1. Unit Summary .................................................................................................. 3 2. Overview of topics covered ............................................................................. 3 3. Business Scenario ............................................................................................ 3 4. Cost Center ...................................................................................................... 5 5. Cost Element ................................................................................................. 19 6. Statistical Key Figures .................................................................................... 31 7. Activity types ................................................................................................. 39 8. Additional functions for master data ............................................................. 52
White Lotus
1. Unit Summary
This Unit will familiarize the participants with the concept of Standard Hierarchy through which Cost centers can be organized. The course will also explain the relation between GL accounts and primary cost elements. After completion of this unit participant will be able to create Cost Center, Activity Types and Statistical key figures. The collective processing functionality also would be introduced.
3. Business Scenario
Auto Components Limited (ACL) uses legacy system for maintaining internal controlling purposes. ACL is a manufacturing company, all the manufacturing is done from its plant in Bangalore. The company has various departments which provide the following support functions Financial Accounting, Controlling, Sales, Legal, HR, facilities etc. The facilities costs are allocated to other departments in the ration of the Square feet area of the department.
White Lotus
The company would like to evaluate SAP to understand compatibility with the above processes. It is also keen to understand the activity based cost allocation functionality provided in SAP.
White Lotus
4. Cost Center
Entering actual costs Primary costs can be transferred to Cost Accounting from other components, for example, Materials Management (MM), Asset Accounting (AA), and Payroll Accounting (PY). Additional costs and outlay costs are recorded using the accrual method. Allocating actual costs You can use various methods to further allocate the actual costs you have recorded, according to their source. The system distinguishes between transaction-based allocations, which occur within one period, and period-based allocations, which occur at period end.
White Lotus
Planning activities and costs You can use planning to define organizational targets and carry out regular cost-effectiveness checks. Variances can be calculated by comparing the actual costs and activities with the plan values. These variances serve as a control signal, which helps you to correct business processes, when required. You can plan costs and activities to determine allocation (activity) prices. Allocating plan costs All actual allocations that occur for cost centers can also be planned (for example, distribution, assessment, and indirect activity allocation). Entering plan and actual statistical key figures Statistical key figures are used as the basis for the indirect allocation methods, as well as for evaluations in the information system (for example, employees, and telephones). Activity Accounting Activity Accounting uses the activity produced by a cost center as the tracing factor for the costs. You can use activities to measure the operating rate or the rate of capacity utilization for a cost center. The target costs of the cost center refer to the activity output. Depending on the source of the costs, the activities of a cost center are divided into various activity types (for example, for the Work center cost center: Repair hours or Assembly hours. Information system The information system provides tools with which you can analyze the cost flows that have occurred in your organization. You can carry out standard recurring evaluations; and create special reports for unique tasks or situations.
White Lotus
Cost center Hierarchy
You can combine cost centers into cost center groups. You can then create cost center hierarchies from these groups by combining the groups according to decision-making area, area of responsibility, or management area. A cost center hierarchy comprises all cost centers for a given period and therefore represents the whole enterprise. This hierarchy is known as the standard hierarchy.
White Lotus
Basic data
Cost Center Valid from Valid to Name Description Cost center category Unique number identifying the cost center Date from which the cost center master data is valid Date upto which the cost center master data is valid Cost center short name Cost center description Default values for the "Lock" and "Record quantity" indicators can be defined in the cost center category, the values are defaulted into the cost center master data at time of creation Activity type master data includes one or more cost center categories. The activity type may be used only by cost centers belonging to those categories. Free text Field - Enter a name Select appropriate node as mentioned in Diagram above Cost Center Currency (can be different from controlling area currency) Profit center to which the cost center is assigned
White Lotus
White Lotus
4.3 Demonstration
Modifying Cost Center Standard Hierarchy Menu Path Transaction code Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Standard Hierarchy -> Change OKEON
Create Cost Center and assign to hierarchy Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost Center-> Individual processing -> Create KS01
Transaction code
White Lotus
4.4 Self Assessment Test
What are the mandatory fields in the cost center master? a) Standard Hierarchy b) Profit center c) Cost center category d) Both A & C Revenues postings to a cost center is a) Possible b) Not possible c) possible but such postings are Statistical
White Lotus
4.5 Exercises
1. Modify the standard cost center hierarchy of your controlling area in accordance with the data shown below.
2. Create the following cost centers and assign them to the appropriate nodes in the standard hierarchy Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency AA0101 01.01.2009 31.12.9999 Fin. Accounting Dept. Financial Accounting Department W Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR
Page 12
White Lotus
Name Description Cost center category Person responsible Hierarchy Currency Cost Accounting Dept. Cost Accounting Department W Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR
Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency
AA0103 01.01.2009 31.12.9999 HR Human Resource W Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR
Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency
AA0104 01.01.2009 31.12.9999 Facilities Mgmt Dept. Facilities Management Department H Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR
Cost Center Valid from Valid to Name Description Cost center category Person responsible
AA0105 01.01.2009 31.12.9999 Legal Dept. Legal Department W Free text Field - Enter a name
White Lotus
Hierarchy Currency Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency Cost Center Valid from Valid to Name Description Cost center category Person responsible Hierarchy Currency Select appropriate node as mentioned in Diagram above INR AA0106 01.01.2009 31.12.9999 Plant Admin. Dept. Plant Administration Department F Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR AA0107 01.01.2009 31.12.9999 Plant Maint. Dept. Plant Maintenance Department F Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR AA0108 01.01.2009 31.12.9999 Production Cost Center Production Cost Center F Free text Field - Enter a name Select appropriate node as mentioned in Diagram above INR
White Lotus
4.6 Solution
Exercise 1 : Modify Standard Hierarchy
Step 1: Change Standard cost center Hierarchy can be accessed either by entering the transaction code or by navigating through the menu path. Menu Path Transaction code Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Standard Hierarchy -> Change OKEON
White Lotus
Step 2: Select the standard hierarchy node under which you want to create sub nodes and select the option to create Lower Level Group.
Enter the group name FA## and description Finance and administration
White Lotus
Above steps to be repeated until all nodes in the Hierarchy have been created. Exercise 2: Create Cost Centers Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost Center-> Individual processing-> Create KS01
Transaction code
Step 1. Enter the cost center number and the validity period and then press Enter key
White Lotus
Repeat the above steps for all the cost centers mentioned in the Exercise.
White Lotus
5. Cost Element
To be able to post to a primary cost element, you require an object in Management accounting (such as a cost center) to identify the origin of the costs. In order to analyze revenues in cost controlling, revenue GL accounts must be created as revenue cost element. Revenue elements are primary cost elements of category 11.
Secondary Cost Elements Secondary cost elements can only be created and administrated in cost accounting (CO). They portray internal value flows, such as those found in internal activity allocation, overhead calculations and settlement transactions.
White Lotus
When you create a secondary cost element, the SAP System checks whether a corresponding account already exists in Financial Accounting. If one exists, you cannot create the secondary cost element in cost accounting. Examples of secondary cost elements include: Assessment cost elements Cost elements for Internal Activity Allocation Cost elements for Order Settlement
When a cost element is created, the cost element cost element category must be entered. The cost element category defines the transactions for which the cost element can be used. For example, category 01 (general primary cost elements) is used for the standard primary postings from Financial Accounting or Materials Management.
White Lotus
Cost elements can be created automatically. For this the default settings which links cost the cost element range is linked to cost element categories. Primary costs are only created if the respective general ledger exists in the operational chart. The cost element is defaulted from the G/L account master data in Financial Accounting. This can be changed in Management Accounting. In the operational chart of accounts settings it is possible to customize whether creating a general ledger automatically created the cost element. In order to use this functionality the pre-settings for the automatic creation of cost elements must be made. Secondary cost elements are also automatically created. The description is taken from the cost element category, which can be changed manually.
White Lotus
5.3
Demonstration
Create primary cost element Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost Element -> Individual processing - > Create Transaction code KA01 Create secondary cost element Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost Element -> Individual processing - > Create Secondary KA06
Transaction code
Create cost element group Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost Element Group -> Create Primary Transaction code KAH1
White Lotus
5.4
White Lotus
5.5 Exercises
Exercise 1: Check if the following primary cost element already exists and if it has the correct cost element category, if not available create the primary cost element. Create the new GL accounts if required Primary Cost element Name Description Cost element category Primary Cost element Name Description Cost element category Primary Cost element Name Description Cost element category 473110 Telephone (basic) Telephone (basic fees) 1 473199 Diesel expense Diesel expense 1 473198 Electricity expense Electricity expense 1
Exercise 2: Create an assessment Cost element to Secondary Cost element 500000 Name Power expenses allocated Description Power Expenses allocated Cost element category 42 Exercise 3: Create cost element group Create a new cost element Group AA00##. To include the above four cost elements directly under it.
White Lotus
5.6 Solution
Check if primary cost element exits Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost element-> Individual processing - > Display primary KA03
Transaction code
Press Enter If the Cost element exists the details of the cost element are displayed.
White Lotus
Menu Path
Transaction code
Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost element-> Individual processing - > Display primary KA01
*please ensure that the corresponding GL account exists if not the same is to be created
White Lotus
Press Enter on the keyboard and in the next screen enter further details - Select cost element category = 1
Click on the save icon. The primary cost element is now created. Repeat the above steps for the remaining cost elements Create Secondary cost element Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost element-> Individual
Cost Center Accounting Master Data Page 27
White Lotus
processing - > Create secondary
Transaction code
KA06
Enter the Cost element number and validity period. Press Enter on the keyboard.
Create cost element group Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost element group-> Individual processing - > Create Group Transaction code KAH1
White Lotus
White Lotus
Enter the Cost element group that is to be created. Press enter on the keyboard.
White Lotus
6. Statistical Key Figures
White Lotus
6.2 Customization consideration
You can define statistical key figures as either:
Key figures defined as fixed values are valid as of the posting period, and in all subsequent posting periods of the fiscal year. The statistical key figure Employees is defined as a fixed value. In period 1 of the fiscal year, you post 10 Employees on cost center 4100. The system then automatically posts 10 employees in periods 2 through 12. In period 6, the number of employees is increased to 15. This means that in period 6, you post 15 Employees on the cost center. The system automatically posts 15 employees in periods 6 through 12. Key figures defined as Totals values are valid only in the posting period in which they are entered. You define the statistical key figure Telephone units as a totals value. In period 1 of the fiscal year, you post 1000 Telephone units on cost center 4100. The system posts 1000 telephone units in period 01 only. As well as entering statistical key figures manually, you can also transfer them automatically from the information systems of other SAP System application components. To do this, statistical key figure maintenance includes an interface that enables you to link the statistical key figures in Controlling with those in the Logistics Information System (LIS). You transfer plan and actual key figures from the LIS separately. Create Statistical key figure (totals) Step 1. In the initial screen enter the Statistical key figure (identifier)
White Lotus
Step 2. Enter the following and click on the Save icon description of the Statistical key figure, unit of measurement key figure category (fixed or total)
White Lotus
6.3
Demonstration
Create Statistical key figure (totals) Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Cost element-> Individual processing - > Create secondary KK01
Transaction code
White Lotus
6.4
Which of the following, Statistical key figures would be of category Totals? a) Number of permanent employees b) No of electricity units c) Number of desktop computers d) None of the above
White Lotus
6.5 Exercises
Create the following Statistical key figure Stat. Key figr. FLSP## INT## SEA## Description Floor Space Internet usage No of seats Unit of measurement Square meter Hours EA Category Fixed Total Fixed
White Lotus
6.6 Solution
Exercise 1: Create Statistical key figure (totals) The create statistical key figure functionality can be accessed either through the menu path or through a transaction code Menu Path Sap Easy Access -> Accounting -> Controlling Cost center accounting -> Master Data -> Statistical Key figure-> Individual processing - > Create KK01
Transaction code
Step 1. In the initial screen enter the Statistical key figure (identifier)
Step 2. Enter the following and click on the Save icon description of the Statistical key figure, unit of measurement key figure category (fixed or total)
White Lotus
Repeat the above process for the remaining statistical key figures
White Lotus
7. Activity types
White Lotus
Allocation of measurable activities; actual quantity plan price Actual quantities result from the Indirect calculation of total of the activity inputs, activity quantities using calculated using tracing factors receiver tracing factors on the individual receivers Actual activities are allocated Automatic allocation of using indirect activity allocation activity quantities using receiver tracing factors Activity types are not allocated This activity type can be used only to record quantities (no values) on the sender cost centers
Activity types describe activities produced by a cost center. They are measured in units of time or quantity. Activity quantities are valuated using a price. For example: the maintenance department provides maintenance service at a labor hourly rate of USD 100. When the activities produced by a cost center are used by other cost centers, orders or projects, this means that the resources of the sending cost center are being used by the receiver objects. By recording the planned and actual quantities consumed, you reallocate cost incurred on the sender into the receivers. Activity Types can be grouped to facilitate reporting and cost allocation. Activity types are used to allocate machine cost from production cost center to the production orders.
White Lotus
Menu Path Accounting Controlling Cost Center Accounting Master Data Activity Type Individual Processing KL01 Create KL01
Transaction Code
Update the following fields: Field Name Activity type Field Description Activity types describe the activity produced by a cost center and are measured in units of time or quantity. Valid from date field Valid to date field
Valid from To
White Lotus
Field Description Description of the Name. Brief text description of the run schedule Description of the Activity unit.
White Lotus
Note: This indicator determines for which cost center types an activity type is allowed for the purpose of planning and internal activity allocation. Select the relevant row Click Continue Button . .
White Lotus
Note: This Indicator determines method activity quantity is planned and allocated. Select 1 - Manual entry, manual allocation in list box.
Field Description The allocation cost element is a secondary cost element, under which the activity type or business process is allocated.
Values Use an existing secondary cost element of category 43. You may also create a new secondary Cost element
White Lotus
Price indicator (1) 3 Entries found
Note: Indicator determines how price of a business process or activity type is arrived at for a cost center. Click <checkbox> Average price . Indicator determining that activity for cost centers/activity types remain constant for the entire fiscal year. Click the Enter button. . prices
White Lotus
Note: This indicator can be used for activity type locking. Click the Enter button.
.
White Lotus
7.3
Demonstration
KL01 - Create Activity Type
Menu Path
Accounting Controlling Cost Center Accounting Master Data Activity Type Individual Processing KL01 Create KL01
Transaction Code
White Lotus
7.4
Activity type is a special type of Cost Element a) True b) False Activity types are created at controlling area level. c) True d) False
White Lotus
7.5 Exercises
Create the secondary cost element for internal activity allocation Secondary Cost element 500001 Name Production Hours Description Production Hours Cost element category 43 Create the following Activity Types Activity type Name Description Activity Units Activity type category Price Indicator Cost element
White Lotus
7.6 Solution
Create Secondary cost element Menu Path Accounting Controlling Cost Center Accounting Master Data Cost element Individual processing -> Create Secondary
KA06
Transaction Code
Create Activity Type Menu Path Accounting Controlling Cost Center Accounting Master Data Activity Type Individual Processing KL01 Create KL01
Transaction Code
White Lotus
Field Name Activity type Field Description Activity types describe the PRD## activity produced by a cost center and are measured in units of time or quantity. Valid from date field Valid to date field 01.01.2009 31.12.9999 Values
White Lotus
8. Additional functions for master data
Time based master data Collective processing option Master Data Groups
White Lotus
8.2 Configuration and usage consideration
Defining Time Based fields Menu Path IMG Controlling Cost Center Accounting Master Data Cost Center define time based fields for cost centers
OKEG
Transaction Code
Master data for cost centers, cost elements, activity Types, and business processes can be maintained with time dependencies. Changes can be made for any given time interval. Master data is stored in database tables with time reference. This way a master data record can have multiple database records storing different information. The following dependencies are supported: o not time-based
White Lotus
o Day-based o Period-based o (Fiscal) year-based Fields which can be changed freely (indicated in the DAY column) can Have different time dependencies only if it is marked additionally as historically relevant. This activates the timebased updating for the records. Collective Changes to Cost Center Master Data
Click on the execute button List of cost centers are displayed with master data fields in change mode. Necessary corrections / changes can be made to the relevant fields
White Lotus
White Lotus
8.3
Demonstration
Collective processing of Cost Center Master changes
Accounting Controlling Cost Center Accounting Master Data Cost Center Collective processing -> Change
KS12
Creation of alternate cost center groups Menu Path Transaction Code Accounting Controlling Cost Center Accounting Master Data Cost Center Group Create
KSH1
White Lotus
8.4
Activity type master data can either be changed or deleted using the collective processing option. a) True b) False
White Lotus
8.5 Exercises
Exercise 1: Use collective processing option to change the person responsible for cost center master AA##06 Plant Administration AA##07 Plant Maintenance AA##08 - Production cost center
Exercise 2: Common services costs are to be allocated during period end. Create alternate receiver cost center groups consisting of the following cost centers - AA##06 Plant Administration - AA##07 Plant Maintenance - AA##08 - Production cost center
White Lotus
8.6 Solution
Exercise 1 Menu Path Accounting Controlling Cost Center Accounting Master Data Cost Center Collective processing -> Change
KS12
Transaction Code
Click on the execute button List of cost centers are displayed with master data fields in change mode. Necessary corrections / changes can be made to the relevant fields
White Lotus
Changes can be saved on clicking the save button Exercise 2 Menu Path Accounting Controlling Cost Center Accounting Master Data Cost Center Group Create
KSH1
Transaction Code
Enter the name of the cost enter group that you wish to create
White Lotus
Press enter on the keyboard.
to insert cost centers under the group. Once all cost centers are added