Sei sulla pagina 1di 36

TRUCK HAUL ROAD - NEAR ASKAR

SCHEDULE OF RATES AND PRICES


PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS

Contractual Requirements

A110 Perfomance Bond sum


A120 Insurance of the Works sum
A130 Third party insurance sum
A140 Insurance against damage to persons and sum
property
Specified Requirements
Accomodation for the Engineer's staff
A211.1 Establishment and removal of offices for the sum
Engineer's staff as specification clause
104.1 to 104.4 inclusive
A211.2 Miantenance of offices for the Engineer's staff wk 20
until completion of the Works
A211.3 Miantenance of offices for the Engineer's staff wk 4
after completion of the Works

1/1 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Services for the Engineer's Staff

Communication System as Special


Specification clause 103

A222.1 Establishement and removal of telephone system sum


A222.2 Maintenance of telephone system until completion wk 20
of the Works
A222.3 Maintenance of telephone system after completion wk 4
of the Works
A222.4 Establishement and removal of independent sum
facsimile/phone systems
A222.5 Maintenance of facsimile/phone system wk 20
until completion of the Works
A222.6 Maintenance of facsimile/phone system wk 4
after completion of the Works
A222.7 Establishement and removal of mobile telephones sum
A222.8 Maintenance of mobile telephones until wk 20
completion of the Works
A222.9 Maintenance of mobile telephones after wk 4
completion of the Works
A229.1 Set of progress photographs as specification. sum

1/2 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Equipment for use by the Engineer's staff

A231.1 Establishment and removal of office equipment as sum


Specification clause 104.5 to 104.9 inclusive.
A231.2 Maintenance of office equipment until wk 20
completion of the Works
A231.3 Maintenance of office equipment after wk 4
completion of the Works
Attendance upon the Engineer's staff
A244.1 Office attendant/ Cleaner until completion man- 20
of the Works wk
A244.2 Office attendant/ Cleaner after completion man- 4
of the Works wk
A245.1 Secretary until completion of the Works man- 20
wk
A245.2 Secretary after completion of the Works man- 4
wk
A246.1 Driver until completion of the Works man- 20
wk
A246.2 Driver after completion of the Works man- 4
wk
Testing of Materials & Works
A250 Testing of Materials sum
A250 Testing of the Works sum

1/3 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

BD/FILS

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Temporary Works

A271 Traffic Diversions sum


A271.1 Traffic regulation; establishment and removal sum
A272 Traffice regulation; continuing operation and sum
maintenance

A279.1 Protection and upkeep of site, adjacent areas sum


and properties
A279.2 Tidying and cleaning the site sum
A279.4 Erection and removal of project sign boards nr 2
A279.5 Maintenance of project sign boards nr 2
As-built drawings
A291 Provide set of as-built drawings upon sum
completion of the contract

1/4 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Method-Related Charges (Cont'd)


(inserted by the Tenderer)

A310 Accommodation and buildings for the Contractor

1/5 To Collection BD
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR
SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Method-Related Charges (Cont'd)


(inserted by the Tenderer)

A320 Services

1/6 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Method-Related Charges (Cont'd)


(inserted by the Tenderer)

A330 Plant

A340 Plant
1/7 To Collection BD
Truck Haul Road February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE


ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Method-Related Charges (Cont'd)


(inserted by the Tenderer)

A350 Temporary Works

1/8 To Collection BD
Truck Haul Road
8

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Method-Related Charges (Cont'd)


(inserted by the Tenderer)

A370 Supervision & Labour

1/9 To Collection BD
Truck Haul Road

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS (Cont'd)

Provisional Sums
A421 Allow Provisional Sums of BD. 1,000/- for sum
Municipality fees for removing trees and shrubs
A422 Allow Provisional Sum of BD. 100,000/- for sum
utilities protection
A423 Allow Provisional Sum of BD. 10,000/- for sum
Dayworks
A424 Allow provisional Sum of BD 1,000/- for ground sum
investigation
A425 Allow Provisional Sum of BD 50,000/- for construction sum
of traffic signal junction.
A426 Allow Provisional Sum of BD 10,000/- for traffic signs sum
& installation
A427 Allow Provisional Sum of BD 30,000/- for road marking sum
& installation
A428 Allow Provisional Sum of BD 115,000/- for purchase sum
of materials for street lighting

1/10 To Collection BD
Truck Haul Road February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES

PART 1 - PRELIMINARIES AND GENERAL ITEMS

ITEM DESCRIPTION UNIT QTY RATE

PART 1 - PRELIMINARIES AND


GENERAL ITEMS

COLLECTION

From page 1/1


From page 1/2
From page 1/3
From page 1/4
From page 1/5
From page 1/6
From page 1/7
From page 1/8
From page 1/9

From page 1/10

1/11 To Collection BD
Truck Haul Road
TRUCK HAUL ROAD - NEAR ASKAR
SCHEDULE OF RATES AND PRICES
PART 2

CLASS B - GROUND INVESTIGATION


Trial Pits and Trenches (All Provisional)

Number in material other than rock

B111.1 Minimum plan area at bottom of excavation 1m²; 5 nr.


maximum depth not exceeding 1m
B111.2 Maximum length at bottom of excavation 5m; 5 nr.
maximum depth not exceeding 1m
B112.1 Minimum plan area at bottom of excavation 1m² 5 nr.
maximum depth 1m to 2m
B112.2 Maximum length at the bottom of excavation 5m; 5 nr.
maximum depth 1m to 2m
Number in material which includes rock
B121.1 Minimum plan area at bottom of excavation 1m² 5 nr.
maximum depth not exceeding 1m
B121.2 Maximum length at bottom of excavation 5m; 5 nr.
maximum depth not exceeding 1m
B130 Depth in material other than rock 20 m
B140 Depth in rock 20 m
B160 Depth backfilled, with selected excavated material. 40 m

CLASS B - TOTAL TO SECTION SUMMARY 2C/1 BD


Truck Haul Road Page 1 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS D - DEMOLITION AND SITE CLEARANCE

General Clearance

D100 General site clearance 10.5 ha


Other Structures (including disposal)
D560 Demolish all structures including fence, shelters, item
concrete buildings or wholly within the limits of the
road corridor.
D561.2 Raising of existing manholes (Provisional) 10 Nr
Dismantle and Remove from Site
Existing road signs including foundations and filling voids
D570 with suitable material, making good and deliver as 10 Nr
directed by the Engineer (Provisional)
D574 Precast concrete kerb including foundation and 100 m
backing (Provisional)
D577.1 Existing concrete bollards (Provisional) 10 Nr
D577.2 Existing light columns, dismantle and re-connection 5 Nr
to be carried out by EDD (Provisional)

CLASS D - TOTAL TO SECTION SUMMARY 2C/2 BD


Truck Haul Road Page 2 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS E - EARTHWORKS

Excavation for Cuttings

E210 Topsoil 14,100 m3


E220 Material other than topsoil, rock or artificial hard 1,050 m³
material
E230 Material in rock 9,200 m³
E250 Asphalt material (Provisional) 200 m³
Excavation Ancillaries
E522 Preparation of excavated surfaces, material other 2,400 m2
than topsoil or rock
E523 Preparation of excavated surfaces, material in rock 21,600 m2
E531 Disposal of excavated material - topsoil 14,100 m3
E532 Disposal of excavated material other than topsoil, 150 m³
rock or artificial hard material.
E533 Disposal of excavated material in rock 1,200 m³
E534 Disposal of excavated material in asphalt (Provisional) 200 m³
E560.1 Excavation 300mm below Type B including disposal 100 m³
and replace with suitable fill material (Provisional)
E560.2 Soil stabilisation geogrid on sub-grade level if
excavtion not possible due to existing services 100 m2
(Provisional)
Filling
E624 Filling to embarkments with selected type B 900 m³
excavated material other than topsoil or rock
E625 Filling to embarkments with selected type B 40,500 m³
imported material other than topsoil or rock
E626 Filling to embarkments with excavated rock 8,000 m³
E722 Preparation of filled surfaces 61,400 m2

CLASS E - TOTAL TO SECTION SUMMARY 2C/3 BD


Truck Haul Road Page 3 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS E - EARTHWORKS (Cont'd)


Embarkment slope protection as standard
drawing SRCD 6.01

E910 Scheme A - 200 x 200 x 200 stone laid on 50mm 200 m²


nominal size stone (Provisional)
E920 Scheme B - 200 thick hard fill type B (Provsional) 20,000 m²
Geotextiles
E730 Geotextile as per standard specifications (Provisional) 20,000 m²

CLASS E - TOTAL TO SECTION SUMMARY 2C/4 BD


Truck Haul Road Page 4 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS E: EARTHWORKS

COLLECTION From page 2C/3


From page 2C/4

CLASS E - TOTAL TO SECTION SUMMARY 2C/5 BD.


Truck Haul Road Page 5 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

Class G - WORK IN CONNECTION WITH SERVICES


(All Provisional)

G910 Excavation to expose existing services 300 m3


G920 Excavation for new services 500 m3
G920 Disposal of excavated material 600 m3
G930 Filling around exposed services with selected 200 m3
material
G940 Filling around exposed services with Type B material 600 m3
G950.1 Filling to cable/service protection - 50mm thick fine 300 m2
sand
G950.2 Filling to cable/service protection - 100mm thick fine 300 m2
sand
G960 Provision of lean mix concrete as SDES Specification 50 m3
Class 20/20
G970 Placing of concrete as protection to services in 50 m3
trenches and formwork.
G980 Provision of reinforced concrete Class 40/20 100 m3
G981 Supplying, bending, placing and tying in position HYS 10 Tonne
deformed bars Gr 460
G982 Formwork plain, vertical and curved to radius 400 m2

CLASS G - TOTAL TO SECTION SUMMARY 2C/6 BD


Truck Haul Road Page 6 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS I - PIPEWORKS

Concrete pipes as Culverts as General


Specification Clause 501.2

(All Provsioinal)

Nominal Bore 900mm

I242 In trenches depth 0-1.5m 40 m


Nominal Bore 600mm
I252 In trenches depth 0-1.5m 190 m

CLASS I - TOTAL TO SECTION SUMMARY 2C/7 BD


Truck Haul Road Page 7 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS K - PIPEWORK - MANHOLES AND


PIPEWORK ANCILLARIES

Manholes (depth measured to channel invert level)

Chamber type "D" in situ concrete as Standard


Detail SD 1.5

K134.1 Depth 1.5 to 2.0m (Provisional) 2 nr.


Catchpits (depth measured to top of base slab)
Chamber type "D" - In situ concrete - as Standard
Detail SD 1.5
K232.1 Depth 1.5 to 2.0m (Provisional) 2 nr.

Other stated chambers

Pipe culvert headwell with wingwall as standard


drawing SRCD 5.03

(All Provisional)

Nominal bore 1x600mm

J512.1 Depth 1.5 - 2m (Provisional) 6 nr.


Nominal Bore 2x600mm
J512.2 Depth 1.5 - 2m (Provisional) 6
Nominal bore 900mm
J512.3 Depth 1.5 - 2m (Provisional) 4 nr.
Soakway
K233.2 Construct soakway pit type 2 as per standard detail 2 nr.
drawing no. 3.7 (Provisional)

CLASS K - TOTAL TO SECTION SUMMARY 2C/8 BD


Truck Haul Road Page 8 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS K - PIPEWORK - MANHOLES AND


PIPEWORK ANCILLARIES (Cont'd)

Gullies (Provisional)

K331 Construct top entry gully complete as per standard 12 nr.

detail drawing no. 3.10

French drains, rubble drains, ditches and trenches

V section unlined ditch in embankment as drawing


no. 1591/T/410

K464 Cross section area 0.75 - 1.0m² 1,200 m


Trapezoidal section unlined ditch in cutting as
drawing no. 1591/T/410
K495 Cross sectional area 1 - 1.5m² 600 m
K496 Cross sectional area 1.5 - 2m² 700 m
K497 Cross sectional area 2 - 3m² 360 m
Cable future ducts as standard drawings SRCD
5.06-5.08
K542.1 100mm dia 6 way ducts for telephone, in trenches 100 m
depth not exceeding 1.5m (Provisional)
K542.2 150mm dia 4 way ducts for electricity, in trenches 340 m
depth not exceeding 1.5m (Provisional)
Miscellaneous
K820 Duct marker blocks; precast concrete; stamp 48 nr.
coded with duct type, as standard detail SRCD 5.08A
(Provisional)
K900.1 300mm thick mortared rip-rap (Provisional) 36 m3

CLASS K - TOTAL TO SECTION SUMMARY 2C/9 BD


Truck Haul Road Page 9 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS K - PIPEWORK - MANHOLES AND


PIPEWORK ANCILLARIES

COLLECTION From page 2C/8


From page 2C/9

CLASS K - TOTAL TO SECTION SUMMARY 2C/10 BD


Truck Haul Road Page 10 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS L - PIPEWORK - SUPPORT AND


PROTECTION, ANCILLARIES TO LAYING
AND EXCAVATION

Beds and surrounds including polythlene sheet,


bitumen paint and warning tape as applicable
(Cont'd)

K512.1 Reinforced concrete class 40/20 surround to 600mm 190 m


dia concrete pipe (Provisional)
K512.2 Reinforced concrete class 40/20 surround to 900mm 40 m
dia concrete pipe (Provisional)
K530 Transporting, installing, testing, backfilling 500mm 100 m
dia DI pipes supplied by WDD including 1 No 150mm
dia UPVC pipe (Provisional)

CLASS L - TOTAL TO SECTION SUMMARY 2C/11 BD


Truck Haul Road Page 11 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS R - ROADS AND PAVINGS

Sub-bases

R114 Granular sub-base material Type A depth 150mm 65,100 m²


Flexible road bases and surfacing
Base course type B28, including tackt coat
between layers where necessary
R323.1 Depth 100mm 63,300 m²
R323.2 Depth 75mm 61,725 m²
Wearing course type GW20, including tack coat
R322 Depth 50mm 60,500 m²
R350 Road oil applied to sub-base 65,100 m²
Kerbs, Channels and Edging (All Provisional)
Precast concrete kerbs half battered, size 125 x 250mm
as standard detail SRCD 10.02
R611 Straight or curved to radius exceeding 12m 2,200 m
R612 Curved to radius not exceeding 12m including 200 m
curved kerb units.
Precast concrete edgings, size 50 x 150mm as
standard detail SRCD 10.02
R611 Straight or curved to radius exceeding 12m 950 m
R612 Curved to radius not exceeding 12m including 50 m
curved kerb units

CLASS R - TOTAL TO SECTION SUMMARY 2C/12 BD


Truck Haul Road Page 12 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS R - ROADS AND PAVINGS (Cont'd)


Light Duty Pavements (All Provisional)

R714 Sub-base of granular material type A depth 150mm 4,150 m²


R792 Rectangular concrete paving blocks 60mm thick 3,000 m²
to BS 6717, in any type of color laid to approved
pattern, with uniform joints on and including 30mm
bed of sand

NOTE:

The following items for Traffic Signs and Road Markings,


all of which are PROVISIONAL, may also be used
for the King Hamad Highway (Durrat Al Bahrain) from
Km 0+000 near to Askar to south Limit of Contract
at boundary with Durrat Development (approx Km
28+000).
CLASS R - TOTAL TO SECTION SUMMARY 2C/13 BD

Page 13 of 19
Truck Haul Road February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS R - ROADS AND PAVINGS (Cont'd)


Ancillaries

Road Traffic Signs (All Items Provisional)


Fabrication, delivery & installation of steel structure
gantry sign of "U" shape and road traffic signs including
post and foundation all as per Ministry of Works and
Housing standards for the following:

R800 Gantry 20 nr
Span up to 22m
R801 Speed Limit Sign 160 nr
Size: 1200mm dia.
R802 Side Road/Bend to Right/Left 50 nr
Size:1200 triangle/1200 x 900mm
R803 Vertical Chevron 50 nr
Size: 1050 x 700mm
R804 Height Limit 20 nr
Size: 1200 mm triangle
R805 Height Limit 10 nr
Size: 1200mm dia.
R806 Chevron Sign (Single) 40 nr
Size: 900 x 600mm
R807 Give Way 40 nr
Size: 1200mm triangle
R808 Directional Arrow 15 nr
Size: 900mm dia
R809 Signal Ahead 30 nr
Size:1200 mm triangle/1200 x 300 mm
R810 No Entry 20 nr
Size: 900mm dia
R811 Stop Sign 10 nr
Size: 900mm octagon

CLASS R - TOTAL TO SECTION SUMMARY 2C/14 BD


Truck Haul Road Page 14 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2
CLASS R - ROADS AND PAVINGS (Cont'd)
Ancillaries (Continued)

Road Traffic Signs - Continued (All Items Provisional)

Fabrication, delivery & installation of steel structure


gantry sign of "U" shape and road traffic signs including
post and foundation all as per Ministry of Works and
Housing standards for the following:

R812 Horizontal Chevron 10 nr


Size: 1800 x 600mm
R813 Roundabout Ahead 10 nr
Size:1200 triangle/1200 x 900mm
R814 One Way 15 nr
650 x 550mm
R815 Road name 15 nr
2300 x 455mm
R816 Exit Sign 10 nr
Size: 3000 x 2000 mm
R817 Finger/Stack Sign 20 nr
2400 x 850mm
R818 Advance Informatory Sign 30 nr
4000 x 4000 mm

CLASS R - TOTAL TO SECTION SUMMARY 2C/15 BD


Truck Haul Road Page 15 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS R - ROADS AND PAVINGS (Cont'd)


Ancillaries (Continued)

Road Markings (All Items Provisional)

Supply and application of road markings all as per


Ministry of Works and Housing standards.

R900 Give Way Line (Code A) 160 m


Double broken line of 0.60m mark, 0.30m gap and
width of 0.20m marked up to C/L of minor road, extend
by 0.60m line, 0.30m gap and width 0.10m
R901 Stop Line at Traffic Signal (Code D) 50 m
Solid line of 0.30m width to be marked 2m before traffic
signal pol;e unless otherwise specified
R902 Lane Line (Code G) 12,868 m
Intermittent line of 2.0m mark, 7.0m gap using 100mm
ceramic studs at 0.5m spacing.
R903 Road Studs (Code H) 16,200 nr
Die-cast aluminium reflectorised studs for lane,
warning or centre line.
R904 Chevron Lines (Code I) 11,000 m2
As per detail drawing
R905 Bus Layby/Edge Line (Code J) 2,000 m
Broken lines of 1.0m mark, 1.m gap, width 0.10m.
R906 Arrow (Code L) 207 nr
As per detail drawing
R907 Edge Line (Code R) 144,500 m
Yellow continuous line width 0.2m
R908 Intermittent Line (Code F) 1,675 m
Line of 3.00m marks, 3.00m gap, width 0.10m changing
to solid line at sharp bends.
R909 Bar marking (Code Q) 2,640 m
As per details 0.40m wide.
R910 Painting of Road Kerbs 1,800 m
Painting with chlorinated yellow & black paint.

CLASS R - TOTAL TO SECTION SUMMARY 2C/16 BD

Page 16 of 19
Truck Haul Road February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS R - ROADS AND PAVINGS

COLLECTION

From page 2C/12

From page 2C/13


From page 2C/14
From page 2C/15
From page 2C/16

CLASS R - TOTAL TO SECTION SUMMARY 2C/17 BD


Truck Haul Road Page 17 of 19 February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS X - MISCELLANEOUS WORK

Safety Fence (Provisional)

X181.1 Tensioned Corrugate Beam (TCB), single sided, 4,800 m


for safety fences and barriers
X181.2 Blocked Out Beam (BCB) for safety barriers at the 100 m
junctions
X189.1 Approach terminal with end posts and concrete 8 nr.
foundations
X189.2 Departure terminal with end posts and conrete 8 nr.
foundations
To MEW Services Corridor (All Provisional)
X189.3 Supply, install and paint concrete bollards adjacent to 60 nr
Batelco Access Road
X189.4 Supply and install boom gates to MEW service road 2 nr
Street Lighting (Civil Work)
(All Provisional)
X590.1 Excavated and backfill trenches for low voltage street 5,500 m
lighting cable depth not exceeding one meter
X590.2 Concrete base for 16m high light column 6 nr.
X590.3 Concrete base for 12m high light column 135 nr.
X590.4 Concrete base for feeder pillar 6 nr.
X590.5 Transport from Central Stores and install 16m high 6 nr.
column with 400 watt high pressure sodium lantern,
double arm
X590.6 Transport from Central Stores and install 12m high 135 nr.
column with 400 watt high pressure sodium lantern,
single arm.
X590.7 Transport from Central Stores and install 12m high 10 nr
column with 400 watt high pressure sodium lantern,
double arm.
X590.8 Transport from Central Stores and install feeder 6 nr.
pillars
X590.9 Transport and install LV 16mm2, 4 core, XLPE/SWE/ 7,500 m
PVC cable
X590.10 Transport and install LV 16mm2, 4 core, XLPE/SWE/ 2,500 m
PVC cable
X590.11 Sand Filling 600 m³

CLASS X - TOTAL TO SECTION SUMMARY 2C/18 BD

Page 18 of 19
Truck Haul Road February 2007

TRUCK HAUL ROAD - NEAR ASKAR


SCHEDULE OF RATES AND PRICES
PART 2

CLASS B GROUND INVESTIGATION 2C/1


CLASS D DEMOLITION & SITE CLEARANCE 2C/2
CLASS E EARTHWORKS 2C/5
CLASS F WORK IN CONNECTION WITH SERVICES 2C/6
CLASS I PIPEWORKS - PIPES 2C/7
CLASS K PIPEWORKS - MANHOLES AND PIPEWORKS 2C/10
ANCILLARIES
CLASS L PIPEWORKS - SUPPORTS AND PROTECTION 2C/11
ANCILLARIES
CLASS R ROADS AND PAVINGS 2C/17
CLASS X MISCELLANEOUS WORK 2C/18

TOTAL CARRIED TO GRAND SUMMARY 2C/19 BD


Truck Haul Road Page 19 of 19 February 2007

TRUCK HAUL ROAD

SCHEDULE OF RATES AND PRICES


GRAND SUMMARY

PART PART DESCRIPTION PAGE NO.


1 PRELIMINARIES AND GENERAL ITEMS 1/11

3 ROADWORKS 3C/21

SUB TOTAL - BD

SUB TOTAL - BD

General Contingency Allowance

Allow 5% for General Contingency Allowance, to be expended in whole or in part as


expressly directed in writing by the Engineer.

- TOTAL TO FORM OF TENDER (BD)

Truck Haul Road


AMOUNT
BD/FILS

0
February 2007

AMOUNT
BD/FILS

0
0

0
February 2007

AMOUNT
BD/FILS

0
February 2007

AMOUNT
BD/FILS

0
0

0
February 2007

AMOUNT
BD/FILS

0
February 2007
AMOUNT
BD/FILS

0
February 2007

AMOUNT
BD/FILS

AMOUNT
BD/FILS

AMOUNT
BD/FILS

0
February 2007

AMOUNT
BD/FILS
1000.000

100000.000

10000.000

1000.000

50000.000

10000.000

30000.000

115000.000

317000.000

AMOUNT
BD/FILS

0
0
0
0
0
0
0
0
0

317000.000

317000.000
February 2007
0

0
0
0

0
0
0

0
0

0
0

0
0
0

0
0
0

0
0

0
0

0
0

0
0
0
0

0
0

0
0
0

0
0

0
0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0.000
0.000
0.000

0.000
0

0.000

0
0

0.000

0.000

0.000
0.000
0.000
0.000

0.000

0
0

0
0
0
0

0.000

0.000
0.000
0.000
0.000
0.000
0.000

0.000

0.000
0.000

0.000

AMOUNT (BD)
317000.000

February 2007