Sei sulla pagina 1di 5

MEMORANDUM Date: December 6, 2013 To: Dr.

Dan Johnson, Superintendent of Schools

From: Dave Gillespie Cc: RE: John Maurer Referendum Objectives: Johnsburg District 12 Johnsburg and Ringwood, Illinois

Per our last meeting, we have prepared this memo in order to express the objectives of a potential referendum. That is, we have made a simple list of items for which money is to be used. This is not meant as a comprehensive, all inclusive or prioritized list, but rather as a tool for communication with the electorate. Items have been listed per building and have been further defined into the following categories: Site Improvements: items on the property not connected to the building Exterior Improvements: items on the exterior shell of the building Interior Improvements: items on the interior of the building Enhancements to be considered: goals to be achieved depending on availability of funds and priorities decided during the design process

The risk in listing individual goals is in considering them as separate projects. Many of the items that we have discussed to date are associated with one another. For example, walls, ceilings, electrical, piping and HVAC are all connected. It would only be prudent to work on these items in a comprehensive manner. Hence, replacing the demountable partitions and ceiling in the high school will result in the general renovation of the classrooms. Further, accessing spaces above the ceiling and behind the walls to replace galvanized piping will cause the toilet rooms to be renovated. Therefore, there is a fair amount of overlap in work and budgeting for the items listed. Please note that for this reason, the final objectives and scope of work are to be determined during the design process.

5307 Business Parkway, Suite 101

Ringwood, Illinois 60072

phone 815.653.7100 fax 815.653.7700

(Referendum Goals, Dr. Dan Johnson; December 6, 2013, page 2)

Johnsburg High School Site Improvements: Repair and/or replace north and south parking lots Improve parking lot lighting Improve storm water drainage in parking lots and around the building Exterior Improvements: Repair and/or replace roof, flashings and scuppers Repair exterior walls tuckpoint and flash Replace windows Replace exterior doors and overhead doors Interior Improvements: Improve security and entry control Replace door hardware Improve handicap accessibility Replace demountable wall partitions Replace HVAC equipment and provide controls Replace galvanized piping Provide efficient lighting and electrical upgrades Renovate kitchen Improve communications Remodel theater and music facilities Expand/renovate cafeteria Renovate all general classrooms Renovate all toilet rooms Improve vocational education spaces Improve/expand fine arts rooms Renovate two science labs Improve locker room facilities Create learning commons - library Enhancements to be considered: Gymnasium improvements Add windows in classrooms Replace or improve concessions area

5307 Business Parkway, Suite 101

Ringwood, Illinois 60072

phone 815.653.7100 fax 815.653.7700

(Referendum Goals, Dr. Dan Johnson; December 6, 2013, page 3)

Johnsburg Junior High School Site Improvements: Repair and/or replace east and west parking lots Improve parking lot lighting Improve storm water drainage in parking lots and around the building Exterior Improvements: Repair and/or replace roof and flashings Repair exterior walls tuckpoint and flash Replace windows Replace exterior doors Interior Improvements: Improve security Upgrade fire alarms Replace door hardware Improve handicap accessibility Replace demountable wall partitions Replace HVAC equipment and provide controls Replace galvanized piping Provide efficient lighting and electrical upgrades Renovate all general classrooms Improve communications Improve interior circulation Renovate all toilet rooms Create learning commons library Expand kitchen and cafeteria Improve music facilities Enhancements to be considered: Consider modifications to accept another grade level Provide stage and audience area Provide additional parking Expand fire sprinklers

5307 Business Parkway, Suite 101

Ringwood, Illinois 60072

phone 815.653.7100 fax 815.653.7700

(Referendum Goals, Dr. Dan Johnson; December 6, 2013, page 4)

James C. Bush Elementary School Site Improvements: Repair and/or replace parking lots Improve parking lot lighting Improve storm water drainage in parking lots and around the building Exterior Improvements: Repair and/or replace roof Replace windows Replace exterior doors Interior Improvements: Improve security Upgrade fire alarms Replace door hardware Improve handicap accessibility Replace HVAC equipment and provide controls Replace galvanized piping Provide efficient lighting and electrical upgrades Improve communications Expand kitchen and cafeteria Renovate all general classrooms Renovate all toilet rooms

Enhancements to be considered: Expand parking Expand fire sprinklers

Alternatives, including shifting grades three and four to other buildings, are to be considered that would negate this list of improvements to Bush School.

5307 Business Parkway, Suite 101

Ringwood, Illinois 60072

phone 815.653.7100 fax 815.653.7700

(Referendum Goals, Dr. Dan Johnson; December 6, 2013, page 5)

Ringwood Primary School Site Improvements: Expand parking lots Improve parking lot lighting Improve storm water drainage in parking lots and around the building Exterior Improvements: Replace windows at original building Repair soffits and fascia at original building Interior Improvements: Improve security Replace HVAC equipment at original building and provide controls Replace galvanized piping Enhancements to be considered: Consider modifications to provide all day kindergarten Consider modifications to accept another grade level Expand fire sprinklers Provide new playground equipment

5307 Business Parkway, Suite 101

Ringwood, Illinois 60072

phone 815.653.7100 fax 815.653.7700

Potrebbero piacerti anche