Sei sulla pagina 1di 14

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)

Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2005

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

120.0

198.7

288.1

386.3

264.7

406.4

30.0

47.0

86.0

107.0

244.0

179.0

8.0
31

10.0
28

15.0
31

17.0
30

8.0
31

18.0
30

5.0
31

3.0
31

9.0
30

8.0
31

22.0
30

24.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

8.00

10.00

15.00

17.00

8.00

18.00

5.00

3.00

9.00

8.00

22.00

24.00

(Delta E)/Epm = (m/20)(18-na);(%)

20.00

16.00

6.00

2.00

20.00

0.00

26.00

30.00

18.00

20.00

-8.00

-12.00

17.74

12.08

4.94

1.47

14.40

0.00

19.35

26.00

16.39

19.08

-6.57

-9.90

70.97

63.42

77.43

72.13

57.60

69.51

55.07

60.67

74.68

76.30

88.74

92.44

Delta E

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

11

P-Ea (mm/ 1/2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19
20

1/2 x (1 + K) x i

21

Kx(Gsom);

22

GS;

23

GS = -Gsom + GS

24

Base Flow = i-GS

25
26
27

200.00

49.03

135.28

210.67

314.17

207.10

336.89

-25.07

-13.67

11.32

30.70

155.26

86.56

249.03

384.31

594.99

909.16

1116.26

1453.15

1428.08

1414.41

1425.73

1456.43

1611.69

1698.24

200.00

200.00

200.00

200.00

200.00

200.00

174.93

161.27

200.00

200.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

-25.07

-13.67

0.00

0.00

0.00

0.00

49.03

135.28

210.67

314.17

207.10

336.89

0.00

0.00

11.32

30.70

155.26

86.56

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

19.61

54.11

84.27

125.67

82.84

134.76

0.00

0.00

4.53

12.28

62.10

34.62

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

13.73

37.88

58.99

87.97

57.99

94.33

0.00

0.00

3.17

8.60

43.47

24.24

17.50

12.49

20.15

31.66

47.85

42.33

21.87

8.75

4.77

5.34

19.53

31.23

50.37

79.14

119.62

105.84

136.66

54.67

21.87

11.91

13.36

48.82

43.76

-12.53

19.14

28.77

40.49

-13.79

30.83

-82.00

-32.80

-9.95

1.45

35.46

-5.05

32.14

34.97

55.50

85.18

96.63

103.93

82.00

32.80

14.48

10.83

26.65

39.68

DRO = WS-i

29.42

81.17

126.40

188.50

124.26

202.13

0.00

0.00

6.79

18.42

93.16

51.93

Storm run off = PxPF if WS > 0, SRO=0

24.00

39.74

0.00

0.00

0.00

0.00

6.00

9.40

17.20

21.40

0.00

35.80

Total Run Off = BFlow+DRO+Storm

85.56

155.88

181.91

273.69

220.88

306.06

88.00

42.20

38.47

50.65

119.80

127.41

8.082

16.302

17.183

26.714

20.864

29.874

8.312

3.986

3.755

4.785

11.694

12.035

Gsom

43.76

54.67

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2006

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

122.3

91.3

117.8

89.4

51.1

12.0

3.0

0.0

0.0

53.0

101.0

346.0

20.0
31

16.0
28

15.0
31

17.0
30

5.0
31

1.0
30

1.0
31

0.0
31

0.0
30

4.0
31

15.0
30

23.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

20.00

16.00

15.00

17.00

5.00

1.00

1.00

0.00

0.00

4.00

15.00

23.00

(Delta E)/Epm = (m/20)(18-na);(%)

-4.00

4.00

6.00

2.00

26.00

34.00

34.00

36.00

36.00

28.00

6.00

-10.00

Delta E

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

11

P-Ea (mm/ 1/2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19

200.00

-3.55

3.02

4.94

1.47

18.72

23.63

25.30

31.20

32.79

26.71

4.93

-8.25

92.26

72.48

77.43

72.13

53.28

45.88

49.11

55.47

58.29

68.67

77.24

90.79

30.04

18.82

40.37

17.27

-2.18

-33.88

-46.11

-55.47

-58.29

-15.67

23.76

255.21

230.04

248.86

289.24

306.51

304.33

270.45

224.34

168.87

110.58

94.91

118.67

373.88

200.00

200.00

200.00

200.00

197.82

163.94

117.83

62.36

4.07

-11.60

200.00

200.00

0.00

0.00

0.00

0.00

-2.18

-33.88

-46.11

-55.47

-58.29

-15.67

0.00

0.00

30.04

18.82

40.37

17.27

0.00

0.00

0.00

0.00

0.00

0.00

23.76

255.21

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

12.02

7.53

16.15

6.91

0.00

0.00

0.00

0.00

0.00

0.00

9.51

102.08

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

20

1/2 x (1 + K) x i

8.41

5.27

11.30

4.84

0.00

0.00

0.00

0.00

0.00

0.00

6.65

71.46

21

Kx(Gsom);

15.23

8.20

7.80

0.05

0.02

2.67

22

GS;

38.06

20.50

19.50

12.64

5.06

2.02

0.81

0.32

0.13

0.05

6.67

74.13

23

GS = -Gsom + GS

-36.07

-17.57

-0.99

-6.87

-7.58

-3.03

-1.21

-0.49

-0.19

-0.08

6.62

67.45

24

Base Flow = i-GS

48.08

25.10

17.14

13.77

7.58

3.03

1.21

0.49

0.19

0.08

2.88

34.63

25

DRO = WS-i

18.02

11.29

24.22

10.36

0.00

0.00

0.00

0.00

0.00

0.00

14.26

153.12

26

Storm run off = PxPF if WS > 0, SRO=0

24.46

18.26

23.56

17.88

10.22

2.40

0.60

0.00

0.00

10.60

20.20

0.00

27

Total Run Off = BFlow+DRO+Storm

90.57

54.65

64.93

42.02

17.80

5.43

1.81

0.49

0.19

10.68

37.34

187.75

8.555

5.715

6.133

4.101

1.682

0.530

0.171

0.046

0.019

1.009

3.645

17.735

29.65
Gsom

74.13

5.06

2.02

0.81

0.32

0.13

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2007

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

57.0

539.0

289.0

331.0

217.8

97.0

23.0

8.0

0.0

157.0

361.0

765.0

6.0
31

19.0
28

21.0
31

20.0
30

12.0
31

10.0
30

5.0
31

2.0
31

0.0
30

9.0
31

18.0
30

26.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

6.00

19.00

21.00

20.00

12.00

10.00

5.00

2.00

0.00

9.00

18.00

26.00

(Delta E)/Epm = (m/20)(18-na);(%)

24.00

-2.00

-6.00

-4.00

12.00

16.00

26.00

32.00

36.00

18.00

0.00

-16.00

Delta E

21.29

-1.51

-4.94

-2.94

8.64

11.12

19.35

27.73

32.79

17.17

0.00

-13.21

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

67.42

77.01

87.31

76.54

63.36

58.39

55.07

58.93

58.29

78.21

82.17

95.74

11

P-Ea (mm/ /2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

-10.42

461.99

201.69

254.46

154.44

38.61

-32.07

-50.93

-58.29

78.79

278.83

669.26

189.58

651.57

853.26

1107.72

1262.15

1300.77

1268.70

1217.77

1159.48

1238.27

1517.10

2186.36

189.58

200.00

200.00

200.00

200.00

200.00

167.93

117.00

58.71

200.00

200.00

14

Soil Storage (mm/ 1/2month)

200.00

-10.42

0.00

0.00

0.00

0.00

0.00

-32.07

-50.93

-58.29

0.00

0.00

15

0.00

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

0.00

461.99

201.69

254.46

154.44

38.61

0.00

0.00

0.00

78.79

278.83

669.26

16

Infiltration Coefficient (if)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

17

Infiltration (i); (30)x if,

0.00

184.80

80.68

101.78

61.77

15.45

0.00

0.00

0.00

31.52

111.53

267.70

18

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

19

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

20

1/2 x (1 + K) x i

0.00

129.36

56.47

71.25

43.24

10.81

0.00

0.00

0.00

22.06

78.07

187.39

21

Kx(Gsom);

22

GS;

23

GS = -Gsom + GS

24

Base Flow = i-GS

25

DRO = WS-i

26

Storm run off = PxPF if WS > 0, SRO=0

27

Total Run Off = BFlow+DRO+Storm

Gsom

200.00

222.34

88.94

35.57

65.97

48.98

3.03

1.21

9.31

34.95

88.94

164.93

122.45

120.23

91.33

47.34

18.94

7.58

3.03

23.27

87.38

222.34

-133.40

76.00

-42.49

-2.22

-28.89

48.09

-43.99

36.53

-28.41

18.94

-11.36

7.58

-4.55

20.24

64.11

134.96

133.40

108.80

123.16

104.00

90.67

59.43

28.41

11.36

4.55

11.27

47.42

132.74

0.00

277.20

121.01

152.67

92.66

23.17

0.00

0.00

0.00

47.27

167.30

401.55

11.40

0.00

0.00

0.00

0.00

19.40

4.60

1.60

0.00

31.40

0.00

0.00

144.80

386.00

244.18

256.68

183.33

102.00

33.01

12.96

4.55

89.95

214.72

534.29

13.678

40.368

23.065

25.054

17.317

9.956

3.118

1.224

0.444

8.496

20.959

50.469

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2008

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

141.0

291.0

470.0

296.0

86.0

104.0

0.0

57.0

101.0

437.0

469.0

515.0

16.0
31

21.0
28

18.0
31

11.0
30

6.0
31

4.0
30

0.0
31

6.0
31

4.0
30

15.0
31

19.0
30

21.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

16.00

21.00

18.00

11.00

6.00

4.00

0.00

6.00

4.00

15.00

19.00

21.00

(Delta E)/Epm = (m/20)(18-na);(%)

4.00

-6.00

0.00

14.00

24.00

28.00

36.00

24.00

28.00

6.00

-2.00

-6.00

Delta E

3.55

-4.53

0.00

10.30

17.28

19.46

26.79

20.80

25.50

5.72

-1.64

-4.95

85.17

80.03

82.37

63.30

54.72

50.05

47.63

65.87

65.58

89.65

83.81

87.49

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

11

P-Ea (mm/ 1/2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19
20

1/2 x (1 + K) x i

21

Kx(Gsom);

22

GS;

23

GS = -Gsom + GS

24

Base Flow = i-GS

25
26
27

Total Run Off = BFlow+DRO+Storm

200.00

55.83

210.97

387.63

232.70

31.28

53.95

-47.63

-8.87

35.42

347.35

385.19

427.51

255.83

466.81

854.44

1087.15

1118.42

1172.38

1124.75

1115.88

1151.31

1498.65

1883.84

2311.35

200.00

200.00

200.00

200.00

200.00

200.00

152.37

143.51

200.00

200.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

-47.63

-8.87

0.00

0.00

0.00

0.00

55.83

210.97

387.63

232.70

31.28

53.95

0.00

0.00

35.42

347.35

385.19

427.51

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

22.33

84.39

155.05

93.08

12.51

21.58

0.00

0.00

14.17

138.94

154.08

171.00

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

15.63

59.07

108.54

65.16

8.76

15.11

0.00

0.00

9.92

97.26

107.85

119.70

71.68

34.93

37.60

58.45

6.14

2.46

4.95

40.88

59.49

87.31

94.00

146.14

123.61

58.20

38.39

15.36

6.14

12.38

102.21

148.74

179.20

-91.89

6.68

52.14

-22.52

-65.41

-19.81

-23.03

-9.21

6.23

89.83

46.53

30.46

114.22

77.71

102.91

115.61

77.92

41.40

23.03

9.21

7.94

49.11

107.55

140.54

DRO = WS-i

33.50

126.58

232.58

139.62

18.77

32.37

0.00

0.00

21.25

208.41

231.11

256.51

Storm run off = PxPF if WS > 0, SRO=0

28.20

0.00

0.00

0.00

17.20

20.80

0.00

11.40

20.20

0.00

0.00

0.00

175.92

204.29

335.49

255.23

113.89

94.57

23.03

20.61

49.39

257.51

338.66

397.05

16.617

21.365

31.691

24.912

10.758

9.231

2.176

1.947

4.821

24.325

33.056

37.505

Gsom

179.20

49.44

23.28

15.36

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2009

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

490.0

345.0

276.0

223.0

111.0

105.0

37.0

0.0

120.0

321.0

489.0

356.0

16.0
31

15.0
28

13.0
31

10.0
30

12.0
31

6.0
30

4.0
31

0.0
31

5.0
30

15.0
31

24.0
30

19.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

16.00

15.00

13.00

10.00

12.00

6.00

4.00

0.00

5.00

15.00

24.00

19.00

(Delta E)/Epm = (m/20)(18-na);(%)

4.00

6.00

10.00

16.00

12.00

24.00

28.00

36.00

26.00

6.00

-12.00

-2.00

Delta E

3.55

4.53

8.24

11.78

8.64

16.68

20.84

31.20

23.68

5.72

-9.86

-1.65

85.17

70.97

74.13

61.82

63.36

52.83

53.58

55.47

67.40

89.65

92.03

84.19

404.83

274.03

201.87

161.18

47.64

52.17

-16.58

-55.47

52.60

231.35

396.97

271.81

604.83

878.87

1080.74

1241.91

1289.55

1341.72

1325.14

1269.68

1322.28

1553.62

1950.60

2222.41

200.00

200.00

200.00

200.00

200.00

200.00

183.42

127.95

200.00

200.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

-16.58

-55.47

0.00

0.00

0.00

0.00

404.83

274.03

201.87

161.18

47.64

52.17

0.00

0.00

52.60

231.35

396.97

271.81

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

11

P-Ea (mm/ 1/2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19
20

1/2 x (1 + K) x i

21

Kx(Gsom);

52.81

66.46

57.28

5.51

2.20

6.77

28.62

55.91

22

GS;

166.16

143.19

113.80

90.65

49.60

34.45

13.78

5.51

16.93

71.55

139.77

132.02

23

GS = -Gsom + GS

34.14

-22.97

-29.39

-23.15

-41.05

-15.15

-20.67

-8.27

11.42

54.62

68.22

-7.76

24

Base Flow = i-GS

127.79

132.58

110.14

87.62

60.11

36.02

20.67

8.27

9.62

37.92

90.57

116.48

25

DRO = WS-i

242.90

164.42

121.12

96.71

28.58

31.30

0.00

0.00

31.56

138.81

238.18

163.09

26

Storm run off = PxPF if WS > 0, SRO=0

0.00

0.00

0.00

0.00

22.20

21.00

7.40

0.00

24.00

0.00

0.00

0.00

27

Total Run Off = BFlow+DRO+Storm

370.69

297.00

231.26

184.33

110.89

88.32

28.07

8.27

65.18

176.73

328.75

279.57

35.015

31.060

21.845

17.992

10.474

8.621

2.651

0.781

6.362

16.694

32.089

26.408

200.00

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

161.93

109.61

80.75

64.47

19.05

20.87

0.00

0.00

21.04

92.54

158.79

108.72

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

113.35

76.73

56.52

45.13

13.34

14.61

0.00

0.00

14.73

64.78

111.15

76.11

Gsom

132.02

45.52

36.26

19.84

13.78

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2010

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

306.0

441.0

364.0

109.0

362.0

389.0

306.0

142.0

383.0

382.0

370.0

355.0

22.0
31

21.0
28

20.0
31

8.0
30

21.0
31

18.0
30

17.0
31

9.0
31

19.0
30

18.0
31

22.0
30

26.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

22.00

21.00

20.00

8.00

21.00

18.00

17.00

9.00

19.00

18.00

22.00

26.00

(Delta E)/Epm = (m/20)(18-na);(%)

-8.00

-6.00

-4.00

20.00

-6.00

0.00

2.00

18.00

-2.00

0.00

-8.00

-16.00

Delta E

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

-7.10

-4.53

-3.29

14.72

-4.32

0.00

1.49

15.60

-1.82

0.00

-6.57

-13.21

95.81

80.03

85.66

58.88

76.33

69.51

72.93

71.07

92.90

95.38

88.74

95.74

210.19

360.97

278.34

50.12

285.67

319.49

233.07

70.93

290.10

286.62

281.26

259.26

410.19

771.16

1049.50

1099.62

1385.30

1704.79

1937.86

2008.79

2298.89

2585.52

2866.78

3126.03

200.00

200.00

200.00

200.00

200.00

200.00

200.00

200.00

200.00

200.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

210.19

360.97

278.34

50.12

285.67

319.49

233.07

70.93

290.10

286.62

281.26

259.26

11

P-Ea (mm/ /2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19
20

1/2 x (1 + K) x i

21

Kx(Gsom);

49.54

43.36

57.77

54.28

27.33

42.93

52.95

47.29

26.86

43.23

49.40

51.26

22

GS;

108.39

144.43

135.71

68.32

107.32

132.38

118.21

67.15

108.09

123.49

128.15

123.85

23

GS = -Gsom + GS

-15.46

36.04

-8.72

-67.39

39.00

25.07

-14.17

-51.07

40.94

15.40

4.66

-4.30

24

Base Flow = i-GS

99.53

108.35

120.06

87.44

75.27

102.73

107.40

79.44

75.10

99.25

107.84

108.00

25

DRO = WS-i

126.11

216.58

167.00

30.07

171.40

191.69

139.84

42.56

174.06

171.97

168.76

155.55

26

Storm run off = PxPF if WS > 0, SRO=0

0.00

0.00

0.00

21.80

0.00

0.00

0.00

28.40

0.00

0.00

0.00

0.00

27

Total Run Off = BFlow+DRO+Storm

225.65

324.94

287.06

139.31

246.68

294.42

247.24

150.40

249.16

271.22

276.60

263.55

21.314

33.982

27.116

13.598

23.301

28.738

23.354

14.207

24.320

25.619

26.999

24.895

200.00

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

84.08

144.39

111.33

20.05

114.27

127.80

93.23

28.37

116.04

114.65

112.50

103.70

K (monthly flow recession constan)

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

58.85

101.07

77.93

14.03

79.99

89.46

65.26

19.86

81.23

80.25

78.75

72.59

Gsom

123.85

Location: Stasiun Citatih


28

Flow (m3/second)

ANALISIS DEBIT ANDALAN (METODE FJ MOCK)


Stasiun Hujan

: Stasiun Citatih

DAS

: Sungai Citatih (Kerta Mukti)

Luas DAS

Tahun Pengamatan

: 2011

No.

Meteorological Data

253 km2

Konst.

Januari

Februari

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

264.0

237.0

236.0

190.0

172.0

144.0

106.0

20.0

18.0

170.0

434.0

262.0

17.0
31

15.0
28

20.0
31

15.0
30

13.0
31

6.0
30

7.0
31

1.0
31

1.0
30

11.0
31

19.0
30

16.0
31

Catc. Precip (P; mm/ /2month)

Catc. Rain Days (n ;days)

Days of Month (Hr; days)


Potential Evapo-Transpiration

Ep (mm/day) = E1-E2+E3

2.86

2.70

2.66

2.45

2.32

2.32

2.40

2.80

3.04

3.08

2.74

2.66

Epm (mm/ 1/2month) = HrxEp


Limited Evapotranspiration

88.71

75.50

82.37

73.60

72.00

69.51

74.41

86.67

91.08

95.38

82.17

82.54

Exposed Surface (m; %)

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

40.00

na (number of rainy days)

17.00

15.00

20.00

15.00

13.00

6.00

7.00

1.00

1.00

11.00

19.00

16.00

(Delta E)/Epm = (m/20)(18-na);(%)

2.00

6.00

-4.00

6.00

10.00

24.00

22.00

34.00

34.00

14.00

-2.00

4.00

Delta E

1.77

4.53

-3.29

4.42

7.20

16.68

16.37

29.47

30.97

13.35

-1.64

3.30

86.94

70.97

85.66

69.18

64.80

52.83

58.04

57.20

60.11

82.02

83.81

79.24

177.06

166.03

150.34

120.82

107.20

91.17

47.96

-37.20

-42.11

87.98

350.19

182.76

377.06

543.09

693.43

814.25

921.44

1012.62

1060.57

1023.37

981.26

1069.24

1419.43

1602.19

200.00

200.00

200.00

200.00

200.00

200.00

200.00

162.80

120.69

200.00

200.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-37.20

-42.11

0.00

0.00

0.00

177.06

166.03

150.34

120.82

107.20

91.17

47.96

0.00

0.00

87.98

350.19

182.76

10

Ea (mm/ /2month) = Epm-Delta E


Water Balance

11

P-Ea (mm/ 1/2month)

12

SMS = ISM+(P-Ea);

13

Soil Moist Storage (mm/ /2month); SMC=

14

Soil Storage (mm/ 1/2month)

15

Water Surplus (mm/ 1/2month); [(11)-(14)]


Run Off & Ground. Stor. (mm/month)

16

Infiltration Coefficient (if)

17

Infiltration (i); (30)x if,

18
19
20

1/2 x (1 + K) x i

21

Kx(Gsom);

56.45

63.61

70.05

70.89

65.73

22

GS;

106.02

116.75

118.16

109.55

100.04

89.20

68.86

41.32

23

GS = -Gsom + GS

-35.10

10.72

1.41

-8.60

-9.52

-10.84

-20.33

-27.55

24

Base Flow = i-GS

105.92

55.69

58.73

56.93

52.40

47.31

39.52

27.55

25

DRO = WS-i

106.24

99.62

90.20

72.49

64.32

54.70

28.77

26

Storm run off = PxPF if WS > 0, SRO=0

0.00

0.00

0.00

38.00

34.40

28.80

21.20

27

Total Run Off = BFlow+DRO+Storm

212.16

155.31

148.93

167.42

151.11

130.81

20.040

16.243

14.068

16.341

14.274

12.768

200.00

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

70.82

66.41

60.13

48.33

42.88

36.47

19.18

0.00

0.00

35.19

140.08

73.11

K (monthly flow recession constan)

0.40

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

PF (Percentage Factor)

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

0.20

49.58

53.13

48.11

38.66

34.30

29.18

15.35

0.00

0.00

28.15

112.06

58.48

24.79

14.87

25.82

82.73

24.79

43.03

137.88

141.21

-16.53

18.24

94.85

3.33

16.53

16.95

45.23

69.77

0.00

0.00

52.79

210.11

109.66

4.00

3.60

34.00

0.00

0.00

89.49

31.55

20.13

103.74

255.34

179.43

8.453

2.980

1.965

9.799

24.923

16.949

Gsom

141.12

60.02

53.52

41.32

Location: Stasiun Citatih


28

Flow (m3/second)

REKAPITULASI DEBIT (METODE MOCK)


Stasiun Hujan
Luas DAS
Thn. Pengamatan

Tahun

: Stasiun Citatih
253
: 2005-2011

Januari

Februari

km2

Maret

April

Mei

Juni

Juli

Agustus

September

Oktober

Nopember

Desember

2005

8.082

16.302

17.183

26.714

20.864

29.874

8.312

3.986

3.755

4.785

11.694

12.035

2006

8.555

5.715

6.133

4.101

1.682

0.530

0.171

0.046

0.019

1.009

3.645

17.735

2007

13.678

40.368

23.065

25.054

17.317

9.956

3.118

1.224

0.444

8.496

20.959

50.469

2008

16.617

21.365

31.691

24.912

10.758

9.231

2.176

1.947

4.821

24.325

33.056

37.505

2009

35.015

31.060

21.845

17.992

10.474

8.621

2.651

0.781

6.362

16.694

32.089

26.408

2010

21.314

33.982

27.116

13.598

23.301

28.738

23.354

14.207

24.320

25.619

26.999

24.895

2011

20.040

16.243

14.068

16.341

14.274

12.768

8.453

2.980

1.965

9.799

24.923

16.949

Rata-Rata
Maksimum
Minimum

17.615
35.015
8.082

23.576
40.368
5.715

20.157
31.691
6.133

18.388
26.714
4.101

14.096
23.301
1.682

14.246
29.874
0.530

6.891
23.354
0.171

3.596
14.207
0.046

5.955
24.320
0.019

12.961
25.619
1.009

21.909
33.056
3.645

26.571
50.469
12.035

REKAPITULASI DEBIT (METODE MOCK)


Stasiun Hujan
Luas DAS
Thn. Pengamatan
Tahun
2005
2006
2007
2008
2009
2010
2011
Rata-Rata
Maksimum
Minimum

: Stasiun Citatih
253 km2
: 2005-2011

Januari

Februari

Maret

April

Mei

Juni

8.082
8.555
13.678
16.617
35.015
21.314
20.040

16.302
5.715
40.368
21.365
31.060
33.982
16.243

17.183
6.133
23.065
31.691
21.845
27.116
14.068

26.714
4.101
25.054
24.912
17.992
13.598
16.341

20.864
1.682
17.317
10.758
10.474
23.301
14.274

29.874
0.530
9.956
9.231
8.621
28.738
12.768

17.615
35.015
8.082

23.576
40.368
5.715

20.157
31.691
6.133

18.388
26.714
4.101

14.096
23.301
1.682

14.246
29.874
0.530

Juli

Agustus

September

Oktober

Nopember

Desember

8.312
0.171
3.118
2.176
2.651
23.354
8.453

3.986
0.046
1.224
1.947
0.781
14.207
2.980

3.755
0.019
0.444
4.821
6.362
24.320
1.965

4.785
1.009
8.496
24.325
16.694
25.619
9.799

11.694
3.645
20.959
33.056
32.089
26.999
24.923

12.035
17.735
50.469
37.505
26.408
24.895
16.949

6.891
23.354
0.171

3.596
14.207
0.046

5.955
24.320
0.019

12.961
25.619
1.009

21.909
33.056
3.645

26.571
50.469
12.035

POLA TANAM
PERIODE
Jan
Feb
Mar
Apr
Mei
Jun
Jul
Agu
Sep
Okt
Nop
Des

1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2

ALTERNATIF A
ALTERNATIF B
WA
WR
LUAS
WR
LUAS
m3/det
l/d/ha
Ha
l/d/ha
Ha
0.000 #VALUE!
0.000
0.513
0.808 #VALUE!
0.808
0.513
1.082
474.290
1.082
0.623
0.525
1186.901
0.525
0.623
0.019 33085.810
0.019
0.693
0.000
#DIV/0!
0.000
0.693
0.187
3707.548
0.187
0.900
0.000
#DIV/0!
0.000
0.900
0.000
#DIV/0!
0.000
0.706
Panen
0.706 Panen
1.109
1.109
0.918
0.803
0.803
0.918
0.791
0.791
0.750
0.100
0.100
0.750
1.179
1.179
0.222
0.590
0.590
0.222
0.451
0.451
0.032
0.000
0.000
0.032
Panen
0.031 Panen
0.000
0.000
0.031
0.000
0.000
0.019
0.000
0.000
0.019
0.000
0.000
0.229
0.000
0.000
0.229