Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1. Apologies
There were no apologies.
• The Welcome Pack is still ‘work in progress’. Some replies have been received W. Ablard
by Brian McDonald. B. McDonald
• Church Loop System – On going M. Jones
• Memorial Garden Crucifix – on going. Fr. Hennessy
• Memorial Garden Pieta – Fr. to organise with C O’Brien when available. Fr. Hennessy
• Hall Floor – Advice on cleaning of hall floor is conflicting, need to contact
Rep. to clear this up. T. Doran
• Trees along driveway have been pruned.
• Sacristy skylights – Outside has been washed. Cannot do anymore with current
Skylight other than replacement.
• Trees at St. Cecelia – in hand, 2 months notice required for electrical safety cover. B. Pinto
Next major expenditure will be drainage work at corner of presbytery. The insurance D. Richardson
excess is £5,000. Three builders have been asked for quotes. They need to carry out
investigations before they can quote. One builder had reports from previous investigations.
5. Finance Committee
The new Finance Committee will be D. Richardson, Fr. Hennessy, T. Doran and N. Gorham
7. Memorial Garden
• Laurel needs cutting back, flagstones removing and lawn laying.
• Stone needs cleaning – M. Jones to clean with power washer. M Jones
• Wooden benches need removing. W. Ablard
• Water feature – needs removing and making into flower bed.
• Plan of how garden would look needs to be created. T. Brazier
• Consideration needs to be given to scattering of ashes.
• CWL wish to have a bench in memory of Fr. John McNally outside
Church.