Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DESCRIPCION
DISEO DE FIERRO
# DE
CANTIDAD ELEMENTOS
LONGITUD
ELEMENTO
1/4"
CAMARA DE CARGA
BASE
2
3/8"
1.00
26.00
12.40
3/8"
1.00
21.25
14.40
11.1 1/4"
1.00
1.00
48.20
48.20
10.58 1/4"
1.00
1.00
46.12
46.12
10.06 1/4"
1.00
1.00
44.04
44.04
9.54 1/4"
1.00
1.00
41.96
41.96
9.02 1/4"
1.00
1.00
39.88
39.88
8.5 1/4"
1.00
1.00
37.80
37.80
2
8.4
10.40
13.00
11.1
13.00
12.48
10.58
12.48
11.96
10.06
11.96
11.44
9.54
11.44
10.92
9.02
10.92
10.40
8.5
10.40
total en VARILLAS
0.25
258.00
64.5
29
3/8"
1/2"
5/8"
3/4"
1"
322.40
306.00
0.56
628.40
351.90
57
1.02
1.60
2.26
4.04
3.50 lt/seg
0.20
Tiempo de almacenamiento
Volumen de almacenamioento
Reservorio Trapezoidal
Dimensiones
Largo mayor
Largo menor
Ancho mayor
Ancho menor
Altura
Borde Libre
Volumen de almacenamioento
12 hr
151.2 m3
1.30
13.00
10.40
11.10
8.50
1.30
0.20
151.26 OK
1.41
13
10.40
11
8.5
8.5
10.4
Talud 1
2.6
1.3
2.25
1.69
3.94
1.98494332
Talud 2
2.6
1.3
1.98494332
Fierro (1/4")
1
1
5
1
2
3
4
5
6
10.4
10.92
11.44
11.96
12.48
13
2
2
2
2
2
2
1
2
3
4
5
6
8.5
9.02
9.54
10.06
10.58
11.1
2
2
2
2
2
2
2.6
0.52
20.8
21.84
22.88
23.92
24.96
26
140.4
2.6
0.52
17
18.04
19.08
20.12
21.16
22.2
117.6
258
37.8
39.88
41.96
44.04
46.12
48.2
11
DISEO HIDRAULICO
1 AFOROS
Metodo Volumetrico
Riachuelo
Huaqueria
Tiempo
Litros
1
2
5.20
5.20
5.00
18.00
18.00
18.00
Total
Q l/s
3.46 l/s
3.46 l/s
3.60 l/s
3.51 l/s
2 CAUDAL DISPONIBLE
Q=
6.00 lt/seg
0.73
0.5 hr
10.8 m3
m3
1.47
1
3.00
2.00
2.00
2.00
2.20
0.73
11.00 OK
11.00 m3
3
2
2
2
2.20
Manante
Res(m3)
3.50 lt/seg
0.20
12 hr
151.2 m3
1.00
1
1
14.00
12.00
13.00
11.00
1.00
0.20
157.00 OK
54.00 m3
1.41
14
12.00
13
11
11
12
Largo
Ancho
18.82
17.82
13
ANEXO N III
1.00 DISEO DE BOCATOMA
1.1 Datos requeridos
PERIODO DE DISEO
Q de diseo
Aforo de rio en tiempo seco
Caudal max. de rio
Ancho de ro encaptacin
20.00
3.50
3.50
80.00
2.00
AOS
l/s
l/s
l/s
m
0.0035 m3/s
0.0035 m3/s
0.08 m3/s
0.42 m
Q
Q
1.84 L
2/3
H
0.42
H= 0.0035
1,84*0,45
t2/3
H=
0.0045 t2/3
H=
0.03 m
Dandole un borde libre de 0,10 cm la altura del azud sera de 0,13 m., pero
por condiciones condiciones construcivas consideraremos=
0,20 m
0,60 m
Q
L' X H
V= 0.0035
0,44 X 0,03
V=
0.3084 m/s
0,30 m/s
<
0.308 m/s
<3,0 m/s
OK
H=
H=
0.08
1.84 x 0,45
t2/3
0.1035 t2/3
0.22 m
Dandole un borde libre de 0,38 cm la altura de los muros sera de 0,60 m., pero
por condiciones topograficas del terreno consideraremos=
1,00 m
0.308
0.027
Potencia
0.46
0.13
PLANILLA DE METRADOS
DESCRIPCION
OBRAS PROVISIONALES
CARTEL DE OBRA
ITEM
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
DESCRIPCION
OBRAS EN BOCATOMA
TRAZO Y REPLANTEO
EXCAVACION MANUAL EN TERRENO MANUAL
Pantalla subterrnea
Losa de contra escarpe
Escollera
Cimiento de muros
Canal de conduccin
ELIMINACION DE MATERIAL EXCEDENTE
ENCOFRADO Y DESENCOFRADO
Cara interior del azud
Muro de encausamiento
Canal de conduccin
Loza de operaciones
Pantalla
CONCRETO CICLOPEO FC=140 KG/CM2 +30 % PM.
Pantalla Subterranea
Losa de contra escarpe
Escollera
Cuerpo del azud
Muro de encausamiento
Cimiento del muro
CONCRETO F'C= 175 KG/CM2
Canal de conduccin (Muros)
Base
Loza de operaciones
Pantalla
TARRAJEO CON IMPERMEABILIZANTE
Muro de encausamiento
UND
No
ELEM
UND
1.00
UND
No
ELEM
03.05.00
03.06.00
DESCRIPCION
ITEM
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
DESCRIPCION
ENCOFRADO Y DESENCOFRADO
TOTAL
OBSERVACIONES
MEDIDAS
LARGO ANCHO ALTO
6.00
3.00
3.00
3.00
3.00
3.00
3.00
0.60
2.00
0.30
0.90
0.60
1
2
2
4
2
3.00
3.00
3.00
0.60
0.30
0.20
1.00
0.70
0.20
0.60
1
1
1
1
2
2
3.00
0.60
2.00
3.00
3.00
0.30
3.00 Area=
3.00
0.30
3.00
0.90
SUB
TOTAL
TOTAL
18.00
18.00
1.80
1.80
0.27
5.40
0.27
9.54
9.54
0.60
6.00
4.20
0.48
0.36
11.64
1.00
0.30
0.30
0.30
1.00
1.00
1.80
1.80
0.27
0.90
1.80
5.40
8.37
1.42
0.15
0.15
0.15
1.07
0.27
0.054
0.027
12.00
3.60
2.40
0.90
7.10
0.97
0.36
0.36
0.18
27.87
m
1.00
0.30
0.30
1.00
0.15
AZUD
9.54
Pantalla subterrnea
M3
Muros de encauzamiento
Muros de encauzamiento
M3
2
A=
M2
UND
2
2
1
1
2
2
4
1
1
A=
No
ELEM
No
VEC
3.55
3
0.6
0.6
M2
M2
M3
M3
M3
M2
ALTO
MEDIDAS
LARGO ANCHO ALTO
3.25
3.53
1
2
1
secciones trapezoidales B
2
2
1
1
M2
4
2
4
4
M2
2
1
1
secciones trapezoidales B
2
2
1
1
UND
0.15
0.6
0.6
0.3
LARGO ANCHO
6.00
1.00
6.00
0.30
3.00
0.80
3.00
0.30
3.55
3.23
0.15
0.60
0.15
0.60
0.60
0.30
0.60
M2
M3
M3
M3
No
VEC
Pantalla
SUB
TOTAL
1.00
1
M3
M2
Loza de operaciones
ITEM
MEDIDAS
LARGO ANCHO ALTO
M2
M3
1
1
1
Azud
Canal de conduccin
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
No
VEC
1.50
3.15
0.70
0.55
0.40
0.40
0.70
0.15
0.15
b
1.40
1.70
1.20
1.50
SUB
TOTAL
4.88
4.45
4.45
0.15
0.60
0.60
0.07
0.10
0.04
1.35
0.15
1.50
0.15
0.36
0.51
0.17
0.27
Losa de operaciones
Canal de conduccin
Muros
TOTAL
4.88
4.45
4.45
1.52
DESARENADOR
MUROS
MUROS
CAJA DE CONTROL
h
0.40
1.00
0.30
1.20
0.55
0.40
1.40
1.70
0.60
0.60
0.40
1.00
0.55
0.40
1.20
0.60
0.60
0.15
1.35
1.32
0.48
4.86
6.80
b
1.40
1.70
1.20
1.50
0.66
0.24
0.18
h
0.40
1.00
0.30
1.20
1.35
1.50
2.43
3.40
1.13
1.80
TARJETA METALICA DE 0,30MX0,30M
1.00
1.00
1.00
1.00
1.00
1
1
1
2
2
TAPA METALICA
No
ELEM
No
VEC
1
1
1
1
1
1
1
1
2
2
1
2
2
MEDIDAS
LARGO ANCHO ALTO
15
14.00
157.00
157.00
12.00
13.00
12.00
54.00
A=
A=
1.00
2
13.00
1.00
1.00
11.00
1.60
1.60
1.00
19.20
20.80
54.00
1.00
1.00
0.15
0.15
0.15
0.20
SUB
TOTAL
182.00
157.00
157.00
19.80
6.24
5.76
10.80
38.40
41.60
54.00
TOTAL
30.00
182.00
157.00
157.00
VEREDA
BASE
PAREDES 1
PAREDES 2
42.60 VEREDAS
134.00
VEREDAS
14
13
PAREDES
ITEM
01.00.00
01.01.00
12
11
BASE
12
11
13
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.03.00
04.03.01
04.03.02
CAMARA DE CARGA
EXCAVACION MANUAL EN TERRENO MANUAL
CONCRETO FC=140 KG/CM2
ENCOFRADO Y DESENCOFRADO
SUMINISTRO DE ACCESORIOS (CAMARA)
Filtros PVC de 2"
Filtros PVC de 3"
Rejilla de Proteccin de FC de 1/4"
CAJA DE LIMPIEZA
EXCAVACION MANUAL EN TERRENO MANUAL
CONCRETO F'C= 175 KG/CM2
M3
M3
M2
GLB
UND
UND
UND
1
1
1
1
M3
M3
ENCOFRADO Y DESENCOFRADO
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
ENCOFRADO Y DESENCOFRADO
04.04.05
04.04.06
04.04.07
M2
UND
GLB
UND
UND
UND
UND
UND
UND
DESCRIPCION
UND
No
ELEM
No
VEC
M2
M3
M3
M2
M2
ML
UND
UND
UND
1
1
2
2
2
1
2
4
4
2
2
2
4
4
1
UND
No
ELEM
No
VEC
ITEM
ITEM
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
06.06.00
06.07.00
06.08.00
06.09.00
ITEM
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
07.06.00
07.07.00
07.08.00
07.09.00
07.10.00
07.11.00
07.12.00
07.13.00
07.14.00
07.15.00
ITEM
DESCRIPCION
LINEA DE CONDUCCION DISTRIBUCION (3000 ML)
TRAZO Y REPLANTEO
EXCAVACION MANUAL EN TERRENO MANUAL
CAMA DE PROTECCION DE TUBERIA
RELLENO APIS ZANJAS CON MATERIAL PROPIO
TUBERIA PVC SAP 3" C-5
TUBERIA PVC SAP 2" C-7.5
TUBERIA PVC SAP 1 1/2" C-10
TUBERIA PVC SAP 1" C-10
TUBERIA PVC SAP 3/4" C-10
DESCRIPCION
M2
M3
M3
M2
DESCRIPCION
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
2
2
4
4
4
ML
M3
ML
M3
ML
ML
ML
ML
ML
UND
1
1
1
1
1
1
2
1
2
2
4
4
4
04.03.04
04.03.05
04.03.06
M2
UND
GLB
UND
UND
UND
0.40
0.40
0.40
0.20
0.40
0.20
0.40
1.00
0.40
0.40
0.10
0.10
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.40
0.60
0.40
0.60
1.00
0.60
0.60
0.60
0.10
0.10
0.60
0.50
0.60
0.75
0.15
0.60
0.60
No
VEC
0.20
0.10
0.30
0.30
0.30
0.10
0.50
0.50
MEDIDAS
LARGO ANCHO ALTO
5.00
0.40
0.40
0.40
0.40
10.00
1.00
0.40
0.40
0.40
0.40
0.40
0.40
MEDIDAS
LARGO ANCHO ALTO
2950.00
2950.00
2950.00
2950.00
164.00
275.00
776.00
1640.00
92.00
No
ELEM
0.90
0.90
0.15
0.15
0.60
0.61
0.12
0.16
0.11
1.44
0.61
0.39 BASE
PAREDES 1
PAREDES 2
1.44
1.00
0.40
0.50
0.40
0.10
MEDIDAS
LARGO ANCHO ALTO
0.03
0.02
0.01
0.01
0.64
0.32
0.64
1.00
0.03
0.03 BASE
PAREDES 1
PAREDES 2
1.00
0.36
0.11
0.04
0.06
0.04
1.44
0.80
1.44
1.00
0.36
0.11
0.14 BASE
PAREDES 1
PAREDES 2
2.24
SUB
TOTAL
5.00
0.13
0.13
1.28
1.28
10.00
SUB
TOTAL
2950.00
590.00
118.00
164.00
SUB
TOTAL
2
5
3
7
2
4
4
2
3
2
3
10.00
2.00
1.00
1.00
0.64
1.00
1.00
1.44
1.00
1.00
TOTAL
10.00
0.13
0.13
1.28
1.44
1.00
TOTAL
2950.00
590.00
2950.00
120.00
164.00
275.00
776.00
1640.00
92.00
TOTAL
2.00
5.00
3.00
7.00
2.00
4.00
4.00
2.00
3.00
2.00
3.00
10.00
2.00
1.00
1.00
No
ELEM
No
VEC
19
19
19
19
1
1
1
13
7
1
13
20
19
2
2
4
MEDIDAS
LARGO ANCHO ALTO
SUB
TOTAL
TOTAL
M3
REJILLA
CAMARA DE CARGA
04.03.03
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
M2
0.90
0.90
0.90
0.60
0.60
2
2
4
0.40
0.20
0.40
1.00
0.40
0.10
0.10
0.40
0.40
0.40
0.40
0.61
0.30
12.16
19.00
0.64
PAREDES
1.00 PAREDES
19.00
0.64
1.00
Tubo FG 1 1/2"
DADOS DE CONCRETO
PAREDES DEL
RESERVORIO
ITEM
DESCRIPCION
ITEM
DESCRIPCION
DESCRIPCION
DESCRIPCION
UND
No
ELEM
UND
UND
M
UND
UND
UND
UND
UND
PZA
4
4
4
4
4
4
4
2
4
UND
No
ELEM
UND
No
ELEM
GLB
UND
No
ELEM
GLB
No
VEC
MEDIDAS
LARGO ANCHO ALTO
SUB
TOTAL
1
2
4.00
8.00
0.00
4.00
8.00
8.00
8.00
8.00
16.00
40.00
1
2
2
2
4
4
No
VEC
MEDIDAS
LARGO ANCHO ALTO
2950.00
TOTAL
SUB
TOTAL
2950.00
TOTAL
2950.00
No
VEC
MEDIDAS
LARGO ANCHO ALTO
SUB
TOTAL
TOTAL
No
VEC
MEDIDAS
LARGO ANCHO ALTO
SUB
TOTAL
TOTAL
1.00
1.00
1.00