DATE: - 19/01/2014

AL HAMRA POWER PLANT


SHIFT REPORT
GTG-1
Unit

A-Shift

B-Shift

C-Shift

A-Shift

B-Shift

C-Shift

Somu

John

Sivamani

Jayesh

06.17
PL/DRP
8571
3000
50.0
10.9
4.04
0.94
10.5
631
14.33
3.10
NG
3.850
342
FAILED
175
1242
81
29
136
43

Balarama
n
14.13
PL/DRP
8853
3000
50.00
13.8
5.57
0.93
10.5
828
18.24
3.80
NG
4.608
338
FAILED
200
1343
107
29
136
45

22:21
PL/DRP
8774
3003
50.0
13.4
4.51
0.95
10.55
775
16.37
3.51
NG
4.591
337
FAILED
196
1310
92
29
134
44

06.11
PL/DRP
8494
2994
50.0
10.0
3.6
0.94
10.6
581
15.58
2.97
NG
3.601
351
70.2
170
1219
60
29.7
127
44

14.15
PL/DRP
8931
2996
49.98
14.4
6.67
0.92
10.56
864
21.15
4.02
NG
4.582
338
76
206
1355
36
29
129
48

Narendr
a
22:23
PL/DRP
8726
2883
50.0
13.2
4.00
0.96
10.63
752
17.91
3.43
NG
4.421
345
68
196
1301
31
29
126
47

Deg. F
PSI
Deg. F

140
8
181

141
8.1
187

139
7.6
183

136
9.7
181

144
10.5
191

137
10.1
184

Deg. F
Deg. F
Deg. F
Deg. F
Mils
Mils
Mils
Mils
Mils

183
217
217
210
0.84
0.85
1.14
1.10

188
227
226
216
0.87
0.89
1.09
1.24

184
223
219
211
0.82
0.85
1.10
1.20

174
200
204
198
0.98
0.81
0.21
0.17

182
219
220
214
0.38
0.37
1.00
0.29

176
199
210
204
0.70
0.18
0.93
0.29

1.10

0.99

1.01

0.67

0.68

0.70

1.69

1.74

1.67

0.39

0.37

0.38

2.09

2.06

2.07

0.28

0.83

0.78

OPERATOR
Time
Status
GT speed
Power Turbine speed
Frequency
Active power
Reactive power
Power factor
Generator Voltage
Generator Ampere
Field Voltage
Field Ampere
Fuel
Fuel Flow
N.Gas/L.fuel Pressure
Ambient Temp.
Compressor Disch.Pressure
Exhaust Temp.
Spread
Lube oil Supply Pres(Gen)
Lube oil Supply temp(Gen)
Lube oil supply
pressure(GT)
Lube oil Supply Temp(GT)
Scav. oil Disch.Pressure
Assy.Gear Box Lube oil
temp.
Sump A Lube oil Temp.
Sump B Lube oil Temp.
Sump C Lube oil Temp.
Sump D Lube oil Temp.
GT Vibration (XA)
GT Vibration (XB)
PT Vibration (XA)
PT Vibration (XB)
DE bearing Vibration(Gen)
X axis
DE bearing Vibration(Gen)
Y axis
NDE bearing Vibration(Gen)
X axis

GTG-2

Hrs
PL/BL
RPM
RPM
HZ
MW
MVAR
PF
KV
AMP
VOLTS
AMP
NG/HSD
M3/HR
PSI
Deg. F
PSI
Deg. F
Deg. F
PSI
Deg. F
PSI

Mils
Mils

NDE bearing Vibration(Gen) Mils


2.54
2.55
Y axis
Deg. F
155
155
DE Bearing Temp(Gen)
Deg. F
157
157
NDE Bearing Temp(Gen)
Deg.
F
124
144
Gen. stator Temp (Max)
WC
3.2
3.4
I/L Air DP
Fire Fighting System
A-Shift B-Shift C-Shift

2.56

0.83

0.94

0.92

154
156
132
3.4

153
155
152
158
159
157
113
138
122
3.0
3.5
3.2
33 KV AC Amps. Status

A-Shift

BShift

C-Shift

DG set

A/M

AUTO

AUTO

AUTO

07.00

15.00

23:00

GT CO2 System
Fire Water System

A/M
A/M

AUTO
AUTO

AUTO
AUTO

AUTO
AUTO

OFF

34 A

OFF

11/33KV

BUS-A

Fuel change over


permissive status for
both unit

Unit-A

OK

OK

OK

Reading

74649.
8

BUS B &
C
90702.2

Consumptio
n

106.1

133.4

Total Consumption

239.5

Unit-B

OK

OK

OK

Unit. A

Unit. B

Total

316.4

318.8

635.2

Aux.Consumption

2.8

3.0

5.8

Running Hours

37327.00

34389.50

After HSE

15848.25

14431.75

Generation

UTILITY REPORT
Receipt & Consumption
Unit

Cap.

Op.
Stock

Receip
t

Closin
g
Stock

Consumption.

HSD

Gallon

79781

79781

NIL

Fire
Water
DM
Water

Gallon

151898

NIL

Gallon

28072

15189
8
28072

Potable
Water

Gallon

NIL

33 KV ENERGY
METER READINGS
(IMPORT FROM
AGP)
OHL- OHL- TOTA
1
2
L
120.0

119.9

239.9

AGP EXPORT : 243.1


DIFFERENCE: 3.2

PERMIT ISSUED
Sr. Permit Type
no Cold/Hot/Ele
ctrical

Job Description

Issued by
Name / Dept

Cancelled
Received
by
Status
Name
/ Name /
Dept.
Progr.

by

Dept.

1.

Hot
Mechanical

2.

3.
4.

P.Senapati/Pla
nt Manager

Balaraman/
Operation

Retheesh/Mechanic
al /work under
progress

Cold
Mechanical

New lube oil shed roof sheet


supporting & Channel welding
work
New lube oil shed road &
Kirby stone fixing work

Somu/Operatio
n

Jayesh/Ope
ration

Cold
Mechanical
Cold
Electrical

HSD forwarding pump A-1


PM work
Gas Engine Load Bank
installation work

Somu/Operatio
n
P.Senapati/Pla
nt Manager

Balaraman/
Operation
Balaraman/
Operation

Deepak/Mechanical
/work under
progress
Retheesh/Mechanic
al /work completed
Arumugam/Electrica
l work completed

HIGHLIGHTS:
1.
2.
3.
4.
5.
6.
7.
8.
9.

GT/A generation in last 24 hours-316.4 MWH.


GT/B generation in last 24 hours-318.8 MWH.
Import from Al Ghail to Al Hamra OHL Feeder1120.0MW, OHL Feeder-2-119.9 MW.
Gas Engine No. 3 Generation: 3696.0 KWh.
New lube oil shed: Roof sheet supporting channel welding work under progress. (Hot
work).
New lube oil shed: Road & Kirby stone fixing work under progress.
HSD forwarding pump A-1 preventive maintenance work completed.
Load bank unloaded and cable connection work completed. Trial to be started
tomorrow.
Gas Engine No.3 started & Synchronized at 9.20 hrs. Stopped at 3.20 P.M. Due to
Load bank installation work completed.

CRITICAL ALRAMS:1. Unit-A TE-1815 T2 Signal failed alarm exist