(Roads) Directorate Schedule of Rates : 2008-2009


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

Section : 4.1 Embankment Works


Darjeeling hill area

Description of Items

Unit

Remarks

1.

Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. Including breaking clods and to fill up back of abutments depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (For petty emergent
works).

For Item No. 1 to 3 and 6 to 8, Cost should be evaluated considering 100 m3 borrow pit earth = 115 m3 of embankment earth.

(a) In ordinary soil. (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (c) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting) Extra for carriage of all kinds of soil for each additional unit lead of 50m (or part thereof) including loading and unloading. (a) Beyond the initial lead of 50 m up to total lead of 150 m. (b) Beyond 150 m but up to 500 m. 3. Extra for each additional unit lift of 1.5m (or part thereof) beyond the initial unit of 1.5 m. Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m. (a) In ordinary soil. (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (c) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)

m3 m3

36.70 40.80

39.30 43.60

m3

48.90

52.40

2.

m3 m3

5.10 6.10

5.40 6.50

m3

4.10

4.40

4.

m3 m3

32.60 36.70

34.90 39.30

m3

44.90

48.00

175

Section : 4.1 Embankment Works


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

P.W. (Roads) Directorate Schedule of Rates : 2008-2009


Darjeeling hill area

Description of Items

Unit

Remarks

5.

Extra for manual compaction of earth by rammers in 250 mm layers including watering etc. if required.
(Borrow pit measurement).

m3

8.60

9.20

6.

Un-compacted Earthwork Earth work in embankment to correct profile as per desired formation level with earth obtained from land owned or arranged by the Department depositing in layers of 250 mm thickness Including breaking clods, dressing etc. complete as per specification, drawing and direction of Engineer-In-Charge. (a) In ordinary soil. (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (c) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)
(Paying will be made in cubic meter on the basis of quantity arrived at on pre-work and post work level Section measurements)

m3 m3

m3
Rates to be specified by the Engineer-inCharge considering Item nos. 1 to 5.

N.B.: 1. This type of Earth work should be done in rural roads at inaccessible remote areas and the height of embankment should not normally exceed 2.0 m.
2. Extra lead and lift are also to be

considered if necessary with specific permission from Engineerin-Charge.


3. Construct additional height of

bank for future consolidation settlement @ 17% of designed height except sandy soil.

176

P.W.(Roads) Directorate Schedule of Rates : 2008-2009


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

Section : 4.1 Embankment Works


Darjeeling hill area

Description of Items

Unit

Remarks

7.

Earth work in embankment to correct profile in any kind of earth obtained from land owned / arranged by the Contractor as per desired formation level with earth obtained from land owned or arranged by the Department depositing in layers of 250 mm thickness Including breaking clods, dressing etc. complete as per specification, drawing and direction of Engineer-In-Charge.
N.B. To arrive at the rate for land owned / arranged by the Contractor, add Rs. 20.00/ m3 extra over corresponding items of earthwork for the lands owned/arranged by the Department. This is applicable for all items of Earth work where land is owned and arranged by Contractor

m3

8.

Compacted Earth Work Earthwork in road embankment in ordinary soil to correct profile as per designed formation level with earth obtained from land owned /arranged by the Department, depositing in layers of 250 mm thickness including breaking clods ,dressing and compacting by power roller (not at OMC ) etc. complete as per specification, drawing and direction of Engineer-in-charge. (Payment shall be made in m3 on finished work on the basis of pre-work and post-work level section measurements. Rates to be evaluated considering 100 m3 of borrow pit earth = 115 m3 of embankment earth = 92 m3 of compacted earth. The rate is only for Roller Compaction, which includes hire charges of Roller, fuel and crews etc. for which deduction from the contractor will be made.) (a) In ordinary soil. (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) m3 m3 17.10 17.90 17.20 18.20

In Item No. 8 & 9, the rate is only for roller compaction. This rate is inclusive of cost of labour for dressing, levelling etc. For earth works from borrow pit please refer earlier Items. Note: To arrive at the rate for land owned / arranged by the contractor add Rs. 20.00 per m3 extra over rate of E/W for land owned / arranged by the Department & for royalty charge on earth @ Rs. 13.25/m3 as per Govt. notification which will be paid on production of necessary documents in support of

177

Section : 4.1 Embankment Works


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

P.W. (Roads) Directorate Schedule of Rates : 2008-2009


Darjeeling hill area

Description of Items

Unit

Remarks

(c) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting) 9. Earthwork in road embankment and construction of sub-grade in all sorts of soil at different chainage by obtaining earth from road side borrow pits and throwing the same in not more than 250 mm.(loose) thick layers and compaction by power roller, each layer of soil up to 450 mm below the subgrade level at O.M.C to 95 % Proctor density and top 450 mm up to the sub-grade level at O.M.C to 97% Proctor density including breaking all clods thoroughly, watering, dressing, cambering, etc. filling depression, making sufficient number of benches on existing embankment, bailing out water, dressing side slopes and crest to proper profile in accordance with the procedure of work as detailed in specification including stripping off the grass-sods, weeds etc. including making proper arrangement for quality control work up to a depth of 150 mm. rolling the original ground, including the hire charge of roller, fuel and crew, etc for which necessary deduction from the contractor shall be made (if Departmental machinery be used) and as per direction of the Engineer-incharge .
(Payment will be made in m3 on the finished work as per specification on the basis of pre-work and post-work level section measurements)

m3

18.80

19.10

payment made towards the royalties. During initial payment of bill, a deduction @ Rs. 13.25/m3 may be made.

Ref to remarks above.

(a) For initial lead up to 50 m. (b) Extra for each additional unit lead of 50 m (or part thereof) beyond the initial unit lead of 50m.upto total lead of 150 m. (c) Extra for each additional unit lead of 50 m (or part thereof) beyond

m3 m3

61.60 4.60

65.20 4.90

m3

8.10

8.60

178

P.W.(Roads) Directorate Schedule of Rates : 2008-2009


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

Section : 4.1 Embankment Works


Darjeeling hill area

Description of Items

Unit

Remarks

the initial unit lead of 150m.upto total lead of 500 m. (d) Extra for additional unit lift of 1.5m (or part thereof) beyond the initial unit lift of 1.5 m. m3 4.60 4.90

10

Compacted Earthwork by Mechanical means Earthwork in embankment to correct profile with approved materials / soil obtained from borrow pit, depositing in layers, spreading to required slope and compacting the same to thickness not more than 200 mm at OMC to at least 97% of maximum dry density by vibratory roller (or static roller not less than 8-10 T capacity) as per the direction of the Engineer-in-Charge. Cost is inclusive of all labours, loading and unloading charges, hire charges of machinery e.g., hydraulic excavator, tipper, dozer, motor grader, water tanker, vibratory roller, crews, etc. with initial lead of 1.0 Km and all lifts. Cost of soil is to be included if the Departmental land is not available with necessary carriage beyond 1.0 Km., if required. Please refer remarks of Item No. 8 for cost of private land. Construction of road embankment with fly ash conforming to IRC: SP: 58 with initial lead of 1Km obtaining from local coal or lignite burning thermal plant as waste materials, spread and compacted in layer of 200 mm thickness each at OMC, to at least 95% of maximum dry density and all as specified in IRC: SP: 58 and as per approved drawings. Note: The earth cover on sides and intermediate layers of earth sandwithching the flyash has not been included in this analysis. The same are required to be provided as per m3 100.60 100.70
The item requires specific approval of the concerned Superintending Engineer before inclusion in the estimate and tender.

11

m3

108.40

---

Construction wing will add cost of extra carriage beyond 1 Km to work site.

179

Section : 4.1 Embankment Works


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

P.W. (Roads) Directorate Schedule of Rates : 2008-2009


Darjeeling hill area

Description of Items

Unit

Remarks

approved design and priced separately as embankment construction. 10. Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. Earth work in road embankment in flank (depth exceeding 150 mm) and slopes to correct profile in layers not exceeding of 150 mm including breaking of clods, dressing and including light ramming by hand rammers (cross grade in flanks 1 in 30 and side slope 1 : 2). (a) With 50 m lead and 1.5m lift from roadside land in ordinary soil. (b) With 50 m lead and 1.5 m lift from roadside land in mixed soil. (c) With 50 m lead and 1.5m lift from roadside land in mixed hard soil. (d) With carried earth, land arranged by the department. (e) With carried earth, land arranged by the contractor.
N.B.: Prior permission of Engineer-inCharge should be necessary for execution of the work in sub - Item No. (d) and (e) Source of earth for filling to be mentioned Rate for road-side borrow-pits.

m2

5.00

5.30

11.

m3 m3 m3 m3 m3

41.70 45.80 53.90

45.00 49.30 58.10

For Item No. 11 add Rs.5.00 per m3 for all other district and Rs.5.70 per m3 for Darjeeling hill area over the rates mentioned in Item No. 1 & 2 to arrive at the complete rate.

12.

Excavation in ordinary rock using manual means including removal of spoil within all lifts and lead upto 50 m. Excavation for roadway in Hard rock (requiring chiselling where blasting is prohibited) including removing of spoil within all lifts and lead upto 50 m trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Excavation for roadway in Hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance

m3

70.90

75.90

13.

m3

365.50

392.80

14.

m3

197.70

198.00

When space for stacking is available the serviceable stone obtained from Item

180

P.W.(Roads) Directorate Schedule of Rates : 2008-2009


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

Section : 4.1 Embankment Works


Darjeeling hill area

Description of Items

Unit

Remarks

with requirements of lines, grades and cross sections including removing of spoil within all lifts and lead upto 50 m inclusive of all materials and labour complete. 15. Extra costs for removal of spoil for each additional unit lift of 1.5 m (or part thereof) beyond the initial lift of 1.5 m. Clearing and removing earth and/or sand slip including labour charges for accumulation of spoils in a regular shape as directed by the Engineer-inCharge. (a) Removal of spoils on the khad side. (b) Removal of spoils within a lead of 50 m. Clearing and removing of mixed slip of (Earth mixed with moorum, kankar, pebbles, Rocks boulders etc.) (a) Removal of spoils on the khad side. (b) Removal of spoils within a lead of 50 m. Extra cost for removal of spoil or earth silp or mixed slip for each additional unit lead of 50 m. (or part thereof) beyond the initial unit lead of 50 m. up to a total lead of 200 m. Turfing with grass sods 50 mm to 80 mm thick (Turf to be arranged by the contractor at no extra cost) including watering and maintaining till the grass is fully grown. Labour for roughening the berms and slopes of earthen embankment and spreading good quality of grass seeds including necessary watering and guarding till the grass is grown complete including all cost of materials and labours as required as per direction of Engineer-in-Charge. m3 m3 11.50 23.10 12.40 24.70 m3 4.60 4.90

No. 12 to 14 should be stacked for which an extra rate of Rs. 2.00 per m3 will be allowed

16.

17.

m3 m3

23.10 38.10

24.70 40.80

18.

m3

4.60

4.90

19.

m2

10.60

11.30

20.

m2

10.40

11.10

181

Section : 4.1 Embankment Works


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

P.W. (Roads) Directorate Schedule of Rates : 2008-2009


Darjeeling hill area

Description of Items

Unit

Remarks

21.

Cutting kutcha drain of 600 mm wide and depth up to 300 mm, including disposal of excavated material in embankment slopes within a lead of 50 m. (a) Through ordinary soil. (b) Through Mixed soil. (c) Through Hard rock. m m m 5.90 6.60 8.10 6.30 7.10 8.60

22.

Diverting water current of jhoras / small water courses during execution of works including cutting kutcha drain through mixed soil on hire of temporary wooden or iron sheet drain. Cutting uprooting and removing bamboo clusters as per direction of Engineer-in-Charge. (a) Diameter at base up to 150 cm.

8.50

9.10

23.

Each cluster

75.10 139.00 225.00 358.00

80.30 148.00 241.00 383.00

(b) Diameter at base above 150 cm Each up to 275 cm. cluster (c) Diameter at base above 275 cm Each up to 375 cm. cluster (d) Diameter at base above 375 cm Each up to 475 cm. cluster 24 Uprooting and removing stumps and roots, compaction of backfilling and stacking of serviceable materials by manual means as the direction of the Engineer-in-Charge. (i) Lead upto 100 m (a) Girth at breast height upto 600 mm (b) Girth at breast height above 600 mm to 900 mm (c) Girth at breast height above 900 mm to 1800 mm Each Each Each

56.40 94.50 192.00

59.80 100.00 203.00

182

P.W.(Roads) Directorate Schedule of Rates : 2008-2009


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

Section : 4.1 Embankment Works


Darjeeling hill area

Description of Items

Unit

Remarks

(d) Girth at breast height above 1800 mm to 2700 mm . (e) Girth at breast height above 2700 mm to 4500 mm (ii) Lead upto 1000 m (a) Girth (at breast height) upto 600 mm (b) Girth at breast height above 600 mm to 900 mm (c) Girth at breast height above 900 mm to 1800 mm. (d) Girth at breast height above 1800 mm to 2700 mm. (e) Girth at breast height above 2700 mm to 4500 mm 25. Jungle cutting in flank and Slopes of embankment including cutting trees up to 7.5 cm. diameter, Where necessary, and removing the same as directed. Supplying and laying open mesh Jute Geotextile (JGT) for slope protection in road embankments, having overall weight of 500gm/m2, thickness 5 mm, width 1220 mm, strength 10 KN/m (in warp direction) and 7.5 KN/m (in weft direction) on slopes of embankments dressed and cut to a stable gradient, providing side lapping of 100 mm and horizontal lapping of 250 mm including cutting and anchoring trenches upto 150 mm depth at top and bottom of slope and refilling the same with excavated earth as per direction complete.
(Payment of this item will be made on the finished area of jute geotextile)

Each

371.00

394.00

Each

755.00

801.00

Each Each Each Each Each

59.40 105.00 205.00 388.00 777.00

62.80 110.00 216.00 411.00 822.00

100 m2

10.40

11.10

26

m2

20.30

20.80

183

Section : 4.1 Embankment Works


Item No. All districts of West Bengal and Darjeeling plain of Siliguri Subdivision

P.W. (Roads) Directorate Schedule of Rates : 2008-2009


Darjeeling hill area

Description of Items

Unit

Remarks

27

Supplying, testing and installation of 2.0 m wide Woven Jute Geotextile for strengthening of subgrades, having minimum tensile strength of 25 KN/m with a porometry range of 200 to 400 micron, duly secured to sub-grade by u-shaped M.S. staples (11 gauge) at an interval of 750 mm or as per direction of Engineer-in-Charge. The jute fabric should be laid with an overlap of 150 mm cross-wise and 300 mm longitudinally as per direction of the Engineer-in-Charge. (a) Using Untreated Woven Jute Geotextile (Grey) (b) Using Treated Woven Jute Geotextile with approved rot-resistant additive. m2 m2 41.20 53.90 43.20 55.90

(Payment of this item will be made on the finished area of jute geotextile)