NO 1 2 3 4 5 6 7 8
Description of Foundations (Customer Scope) Boiler Main & Auxiliary Column Foundation PA Fan ID fan FD Fan Duct Support Foundation Boiler (Outlet) & ESP (Inlet) Duct Support Foundation ESP (Outlet) & ID Fan (Inlet) Duct Support Foundation ID Fan (Outlet) & Chimney Condenser Foundation/ TG Deck
Actual / Expected 28.10.2010 30.04.2013 15.07.2012 30.04.2013 30.01.13 30.02.2012 15.12.2011 28.08.2012(3rd Pedestal handed over)
31.12.2010
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
TG Hall With covering & EOT crane in Remote control mode Oil Canal Control Fluid Room with Foundations Main Oil Room wall ESP De-aerator Floor CEP MD-BFP TD-BFP Mills foundations System Readiness DC Power Control Room with A/C ESP Control Room Instrument air, Compressed air & Service Air Start Up Power (ST & STN Board Charging) NDCT- Cooling Tower Chimney for Duct Connection DM Plant Switch Yard
30.01.2011 30.05.2012 30.03.2012 15.03.2012 30.04.2010 30.06.2011 24.06.2011 30.07.2011 30.07.2011 31.08.2011 02.11.2011 31.10.2011 30.09.2011 31.03.2012 31.01.2012 31.03.2012 28.12.2011 15.10.2011 30.07.2012 30.04.2013 30.04.2013 10.04.2013 22.01.2011 25.11.2012 30.07.2012 23.10.2012 30.04.2013 15.05.2013 30.12.2012 30.03.2013 30.10.2012 30.03.2013 30.01.2013 30.05.2013 30.05.2013 30.06.2012 30.08.2012
30 31 32 33 34 35
CW & ACW System Fire Protection system Coal handling System Ash Handling System Readiness for Power Evacuation AC & Ventilation system
20.02.2013
Remarks
Only RHS handed over on 28.12.2012 Only RHS handed over on 28.12.2012
Deck handed Over on 28.02.2012 (TES -25.05.12 ) Side covering is Still pending. Floors (0.0, 8.5 & 17 M pending)
1 Nos was handed over on 25.02.2013 LHS last 2 Nos handed over on 23.03.2013 Ready Ready Ready Ready Ready 157/172 completed, work stopped since Oct12 because of fatal accident BLU was done with temp chimney Ready Ready
Ready Pending
Sl. No.
Description
Scheduled Date
Remarks
Foundation Readiness
1 Boiler Main & Auxiliary Column Foundation 30-Mar-10 31-Dec-10 2 Condenser Foundation TG Hall With covering with 31-Jan-11 EOT crane De-aerator Floor 30-Jun-11 PA Fan Foundation Availability of TG Foundation 30-Jun-11 31-Dec-10
Available Available (handed over on 28.02.12 Side cladding is still pending Available A side- Not yet available Available
30.06.13 Available 07.08.13 Available F & G Available A by 19.06.13 H by 24.06.13 B by 30.07.13 C, D & E by 15.08.13 J by 30.08.13 Available Available Available
3 4 5 6
Mill Foundations
31-Aug-11
Still pending
8 9 10
completed
Sl. No.
Description
Remarks
A side- Not yet available Available
11
12
13
FD Fan Foundation Duct Support Foundation Boiler (Outlet) & ESP 30-Apr-11 (Inlet) Duct Support Foundation ESP (Outlet) & ID Fan 31-Mar-11 (Inlet) Duct Support Foundation - 30-Apr-11 ID Fan (Outlet) & Chimney MDBFP Foundation 30-Jul-11 30-Jul-11
01.05.13
01.05.13
Available
Available
01.05.13
Available
14 15
16 17 18 19 20 21
TDBFP Foundation Bunker Bay Transfer Point 2-Dec-11 A Bunker Bay Transfer Point 2-Dec-11 B Bunker Floor 2-Dec-11 ESP Foundation 30-Apr-10 Feeder Floor
A, B available
Available A,B available Available
A, B available
Available A,B available and C, D, E by 05.07.13 and F, G, H, J by 07.08.13
Sl. No.
Description
Scheduled Date
Remarks
INPUT Readiness
1 Approach Roads Plot Plan with Storage Yard and BHEL's office Marking Courtyard Lighting for Erection Construction Power Construction Water Pre-Assembly Yard DC-Power Control Room with A/C Fuel Oil Pump House ESP Control Room Instrument Air Service Air Start-Up Power (220 KV / 400 KV) 31-Mar-10
Approach to both side of boiler is not there. completed completed completed Available
17-Sep-09 31-Mar-10
Available Available
3 4 5 6 7 8 9 10 11 12 13
31-Mar-10 31-Mar-10 28-Feb-10 2-Nov-11 31-Jan-12 31-Oct-11 30-Sep-11 31-Mar-12 31-Mar-12 31-Jan-12
Available Available
Sl. No.
Description Readiness of Cooling Tower Readiness of Chimney O&M Staff Availability of Coal at Bunker
Remarks
14 15 16 17
Placed
Available 30.08.13
System Readiness
1 2 3 4 5 6 7 Readiness of Compressed 31-Mar-12 Air System Readiness of DM Plant 15-Oct-11 Readiness of Switchyard Start-Up Power (ST & STN Board Charging) Readiness of Circulating Water System Readiness of Cable and Pipe Rack for LU Readiness of Fire protection System Readiness of Communication System 30-Jul-12 30-Jan-12 28-Feb-12 2-Feb-12 2-Feb-12 28-Feb-12 Pending pending pending Available
Ready
Ready Available
Sl. No.
Description Readiness of Air Conditioning System Readiness of ventilation System Readiness of Auxiliary Cooling Water Readiness of Fuel Oil System Readiness of ASH Dyke Readiness of Coal Handling System Readiness of Ash Handling System Readiness for Power Evacuation
Scheduled Date 28-Feb-12 28-Feb-12 28-Feb-12 28-Feb-12 31-Jul-12 31-Jul-12 31-Jul-12 31-Jul-12
9 10 11 12 13 14 15 16
Jul'13
15.05.13 bottom seal
Date
30.03.2010 30.06.2011
PA Fan
ID fan FD Fan
30.06.2011 30.06.2011
Duct Support Foundation Boiler (Outlet) & ESP (Inlet) Duct Support Foundation ESP (Outlet) & ID Fan (Inlet)
30.04.2011 31.03.2011
Duct Support Foundation ID Fan (Outlet) & Chimney Condenser Foundation/ TG Deck
30.04.2011 31.12.2010
30.01.2011
Oil Canal Control Fluid Room with Foundations Main Oil Room wall ESP De-aerator Floor CEP MD-BFP TD-BFP
31.08.2011
02.11.2011
Control Room with A/C ESP Control Room Instrument air, Compressed air & Service Air Start Up Power (ST & STN Board Charging) NDCT- Cooling Tower
28.12.2011
DM Plant Switch Yard CW & ACW System Fire Protection system Coal handling System
Ash Handling System Readiness for Power Evacuation AC & Ventilation system
Remar ks as on 10.06. 13 28.10.2 Handed 010 over 30.04.2 Only 013 RHS handed over on 28.12.2 012 15.07.2 012 30.04.2 013 Handed over Only RHS handed over on 28.12.2 012 30.01.1 3 30.02.2 012 Handed over RHS handed over 15.12.2 01 15.12.2 Handed 011 over 28.08.2 Deck 012(3r handed d Pedest Over on al handed 28.02.2 012 over) (TES 25.05.1 2)
Actual / Expect ed
30.04.2 013 30.04.2 013 10.04.2 013 22.01.2 011 25.11.2 012 30.07.2 012 23.10.2 012 30.04.2 013
Side coverin g is Still pendin g. Floors (0.0, 8.5 & 17 M pendin g) Pendin g Pendin g Pendin g Handed over Handed over Handed over Handed over 1 Nos was handed over on 25.02.2 013, 2nd Founda tion still pendin g
30.03.2 013 30.10.2 012 30.03.2 013 30.01.2 013 30.05.2 013
Ready Ready Ready Ready 157/17 2 comple ted, work stoppe d since Oct12 becaus e of fatal acciden t
30.05.2 Still 013 pendin g -BLU was done with temp chimne y 30.06.2 Ready 012 30.08.2 Ready 012 28.02.2012 Still pendin g 02.02.2012 Still pendin g 31.07.2012 Still pendin g
31.07.2012