Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
ETR
OTC
STP
PTP
EHS
GRC
Global Compliance
BI
Others
Duet Ent
2009
2010
2011
2012
2013
SAP PI v 7.01
SAP SRM
V 7.01
cFolders 4.5 Shopping T Cart, Purchase Req., Self Registration
FI
CO
EC
TR
ROS DMS
SC
LE
SD
MM
IM
PP
QM
WM
PM
Environment, Health and Safety (EHS), Document Management System (DMS), Mini Master (HCM)
HCM
DMS
EHS
SAP TREX
V 7.10 Search
SAP Web SAP IDM Provisioning Dispatcher (WD)V 7.1 SP4 V NW 7.0 (DMZ)
GRC
SAP EP
Enterprise Portal SAP GUI, cFolders, SNC, EHS, SSO, GRC (Federated Consumer/Producer)
V7.01 EHP1
SAP BPC (Business Process & Consolidation) v7.5 Enterprise FP 1.0 SAP BW v 7.01 EHP 1 V NW 7.02 EHP2 NW Gateway 2.0 (SCL) SAP BI/BOBJ v 3.1
DUET (SCL)
V7.0
SNC
Live Cache
DP
SNP
BPC
BW
Hazardous Substance Mgmt Global Label Mgmt Product Safety Comm. Dangerous Goods Mgmt Recycling Administration
Simple, fast reporting of incidents, near misses, and observations by anyone Define, monitor and assess chemical and non-chemical exposures Planning and execution of medical surveillance programs Flexibility to meet local requirements
Integration between IM, IH, and OH as well as to other ERP modules Dashboards and analytics to see trends and exceptions for quick action
10
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
11
[ Objectives
Standardize business processes globally Create single, global database for EHS reporting Eliminate manual and spreadsheet tracking of data Improve reporting of all incidents Enable incident reporting by all supervisors and EHS associates globally Integrate Incident Management, Occupational Health and Industrial Hygiene data Reduce Injury rate
12
13
[ Holistic Example
Problem from industrial hygiene sampling Incident creation (tie incident to work area) Medical monitoring (tie medical record to incident)
14
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
15
16
17
Build in enough time for knowledge transfer Make sure to plan for face-to-face time
Involve lead technical person in blueprinting sessions
19
20
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
21
22
23
24
25
26
27
28
[ Agenda
1. Introduction 2. Health & Safety at First Solar 3. Key Success Factors 4. Final Solution Highlights 5. Key Takeaways
29
[ Key Takeaways
Holistic blueprint approach Keep it simple Use offshore development model to reduce cost Offer local training and testing sessions Focus enhancement budget on ease of use Have a strong team
30
]
31