CHK'D APPVD CERT'D

DESIGN CALCULATION OF 110V Battery and Battery Charger Sizing Calculations

REVISIONS
BY:

DRAWN Shabeer.A

DATE: 10/08/2008

CHECKED
BY:

K. Kandiah

DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

1 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

110V Battery & Battery charger Sizing Calculations Submitted for approval

DESCRIPTION

CHK'D APPVD CERT'D

TABLE OF CONTENTS 110V Battery & Battery charger Sizing Calculations Submitted for approval Page

12-

110V Battery Bank Sizing Calculations 110V Battery Charger Sizing Calculations

3 10

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

2 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

DESCRIPTION

CHK'D APPVD CERT'D

A. 110V BATTERY BANK SIZING CALCULATIONS 110V Battery & Battery charger Sizing Calculations Submitted for approval

1- SCOPE To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this document deals with sizing 110V battery bank to cater for new as well as relocated equipment in substation building. 110V DC system shall consist of 1 No. battery bank and charger. 2 - CALCULATIONS The calculations for sizing the battery are based on IEEE-1115

2-1

CELL SIZING CALCULATIONS :

The station DC auxillary power supply parameters for DC Control System are as follows. Battery Type Nominal DC system Voltage Minimum allowable system voltage percentage End cell voltage Minimum Allowable DC system Voltage = = = = = Ni-Cad 110 V 0.9 1.1 V 99 V

BY

Number of cells Required ( Ncell ) 10-Aug-08

Minimum Allowable DC system Voltage End cell voltage 99/1.1 90 Cells

DATE

( Ncell )

= =

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

3 of 13
DWG CONT SHT

0 AG/ALS/G-001

20641055/00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

NO.

DESCRIPTION

CHK'D APPVD CERT'D

2.2 LOAD CALCULATION : Continuous load of 401.2 W ( 3.65A ) for Duration of 8 hours is considered. Load details are given in Table - 1

TABLE-1

Sl.No.

Description Continuous Loads

Qty

Unit Load (Watt)

Total Load (Watt)

1 2 3 4 5 6

33kV feeder Panel (+ARH05 ) 33kV Bus Coupler feeder Panel (+ARH07 ) 33kV Bus bar Protection Panel ( +ARHBB02 ) 33kV Transformer Protection Panel ( +ARH06 ) 33kV Transformer AVC Panel ( +AVC3) 33kV Transducer Panel

1 1 1 1 1 1

75.2 24.4 29.8 61.2 77.3 133.3

75.2 24.4 29.8 61.2 77.3 133.3

TOTAL TOTAL CONTINUOUS CURRENT 401.2/110

401W 3.65A

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

4 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

110V Battery & Battery charger Sizing Calculations Submitted for approval

DESCRIPTION

CHK'D APPVD CERT'D

2.3 110V Battery & Battery charger Sizing Calculations Submitted for approval

TRIPPING LOADS Unit Loads for Trip Coils have been given table-2 a) Worst Critical case of assessing the momentary Loading : i ) Worst Critical case assessing the momentary loading has been assessed which involves simultaneous tripping of 5 Nos. of 33kV CBs on 33kV bus fault and 8 Nos. of 13.8kV CBs on 13.8kV bus fault Load of 5 x 2 No. Trip Coils Load of 8 x 2 No. Trip Coils Total Trip Coils Nominal DC system Voltage Total Tripping Current = = 5 x 2 x 50 8 x 2 x 50 = = = = = 500 800 1300 110 11.82 W W W V A

2.4

RESTORATION LOADS Momentary Loading for restoration is considered as the load for closing 2 no. 33kV CB, 1 Nos. of 13.8kV CBs, tripping of 1 No. of 13.8kV CB ( if the fault persists ) and 1 No. of Spring Charging motor running. Load details are given in table 2 i) ii) iii) iv) Load of 2 33kV closing CB Load of 1 13.8kV closing CBs Load of 1 13.8kV Tripping CB Load of one operating motor running Total = = = = 2 x 50 1 x 50 1 x 50 1 x 380 = = = = 100 50 50 380 W W W W

BY

= =

580 5.27

W A

10-Aug-08

Total Restoration Current

Table - 2 MOMENTARY LOADS Sl.No a) Description 33kV Switchgear ( assumed) Circuit Breakers Trip Coil-1 Trip Coil-2 Closing Coil 13.8kV Switchgear Circuit Breakers Drive Mechanism Trip Coil-1 Trip Coil-2 Closing Coil Qty Unit Load (Watt ) Total Load (Watt )

REVISIONS
DRAWN BY:\ Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

1 1 1

50 50 50

50 50 50

OPRG DEPT
BY: DATE:

b)

ENG'G DEPT
BY: DATE:

1 1 1 1

380 50 50 50

380 50 50 50

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

5 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

NO.

DATE

DESCRIPTION

CHK'D APPVD CERT'D

2.5 110V Battery & Battery charger Sizing Calculations Submitted for approval

EMERGENCY LOAD Emergency Lighting load for 1.5 hours is considered as 360W ( 2.88A ) maximum number of 9 incandascent lamps of 40W each are switched on at any given time by the maintenance personnel who reach the substation within 1.5 hours of power failure

LOAD SUMMARY : The respective loads are listed below. Duty cycle is given in Annex-1 Continuous Load Momentary Tripping Load Momentary Restoration Load Emergency Lighting Load 8 hours 1 min. 1 min. 1.5 Hours = = = = 3.65 11.8 5.27 2.88 A A A A

BATTERY SIZING WORKSHEET : Given in Annexure II and III.

BATTERY CURVE/ DATA : Manufactures Data are given in Annexure IV.

CALCULATION OF REQUUIRED SIZE : Maximum uncorrected size = 107.85 Ah

Temperature Correction 10-Aug-08

1.20

(Refer IEEE-1106, Table A.1) (at minimum Temp = -5C)

Design Margin Aging Factor

= =

1.15 1.25

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

Required Capacity

Uncorrected Size x Design Margin x Aging factor x Temperature Correction Factor

CHECKED
BY: K. Kandiah DATE: 10/08/2008

Required Capacity

107.84948 x 1.15 x 1.25 x 1.2

OPRG DEPT
BY: DATE:

Required Capacity

186.04 Ah

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

6 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

NO.

DATE

BY 0

DESCRIPTION

CHK'D APPVD CERT'D

7 - CONCLUSION

Required Battery Ah capacity Nearest available size

= =

186.0 Ah 208 Ah

The Total Ampere - hour capacity may be used to determine the intial cell size, the total capacity = 186.0 Ah and the choosen battery is SBM208 Rated Capcity = 208 Ah

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

7 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

110V Battery & Battery charger Sizing Calculations Submitted for approval

DESCRIPTION

CHK'D APPVD CERT'D

110V Battery & Battery charger Sizing Calculations Submitted for approval

A1 A2 A3 A4 A5

= = = = =

Continuous Load + momentary Tripping Continuous Load Continuous + Emergency Continuous Continuous + Restoration

= = = = =

15.5 A 3.65 A 6.53 A 3.65 A 8.92 A

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

8 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

DESCRIPTION

CHK'D APPVD CERT'D

ANNEXURE 110V Battery & Battery charger Sizing Calculations Submitted for approval AMPERE

A1= 15.5A

A5=8.92A

A3=6.53A 10-Aug-08

2.88A A2=A4=3.65A

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

M1

M2

M3

M4

M5

ENG'G DEPT
BY: DATE:

90

180

479

480

MINUTES

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

Al-Leith 33/13.8kV Substation Load duty cycle profile for 110V DC Battery Sizing Calculation

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

9 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY

DESCRIPTION

NO.

DATE

5.27 A

CHK'D APPVD CERT'D

B. 110V BATTERY CHARGER SIZING CALCULATIONS

DESCRIPTION 110V Battery & Battery charger Sizing Calculations Submitted for approval

1 - SCOPE : To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this document deals with sizing 110V battery charger to cater for new as well as relocated equipment in existing SWGR building. DC system shall have one battery float / boost charger.

2 - CALCULATIONS : The ampere hour rating of a battery charger is determined by equation which is as per Technical specification A = (1.25 X L)+ (BIF X AHR) ) / 0.83 RT 1

Where : A L = = required charger rating in amperes Maximum Required DC load in amperes ( Continuous load is considered ) Battery inefficiency factor Ampere hour removed during discharge (Maximum discharger is considered) Recharge time in hours = 3.6

BIF AHR

= =

= =

1.1 208

RT BY

16

Subsitituting the above values in Equ - 1 AR = [ (1.25 x 3.2 ) + (1.1 x 200) ] / 0.83 16 AR = 22.7 = 50A

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

Next higher size available

CHECKED BY: K. Kandiah


DATE: 10/08/2008

OPRG DEPT
BY: DATE:

The battery Charger Current Size

50A

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

10 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

NO. 0

DATE 10-Aug-08

CHK'D APPVD CERT'D

ANNEXURE -II CALCULATION OF CAPACITY RATING FACTOR.( KT ) 110V Battery & Battery charger Sizing Calculations Submitted for approval REFERENCE Minimum Cell Voltage Cell Mfg. : : : IEEE Std. 1115-2000 1.1 V SAFT

DESCRIPTION

KT

Rated Ampere hour capacity (Ay std. Time Rate at 25 C to Std % end of discharge) Ampere that will be supplied for T minute at 25 C to given end of discharge voltage

The Kt factor for time t is calculated in the table by interpolation using the formula (Kt2 - Kt1) x ( t2 - t ) Kt = Kt2 ( t2 - t1 )

End voltage discharge voltage of cell Rated Ampere hour capacity

= =

1.1 V 208 Ah

Calculation of K T Factor :

Sl.No 10-Aug-08 DATE 1 2 3 4 5

T minute 1 90 180 479 480

Total Ampere 354 93.9 60.6 25.65 25.60

KT Factor 0.588 2.215 3.432 8.109 8.125

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED BY: K. Kandiah


DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

11 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

NO.

BY 0

CHK'D APPVD CERT'D

ANNEXURE-III Duration of operation (min) Require section size (Ah) +ve value -ve value

110V Battery & Battery charger Sizing Calculations Submitted for approval

change in period Load (A) load (A)

time to end of section (min)

KT factor

Section - 1 first period only 1 A1 = 15.50 A1-0= 15.50 M1 = 1.0 T = M1 = 1.0 0.5880 Total Section - 2 first two periods only 1 2 A1 = 15.50 A2 = 3.65 A1-0= 15.50 A2-A1= -11.85 M1 = 1.0 M2 = 89.0 T =M1+M2 = 90 T = M2 = 89.0 2.2150 2.1970 Total Section - 3 first three periods only 1 2 3 A1 = 15.50 A2 = 3.65 A3 = 6.53 A1-0= 15.50 A2-A1= -11.85 A3-A2= 2.88 T = M1+M2+M3 = 180.0 T = M2+M3 = M2 = 89.0 179.0 T = M3 M3 = 90.0 90.0 M1 = 1.0 3.4320 3.4190 2.2150 Total Section - 4 first four periods only 1 2 A1 = 15.50 A2 = 3.65 A3 = 6.53 A4 = 3.65 A1-0= 15.50 M1= T= M1+M2+M3+M4 = A2-A1= T = M2+M3+M4 = M2 = 89.0 -11.85 478.0 A3-A2= T = M3+M4= M3 = 90.0 2.88 389.0 A4-A3= T =M3 M4 = 299 2.88 299.0 1.0 8.1080 8.0920 6.6070 5.1090 Total Section - 5 first five periods only 1 2 3 4 5 A1 = 15.50 A2 = 3.65 A3 = 6.53 A4 = 3.65 A5 = 8.92 A1-0= 15.50 T= M1+M2+M3+M4 = A2-A1= T= M2 = 89.0 -11.85 M2+M3+M4+M5 = A3-A2= T = M3+M4+M5= M3 = 90.0 2.88 390 A4-A3= T = M4+M5 M4 = 299 2.88 300 A5-A4= T = t4 M5 = 1.0 5.27 1.0000 M1 = 1.0 8.1250 8.1080 6.6240 5.1230 0.5880 Total 3.10 37.28 107.85 19.08 -14.75 125.94 -96.08 34.10 19.03 -14.71 125.67 -95.89 6.38 19.06 53.20 -40.52 8.30 34.33 -26.03 9.11 9.11

3 4

REVISIONS
DRAWN
BY: Shabeer.A DATE: 10/08/2008

CHECKED
BY: K. Kandiah DATE: 10/08/2008

OPRG DEPT
BY: DATE:

ENG'G DEPT
BY: DATE:

SECTION - 1 to 5 (TOTAL)

CERTIFIED
BY: DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED

DRAWING TITLE

DRAWING NO.

SHEET NO.

REV NO.

REINFORCEMENT OF Al Leith 33/13.8kV S/S 110V Battery & Battery charger Sizing Calculations JEDDAH SAUDI ARABIA

AG/ALS/E-342
JOB ORDER NO

12 of 13
DWG CONT SHT

20641055/00

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BY NO. 0 10-Aug-08 DATE

DESCRIPTION

13 of 13

Potrebbero piacerti anche