard considered cument prepared by company 80 222 Lines sizing checking 32 Pumps - 30%, 60%, 90% and IFC considered

480

160 30 80 40 520 100 1190 4060 1284 34 PFD- 30%, 60%, 90% and IFC considered 116 P&ID -30%, 60%, 90% and IFC considered 107 Datasheet updation - 60%, 90% and IFC considered PHA/Hazid report and finding are to furnished to Citec Hazop and SIL report along with finding are to furnished to Citec Final As built preparation Outsourced, Not included 2% considered 6 relief scenarios and relief load calculation checking for 65 equipments 3 Air blowers are considered

40

100

770

150

9084 9284

the necessary information about the equipments, plate details, designed loads and operating ficiency certificates etc., if any required for

ow up the offers.

this project will be outsourced not included in

Potrebbero piacerti anche