Sei sulla pagina 1di 41

1.

CENTRIFUGAL MONOBLOC PUMPSET WITH ISI MARK AS PER


IS 9079/1989 WITHOUT PANEL BOARD (3 PHASE)

Sl.
No.

Duty
lpm x m

H.P. of Pumpset

Unit

Rate for 2013-14


in Rupees

2
100x20

3
1

4
1 No

5
7266.00

1
2

150x20

1.5

1 No

10704.00

200x20

1 No

11123.00

250x20

1 No

12310.00

300x20

1 No

14231.00

350x20

1 No

14231.00

400x20

1 No

14766.00

450x20

1 No

14766.00

500x20

1 No

14766.00

10

700x20

1 No

17502.00

11

50x35

1 No

11553.00

12

100x35

1 No

13129.00

13

150x35

1 No

18260.00

14

200x35

1 No

20557.00

15

250x35

1 No

20557.00

16

300x35

7.5

1 No

22822.00

17

350x35

7.5

1 No

22822.00

18

400x35

7.5

1 No

23933.00

19

450x35

7.5

1 No

24055.00

20

500x35

7.5

1 No

24055.00

21

50x50

1 No

20556.00

22

100x50

1 No

20556.00

23

150x50

7.5

1 No

22409.00

24

200x50

7.5

1 No

22409.00

25

250x50

7.5

1 No

22409.00

26

300x50

7.5

1 No

24651.00

27

350x50

10

1 No

28078.00

28

400x50

10

1 No

28078.00

1 No

35141.00

29
Note:

500x60
12.5
Rates are excluding excise duty and VAT.
Excise duty at 6.18% as extra
VAT at 5% on Rate +Excise Duty as extra

81

2.0

SINGLE PHASE SUBMERSIBLE PUMPSET AS PER IS 8034 WITHOUT


PANEL BOARD WITHOUT PANEL BOARD

Sl. No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

15x40

0.50

1 No

11120.00

15x50

0.75

1 No

8809.00

15x60

0.75

1 No

11154.00

15x70

0.75

1 No

12888.00

15x80

1.00

1 No

12888.00

15x90

1.00

1 No

12888.00

15x100

1.00

1 No

16055.00

15x125

0.75

1 No

18239.00

15X150

0.75

1 No

19635.00

10

20x40

0.50

1 No

11154.00

11

20x50

0.75

1 No

8809.00

12

20x60

0.75

1 No

11154.00

13

20x70

1.00

1 No

12888.00

14

20x80

1.00

1 No

12888.00

15

20x90

1.00

1 No

14333.00

16

20x100

1.00

1 No

17094.00

17

20X125

1.50

1 No

18239.00

20X150
2.00
1 No
Rates are excluding excise duty and VAT
Excise duty at 6.18% as extra
VAT at 5% on Rate + excise duty as extra

19520.00

18
Note:

3.0

3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MM DIA BOREWELL


WITH ISI MARK IS 8034 WITHOUT PANEL BOARD

Sl. No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

30x40

0.50

1 No

11546.00

30x50

0.75

1 No

11654.00

30x60

0.75

1 No

12231.00

30x70

0.75

1 No

12888.00

30x80

1.00

1 No

15559.00

30x90

1.00

1 No

16979.00

30x100

1.50

1 No

16979.00

30x125

2.00

1 No

18596.00

40x40

0.75

1 No

11546.00

10

40x50

0.75

1 No

12231.00

11

40x60

1.00

1 No

12231.00

12

40x70

1.00

1 No

15998.00

13

40x80

1.00

1 No

17525.00

14

40x90

1.50

1 No

18649.00

15
Note:

40x100

1.50

1 No

18649.00

Rates are excluding excise duty and VAT.


Excise duty at 4.12% as extra.
VAT at 5% on Rate + excise duty as extra.

3.1

3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIA BOREWELL


WITH ISI MARK IS 8034 WITHOUT PANEL BOARD

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

50x40

2.00

1 No

16496.00

50x50

2.00

1 No

17312.00

50x60

2.00

1 No

18162.00

50X75

3.00

1 No

19363.00

50x100

3.00

1 No

26565.00

50x125

4.00

1 No

26591.00

50x175

5.00

1 No

34188.00

50x200

6.00

1 No

37422.00

50x225

7.00

1 No

48187.00

10

50x250

10.00

1 No

48759.00

11

50x275

10.00

1 No

56183.00

12

75x40

2.00

1 No

16774.00

13

75x50

2.00

1 No

17312.00

14

75x60

3.00

1 No

18162.00

15

75x75

3.00

1 No

20711.00

16

75x100

4.00

1 No

26565.00

17

75x125

4.00

1 No

31231.00

18

75x150

5.00

1 No

33611.00

19

75x175

6.00

1 No

27531.00

20

75x200

7.50

1 No

36758.00

21

75x225

10.00

1 No

48673.00

22

75x250

10.00

1 No

56183.00

23

75x275

10.00

1 No

54942.00

24

100x30

1.50

1 No

15862.00

25

100x40

2.00

1 No

16774.00

26

100x50

3.00

1 No

19257.00

27

100x60

3.00

1 No

19363.00

28

100x75

3.00

1 No

23972.00

29

100x100

4.00

1 No

27583.00

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

30

100x125

5.00

1 No

32176.00

31

100x175

7.50

1 No

30681.00

32

100x200

10.00

1 No

36758.00

33

100x225

10.00

1 No

48673.00

34

100x250

10.00

1 No

50368.00

35

125x25

1.50

1 No

15862.00

36

125x40

3.00

1 No

16774.00

37

125x50

3.00

1 No

19257.00

38

125x60

3.00

1 No

21653.00

39

125x75

3.00

1 No

23175.00

40

125x100

4.00

1 No

28446.00

41

125x125

6.00

1 No

33611.00

42

125x200

10.00

1 No

45246.00

43

125x225

10.00

1 No

50368.00

44

150x25

1.50

1 No

15862.00

45

150x40

3.00

1 No

16774.00

46

150x50

3.00

1 No

17312.00

47

150x60

3.00

1 No

21653.00

48

150x75

4.00

1 No

23175.00

49

150x100

5.00

1 No

31231.00

50

150x125

6.00

1 No

33611.00

51

175x40

3.00

1 No

16774.00

52

175x50

3.00

1 No

21153.00

53

175x60

3.00

1 No

21653.00

54

175x75

4.00

1 No

21653.00

55

175x100

6.00

1 No

31231.00

56

200x25

2.00

1 No

15862.00

57

200x40

3.00

1 No

16774.00

58

200x50

4.00

1 No

21435.00

59

200x60

5.00

1 No

23849.00

60

200x75

5.00

1 No

23972.00

61

200x100

6.00

1 No

31231.00

62

200x125

7.50

1 No

34709.00

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

63

250x40

3.00

1 No

16774.00

64

250x50

4.00

1 No

21435.00

65

250x60

5.00

1 No

23175.00

66

250x75

6.00

1 No

27334.00

67

250x100

7.50

1 No

34143.00

68

250x125

10.00

1 No

39955.00

69

300x40

4.00

1 No

22263.00

70

300x50

5.00

1 No

23175.00

71

300x60

6.00

1 No

27334.00

72

300x75

7.50

1 No

31979.00

73

300x100

12.50

1 No

38515.00

74

350x40

5.00

1 No

21435.00

75

350x50

6.00

1 No

23849.00

76

350x60

7.50

1 No

31979.00

77

350x75

10.00

1 No

34143.00

78

350x100

12.50

1 No

39955.00

79

400x40

6.00

1 No

25832.00

80

400x50

7.50

1 No

31709.00

81

400x60

7.50

1 No

31945.00

82

400x75

10.00

1 No

41287.00

83

500x40

7.50

1 No

26762.00

84

500x50

7.50

1 No

35199.00

85

500x75

12.50

1 No

44632.00

86

600x40

7.50

1 No

29068.00

87

600x50

12.50

1 No

39172.00

600x75
12.50
1 No
Rates are excluding excise duty and VAT.
Excise duty at 4.12% as extra.
VAT at 5% on Rate + excise duty as extra.

45133.00

88
Note:

4.0

OPENWELL SUBMERSIBLE PUMPSET WITH ISI MARK IS 14220 WITHOUT


PANEL BOARD

Sl. No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for 2013-14


in Rupees

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

2
50x25
50x40
50x50
50x60
50x75
50x100
50x125
75x25
75x40
75x50
75x60
75x75
75x100
75x125
75x150
100x25
100x40
100x50
100x60
100x75
100x100
100x125
125x25
125x40
125x50
125x75
125x100
125x125
150x25
150x40
150x50
150x60
150x75
150x100
150x125
175x25
175x40
175x50

3
1.00
1.00
1.50
2.00
4.00
5.00
6.00
1.00
1.50
2.00
2.00
4.00
5.00
6.00
7.50
1.00
2.00
3.00
4.00
4.00
5.00
6.00
3.00
3.00
3.00
4.00
5.00
6.00
3.00
3.00
3.00
4.00
4.00
5.00
7.50
3.00
3.00
3.00

4
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

5
13804.00
13804.00
16393.00
20502.00
29875.00
36511.00
44290.00
13804.00
15684.00
17536.00
20502.00
29875.00
36511.00
43749.00
55882.00
14930.00
17536.00
17556.00
29875.00
29875.00
36511.00
44290.00
14930.00
17556.00
22806.00
29875.00
36511.00
44290.00
14930.00
17556.00
17556.00
30165.00
29875.00
36511.00
55882.00
14930.00
17556.00
22806.00

Sl. No.

Duty
lpm x m

H.P. of
Pumpset

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

175x60
175x75
175x100
200x25
200x40
200x50
200x60
200x75
200x100
200x125
250x25
250x40
250x50
250x60
250x75
250x100
250x125
300x25
300x40
300x50
300x60
300x75
300x100
350x25
350x40
350x50
350x60
350x75
350x100
400x25
400x40
400x50
400x60
400x75
500x25
500x40
500x50
500x75
600x25
600x40
600x50
600x75

4.00
5.00
6.00
3.00
4.00
4.00
4.00
6.00
7.50
10.00
3.00
4.00
5.00
5.00
7.50
7.50
10.00
3.00
5.00
5.00
6.00
10.00
10.00
3.00
5.00
7.50
7.50
10.00
10.00
3.00
5.00
5.00
7.50
10.00
5.00
5.00
5.00
10.00
5.00
7.50
7.50
10.00

Unit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Rate for 2013-14


in Rupees
29875.00
29875.00
36511.00
14930.00
17556.00
17556.00
29875.00
29875.00
36511.00
66194.00
14930.00
17556.00
22806.00
29875.00
36511.00
40604.00
81197.00
14930.00
17556.00
22806.00
29875.00
36511.00
40604.00
17556.00
25687.00
22806.00
29875.00
36511.00
40604.00
17556.00
25687.00
22806.00
32256.00
40604.00
17556.00
25687.00
22806.00
40604.00
17556.00
25687.00
32256.00
40604.00

Sl. No.
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
Note:

Duty
lpm x m

H.P. of
Pumpset

Unit

700x40
10.00
1 No
700x60
10.00
1 No
700x80
10.00
1 No
700x100
10.00
1 No
800x40
10.00
1 No
800x60
10.00
1 No
800x80
10.00
1 No
800x100
10.00
1 No
900x40
10.00
1 No
900x60
10.00
1 No
900x80
10.00
1 No
900x100
10.00
1 No
1000x40
12.50
1 No
1000x60
15.00
1 No
1000x80
20.00
1 No
1000x100
25.00
1 No
1250x40
20.00
1 No
1250x60
25.00
1 No
1250x80
35.00
1 No
1250x100
35.00
1 No
1500x40
20.00
1 No
1500x60
30.00
1 No
1500x80
35.00
1 No
1500x100
50.00
1 No
2000x40
30.00
1 No
2000x60
35.00
1 No
2000x80
35.00
1 No
2000x100
35.00
1 No
2500x40
35.00
1 No
2500x60
35.00
1 No
2500x80
35.00
1 No
2500x100
35.00
1 No
Rates are excluding excise duty and VAT.
Excise duty at 6.18% as extra.
VAT at 5% on Rate + excise duty as extra

Rate for 2013-14


in Rupees
30146.00
40604.00
40604.00
40604.00
30146.00
40604.00
40604.00
40604.00
40604.00
40604.00
40604.00
40604.00
45980.00
48258.00
54390.00
83050.00
51030.00
83050.00
90530.00
87194.00
55770.00
80190.00
93720.00
170941.00
84150.00
93720.00
93720.00
93720.00
93720.00
93720.00
93720.00
93720.00

HORIZONTAL SPLIT CASTING CENTRIFUGAL PUMP (1500 RPM)


(BRONZE IMPELLER AND SS10 SHAFT)
Rupees in Lakhs
Sl.N
o.

Pump
Capacity in
LPM

Rate for 2013-14 in Rupees


Head in Metres
25

30

35

40

45

50

55

60

70

80

90

1500

2.04

2.04

2.41

2.41

2.43

3.09

3.13

3.16

3.34

3.34

3.74

2500

2.04

2.04

2.49

2.58

3.13

3.15

3.13

4.04

3.70

3.83

3.83

3000

2.15

2.04

2.58

2.58

2.80

2.90

2.90

4.13

4.13

3.96

3.99

3500

2.04

2.04

2.58

2.58

3.66

3.76

4.18

4.34

4.40

4.79

4.79

4000

2.36

2.36

2.58

2.58

3.34

3.76

4.06

4.13

4.23

4.23

4.23

5000

2.73

2.73

2.73

2.96

3.89

4.28

4.31

4.75

4.93

4.93

4.93

6000

2.58

2.58

3.83

3.89

3.89

4.35

4.67

5.13

5.38

5.38

5.38

7000

3.55

3.68

3.89

3.89

4.26

4.44

4.54

5.13

5.14

9.34

9.34

8000

3.56

3.39

3.69

4.44

4.44

4.44

4.63

4.76

8.74

8.74

8.74

10

9000

3.56

3.80

3.83

4.44

4.46

4.45

4.51

4.61

9.34

11

10000

3.56

3.90

3.84

4.46

4.74

4.64

4.64

8.49 10.71 10.71 10.79

12

15000

4.38

4.53

4.40

5.41

5.41

6.54

7.15

9.34 10.71 10.71 10.79

13

20000

4.81

4.90

4.91 11.39 12.53 12.53 12.53 12.53 12.53 12.53 12.53

14

25000

12.25 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53

15

30000

12.46 12.94 13.55 13.55 13.55 13.55 13.55 16.25 17.88

Note: 1) The rates are inclusive of MS base plate, flexible tyre coupling and foundation bolts.
2) The rates are inclusive of all duties taxes handling charges and at
F.O.R. destination.
3) Efficiency may be taken from

HORIZONTAL SQUIRREL CAGE MOTOR 1500 RPM


AC 3 Phase /415 V/ Horizontal SPDP 4 Pole Squirrel cage Induction motor
for HSC Centrifugal pumps
Sl.
No

KW

HP

Rate for 2013-14


in Rupees

9.3

12.5

81563.00

11

15

85811.00

15

20

106868.00

18.5

25

137750.00

22

30

151500.00

30

40

175363.00

37

50

218923.00

45

60

282338.00

55

75

261250.00

10

75

100

408375.00

11

90

120

430375.00

12

110

150

542625.00

13

125

170

698125.00

14

132

180

739500.00

15

150

200

746750.00

16

160

215

818500.00

17

180

240

871750.00

18

187

250

912250.00

19

200

270

978500.00

20

220

300

1281625.00

21

250

335

1461192.00

22

280

375

2025125.00

23

300

400

2172750.00

Note:

The above rates are inclusive of excise duty, taxes, handling charges
etc.,
Excise duty at 12.36,VAT at 5%

HORIZONTAL SQUIRREL CAGE MOTOR 1000 RPM


AC 3 Phase /415 V/ Horizontal SPDP 6 Pole Squirrel cage Induction moror
for HSC Centrifugal pumps
Sl.No

KW

HP

Rate for 2013-14


in Rupees

9.3

12.5

74534

11

15

78320

15

20

110379

18.5

25

130356

22

30

167790

30

40

209291

37

50

261602

45

60

322264

55

75

369206

10

75

100

443155

11

90

120

502690

12

110

150

645431

13

125

170

767925

14

132

180

767925

15

150

200

819718

16

160

215

884035

17

180

240

1237200

18

187

250

1256988

19

200

270

1360531

20

220

300

1539083

21

250

335

1723007

Note:

The rates are inclusive of excise duty,taxes,


handling charges etc.,
Excise duty at 12.36%,VAT at 5%.

8.0

VERTICAL TURBINE PUMP (WATER LUBRICATED)1500 RPM SUITABLE FOR


VERTICAL HOLLOW SHAFT SQUIRREL CAGE INDUCTION MOTOR
Rupees in lakhs

Pump
Sl.N Capacity
o.
in LPM
1

1500

2000

3000

4000

5000

6000

7000

8000

10000

10

15000

11

20000

12

25000

13

30000

Rate for 2013-14 in Rupees


Head in meters
15m

20m

30m

40m

50m

60m

70m

80m

Note:
1) The above rates are including excise duty at12.36%, VAT 5% ,transportaion and
handling charges etc.,
2) Multiply with 1.15 for oil lubricated pumps (for raw water)
3) Rates given are with suspension length of 7m, bronze impeller, SS 40

90m

100m

9.0 VERTICAL HOLLOW SHAFT MOTORS FOR TURBINE PUMP


AC 3 Phase /415 V/ Vertical Hollow Shaft TEFC & SPDP 4 Pole Squirrel cage
Induction moror 1500RPM

Sl.No

KW

HP

Rate for 2013-14


in Rupees

18.5

25

22

30

30

40

37

50

45

601

55

75

75

100

90

120

110

150

10

125

170

11

132

180

12

150

200

13

160

215

14

180

240

15

187

250

16

200

270

17

220

300

18

250

335

19

280

375

20

300

400

TEFC MOTORS

SPDP MOTORS

Note: The rates are inclusive of excise duty,taxes,etc.,


Excise duty at 12.36%, VAT at 5%.

10.0 IRON CORE OIL COOLED TRANSFORMERS WITH COPPER WINDING


CONFIRMING TO IS 2026
Rate for 2013-14 in Rupees
Sl.No

Rating in KVA
11KV

22 KV

11KV/22KV

160

219600.00

234000.00

261000.00

200

243000.00

261000.00

288000.00

250

265500.00

288000.00

315000.00

315

327600.00

344700.00

378000.00

400

392400.00

445500.00

479700.00

Note :- Excise duty at 12.36 % and TNVAT at 5% and handling charges are extra.
10.1 OIL NATURAL AND AIR NATURAL COOLED COPPER WINDING H.T.
TRANSFORMER CONFORMING TO IS 2026
Rate for 2013-14 in Rupees
Sl.No.

Rating in KVA
11KV/433V

22KV/433V

500

524700.00

564300.00

630

653400.00

693000.00

750/800

803000.00

882000.00

1000

957000.00

1035000.00

Note : Excise duty at 12.36%, TNVAT at 5% and handling charges are extra

11.0 SINGLE PHASE PANEL BOARD WITH TWO LEVEL GUARD AND AUTO
START

Sl. No.

HP

Unit

Rate for 2013-14 in Rupees

1 No.

4065.00

1.5

1 No

4453.00

1 No

5082.00

Note

1) The rate are excluding excise duty and taxes


2) Excise duty Nil and VAT at 5 % extra over the above rate.
3)The above rates are inclusive of two level guard worth
Rs.550/- and auto star facility worth Rs. 400/4) Timer is not recommended for this panel board.
2) Panel board should be provided as per specification given in Board
circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.1 3 PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD AND AUTO
START
Sl. No.

HP

Unit

Rate for 2013-14 in Rupees

1 No.

9020.00

1 No

9020.00

1 No

9020.00

1 No.

9020.00

1 No

9020.00

1 No

9020.00

Note

1) The rate are excluding excise duty and taxes


2) Excise duty Nil and VAT at 5 % extra over the above rate.
3)The above rates are inclusive of two level guard worth
Rs.550/- and auto star facility worth Rs. 400/4)For Timer facility if necessoryRs. 4000 may be added as extra.
2) Panel board should be provided as per specification given in Board
circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.2 3 PHASE PANEL BOARD-STAR DELTA WITH TWO LEVEL GUARD AND
AUTO START
Sl. No.

HP

Unit

Rate for 2013-14 in Rupees

1 No.

10660.00

7.5

1 No

12870.00

10

1 No

15015.00

12.5

1 No.

15675.00

15

1 No

15675.00

20

1 No

16500.00

25

1 No

16500.00

Note

1) The rate are excluding excise duty and taxes.


2) Excise duty Nil and VAT at 5 % extra over the above rate.
3)The above rates are inclusive of two level guard worth Rs.550/- and auto
star facility worth Rs. 400/-.
4) Timer is not recommended for this panel board.
2) Panel board should be provided as per specification given in Board
circular No. 23/DCE/QATA/2004/Dt. 23.8.2004.

11.3 DOL STARTER WITH SINGLE PHASING PREVNTOR WITH AMMETER


CONFORMING TO IS 13947 WITH AUTO RESTART FACILITY FOR PUMP
HOUSES WHERE PANEL BOARDS ARE AVAILABLE

Up to 10 HP rating Rs. 4416

The above rates are inclusive of all taxes ,duties and handling charges
Excise duty at 10.3 %,VAT 5 %)

11.4

FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE


FOR L.T.SQUIRREL CAGE MOTOR

Sl.No.

Description

Unit

Rate for 2013-14 in Rupees

30 to 37

1 No

167600.00

38 to 75

1 No

273200.00

76 to 135

1 No

409600.00

136 to 160

1 No

467000.00

161 to 250

1 No

640800.00

251 to 300

1 No

758400.00

301 to 500

1 No

1170800.00

501 to 750

1 No

1512200.00

11.5

FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE


FOR H.T.SQUIRREL CAGE MOTOR

Sl.No.

Description

Unit

Rate for 2013-14 in Rupees

250

1 No

635600.00

300

1 No

698900.00

350

1 No

741100.00

400

1 No

790000.00

500

1 No

825500.00

600

1 No

931900.00

700

1 No

974000.00

800

1 No

1016200.00

900

1 No

1102400.00

10

1000

1 No

1185000.00

Note:

**

1)The rates are inclusive of excise duty taxes etc.


2) DOL starters are to be adopted up to 6 HP
3) Air break fully automatic star delta starters are suggested for above 6 HP
upto 20HP except submersible pumpsets for which fully automatic ATS starters a
4) FCMA soft starter are to be adopted for 100 HP and above.
5)Excise duty at 12.36% VAT at 5%

11.6

FULLY AUTOMATIC AIR BREAK STAR DELTA STARTER


WITH SINGLE PHASING PREVENTOR WITH AMMETER
CONFORMING TO IS 13947 WITH AUTO RESTART
FACILITY

Sl.No

KW Rating

HP

Unit

7.5

10

1 No

11

15

1 No

15

20

1 No

18.5

25

1 No

22

30

1 No

30

40

1 No

37

50

1 No

Rate for 2013-14 in Rupees

The above rates are inclusive of all taxes, duties and handling charges.
Excise duty at 12.36%, VAT at 5%

11.7

FULLY AUTOMATIC AIR BREAK AUTO TRANSFORMER


STARTER WITH SINGLE PHASING PREVENTORY WITH
AMMETER WITH AUTO RESTART FACILITY

Sl.No

KW Rating

HP

Unit

5.5

7.5

1 No

7.5

10

1 No

12.5

1 No

11

15

1 No

15

20

1 No

22

30

1 No

30

40

1 No

37

50

1 No

45

60

1 No

10

60

80

1 No

11

75

100

1 No

Rate for 2013-14 in Rupees

The above rates are inclusive of all taxes, duties and handling charges.
Excise duty at 12.36%, VAT at 5%

12.0

L.T. CABLES

3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE


CONFORMING TO IS 1554 PART I WITH ISI MARKING

Sl.No.

Description

Rate for 2013-14 in Rupees

Unit

3 Core

3.5 Core

4 Core

4sq.mm

metre

42.00

--

49.00

6sq.mm

metre

51.00

--

56.00

10sq.mm

metre

58.00

--

66.00

16sq.mm

metre

61.00

--

73.00

25sq.mm

metre

76.00

89.00

97.00

35sq.mm

metre

93.00

108.00

123.00

50sq.mm

metre

123.00

140.00

158.00

70sq.mm

metre

163.00

195.00

210.00

95sq.mm

metre

213.00

240.00

268.00

10

120sq.mm

metre

256.00

303.00

330.00

11

150sq.mm

metre

312.00

359.00

403.00

12

185sq.mm

metre

385.00

437.00

493.00

13

240sq.mm

metre

486.00

554.00

625.00

14

300sq.mm

metre

590.00

675.00

764.00

15

400sq.mm

metre

755.00

861.00

978.00

Note: Excise duty 12.36% and VAT at 5% are extra


12.1

PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE


CONFORMING TO IS 694/1990
Rate for 2013-14 in Rupees

Sl.No.

Description

Unit

1.5 sq.mm

With excise
duty

Without excise
duty

meter

36.00

32.00

2.5 sq.mm

meter

59.00

52.00

4.0 sq.mm

meter

85.00

76.00

6.0 sq.mm

meter

126.00

113.00

10.0 sq.mm

meter

214.00

192.00

16.0 sq.mm

meter

330.00

296.00

Note:

Excise duty at 12.36% and VAT at 5% are extra.

12.2

RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR


The cost of cable per meter will be the cost per joint

12.3

CABLE LAYING
Rate for 2013-14 in Rupees
For laying below GL For laying in trenches
including earth
inside the pump room
work per meter
or in air per meter

Sl.No.

Description

up to 95 sq. mm

90.00

60.00

95 to 240 sq.mm

130.00

86.00

240 to 400 sq.mm

190.00

150.00

12.4
Description

Unit

Rate for 2013-14


in Rupees

up to 95 sq. mm

each

180.00

95 to 240 sq.mm

each

220.00

Sl.No.

3
Note:

CABLE CLAMPS

each
320.00
240 to 400 sq.mm
1.For every 3 metre length one set of clamp is to be provided
2.Suitable number of clamps are to be arrived at according to the length
3.Provision for cable trench and delivery pipe ducting are to be provided in
pump house detailed estimate.
12.5 H.T. CABLE
PVC INSULATED ARMOURED ALUMINIUM CONDUCTOR CABLE

Sl.No.

Description

Rate for 2013-14


in Rupees

Unit
11KV

12KV

3 C 240 sq.mm

metre

787.00

962.00

3 C 185 sq.mm

metre

656.00

813.00

3 C 150 sq.mm

metre

557.00

723.00

3 C 120 sq.mm

metre

495.00

650.00

3 C 95 sq.mm

metre

420.00

589.00

3 C 70 sq.mm
metre
376.00
Excise duty at 12.36% and VAT at 5% are extra

519.00

6
Note:

LE

13.0
Sl.
No.
1

2
3

VACCUM PUMP SET WITH ACCESSORIES

Description
Rate for 5 HP Model/ Rotary type Vaccum
pumpsets (Pumpset + GI Pipes + Fittings +
Starters + Valves + 100 Lr.Tank) including
Transportation, handling charges all taxes and
duties
Rate for 10 HP Vaccum pumpset with all above
Accessories
150mm dia Pressure Gauge and Vaccum guage
including all accessories as per specification
(For Suction and Delivery to be mounted on
wall on Teak Wood Board)
14.0

Unit

Rate for 2013-14


in Rupees

1 No

212129.00

1 No

242077.00

1 No

3744.00

MOULDED CASE CIRCUIT BREAKER(MCCB)

Sl.N
o.

Range

Rate for 2013-14 in Rupees


3POLE

4 POLE

32-100

8857.00

11000.00

125

10500.00

13000.00

160

13000.00

17424.00

200

23553.00

24684.00

250

23553.00

28314.00

320

28500.00

33000.00

400

30000.00

34500.00

630

33188.00

40000.00

800

45000.00

59968.00

10

1000

70000.00

90000.00

11

1250

79000.00

115000.00

90000.00
145000.00
12
1600
NOTE:
1) The rates are inclusive of all taxes, duties and handling charges and F.O.R. destination.
2) The rate for MCB for single phase useage the PWD schedule of rates shall be referred.
3) Add 35% cost of MCCB/ACB/ MCB towards the cost of fabrication other fittings and labour
4) Upto 15 KW distribution box shall be used for more than one outgoing loads and for rates PWD
schedule rates shall be referred.

15.0 RATE FOR MIXED DIE ELECTRIC CAPACITOR WITH TNEB TEST CERTIFICATE
WITH ACCESSORIES INCLUDING BANKING CONFORM TO IS 2834.
Rs.400/- per KVAR (including all taxes, duties and handling charges).

Note:
a. The rate for mixed Die Electric Capacitor with Test Certificate given as Rs.400/- per KVAR is
inclusive of all taxes and duties and inclusive of Banking charges, such as providing of copper bus
bars with provision for adding atleast 2 capacitors at later date, cable entry box, fabricating charges
etc. complete. This rate is not applicable for replacement of capacitors which do not require banking
and fabrication works.

16.0
Sl.N
o.

LT METERING BOX
Unit

Rate for 2013-14 in


Rupees

Up to 50HP/37 KW (which includes LT meter


panel board 6 Nos. suitable fuse carriers

1 No.

18750.00

75 HP/56 KW
(which includes LT meter
panel board 6 Nos. suitable fuse carriers

1 No.

24470.00

75HP-150HP/56-112 KW (which includes LT


meter panel board 6 Nos. suitable fuse carriers

1 No.

30580.00

IN HT supply using LT metering board (Above


150 HP below 200 HP) 112-150 KW

1 No.

50000.00

Description

17.0

TRANSFORMER SUB STATION RELATED WORKS

Sl.No.

Description

Unit

Rate for 2013-14 in


Rupees

Designing and preparation of CEIG drawings,


obtaining Approval and safety certificate
including submission of Completion report and
rectification report.

1 No.

50000.00

Supply, delivery of 6 pole structure materials


with suitable Size RSJ along with all structure
material are as under.
For 11 KV Sub station

1 No.

250000.00

For 22 KV Sub station

1 No.

350000.00

Construction of transformer plinth

1 No.

17480.00

1 No.

45000.00

Chain link fencing with gate including the


TNEB 2 poles Spreading of materials as per
CEIG requirements
Transformer yard earthing

Upto 250 KVA Transformer sub station

1 No.

25000.00

Above 250 KVA

1 No.

50000.00

Transformer sub station erection charges

1 No.

15890.00

Note: Provision for cement concrete flooring has to be made at the sub astation yard
17.1

Sl.No.

AIR CIRCUIT BREAKER (ACB)

Range in AMPS

Rate for 2013-14 in Rupees


3POLE

4 POLE

1000

138500.00

170400.00

1250

146700.00

179700.00

1600

162800.00

209400.00

2000

203500.00

246400.00

2500

245600.00

300300.00

3200

311200.00

384100.00

4000

385300.00

473000.00

8
Note:

The rates are inclusive of all taxes, duties, handling charges and F.O.R. destination.

18.0

SAFETY APPLIANCES

Sl.No.

Description

Unit

Rate for 2013-14 in


Rupees

Electrical gloves tested to 11 KV /22 KV with


wooden box dusted with french chalk powder

1 No.

410.00

Electrical quality 6mm thick rubber mat

1 No.

590.00

5 kg capacity ISI marked Dry chemical powder


fire extinguisher

1 No.

1650.00

1 No.

660.00

Fire Bucket-3 Nos Hooked to MS stand

Laminated shock treatment chart

1 No.

500.00

Wooden First Aid Box

1 No.

650.00

Rechargeable Emergency
fluorescent lamp)

1 No.

2750.00

lamp(

600mm

H.T. SUPPLY
8

Wooden ladder 3M Ht.

1 No.

990.00

Earth Discharge Rod

1 No.

830.00

Note:

The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

19.0

TOOLS

Sl.No.

Description

1
2
3
4
5
6
7

6 Chain wrench best India make


8Chain Wrench Best India Make
Connector Screw Driver 901 Taparia Make
200mm Screw Driver 825 Taparia Make
300mm Screw Driver 829 Taparia Make
400mm Screw Driver 930 Taparia Make
200mm Cutting Plier Taparia Make
800gm Ball Pane Hammer with Handle
Taparia Make

1
1
1
1
1
1
1

Digital Tong Tester CE Make


Digital Multi Meter CE Make
15 Screw Spanner Taparia Make
12 Bearing Puller
Lever Type Grease Gun
12Screw Spanner
Crow Bar 5
1 Cold Chisel
Hacksaw Frame with Blade
Electrical Air Blower
Digital Tachometer
Hand Crimpling Tool 8
DE Spanner set 6 to 32 Jhalani Make
Rings spanner set 6 to 32 Jhalani Make
Pipe Wrench 24 Jhalani Make
Pipe Wrench 14 Jhalani Make
12 Flat rough File Scissors Make
12 Flat smooth File Scissors Make
12Round File Rough Scissors
12 Round File Smooth Scissors Make
12Half Round File Rough Scissors Make
12Half Round File Smooth Scissors Make

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Unit

Rate for 2013-14 in


Rupees

No.
No.
No.
No.
No.
No.
No.

500.00
700.00
41.00
70.00
137.00
198.00
250.00

1 No.

300.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

3000.00
1750.00
600.00
594.00
487.00
422.00
430.00
144.00
90.00
2500.00
1500.00
372.00
750.00
1798.00
1080.00
450.00
242.00
372.00
317.00
350.00
540.00

1 No.

540.00

Note: The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

20.0 PUMP ROOM WIRING AND OTHER ITEMS

Sl.No.

Description

Unit

Rate for 2013-14 in


Rupees

Providing lighting wiring using MS conduit


pipes and specials with 2 runs 1.5 sq.mm PVC
copper wire and 1 run 12 swg GI wire for
earthing for light, fans and 5A plug points
including switch box 5A switch sockets ceiling
rose and consumables

1 No.

750.00

Supply of portable hand lamp with 100w bulb,


lamp guard and wooden handle and 25M long
flexible cable.

1 No.

830.00

Supply of pedestal fan

1 No.

2860.00

Note:

1)Add 35% for wiring on the total fittings cost.


2)The above rates are inclusive of all taxes duties handling charges and F.O.R destination.
3)Excise duty at 12.36% VAT 5%.

21.0 TWIN GI EARTHING


Sl.No.

Description

Unit

Rate for 2013-14 in


Rupees

Upto 25 HP installation

1 No.

1500.00

Above 25-60 HP

1 No.

2000.00

Above 60-150 HP

1 No.

3000.00

1 No.
5000.00
Above 150 HP
4
Note: In case of collector well the collctor well distance from the bank of the rivr should be
ascertained to find out the weight of GI strip to be usd only in the foot bridge and rate
rate of Rs.47/- per Kg should be adopted for estimation and this amount should be added
with the above rates.

22.0

H.O.T. CRANE AND ACCESSORIES

Sl.No.

Description

2T capacity hand operated over head


Travelling (HOT) crane suitable for a span
upto 6 Mtrs, and travel length upto 10 Mtrs.
with clear lift upto 6 Mtrs. including gear type
chain pulley block and geared Travelling trolley
complete with all accessories.

Unit

Rate for 2013-14 in


Rupees

1 No.

302570.00

2T HOT crane with above specifications upto 8


M Span

1 No.

312380.00

2T HOT crane with above specifications upto


10 M Span

1 No.

333640.00

3T capacity hand operated over head


Travelling (HOT) crane suitable for a span
upto 6 Mtrs, and travel length upto 10 Mtrs.
with clear lift upto 6 M including gear type
chain pulley block and geared Travelling trolley
complete with all accessories.

1 No.

325470.00

3T HOT crane with above specifications upto 8


M Span

1 No.

335280.00

3T HOT crane with above specifications upto


10 M Span

1 No.

348360.00

5T capacity hand operated over head


Travelling (HOT) crane suitable for a span
upto 6 Mtrs, and travel length upto 10 M with
clear lift upto 6 M including gear type chain
pulley block and geared Travelling trolley
complete with all accessories.
5T HOT crane with above specifications upto 8
M Span

1 No.

420320.00

1 No.

449760.00

1 No.

479200.00

8
9

5T HOT crane with above specifications upto


1M Span

Note: The rates are inclusive of all taxes,duties, handling charges.

23.0

CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY


APPLICATION OF GLASS FLAK COATING FOR HORIZANDAL
SPLIT CASE PUMPS
Rupees in Thousands
Rate for 2013-14 in Rupees

Sl.No

Capacity
in LPM

HEAD IN METRES
25

30

35

40

45

50

55

60

70

80

72

90

1500

31

31

31

31

31

2500

37

37

37

38

39

3000

39

39

39

39

39

3500

39

39

39

39

40

44

44

44

4000

39

39

42

42

44

44

44

44

5000

40

44

44

44

44

54

54

54

6000

44

44

44

54

54

54

59

59

7000

54

59

68

68

72

72

72

72

72

8000

72

72

72

79

79

79

79

79

79

10

9000

79

79

87

87

87

87

87

87

87

11

10000

87

91

91

91

91

91

91

91

91

12

15000

104

110

110

110

110

110

110

110

110

137

137

13

20000

129

137

137

137

137

137

137

137

137

158

158

14

25000

137

158

158

159

159

159

159

159

159

168

168

15

30000

158

158

161

161

168

168

168

168

168

188

188

Note:

The rates for testing and repairs, if any required, for pump sets will be extra.

23.1

CARRYING ENERGY EFFICIENCY IMPROVEMENT JOB BY


APPLICATION OF GLASS FLAK COATING FOR MIXED
FLOW PUMPS
Rate for 2013-14 in Rupees

Sl.No

Head in meters

Capacity in Cum/Hr.
10

15

400

40000

40000

500

40000

40000

600

43000

43000

700

45000

45000

800

47000

47000

900

47000

47000

1000

57000

57000

1100

57000

57000

1200

77000

77000

10

1300

77000

77000

11

1400

98000

98000

12

1500

98000

98000

Note:The rates for testing and repairs, if any required, for pump sets will be extra.

23.2

CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY


APPLICATION OF GLASS FLAK COATING FOR VERTICAL
TURBINE PUMPS
Rate for 2013-14 in Rupees

Sl.No

Capacity
in LPM

HEAD IN METERS
15

20

25 30 35

40 45 50

55 60

70 80 90

2500

60000

59300

84050

93900

108750

108600

3000

60000

59300

84050

108750

123600

178050

3500

60000

59300

84050

118650

133500

182950

4000

64000

63260

89000

126570

148350

192850

5000

64000

63260

89000

126570

148350

192850

6000

70000

69200

93900

133500

158250

202750

7000

79000

78110

103800

138450

168150

212650

8000

88000

86970

113700

148350

178050

222550

9000

88000

86970

113700

148350

178050

222550

10

10000

99000

97860

118650

158250

182950

232450

11

15000

109000

107760

133500

168150

192850

242350

12

20000

120000

118650

143400

178050

202750

252550

13

25000

130000

128550

158250

182950

212650

262150

14

30000

140000

138450

168150

192850

222550

272050

Note: The rates for testing and repairs, if any required, for pump sets will be extra.

Potrebbero piacerti anche