Sei sulla pagina 1di 148

Schedules of Rates

1: A Conversion from &tem 1


A A-1

Schedule No. 1 - Plant and Mandatory Sp

!" to 1#$!" %A&S' (rid Stations at )a

-escription $ 1#$ !" ./0&PM.N)


132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement.

A-$

A-#

132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor.
132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm

A-1 A-2

A-

A-3

A-4

A-5 A-16

A-11

A-1$

1#$ !" Substation Connectors i) !ML" ii) !M"" iii) #0B $3% iv) !M $3 A

)otal of &tem 7A8

9 9-1 Control Panels:

1#$ !" Control : Protection System


i) Line Control Panel CP*20 ii) Line Control Panel CP*30 ii) !rans ormer Control Panel CP*'0

9-$

Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798 1#$ !" Substation (eneral .;uipment


%9idders to indicate ;uantities for satisfactory completion of +or<'

C*1

i) All Aluminum -on0u-tor $00mmD 7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 2is- ?nsulator @0 K; vii) 11 KV stru-ture. viii).4%$ >as C:lin0er 10 Kg

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB>

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les -on0uits et-. .arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

C-1

i' #'mmD Co++er -on0u-tor


ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps.

!:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CControl house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified.
Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified.

C-3 C-4

11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A

C-5

9attery And 9attery Char*er:

?. ??.
???. ?V. V. V?. C-16 C-11

Batter: 110V 2C) 1'0 A" Batter: Charger 110V 2C


AC&2C 4tation Au/iliar: Panel 11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. Marshalling Bo/ or !&% Ba:) Line Ba: Marshalling Bo/ or P! Ba:

116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing 7,all mounte0)

C-1$

Control Room >urniture a) .) -) 0) e) ) C i-er !a.le si3e =8/18 4u+ervisor !a.le si3e '8/38 C i-er Es Chairs Visitor8s Chairs ;oti-e Boar0 si3e $8/3F8 4+lit Air -on0itioner 1.'tons 1#$ !" S-) Matli A )ando (hulam Ali )?,ine %>eed for )ando (hulam Ali (rid Station Ne+@ ,en*th #6.12 !ms'

g) <e rigerator C-1#

i) !o,er !:+e GM1 ii) 3 Meter Leg E/tension iii) $ Meter Leg E/tension iv) !o,er !:+e GM30 v) 3 Meter Leg E/tension vi) !o,er !:+e GM$0 vii) 3 Meter Leg E/tension viii) >roun0ing 4ets

or GM1 or GM1 or GM30 or GM$0

i/) L:n/ Con0u-tor /) Earth Bire # mm /i) 2is- ?nsulators7@0K; %og t:+e) /ii) 4ingle 4us+ension %itting or L:n/ /iii) 4ingle !ension itting or L:n/ /iv) 4to-( Bri0ge 0am+er or L:n/ /v) Mi0 4+an Hoints or L:n/ /vi) <e+air sleeve or L:n/ /vii) 4ingle 4us+ension itting or earth /viii) 4ingle !ension itting or Earth ,ire /i/) 4to-( Bri0ge 0am+er or Earth Bire //) Mi0 4+an Hoints or Earth Bire //i) P.> Clam+ or L:n/ )otal of &tem 7C8 .rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 4et o ,ren-hes 2) 2igital +hase angle meter 3) 2C insulation <esistan-e tester7'000V) 1) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent. ') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent. )otal of &tem 7-8
)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

Schedules of Rates and Prices

o. 1 - Plant and Mandatory Spare Parts Supplied from Abroad 0nit Price1 Country of Bri*in # 1 /ty >orei*n Currency 2 C&P Cyderabad )otal Price1 >orei*n Currency 3D1=

#$!" %A&S' (rid Stations at )ando (hulam Ali alon* +ith allied )ransmission ,ine.

1 ;o.

3;os.

3 *4ets

1*sets

2 sets

$ ;os.

3 ;os.

3 ;os. 3 ;os. $ 4ets

1 ;os $ ;os. 01 ;o. @ ;os. $ ;os. 12 ;os. 03 ;os. 0# ;os.

1 ;os 1 ;os 1 ;o 2 ;os. 1 ;o.

'00 Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. $$ ;os. 1 ;o. 1 ;o.

@00Mtrs **** 330Mtrs 0# ;os. *** @ ;os. 0# ;os. *** $ ;os. 1''0Mtrs 1300 Mtrs #'0 Mtrs 11'0 Mtrs 1*Lot

2000Mtrs 1' ;os. 1'0 ;os. $0 ;os. 1' ;os.

03 ;os. 02 ;os. 02 ;os. ;il ;il ;il 1*Lot 1*Lot

1*Lot

1 ;o. $ ;os.

1*set
1 ;o. 1 ;o. 1 ;o. 3 ;o. 1 ;o.

1*Lot
' ;os. 12 ;os. 1 ;o. 1 ;o. $ ;os. $ ;os. 2 ;os. 2 ;os. 1 ;o.

#3 ;os. 0' ;os. 02 ;os. 0@ ;os. 01 ;o. 0$ ;os. 01 ;o. 10= 4ets.

#2.'0 Km 30.'0 Km 12@2 ;os. 2=# 4ets #0 4ets. $3$ ;os. 1' ;os. 20 ;os. #3sets. 2@ sets. 212 ;os. 20 ;os. @1 ;os.

1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

)a=es and -uties ,ocal Currency 4

Schedule No. 1 - Plant and Mand


1-9: Conversion from
&tem 1
A A-1

!" to 1#$!" %A&S' (r

-escription $

1#$ !" ./0&PM.N)


132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement. 132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm

A-$

A-# A-1 A-2

A-

A-3

A-4 A-5 A-16 A-11

A-1$

1#$ !" Substation Connectors i) !ML" ii) !M"" iii) !M $3% iv) !M $3 A

)otal of &tem 7A8


9 9-1

1#$ !" Control : Protection System


Control Panels: i) Line Control Panel CP*20

ii) Line Control Panel CP*30 iii) !rans ormer Control Panel CP*'0 9-$ Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798


C

1#$ !" Substation (eneral .;uipment %9idders to indicate ;uantities for satisfactory completion of +or<'
i) All Aluminum -on0u-tor $00mmD 7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 4%$ >as C:lin0er 10 Kg vi) 2is- ?nsulator @0 K; vi) 11 KV stru-ture.

C*1

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB>

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les -on0uits et-. .arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

C-1

i' #'mmD Co++er -on0u-tor


ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B

!:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CC-3 C-4 Control house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified. Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified. 11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A C-5 9attery And 9attery Char*er:

i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C


iii) AC&2C 4tation Au/iliar: Panel iv)11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. /vii) Marshalling Bo/ or !&% Ba:) Line Ba: /viii) Marshalling Bo/ or P! Ba: C-16 C-11 116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing C-1$ Control Room >urniture a) C i-er !a.le si3e =8/18 .) 4u+ervisor !a.le si3e '8/38 -) C i-er Es Chairs 0) Visitor8s Chairs e) ;oti-e Boar0 si3e $8/3F8 ) 4+lit Air -on0itioner 1.'tons g) <e rigerator C-1# Material for 1#$ !" S-) )ando (hulam Ali- -i*ri )?, feed for -i*ri (?S Ne+ ,en*th $ .16 !ms 7,all mounte0)

?. !o,er !:+e GM1 ??. 3 Meter Leg E/tension or GM1 ???. !o,er !:+e GM30 ?V. 3 Meter Leg E/tension or GM30 V. !o,er !:+e GM$0 V?. 3 Meter Leg E/tension or GM$0 V??. >roun0ing 4ets V???. L:n/ Con0u-tor ?A. Earth Bire # mm A. 2is- ?nsulators7@0K; %og t:+e) A?. 4ingle 4us+ension %itting or L:n/ A??. 4ingle !ension itting or L:n/

A???. 4to-( Bri0ge 0am+er or L:n/ A?V. Mi0 4+an Hoints or L:n/ AV. <e+air sleeve or L:n/ AV?. 4ingle 4us+ension itting or earth AV??. 4ingle !ension itting or Earth ,ire AV???. 4to-( Bri0ge 0am+er or Earth Bire A?A. Mi0 4+an Ioints or Earth Bire AA. P.> Clam+ or L:n/ .rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 4et o ,ren-hes 2) 2igital +hase angle meter 3) 2C insulation <esistan-e tester7'000V) 1) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent. ') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent.

)otal of &tem 7-8


)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

Plant and Mandatory Spare Parts Supplied from Abroad


to 1#$!" %A&S' (rid Stations at -i*ri alon* +ith allied )ransmission ,ine.
Country of Bri*in # 0nit Price1 /ty >orei*n Currency 1 2 C&P Cyderabad

1 ;o.

3;os.

3 *4ets 1*sets 2 sets

$ ;os.

3 ;os.

3 ;os. 3 ;os $ 4ets

1 ;os $ ;os. 01 ;o. @ ;os. $ ;os. 12 ;os. 03 ;os. 0# ;os.

1 ;os

1 ;os 1 ;o 2 ;os. 1 ;o.

'00Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. 1 ;o. $$ ;os. 1 ;o.

@00Mtrs **** 330 Mtrs 0#;os. *** @ ;os. 0# ;os. *** $ ;os. 1''0Mtrs 1300 Mtrs #'0 Mtrs 11'0 Mtrs 1*Lot

2000Mtrs 1' ;os. 1'0 ;os. $0 ;os. 1' ;os. 03 ;os. 02 ;os.

02 ;os. ;?L ;?L ;?L 1*Lot 1*Lot 1*Lot

1 ;o. $ ;os.

1*set
1 ;o. 1 ;o. 1 ;o. 03 ;os. 01 ;o.

1*Lot
' ;os. 12 ;os. 1 ;o. 1 ;o. $ ;os. $ ;os. 2 ;os. 2 ;os. 1 ;o.

@0 ;os. 02 ;os. 0' ;os. 01;o. 0@ ;os. 01 ;o. #3 4ets @0.00 Km 2$.00Km 3==0 ;os 210 4ets @1 4ets.

''2 ;os. 10 ;os. 1' ;os. @0 sets. 2@ sets. 1@1 ;os. 1# ;o. @0 ;os.

1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

ne.
)otal Price1 >orei*n Currency 3D1= )a=es and -uties ,ocal Currency 4

Schedule No. 1 - Plant and Mandatory Spare Parts Sup


1-C: Conversion from

!" to 1#$!" %A&S' (rid Stations at )ando Ean Muhamm

&tem

-escription

1
A

$ 1#$ !" ./0&PM.N)

A-1 132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. A-$ 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement. 132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor.

A-#

A-1

A-2

A-

A-3

A-4

A-5 A-16 A-11

11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm

A-1$

1#$ !" Substation Connectors

i) !ML" ii) !M"" iii) #0B $3% iv) !M $3 A

)otal of &tem 7A8


9 9-1 1#$ !" Control : Protection System Control Panels: i) Line Control Panel CP*20 ii) Line Control Panel CP*30 iii) !rans ormer Control Panel CP*'0 9-$ Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798


C

1#$ !" Substation (eneral .;uipment


%9idders to indicate ;uantities for satisfactory completion of +or<'

C-1

i) All Aluminum -on0u-tor $00mmD7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 2is- ?nsulator @0 KM vi) 11 KV stru-ture. vii). 4%$ >as C:lin0er 10 Kg

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB>

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les -on0uits et-.

C-1

.arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

i' #'mmD Co++er -on0u-tor


ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CControl house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified.

C-3 C-4

Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified.

11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A

C-5

9attery And 9attery Char*er:

i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C


iii) AC&2C 4tation Au/iliar: Panel iv)11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. /vii) Marshalling Bo/ or !&% Ba:) Line Ba: /viii) Marshalling Bo/ or P! Ba: C-16 C-11 116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing C-1$ Control Room >urniture a) .) -) 0) e) ) C-1# C i-er !a.le si3e =8/18 4u+ervisor !a.le si3e '8/38 C i-er Es Chairs Visitor8s Chairs ;oti-e Boar0 si3e $8/3F8 4+lit Air -on0itioner 1.'tons 7,all mounte0)

g) <e rigerator Material for 1#$ !" S-) -i*ri A )ando Ean Muhammad )?,ine % >eed for ).E. Muhammad (rid Station Ne+' ,en*th 12.36 !m'

?.

!o,er !:+e GM1

??. ???. ?V. V. V?. V??. V???. ?A. A. A?. A??. A???. A?V. AV.

!o,er !:+e GM30 !o,er !:+e GM$0 >roun0ing 4ets L:n/ Con0u-tor Earth Bire # mm 2is- ?nsulators7@0K; %og t:+e) 4ingle 4us+ension %itting or L:n/ 4ingle !ension itting or L:n/ 4to-( Bri0ge 0am+er or L:n/ Mi0 4+an Hoints or L:n/ <e+air sleeve or L:n/ 4ingle 4us+ension itting or earth 4ingle !ension itting or Earth ,ire

AV?. 4to-( Bri0ge 0am+er or Earth Bire AV??. Mi0 4+an Ioints or earth Bire AV???. P.> Clam+ or L:n/ )otal of &tem 7C8 .rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 4et o ,ren-hes 2) 2igital +hase angle meter 3) 2C insulation <esistan-e tester7'000V) 1) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent. ') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent. )otal of &tem 7-8
)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

Mandatory Spare Parts Supplied from Abroad


Stations at )ando Ean Muhammad alon* +ith allied )ransmission ,ine.
0nit Price1 Country of Bri*in /ty >orei*n Currency 1 2 C&P >orei*n Cyderabad Currency 3D1= ,ocal Currency 4 )otal Price1 )a=es and -uties

1 ;o.

3;os.

3 *4ets

1*sets

2 sets

$ ;os.

3 ;os.

3 ;os.

3 ;os. $ 4ets

1 ;os $ ;os. 01 ;o. @ ;os.

$ ;os. 12 ;os. 03 ;os. 0# ;os.

1 ;o 1 ;o. 1 ;o 2 ;os. 1 ;o.

'00Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. $$ ;os. 1 ;o. 1 ;o.

@00Mtrs **** 330Mtrs 0# ;os. *** @ ;os. 0# ;os. *** $ ;os. 1$'0Mtrs 1'00 Mtrs 1000 Mtrs 1''0 Mtrs 1*Lot

2000Mtrs 1' ;os. 1*Lot 1'0 ;os. $0 ;os. 1' ;os. 03 ;os. 02 ;os. 02 ;os. ;il ;il ;il 1*Lot 1*Lot

1*Lot

1 ;o. $ ;os.

1*set
1 ;o. 1 ;o. 1 ;o. 3 1

1*Lot
' ;os. 12 ;os.

1 ;o. 1 ;o.

$ ;os.
$ ;os. 2 ;os. 2 ;os.

01 ;o. 13 ;os.

01 ;os. 03 ;os. '0 4ets 1@.00 Km 1$ Km 23@0 ;os 12# 4ets =2 4ets. 31@ ;os. 22 ;os. 0' ;os. 13 sets. 0# sets. #@ ;os. 10 ;o) $$ ;os.

1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

Schedule No. $- Plant and Mandatory Spare Parts Supplied from +it
$:A Conversion from

!" to 1#$!" %A&S' (rid Stations at )ando (hulam Ali alon* +i

&tem
1

-escription
$

/ty
#

A A-1

1#$ !" ./0&PM.N)


132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement. 1 ;o.

A-$

3;os.

A-#

132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm 2 hori3ontal Aluminum Con0u-tor.
132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0.

3 *4ets

A-1

1*sets

A-2

2 sets

A-

$ ;os.

A-3

3 ;os.

A-4

3 ;os.

A-5 A-16

3 ;os. $ 4ets

A-11

1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm 1 ;os $ ;os. 01 ;o. @ ;os.

A-1$

1#$ !" Substation Connectors i) !ML" ii) !M"" iii) #0B $3% iv) !M $3 A $ ;os. 12 ;os. 03 ;os. 0# ;os.

)otal of &tem 7A8


9 9-1

1#$ !" Control : Protection System


Control Panels: i) Line Control Panel CP*20 ii) Line Control Panel CP*30 ii) !rans ormer Control Panel CP*'0 1 ;os 1 ;os 1 ;o 2 ;os. 1 ;o.

9-$

Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798


C

1#$ !" Substation (eneral .;uipment


%9idders to indicate ;uantities for satisfactory completion of +or<'

C*1

i) All Aluminum -on0u-tor $00mmD 7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 2is- ?nsulator @0 K; vii) 11 KV stru-ture. viii).4%$ >as C:lin0er 10 Kg

'00 Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. $$ ;os. 1 ;o. 1 ;o.

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB> @00Mtrs **** 330Mtrs 0# ;os. *** @ ;os. 0# ;os. *** $ ;os. 1''0Mtrs 1300 Mtrs #'0 Mtrs 11'0 Mtrs -on0uits et-. 1*Lot

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les

C-1

.arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

i' #'mmD Co++er -on0u-tor


ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CControl house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified.
Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified.

2000Mtrs 1' ;os. 1'0 ;os. $0 ;os. 1' ;os. 03 ;os. 02 ;os. 02 ;os. ;il ;il ;il 1*Lot 1*Lot

C-3 C-4

1*Lot

11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A 1 ;o. $ ;os.

C-5

9attery And 9attery Char*er:

?. ??.
???.

Batter: 110V 2C) 1'0 A" Batter: Charger 110V 2C


AC&2C 4tation Au/iliar: Panel

1*set
1 ;o. 1 ;o. 1 ;o. 3 ;o. 1 ;o.

?V. 11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. V. V?. C-16 C-11 Marshalling Bo/ or !&% Ba:) Line Ba: Marshalling Bo/ or P! Ba:

116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing 7,all mounte0)

1*Lot
' ;os. 12 ;os.

C-1$

Control Room >urniture a) .) -) 0) e) ) C i-er !a.le si3e =8/18 4u+ervisor !a.le si3e '8/38 C i-er Es Chairs Visitor8s Chairs ;oti-e Boar0 si3e $8/3F8 4+lit Air -on0itioner 1.'tons 1#$ !" S-) Matli A )ando (hulam Ali )?,ine %>eed for )ando (hulam Ali (rid Station Ne+@ ,en*th #6.12 !ms' 1 ;o. 1 ;o. $ ;os. $ ;os. 2 ;os. 2 ;os. 1 ;o.

g) <e rigerator C-1#

i) !o,er !:+e GM1 ii) 3 Meter Leg E/tension or GM1 iii) $ Meter Leg E/tension or GM1 iv) !o,er !:+e GM30 v) 3 Meter Leg E/tension or GM30 vi) !o,er !:+e GM$0 vii) 3 Meter Leg E/tension or GM$0 viii) >roun0ing 4ets i/) L:n/ Con0u-tor /) Earth Bire # mm /i) 2is- ?nsulators7@0K; %og t:+e) /ii) 4ingle 4us+ension %itting or L:n/ /iii) 4ingle !ension itting or L:n/ /iv) 4to-( Bri0ge 0am+er or L:n/ /v) Mi0 4+an Hoints or L:n/ /vi) <e+air sleeve or L:n/ /vii) 4ingle 4us+ension itting or earth /viii) 4ingle !ension itting or Earth ,ire /i/) 4to-( Bri0ge 0am+er or Earth Bire //) Mi0 4+an Hoints or Earth Bire //i) P.> Clam+ or L:n/ )otal of &tem 7C8 .rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 2) 3) 1) 4et o ,ren-hes 2igital +hase angle meter 2C insulation <esistan-e tester7'000V) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent.

#3 ;os. 0' ;os. 02 ;os. 0@ ;os. 01 ;o. 0$ ;os. 01 ;o. 10= 4ets. #2.'0 Km 30.'0 Km 12@2 ;os. 2=# 4ets #0 4ets. $3$ ;os. 1' ;os. 20 ;os. #3sets. 2@ sets. 212 ;os. 20 ;os. @1 ;os.

1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent. )otal of &tem 7-8
)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

ts Supplied from +ithin employers country

)ando (hulam Ali alon* +ith allied )ransmission ,ine.

.GH 0nit Price1


1

)otal .GH Price1


2 D # =1

Sales )a=

)otal Price
3D2F

Schedule No. $- Plant and Mandatory Spare Parts Supplied from +ithi
$:9 Conversion from
&tem
1

!" to 1#$!" %A&S' (rid Stations at -i*ri alon* +ith allied


/ty
#

-escription
$

A A-1

1#$ !" ./0&PM.N)


132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement. 132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 1 ;o.

A-$

3;os.

A-#

3 *4ets

A-1

132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor.

1*sets

A-2

2 sets

A-

$ ;os.

A-3

3 ;os.

A-4

3 ;os.

A-5 A-16 A-11

11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0.

3 ;os $ 4ets

1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm 1 ;os $ ;os. 01 ;o. @ ;os. $ ;os.

A-1$

1#$ !" Substation Connectors i) !ML"

ii) !M"" iii) !M $3% iv) !M $3 A 9 9-1

12 ;os. 03 ;os. 0# ;os.

)otal of &tem 7A8 1#$ !" Control : Protection System


Control Panels: i) Line Control Panel CP*20 ii) Line Control Panel CP*30 iii) !rans ormer Control Panel CP*'0 1 ;os 1 ;os 1 ;o 2 ;os. 1 ;o.

9-$

Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798 1#$ !" Substation (eneral .;uipment %9idders to indicate ;uantities for satisfactory completion of +or<'
i) All Aluminum -on0u-tor $00mmD 7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 4%$ >as C:lin0er 10 Kg vi) 2is- ?nsulator @0 K; vi) 11 KV stru-ture. '00Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. 1 ;o. $$ ;os. 1 ;o.

C*1

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB> @00Mtrs **** 330 Mtrs 0#;os. *** @ ;os. 0# ;os. *** $ ;os. 1''0Mtrs 1300 Mtrs #'0 Mtrs 11'0 Mtrs -on0uits et-. 1*Lot

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les

C-1

.arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

i' #'mmD Co++er -on0u-tor

2000Mtrs

ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CControl house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified. Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified. 11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A C-5 9attery And 9attery Char*er:

1' ;os. 1'0 ;os. $0 ;os. 1' ;os. 03 ;os. 02 ;os. 02 ;os. ;?L ;?L ;?L 1*Lot 1*Lot

C-3 C-4

1*Lot

1 ;o. $ ;os.

i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C


iii) AC&2C 4tation Au/iliar: Panel iv)11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. /vii) Marshalling Bo/ or !&% Ba:) Line Ba: /viii) Marshalling Bo/ or P! Ba: C-16 C-11 116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing C-1$ Control Room >urniture a) C i-er !a.le si3e =8/18 .) 4u+ervisor !a.le si3e '8/38 -) C i-er Es Chairs 0) Visitor8s Chairs e) ;oti-e Boar0 si3e $8/3F8 ) 4+lit Air -on0itioner 1.'tons g) <e rigerator C-1# Material for 1#$ !" S-) )ando (hulam Ali- -i*ri )?, feed for -i*ri (?S Ne+ ,en*th $ .16 !ms 7,all mounte0)

1*set
1 ;o. 1 ;o. 1 ;o. 03 ;os. 01 ;o.

1*Lot
' ;os. 12 ;os.

1 ;o. 1 ;o. $ ;os. $ ;os. 2 ;os. 2 ;os. 1 ;o.

?. !o,er !:+e GM1 ??. 3 Meter Leg E/tension or GM1

@0 ;os. 02 ;os.

???. ?V. V. V?. V??. V???. ?A. A. A?. A??. A???. A?V. AV. AV?. AV??. AV???. A?A. AA.

!o,er !:+e GM30 3 Meter Leg E/tension or GM30 !o,er !:+e GM$0 3 Meter Leg E/tension or GM$0 >roun0ing 4ets L:n/ Con0u-tor Earth Bire # mm 2is- ?nsulators7@0K; %og t:+e) 4ingle 4us+ension %itting or L:n/ 4ingle !ension itting or L:n/ 4to-( Bri0ge 0am+er or L:n/ Mi0 4+an Hoints or L:n/ <e+air sleeve or L:n/ 4ingle 4us+ension itting or earth 4ingle !ension itting or Earth ,ire 4to-( Bri0ge 0am+er or Earth Bire Mi0 4+an Ioints or Earth Bire P.> Clam+ or L:n/

0' ;os. 01;o. 0@ ;os. 01 ;o. #3 4ets @0.00 Km 2$.00Km 3==0 ;os 210 4ets @1 4ets. ''2 ;os. 10 ;os. 1' ;os. @0 sets. 2@ sets. 1@1 ;os. 1# ;o. @0 ;os.

)otal of &tem 7C8


.rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 4et o ,ren-hes 2) 2igital +hase angle meter 3) 2C insulation <esistan-e tester7'000V) 1) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent. ') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent. 1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

)otal of &tem 7-8


)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

arts Supplied from +ithin employers country


.GH 0nit Price1
1

tions at -i*ri alon* +ith allied )ransmission ,ine.


)otal .GH Price1
2 D # =1

Sales )a=

)otal Price
3D2F

Schedule No. $- Plant and Mandatory Spare Parts Supplied fro


$:C Conversion from

!" to 1#$!" %A&S' (rid Stations at )ando Ean Muhammad

&tem
1

-escription
$

1#$ !" ./0&PM.N)


132&11.'(V) 20&2$ MVA) 3*+hase +o,er trans ormer -om+lete ,ith -ontrol -u.i-le) a--essories) .ushings ,ith e/ten0e0 -ree+age 0istan-e an0 -onne-tors. 11' (V single +hase surge arrester su.station -lass having an e/ten0e0 -ree+age 0istan-e ,ith steel su++orting stru-ture -om+lete ,ith mounting arrangement. 132 (v) 10(A) 2000 Am+s.) 110V 2C) 3*Pole Cir-uit Brea(ers ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&'A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132KV) 10 KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel su++orting stru-ture an0 -onne-tors. 132 (v) Voltage !rans ormers ratio 132 KV&93& 110&93 4& Phase t,o -ore ,ith e/ten0e0 -ree+age 0istan-e in-lu0ing steel su++orting stru-tures) oun0ation .olts an0 terminal -onne-tors or $00mm2 hori3ontal Aluminum Con0u-tor. 11 KV Lightening Arrestors 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having 11 insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12 m ii) Column 10+3.1 m iii) Earth Mast 13.1 m iv) Earthing Plat orm

A-1

A-$

A-#

A-1 A-2

A-

A-3

A-4 A-5 A-16 A-11

A-1$

1#$ !" Substation Connectors i) !ML" ii) !M"" iii) #0B $3% iv) !M $3 A

)otal of &tem 7A8


9 9-1 1#$ !" Control : Protection System Control Panels: i) Line Control Panel CP*20 ii) Line Control Panel CP*30 iii) !rans ormer Control Panel CP*'0 9-$ Relay Panels: i) Line <ela: Panel <P*3 ii) !rans ormer <ela: Panel <P*1

)otal of &tem 798


C

1#$ !" Substation (eneral .;uipment


%9idders to indicate ;uantities for satisfactory completion of +or<'

C-1

i) All Aluminum -on0u-tor $00mmD7"a,thorn) ii) 11Kv Aluminium Pi+es $3 mm 0ia )1 m long. iii) Earth ,ire =&3.0 7#mm 0ia.) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost ?nsulator ,ith -lam+ vi) 2is- ?nsulator @0 KM vi) 11 KV stru-ture. vii). 4%$ >as C:lin0er 10 Kg

C-$

Cables : accessories a) 1' KV ALPE Po,er Ca.les along ,ith termination Kits. i) 1 -ore 1000 MCM ii) 1 -ore '00 MCM iii) 3 -ore 1&0 AB> 120 s5 mm iv) ?n0oor termination (it or 1000 MCM v) ?n0oor termination (it or '00MCM vi)?n0oor termination (it or 3 Core 1&0 AB> vii)Cut0oor termination (it or 1000 MCM viii)Cut0oor termination (it or '00 MCM i/) Cut0oor termination (it or 3 Core 1&0 AB>

C-#

Control Cables: i)Control Ca.le 1/2.'mmD ii)Control Ca.le @/2.'mmD iii)Control Ca.le 1$/2.'mmD iv)Control Ca.le 1/$mmD v) Ca.le !ra:s) <a-(s) 4u++orts) -a.les -on0uits et-.

C-1

.arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*.

i' #'mmD Co++er -on0u-tor


ii' Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C

iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? C-2 CControl house buildin* li*htnin* protection system S+itch yard li*htin* system 112?$16" AC and : emer*ency li*htin* system $$6" : 1 16"-C@ po+er soc<ets includin* cablin* etc as specified.

C-3 C-4

Control buildin* electrification system 112?$16" AC : emer*ency li*htin* system $$6" : 116" -C@ po+er soc<ets includin* cablin* etc as specified.

11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A

C-5

9attery And 9attery Char*er:

i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C


iii) AC&2C 4tation Au/iliar: Panel iv)11&0.11' KV +a0 mounte0 !rans ormer) 200KVA ,ith L! Ca.le 1#&.0@3. /vii) Marshalling Bo/ or !&% Ba:) Line Ba: /viii) Marshalling Bo/ or P! Ba: C-16 C-11 116 " -C au=iliary services system as specified. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing C-1$ Control Room >urniture a) .) -) 0) e) ) g) C-1# C i-er !a.le si3e =8/18 4u+ervisor !a.le si3e '8/38 C i-er Es Chairs Visitor8s Chairs ;oti-e Boar0 si3e $8/3F8 4+lit Air -on0itioner 1.'tons <e rigerator 7,all mounte0)

Material for 1#$ !" S-) -i*ri A )ando Ean Muhammad )?,ine % >eed for ).E. Muhammad (rid Station Ne+' ,en*th 12.36 !m'

?. ??. ???. ?V. V. V?. V??.

!o,er !:+e GM1 !o,er !:+e GM30 !o,er !:+e GM$0 >roun0ing 4ets L:n/ Con0u-tor Earth Bire # mm 2is- ?nsulators7@0K; %og t:+e)

V???. ?A. A. A?. A??.

4ingle 4us+ension %itting or L:n/ 4ingle !ension itting or L:n/ 4to-( Bri0ge 0am+er or L:n/ Mi0 4+an Hoints or L:n/ <e+air sleeve or L:n/

A???. 4ingle 4us+ension itting or earth A?V. AV. 4ingle !ension itting or Earth ,ire AV?. 4to-( Bri0ge 0am+er or Earth Bire AV??. Mi0 4+an Ioints or earth Bire AV???. P.> Clam+ or L:n/ )otal of &tem 7C8 .rection : )estin* .;uipment and Maintenance )ools !he !esting) Maintenan-e an0 ere-tion e5ui+ment shall in-lu0e the ollo,ing -om+ati.le ,ith the +lant su++lie0 in a--or0an-e ,ith the te-hni-al +rovisions6 1) 4et o ,ren-hes 2) 2igital +hase angle meter 3) 2C insulation <esistan-e tester7'000V) 1) 4tan0ar0 multi range multi meter ,ith 2C to AC -urrent. ') 2C earth ault 0ete-tor $) ?nstruments trans ormers +olarit: testers. =) Earth resistan-e testing set @) ?nsulating oil 0iele-tri- testing set #) !em+orar: earthing 0evi-e 10) Multimeter) lu(e) @0$0 A or e5uivalent. )otal of &tem 7-8
)otal of column No. 3 to be carried for+ard Schedule No. 2- (rand Summery

y Spare Parts Supplied from +ithin employers country

Stations at )ando Ean Muhammad alon* +ith allied )ransmission ,ine.

/ty
#

.GH 0nit Price1


1

)otal .GH Price1


2 D # =1

Sales )a=

)otal Price
3D2F

1 ;o.

3;os.

3 *4ets

1*sets 2 sets

$ ;os.

3 ;os.

3 ;os. 3 ;os. $ 4ets

1 ;os $ ;os. 01 ;o. @ ;os. $ ;os. 12 ;os. 03 ;os. 0# ;os.

1 ;o 1 ;o. 1 ;o 2 ;os. 1 ;o.

'00Mtrs 3 ;os. 2$0 Mtrs 12 ;os. 3 ;os. $$ ;os. 1 ;o. 1 ;o.

@00Mtrs **** 330Mtrs 0# ;os. *** @ ;os. 0# ;os. *** $ ;os. 1$'0Mtrs 1'00 Mtrs 1000 Mtrs 1''0 Mtrs 1*Lot

2000Mtrs 1' ;os. 1*Lot 1'0 ;os. $0 ;os. 1' ;os.

03 ;os. 02 ;os. 02 ;os. ;il ;il ;il 1*Lot 1*Lot

1*Lot

1 ;o. $ ;os.

1*set
1 ;o. 1 ;o. 1 ;o. 3 1

1*Lot
' ;os. 12 ;os. 1 ;o. 1 ;o.

$ ;os.
$ ;os. 2 ;os. 2 ;os.

01 ;o.

13 ;os. 01 ;os. 03 ;os. '0 4ets 1@.00 Km 1$ Km 23@0 ;os

12# 4ets =2 4ets. 31@ ;os. 22 ;os. 0' ;os. 13 sets. 0# sets. #@ ;os. 10 ;o) $$ ;os.

1*set 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o. 1 ;o.

Schedule No. # - -esi*n Serv


#:A Conversion from

!" to 1#$!" %A&S' (rid Stations at )ando (hulam

&tem 1

-escription $

2esign o 132 (V) 10 (A A?4 >ri0 4tation having 4ingle Bus*Bar) 4ingle Brea(er 4-heme -om+rising the ollo,ing along ,ith allie0 transmission line

2 ;o. Line Ba:s 1 ;o. !rans ormer Ba: + 1 ;o. !&% 1 ;o. P! Ba:. 2esign 7as +er ;!2C s+e-.) o Control"ouseBuil0ing as +er 0ra,ing 7 out line) atta-he0 here,ith -om+lete in all as+e-ts along ,ith all allie0 a-ilities as +er international +ra-ti-e) rea0: to use) All e5ui+ment oun0ations outsi0e the -ontrol house .uil0ing as +er s-o+e in s-he0ule 1 or 2) ?nter-onne-tion o 132 (V overhea0 transmission line ,ith line .a: ?solator) ?nter-onne-tion arrangement o 11 (V out going +anels ,ith ee0ers) Boun0ar: ,all ) trans ormer ,a:) s,it-h:ar0 tren-hes 7i an:)) 0ra, +it) s,it-h :ar0 gravel) earthing mash ) gate) gri0 station lighting ) lightening +rote-tion) et-.

%)he

soil bearin* capacity to be considered for the civil +or<s desi*n is as per soil test results of Central Material )estin* ,aboratory %CM),' ,ahore or any other HAP-A approved )estin* ,aboratory'. )B)A, Columns and 3 to be carried for+ard to Schedule No. 2. (rand Summary

le No. # - -esi*n Services


0nit Price1 >orei*n Currency Portion 2 )otal Price1

id Stations at )ando (hulam Ali alon* +ith allied )ransmission ,ine.

/ty. #

,ocal Currency Portion 1

,ocal Currency Portion D#=1

>orei*n Currency Portion 3D#=2

,ot

chedule No. 2. (rand Summary

Schedule No. # - -esi*n Services


#-9: Conversion from

!" to 1#$!" %A&S' (rid Stations at -i*ri alon* +ith allie

&tem
1

-escription
$

/ty.
#

2esign o 132 (V) 10 (A A?4 >ri0 4tation having 4ingle Bus* Bar) 4ingle Brea(er 4-heme -om+rising the ollo,ing along ,ith allie0 transmission line

2 ;o. Line Ba:s 1 ;o. !rans ormer Ba: + 1 ;o. !&% 1 ;o. P! Ba:. 2esign 7as +er ;!2C s+e-.) o Control"ouseBuil0ing as +er 0ra,ing 7 out line) atta-he0 here,ith -om+lete in all as+e-ts along ,ith all allie0 a-ilities as +er international +ra-ti-e) rea0: to use)

All e5ui+ment oun0ations outsi0e the -ontrol house .uil0ing as +er s-o+e in s-he0ule 1 or 2) ?nter-onne-tion o 132 (V overhea0 transmission line ,ith line .a: ?solator) ?nter-onne-tion arrangement o 11 (V out going +anels ,ith ee0ers)Boun0ar: ,all ) trans ormer ,a:) s,it-h:ar0 tren-hes 7i an:)) 0ra, +it) s,it-h :ar0 gravel) earthing mash ) gate) gri0 station lighting ) lightening +rote-tion) et-. %)he soil bearin* capacity to be considered for the civil +or<s desi*n is

,ot

as per soil test results of Central Material )estin* ,aboratory %CM),' ,ahore or any other HAP-A approved )estin* ,aboratory'.

)B)A, Columns

and 3 to be carried for+ard to Schedule No. 2. (r

# - -esi*n Services
0nit Price1 ,ocal Currency Portion
1

d Stations at -i*ri alon* +ith allied )ransmission ,ine.


)otal Price1 ,ocal Currency >orei*n Currency Portion Portion
D#=1 3D#=2

>orei*n Currency Portion


2

e carried for+ard to Schedule No. 2. (rand Summary

Schedule No. # - -esi*n Services #-C: Conversion from

!" to 1#$!" %A&S' (rid Stations at )ando Ean Muhammad alon* +ith allied )ran

&tem 1

-escription $

/ty. #

2esign o 132 (V) 10 (A A?4 >ri0 4tation having 4ingle Bus*Bar) 4ingle Brea(er 4-heme -om+rising the ollo,ing along ,ith allie0 transmission line 2 ;o. Line Ba:s 1 ;o. !rans ormer Ba: + 1 ;o. !&% 1 ;o. P! Ba:. 2esign 7as +er ;!2C s+e-.) o Control"ouseBuil0ing as +er 0ra,ing 7 out line) atta-he0 here,ith -om+lete in all as+e-ts along ,ith all allie0 a-ilities as +er international +ra-ti-e) rea0: to use)

All e5ui+ment oun0ations outsi0e the -ontrol house .uil0ing as +er s-o+e in s-he0ule 1 or 2) ?nter-onne-tion o 132 (V overhea0 transmission line ,ith line .a: ?solator)?nter-onne-tion arrangement o 11 (V out going +anels ,ith ee0ers)Boun0ar: ,all ) trans ormer ,a:) s,it-h:ar0 tren-hes 7i an:)) 0ra, +it) s,it-h :ar0 gravel) earthing mash ) gate) gri0 station lighting ) lightening +rote-tion) et-.

,ot

%)he soil bearin* capacity to be considered for the civil +or<s desi*n is as per soil

test results of Central Material )estin* ,aboratory %CM),' ,ahore or any other HAP-A approved )estin* ,aboratory'.

!C!AL Columns $ an0 = to .e -arrie0 or,ar0 to 4-he0ule ;o. '. >ran0 4umma

ervices

n Muhammad alon* +ith allied )ransmission ,ine.


0nit Price1 ,ocal Currency Portion 1 >orei*n Currency Portion 2 )otal Price1 ,ocal Currency Portion D#=1 >orei*n Currency Portion 3D#=2

rrie0 or,ar0 to 4-he0ule ;o. '. >ran0 4ummar:

Schedule No. 1 - &nstallation and Bther Service


1: A Conversion from
-escription &tem /ty

!" to 1#$!" %A&S' (rid Stations at )ando (hulam Ali alon* +i

.arth+or< Com+a-tion o earth,or( ,ith +o,er roller in-lu0ing +loughting mi/ing moistening earth to o+timum moisture -ontents in la:ers et- -om+lete. a) #0K Ma/imum mo0i ie0 AA4"!C 0r: 0ensit: as +er 0ra,ings an0 s+e-i i-ations. )otal Bf &tem 7.8 1#$ !" S+itch Iard .;uipment >oundation E/-avation in oun0ation o .uil0ings).ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+to 30 m an0 li t u+to 1.' m.

>

>-1

>-$

a) ?n or0inar: soil. Cement -on-rete +lain in-lu0ing +la-ing -om+a-ting inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing o stone aggregate) ,ith out shuttering.7using 4.< -ement) a) <atio 1616@ .) .) <atio 16261 Pa--a .ri-( ,or( in other than .uil0ing i&- stri(ing o Hoints. .7using 4.< -ement) a) ?n 161 -ement mortar .) ?n 16' -ement mortar -) ?n 163 -ement mortar 2am+ +roo -ourse ,ith 7-ement san0 an0 shingle -on-rete 16261) in-lu0ing 2 -oats o as+halti- mi/ture. .7using 4.< -ement) a) 3@ mm thi-(. 4u.*.ase -ourse o +it run gravel granuler +la-ing) -om+a-ting to re5uire0 -ham.er J gravel.& 4u++l:ing illing san0 un0er loor J +lugging in ,ells <ein or-e0 -ement -on-rete ,or( using -oarse san0 in-lu0ing all la.our an0 material e/-e+t -ost o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing) ,hi-h ,ill .e +ai0 se+aratel:. !his rate also in-lu0es all (in0s o orms moul0sL li ting shuttering) -uring ren0ering an0 inishing the e/+ose0 sur a-e 7in-lu0ing s-reening an0 ,ashing o shingle). a) <.C ,or( in roo sla.s) .eams) -olumns ra ts) lintels an0 other stru-tural mem.er lai0 in situ or +re -ast lai0 in +osition -om+lete in all res+e-ts.

1'10

111.#2' 110.'

>-#

2@.1= #'.#13 21.=12

>-1

=1.$1@ 1#.1# 3'0

>-1A >1-9

>-2

>-

a) <atio 16261 4u++l:ing an0 a.ri-ation o ?nterme0iate gra0e 0e orme0 rein or-ement o 10000 +si 72=$ M+a) :iel0 or <.C.C. in .eams -olumns an0 +ile -a+s) in-lu0ing utting).en0ing la:ing in +osition in-lu0ing -ost o .in0ing ,ire an0 removal o rust et-. %illing ,atering an0 ramming earth un0er loor ,ith sur+lus earth rom oun0ations lea0 u+ to 31 meters an0 li t u+ to 1.'0 meters. %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7e/-avation rom outsi0e lea0 u+to 30m an0 li t u+to 1 .'m). Carriage o 2.@3 CMM&' metri- tons o all material li(e stone aggregate s+a,l) -oal) lime) sur(hiet-.B.>.<ail astening) .ri0ge) gir0ers) +i+es) sheets) rails) M.4 Bars or 1000 ;o. Bri-(s 2'1/ 2=/=$mm or 1000 ;o. tiles 30'/ 1'2/ '1 mm or 1.2' CMM o tim.er or 3.=3 metri- tons o uel ,oo0 .: tru-( or an: other means o,ne0 .: the -ontra-tor. Carriage or earth lea0s 1 K.M.

2#1.#13

1$2@'.@$1

>-3

$'0.=

>-4

2=02.3'

>-5

2=02.3'

>-11 >-1$ >-1# >-11

Cement +lasters 716') u+ to $.00 meter height 13 mm thi-( Painting ne, sur a-es) Pre+aring sur a-e an0 +ainting o guar0 .ars. Priming -oat + t,o -oats Ere-tion an0 removal o -entering P&Lo,ering J la:ing into tren-hes an0 Hointing -ement -on-rete rein or-e0 +i+eline to -orre-t alignment J gra0e in-lu0ing -utting o +i+es ,here ne-essar: -ost o Hointing material J testing. a) 22' mm. P&% M4 0a,el .ars 1$ mm 0ia an0 1200 mm long -om+lete as +er 0ra,ing. Ma(ing holes 1'= mm 0ee+ in -ement -on-rete or stone masonr: an0 re+airing =$ mm 0ia. M4 rail 132.$ Kg +er meter 7#0*l.s +er t.) P/F switch yard gate 1.5 inch GI and GI wire 8 mesh 2 x 2 complete with rail ixing in position as per drawing !"etted rate# Fixing in position o o$ndation %olts d$ly assem%led in template which will %e pro"ided %y the contactor &/erection in position Precast/pre'stressed ()) trench co"ers rom I*har concrete P"t +td. &hei,h$p$ra road +ahore to site rate "etted %y -anager )i"il ./0) +ahore .o. 285 dated 12'12'2113.

@$'.1$# 1##.2' 13$.11# $'.@11

>-12 >-1 >-13

12$ 21$ 12.19

11.02

>-14

1@0

>-15

#@.$@

>-$6

Filling expansion 5oint 14 mm thic, or 112 to 152 mm deep sla% with %it$men mixed with sand and saw d$st )oal tar painting laid hot irst and second )oat P/F ca%le tray 2 way o GI angle iron I/) anchor %olts ixing in ca%le trench x 6. P/F ca%le tray 4 way o GI angle iron I/) anchor %olts ixing in ca%le trench P/Fixing GI earth strip 1.25 x 1.125 or switch yard encing rame with allied %olts7 n$ts as per drawing .o. P08//&'983. P& i/ing >? angle iron +ost '0/'0/$mm or .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 0ul: i/e0 in +osition as +er 0ra,ing ;o. P2B&!B 12$. +ost length 0.=0 Mtr. P& i/ing 1 ro,s .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 >.? .ar.e0 ,ire 11 4B>)2*Pl:) 1 +oints i/e0 on >? angle iron +ost 7e/-lu0ing P& i/ing o s,it-hing :ar0 en-ing rames as +er 0ra,ing ;o. P2B&!4*=@$ e/-e+t earth stri+ et-. <ate vette0 CE7!J>) BAP2A Lahore. Ma(ing groves 2'/13mm 4u++l: an0 s+rea0ing o -rush stone & ,ater .orn gravel o 11&2 in-h si3e. Bhite ,ashing 3*-oats 2ressing o .an(s or groun0 sur a-e 2ismantling o .ri-( ,or( in -ement mortor 2ismantling o -ement -on-rete +lain 160160@ 1602601 2ismantling o 2.P.C o -ement -on-rete 10mm thi-( J -leaning the site et-6 2ismantlling o ,ire netting tennis -ourt J rame ,or( )otal Bf &tem 7>8 ControlCouse9uildin* 1) E/-avation in oun0ation o .uil0ings).ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+to 30 m an0 li t u+to 1.' m. a) ?n or0inar: soil.

#1.'

>-$1

$1@.1=#

>-$$

#@

>-$#

2'

>-$1

58

>-$2

=@

>-$

1@'

>-$3

210.2'

>-$4 >-$5 >-#6 >-#1 >-#$ >-##

$31 13' $11.2@ $11.2@ 2'.1' 1.0#' 1.'$$ 11.1# 1=.12'

F'42 F'45 (

3''

2) Cement -on-rete +lain in-lu0ing +la-ing 7in-lu0ing s-reening an0 ,ashing o stone aggregate) ,ith out shuttering. a) <atio 1616@ .) <atio 1636$ -) <atio 16261 3) Pa--a .ri-( ,or( in oun0ation an0 +linth. a) ?n 16$ -ement mortar .) ?n 16' -ement mortar -) ?n 163 -ement mortar 1) 2am+ +roo -ourse ,ith 7-ement san0 an0 shingle -on-rete 16261) in-lu0ing 2 -oats o as+halti- mi/ture.3@ mm thi-(. 11$.$0# 11.@' 1=.31'. 112.1@3 #'.#13 21.=12

@0

4u. .ase -ourse o +it run gran0 granular material 7in-lu0ing +la-ing) mi/ing an0 -om+arting re5uire0 -am.ring an0 gra0e) ') Verti-al 0am+ +roo -ourse o 1# mm hi-( -ement +laster 162 ,ith .itumen at 1 (g +er s5 m. $) Pa--a .ri-( ,or( in groun0 loor 7in-lu0ing stri(ing o Hoints). a) 16$ C.M. .) 161 C.M. =) <ein or-e0 -ement -on-rete ,or( using -oarse san0 in-lu0ing all la.our an0 material e/-e+t -ost o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing) ,hi-h ,ill .e +ai0 se+aratel:. !his rate also in-lu0es all (in0s o orms moul0sL li ting shuttering) -uring ren0ering an0 inishing the e/+ose0 sur a-e 7in-lu0ing s-reening an0 ,ashing o shingle). a) <.C ,or( in roo sla.s) .eams) -olumns ra ts) lintels an0 other stru-tural mem.er

='.@ '#=.332

110.211 1$.'

a# (atio 1:2:2. !Precast# c# ;rrection in poison ()) !Precast# 8# &$pplying and a%rication o Intermediate grade de ormed rein orcement o 21111 psi !293-pa# yield or (.).).in %eams col$mns and pile caps7 incl$ding c$tting7 %ending laying in position incl$ding cost o %inding wire and remo"al o r$st etc. 9# &ingle layer o %$rnt clay tiles 229x1 12x48 mm laid o"er 111mm earth < 25mm m$d plaster witho$t %hoosa gro$ted with cement sand 1:4 on top o (.).) roo sla% pro"ided with 1.33 ,g %it$men coating sand %linded.

121.914

9531

281.25

11# Polythine sheet 1.2 mm thic, laid o"er /wo coatso %it$men$sing1.33,g.%it$men hot per s=.m o"er loors < 0P)etc. /wo coats o %it$men laid hot $sing1.33 ,g. per &=.m o"er roo < %linded withsand at 1.114 c$m per &=. m. 11# Pro"iding and laying thermo pore sheet 48 mm thic,. 12# Filling watering and ramming earth $nder loor with s$rpl$s earth rom o$ndationslead $p to 41 meters and li t $p to 1.51meters. 14# Filling watering and ramming earth $nder loors with new earth !exca"ation romo$tside lead $pto 41m and li t $pto 1.5m 12# P/F steel doors w/o grill on o$ter ace 15# )arriage o 2.84 )>-/5 metric tons o all material li,e stone aggregat spaw coal7 lime7 s$r,hi etc. ?.G. (ail astening7 %ridge7 girders7 pipes7 sheets7 rails7 -.& ?ars or 1111 .o. ?ric,s 252x 129x93mm or 1111 .o. tiles 415x 152x 51 mm or 2.25 )>o tim%er or 4.94 metric tons o $el wood %y tr$c, or any other means owned %y the contractor. )arriage or earth leads 2 @.-. 1$) 4u++l: an0 illing san0 un0er loors or +lugging in ,ells. 1=) Mosai- looring -onsisting o mosai- to++ing o one +art o -ement to t,o +arts o mar.le -hi+s lai0 over 3@ mm thi-( looring o 16261 -ement -on-rete in-lu0ing ru..ing an0 +olishing -om+lete. 13 mm thi-( mosai- to++ing 7,ith gre: -ement). 1@) Bri-( on e0ge looring lai0 in 16$ -ement mortar over a .e0 o 20 mm thi-( 16$ -ement mortar. 1#) Mosai- 0a0o or s(irting ,ith one +art o -ement J 2 +arts or mar.le -hi+s lai0 over 13 mm thi-( -ement +laster 163 -om+lete ,ith inishing an0 +olishing. 10 mm thi-( 7,ith gre: -ement). 20) >lass stri+s or 0ivi0ing an0 looring into +anels. i) 10 mm ,i0e glass stri+s. ii) =' mm ,i0e glass stri+s. iii) 2' mm ,i0e glass stri+s 21) Cement +lasters 716') u+ to $.00 meter height 13 mm thi-(

431.29

281.25

111.59

1451 3.525

1451

'30

1=0.@

'@.#

32.#13

'$0.=' @0 * 2@0.@' @#.1=2 1==.@@# 210

22) Cement +lasters 7161) u+ to $.00 meter height 13 mm thi-(. 23) Cement +lasters 7163) u+ to $.00 meter height 13 mm thi-( 21) Cement +ointing stru-( Hoints on ,alls. a) <atio 162.

2') Khuras on roo 7$10/$10/1 '0mm) 2$) Cast iron rain ,ater 0o,n +i+e i/e0 is +la-e e/-lu0ing hea0 an0 shoes .ut in-lu0ing-lam+s et-. a) 100 mm 0ia a) 100 mm 0ia.. P&%i/ing steel la00er or over hea0 tan( ma0e o angle iron '0/'0/$mm -om+lete in all res+e-t. 2=) <ain ,ater 0o,n +i+e -ast iron hea0s i/e0 in +la-e in-lu0ing -ost o -lam+s hol0 ast an0 +ainting 100 mm 0ia C.? hea0s. 2@) 4hoes) .en0s or o sets or -ast iron rain ,ater 0o,n +i+e in-lu0ing i/ing an0 +ainting 2#) Provi0ing an0 i/ing 1$ mm 0ia .ar "oo( or an.. 30) 2ou.le la:er o .uil0ing +a+er lai0 over 2 -oats o hot .itumen PB*3 or PB*1 or loors et- using 1.$$ (g .itumen&45m. 31) P& aluminum natural ano0i3e0 o+en a.le 0ou.le lea 0oor hinge0 ,ithout gla3ing 32) P& aluminum natural ano0i3e0 o+en a.le ,in0o, hinge0 ,ithout gla3ing 33) Provi0ing an0 i/ing 2oor lo-( natural ano0i3e0.. 31) P& aluminum 0oor -loser 7single a-tion natural ano0i3e0. 3') P& aluminum 0oor -loser 72ou.le a-tion natural ano0i3e0. 3$) >la3ing ,ith +late glass $ mm thi-( using PVC >as Kit. 3=) P&% +lat orm o 10 / 1mm > ? stra+ %latan0 .ottom or > ? tee iron. '0/100/$mm1='0mm long i/e0 in +osition -om+lete in allres+e-ts as +er0ra,ing ;o. P2B&!B*$2$. 3@) P& M4 Plate 11 4,g 4i3e $00mm 7!ren-h-over) in-lu0ing ,el0e0 ,ith M4 angle iron2' / 2' / 3mm i/e0 in +osition as +er0ra,ing ;o. P2B&!B*$2' 3#) P&% steel rame or 0oor o M4 angle iron'1/'1/' mm M4 lat $1/' mm an0 M4 stra+'1/2' mm. 10) Bhite ,ashing three -oats. 11) Painting ne, sur a-es) Pre+aring sur a-e an0 +ainting o 0oors an0 ,in0o, an: t:+e 7in-lu0ing e0ges). Priming -oat + t,o -oats. 12) !o++ing o -ement -on-rete16261 in-lu0ing sur a-e inishing an0 0ivi0ing into +anels 10mm thi-(. 13) 2istem+ering !hree -oats ?&- -ost o +riming -oat 1$) Era-tion an0 removal o -entering 11) Bottom Khura o Bri-( masonr: in -ement san0 mortar 716$) 1.20 / 0.$1 / 0.11' Mtr. Cver =$mm -ement -on-rete 160160@

2'.#$@ @.' 1 @ 1 '0 10.$2# 30.'' 1 3 1 3'.='

21.'

'

'.$ 10#3.@2$ 13.12'

=@.# 1=1@.$' 13$.11#

1') P& M4 Channel 10 / =' mm 300mm Long in-lu0ing groun0ing .olt si3e 12mm 2ia 230mmlong as +er 0ra,ing ;o. P2B&!<*'2' 7vette0 rate) 1') Pre+aring sur a-e an0 a++l:ing o a-i0 resistan-e +aint 7vette0 rate) 1$).2ismantling o .ri-( ,or( in -ement mortor 1=).2ismantling o -ement -on-eret 1616@ 1@).2ismantling o -ement -on-rete rein or-e0 in se+arating rein or-ement rom -on-rete -leaning Jstraighting the site )otal Bf &tem 7(8 A WATER SUPPLY, SANITARY AND SEWERAGE/DRAINAGE WORKS. 01) P&Lo,ering J la:ing into tren-hes an0 Hointing -ement -on-ret rein or-e0 +i+eline to -orre-t alignment Jgra0e in-lu0ing -utting o +i+es ,here ne-essar: -ost o Hointing material J testing. a) 1'0 mm .) 22' mm 02) Provi0ing) la:ing) Hointing J testing heav: ,ater or steam 5ualit: >.? or B.? +i+es an0 s+e-ials insi0e .uil0ings J tren-hes. a) 13 mm i&0. .) 20 mm i&0. -) '0 mm i&0. 03) P&% har0 .rass or gun metal +eet value heav: +attern ,ith han0 ,heel on >.? or B.? +i+e lines lai0 in the groun0 or insi0e .uil0ings. a. 20mm i&0. 01)100mm i&0 gull: tra+ o -ement -on-rete 7in-lu0ing 30'mm/ 30'mm masonr: -ham.er an0 C.? grating 1'0 mm / 1'0 mm). 0') %loor !ra+ 100mm / '0mm 7in-lu0ing '0mm -on-rete -ham.er all roun0).Bith C.? grating. 0$) Provi0ing an0 i/ing C.? soil +i+es ,ith -ement Hoints 7162). a. 100mm i&0. 0=) C.? soil s+e-ials ,ith -ement Hoints 7162). a. 100mm i&0. 0@) C.? manhole -overs ,ith rames6 a. 300mm i&0 light. .. 1'0mm i&0 light. 0#) 4. !ra+ 102mm i&0 China ,are 7Pa(istan ma0e). 10) Bhite gla3e0 earthen,are ,ater -loset s5uatting Crissa +attern t:+e 0omesti- o .est 5ualit:.

'$ =1.1#3 2#.1@ 1.@$1 1.$'

1@ 2'.21'

1$ 22.211 20.3

1 2 2

23 12 1 2 1 1

11) 13.' liters -a+a-it: lo, level lushing -istern .est 5ualit:. 12) C.P .i. ta+ 13mm 0ia 13) C.P sto+ -o-(s 13mm 0ia 11) 13mm / 100mm C.P sho,er rose 1') Chromium +late0 to,el rail & ring. <ail $1 0mm/20mm. 1$) PVC lushing +i+e 32mm 0ia. 1=) PVC lushing .en0 32mm 0ia.. 1@) C.P ,aste -ou+ling 10mm 0ia. 1#) Baste +i+e or sin(s J urinals 10mm 0ia PVC 20) Conne-tions 13mm 0ia 7PVC) 21) Provi0ing an0 i/ing 32 mm 0ia ru..er -hain +lug. 22) Provi0ing an0 i/ing loo(ing glass '$0 / 10' mm si3e irst 5ualit: ,ithout rame7PAK ma0e)

1 2 3 1 1 1 1 1 2 2 1

23) Constru-tion o slui-e valve or ire h:0rant -ham.er $1 0/$1 0mm minimum si3e 230mm thi-( .ri-( ,or( 16' -ement san0 mortar) 111mm thi-( 16$612 -ement -on-rete in oun0ation '0mm thi-( 16261 -ement -on-rete in .e0) ='mm 16261 <CC sla. on to+ an0 13mm thi-( 163 -ement san0 +laster insi0e

21) >lass shelves $10 / 12' mm si3e ,ith CP .ra-(et ,ith CP railing 2') Bhite gla3e0 earthen ,are ,ash han0 .asin 0omesti- o su+reme 5ualit: $' -m. 2'). P&%i/ing C.P Pillar Co-( 2$).P&%i/ing soa+ 0ish Chromium +late0 2=) Bhite gla3e0 earthen ,are e0estal or ,ash han0 .asin 0omestio su+reme 5ualit:. )otal Bf &tem 7C8 & C.C.9 .,.C)R&CA, HBR!S 01) Biring light or an +oints ,ith1&1.1373.02#) steel insulate0 ,ire in 20mm 73&1N) steel -on0uit $2 mm gauge re-esse0 in ,all or -olumn -om+lete ,ith ,it-h) -eiling rose&.utton hol0er et-. 02) Biring 3&'*+in ' Am+. Ball so-(et +oint ,ith 1.1373&0.02#) PVC insulate0 ,ire ,ith 2.' mm PVC insulate0 earthing -on0u-tor in M4 -on0uit 1#.1 mm 0ia re-esse0 in the ,all or -olumn -om+lete ,ith the s,it-h so-(et -om.ine0

1 1 1 1 1

10

03) Biring mains ,ith 2*1&=&1.3' 7=.011) PVC insulate0 ,ire in 1#.1 mm 1$ 4B> 71.$2 mm) steel -on0uits re-esse0 in ,all as re5uire0 in-lu0ing all a--essories. 01) Biring mains ,ith 1*1&=&1.01 7=&.011) PVC insulate0 ,ire $$0 volts gra0e in 2'.1 mm 1$ 4B> steel -on0uit re-esse0 in the ,all as re5uire0 in-lu0ing all a--essories. 0') Biring mains ,ith 2*1&1.=@ 7=.02#) PVC insulate0 ,ire in 1#.1 mm 1$ 4B> 71.$2 m) steel -on0uits re-esse0 in ,all as re5uire0 in-lu0ing all a--essories. 0$) Provi0ing&la:ing an0 -onne-ting har0 0ra,n .are -o++er ,ire 3.2 mm2 711 4B>) as earth -ontinuit: -on0u-tor ,ith an: given main or su.*main in all s:stem o ,iring. 0=) Provi0ing J i/ing lush t:+e 3*+n 1' Am+ 4&Phase +lug so-(et s,it-h 7-om.ine0) as re+la-ement on .oar0 alrea0: e/ist 0@) Provi0ing J i/ing o 0istri.ution .oar0 100 Am+ 100*v 10 ,a: +er +hase ,ith 01*;o ?&C -ir-uit Brea(er 100 Am+s.!.P. an0 outgoing -ir-uit .rea(er $*30 Am+s -om+lete ,ith volt meter sele-tor s,it-h +hase in0i-ation light an0 neutral lin( et-. re-esse0 in ,all

110

#'

2@0

0#) 4u++l: an0 ere-tion o -eiling an .est 5ualit: Pa( ma0e in-lu0ing ,iring o 0o,n ro0 ,ith 1&1.13 mm 73&.02#) PVC ,ire i/ing o regulator .la0e -ano+: et-. 4i3e '$N 10) Provi0ing an0 su++l:ing o AC4P e/haust an 1'=mm 71@N s,ee+ -om+lete ,ith regulator) 11) Ere-tion o E/haust ans o all si3e0 in the o+ening alrea0: e/ist 12) Provi0ing an0 ere-tion .utter l: shutter or 1'=mm 71@N)s,ee+ e/haust an -om+lete as re5uire0 13) Provi0ing an0 i/ing B.C Ba(elite8s .utton lam+ hol0er ,ith 200mm ,hite glass glo.e an0 galler: et11) Provi0ing an0 i/ing mille0 steel .ar an -lam+ 13 mm 0ia suita.le or <CC <oo 1') Provi0ing an0 i/ing emergen-: itting 72.C) light 1/100 ,att 7in-an0es-ent C.".B) 1$) Provi0ing J i/ing 3*+hase 1*+in ,ater +roo so-(et im+orte0 11'* volts 30 Am+ in-lu0ing .ase -om+lete in all res+e-t as +er 0ra,ing. 1=) Provi0ing an0 i/ing luores-ent tu.e light a++rove0 Phili+s .utton light 1 / 10 ,atts -om+lete ,ith -ho(e starter +re ,ire0 internal -onne-tion -om+lete. )otal Bf &tem 7&8 E S)R..) : SH&)CC IAR- ,&(C)&N(

2 2 2

$ 1 3 2

20

01) E/-avation in oun0ation o .uil0ings) .ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+ to 30 m an0 li t u+ to 1.' m. a) ?n or0inar: soil. 02) Cement -on-rete +lain i&- +la-ing) -om+a-tion inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing stone aggregate ,ithout shuttering <atio 16261) 03) Ere-tion an0 removal or -entering or <.C.C. o +lain -ement -on-rete 7Verti-al) 01) Biring ,ith 2*1&1.1=@ 7=&.02#) PVC ?nsulate0 ,ire in20mm 73&1N) PVC -on0ition re-esse0 in the ,all as re5uire0 0') Biring ,ith 2*1&=&.0@'7=&.03$) PVC insulate0 ,ire in 2'mm 71N) -on0uit re-esse0 in the ,all as <e5uire0 0') Biring ,ith 1*1=&.0@' 7=.03 $) PVC insulation ,ire $$0 volts gra0e in 2'mm71) >.? +i+e on sur a-e. 0$) Biring ,ith 1*1=&1.3'7=.0'2) PVC insulate0 ,ire $$0 Volts gra0e in 2'mm 71) >. Pi+e on sur a-e 0=) Biring ,ith 1*1=&1.3'7=.0'2) PVC insulate0 ,ire $$0 volts gra0e in 30mm 71 1&1N) PVC -on0uit on sur a-e 0@) P&% +o,er so-(et out let 30 AMP '00 Volts gra0e 1 +in ,ater +roo CEC ma(e -om+lete in all res+e-t rate vette0 .: CE;!2C Lahore ;o. 1#@1$ 0ate0) 13*01*2001. 0#) 4,it-h A.C one ,a: 4.P 1' Am+s ,ith si0e o+erating i/e0 "an0le 10) Provi0e i/ing o 0istri.ution .oar0 three +hase 100Vots .3 Ba: +er +hase ,ith one ?C -ir-uit .rea(er 30Am+. !.P. An0 out going .rea(er $*30 Am+. Com+lete ,ith ; lin( in Ball re-esse0. 11) Provi0ing %i/ing !.P J ;L?C s,it-h $00 volts gra0e re,ire a.le !:+e 7$0 am+s) 12) Provi0ing an0 installation o ,eather +roo light .eam loo0 lighting t:+e ;.VM ,ith 100 ,att in-an0es-ent lam+ "ol0er + Lam+ .ase O +late + Pit-h .lo-( + glass -over <ate vette0 .: C.E 7>4C) Lahore ;o. $@#*#0 0ate0 23* 0= 1##@. 13) P&?nstallation o s,it-h :ar0 light Phili+s ma(e t:+e "AV '11&2'0 ,atts ,ith -ho,) -a+a-itor Mer-ur: Va+our luores-ent lam+ i&- -over an0 all a--essories ,ith out +i+e itting vette0 rate C.E. 7>4C) ;orth Lahore ;o. $@# #0 0ate0 23*0=*1##@. 11) %illing ,atering an0 ramming earth un0er loors ,ith sur+lus earth rom oun0ation lea0 u+ to 31 m an0 li t u+ to 1 .'m 1') !P J ;L?C s,it-h use '00 volts gra0ere,ire a.le t:+e 730 am+s) 1 ) PVC 74hav:l) Pi+e P2N -lass 1N 7100ml) P22*$&103mm

1@.131

'.='

10.@ 31'

1'@ 12@ '0 210

'

21

23.' 1 =0

13'. P?, :-onne-ting har0 0ra,n -o++er ,ire 2.0$mm as earth -ontinuit: -on0u-tor ,ih an: given main or su. main in all ms:stem o ,iring 1@).P&% 220KV 2C 2'0*B in0i-ent lam+ +hli+hs ma(e ;V*1' 7 loo0 light' 1#) P&% 2'0*B mer-ur: lour-ent lam+ +hili+hs ma0e )otal Bf &tem 7E8 ! .R.C)&BN HBR! %&ncludin* )estin* and Commissionin*' 1' 1#$ !" .;uipment a) Assem.l:) ere-tion) oil 0eh:0ration an0 neutral groun0ing arrangement -om+lete o 132&11.' KV) 20&2$ MVA '0 "3) 1 0K?m+e0an-e) Ve-tor 2Q;1 1) Cn Loa0 !a+ Changer) three +hase trans ormers ,ith all a--essories an0 asso-iate0 ,or( in-lu0ing the su++l: o re5uisite materials) -om+lete as +er 0etails given in the s+e-i i-ations an0 0ra,ings. .) 11' KV Metal C/i0e 7>a+less) Lightening Arrestors ,ith 4teel 4u++orting stru-ture an0 -onne-tors. -) 132KV) 10KA) 2000Am+) 110 Volt 3 Pole 4%*$ Cir-uit Brea(er ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. 0) 132KV) 20KA) 1$00Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. e) 132KV) 10KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors.

1'@0 2 3

) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&' A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors

g) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors

h) 132KV) Voltage !rans ormer P!8s <atio132 KV&93& 110&93 Volt single Pole ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. 11 KV Lightening Arrestors H) 132 KV tension string assem.lies -om+lete ,ith har0,are 0ist:+e strength 100 K; having @ insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12m i)

3 3 $

ii) Column 10+3.1m iii) Earth Mast 13.1m iv) Earthing Plat orm 1#$ !" Substation Connectors i) !ML" ii) !M"" iii) #0B$3% iv) !M$3A $'1#$ !" Control : Protection System Control Panels: ?. Line Control Panel ,ith P!) CP*20 ??. Line Control Panel ,ith P!) CP*30 ???. !rans ormer Control Panel CP*'0 Relay Panels6 i)6 Line <el: Panel <P*3 ii)!rans ormer rela: +anel <P*1 #' 1#$ !" Substation (eneral .;uipment 7Bi00ers to in0i-ate 5uantities or satis a-tor: -om+letion o ,or() i)6 All Aluminum -on0u-tor $00mmD 7"a,thorn)

$ 1 @ $ 12 3 #

1 1 1 2 1

'00 3 2$0 12 3 1 @

ii) 11 KV Al +i+es $3mm 0ia 1m long. iii) Earth ,ire =&3.0 7#mm 0ia) iv)6 Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost insulator ,ith -lam+. v) 11 KV stru-ture vi) Earthing +lat orm Cables : accessories 12 !" G,P. Po+er Cables alon* +ith terminations i) 1 -ore 1000 MCM ii) 3 -ore 1&0 AB> 120 s5. mm Control Cables: i) Control Ca.le 1/2.'mmD ii) Control Ca.le @/2.'mmD iii) Control Ca.le 1$/2.'mmD iv) Control Ca.le 1/$mmD Ca.le!ra:s) <a-(s) 4u++orts) -a.les -on0uits et-. .arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*. i)6 #'mmD Co++er -on0u-tor ii)6 Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B

@00 330 1''0 1300 #'0 11'0 1

2000 1' 1'0 $0

!:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? Control house buildin* li*htnin* protection system. 4,it-h :ar0 lighting s:stem 11'&210V AC an0 emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling et- as s+e-i ie0 Control .uil0ing ele-tri i-ation s:stem 11'&210V AC J emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling etas s+e-i ie0. 11 !" Panels i)6 11 KV in-oming +anel 2' KA) 2'00A ii)6 11 KV outgoing +anel 2' KA) $30A 9attery And 9attery Char*er6 i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C iii) AC&2C 4tation Au/iliar: Panel iv) 11&0.11' KV +a0 mounte0 trans ormer) 200KVA ,ith L! Ca.le 1#&.0@3 v) 110 V 2C au/iliar: servi-es s:stem as s+e-i ie0. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing 7,all mounte0) -) Control <oom Air*-on0itioner 1@000 B!M Bin0o, !:+e Total of Item K )otal of Column No. : 3 to be carried for+ard to Schedule No.1 for (rand Summary. CBS) B> C&"&, ? .,.C)R&C HBR!S 1#$ !" S-) Matli A )ando(hulam Ali )?,ine %>eed for )ando(hulam Ali (rid Station Ne+' ,en*th #6.12 !m L-1 )o+er >oundation at $6?12 de*ree

1' 3 2 2 ;il ;il ;il

1 $ 1 1 1 1 1 ' ' 12 2

Constru-tion o the to,er oun0ation o the ollo,ing t:+e o to,er in ,ater logge0&normal soil area using 4.< -ement -rush stone si3e FN to SN hill san0 -on-reting -om+lete i&- e/-avation in varie0 t:+e o soil) o+en 0e,atering i re5uire0) stu. setting) +rovi0ing steel ormer as +er a++rove0 0esign -on-rete mi/ ratio ,ith mi/ture ma-hine) -on-rete mi/ ratio 16261 -uring .a-( illing -om+a-ting an0 also -:lin0er -u.e test u+ to the strength 21;&mmD 73000 P4?) at 2@ 0a:s -uring.

i. ii. iii. i". ". "i. "ii. 2 L-2

i.

!o,er !:+e GM1) GM1+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1#@ !o,er t:+e GM1+$ at 20 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*1#@ !o,er !:+e GM30) GM30+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1## !o,er t:+e GM$0 at 20 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*200 !o,er t:+e GM1) GM1+3) GM1+$ at 1' 0egree angle o re+ose as +er 0ra,ing no. P2B&!C*110 !o,er t:+e GM30) GM30+3) at 1' 0egree angle o re+ose as +er 0ra,ing no. P2B&!C*111 !o,er t:+e GM$0) GM$0+3) at 1' 0egree angle o re+ose as +er 0ra,ing no. P2B&!C*112 ?nstallation o groun0ing set )o+er )ype Pile >oundation GM1) GM 1+3) GM 1+$R 1 ;o. GM30) GM30+3) R 1 ;o. GM$0) GM$0+3 R 1;o. 2B>6 P2B&!C&#02 Pile Hor<@ 66 mm dia. Provi0ing J Casting in 4itu Bore0 <CC Pile in 161*1&263 7Cement -on-rete o a++rove0 -rushe0 stone J -oarse san0 +la-e0 in nominal 0ia ?&C all -osts .oring 0rilling ,ith rotar:) reserve0 rotar: or an: a++rove0 metho0) +la-ing -on-rete ,ith tremieJ e/-lu0ing -ost o su++l: an a.ri-ation o steel .ars rein or-ement -age) ,hi-h shall .e +ai0 se+aratel: in-lu0ing ,ashing o shingle. 7BC4<*2013) +age6 '*2) item ;o.1 7ii).

3$0 1 21 1$ 1 1 1 10=

1$@

ii.

RCC Concrete <ein or-e0 -ement -on-rete ,or( using -oarse san0 e/-e+t the -ost o -on-rete o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing. !his rates also in-lu0es all (in0s o orms moul0s) li ting shuttering) -urring) ren0ering an0 inishing the e/+ose0 sur a-e0 7in-lu0ing s-reening an0 ,ashing o shingle) a) ?n*situ in roo sla.s) -olumn) .eam) ra ts lintels an0 other stru-tural mem.er -om+lete in all res+e-t BC4<*2013) +age '*1)2) item ;o.3*a)7ii)

1@.3

iii.

Steel

4u++l: J %a.ri-ation o interme0iate gra0e 0e orme0 rein or-ement or <CC Piles i&C Cutting .an0ing) la:ing in +osition ,el0ing an0 astening i&- -ost o .in0ing ,ire an0 removal o rust et- 7a) 10)000 P4? 72=$ MPA) Qiel0. BC4<*2013) +age6 '*3) item*= 7a)

13@=3

i".

Cost of -ifference of S.R Cement 4.< Cement 1 Bag T 11$.00 C.P Cement 1 Bag T 1$@.00 2i eren-e 22.00 7BC4<*2013 Page6 22*1) ?tem ;o.1$) J +age6 22*1$ ?tem no. $1#) )otal Cost of , D ,1 F ,$ M )o+er .rection !rans+ortation o material rom site store to lo-ation an0 ere-tion o 2&C t:+e to,er installation o AC2) 4ign +late .ar.e0 ,ire an0 -om+lete in all res+e-t or ollo,ing t:+e o to,ers6

'30

!o,er !:+e GM1 !o,er !:+e GM1+3 !o,er !:+e GM1+$ !o,er !:+e GM30 !o,er !:+e GM30+3 !o,er !:+e GM$0 !o,er !:+e GM$0+3 !otal o ?tem U .lectric Heldin* Ele-tri- ,el0ing nuts J .olts on ere-te0 to,ers u+ to $*meters an0 a++l:ing +aint on ,el0e0 nuts J .olts6 !o,er !:+e GM1 &1$0 &to,er !o,er !:+e GM1+3 &2$0 &to,er !o,er !:+e GM1+$ &310 &to,er !o,er !:+e GM30 &3=0 &to,er !o,er !:+e GM30+3 &1'0 &to,er !o,er !:+e GM$0 &3#2 &to,er !o,er !:+e GM$0+3 &'1' &to,er )otal Nuts : 9olts )otal of &tem R Strin*in* Hor< !he stringing&sagging a--or0ing to Ba+0a stan0ar0 03*;o. -on0u-tor t:+e AC4< L:n/ -on0u-tor an0 01*;o. shiel0 ,ire i&- installation o assem.lies) har0,are) 4B 0um+er or l:n/ J earth ,ire) insulator) Hoints) 0ea0 en0 .o0ies an0 Hum+ering 7,here re5uire0) testing an0 -ommissioning -om+lete !otal o ?tem 4 )otal Cost of ,FMFNFB Abstract of cost of Part ,-# Eun*le Clearance

@$ ' 2 = 1 ' 1

13=$0 1300 $20 . 2'#0 . 1'0 . 1#$0 '1' $1$$2

30.1'

1. P (A) (B) (C) (D) (E) (F)

Iungle -learan-e an0 removing ,ith 30 mater 7site -learan-e or 0emar-ation) 7B4*200@) P&20*2) 1&11 7a) Environmental and Social Mitigation & monitoring costs Air Quality Monitoring/ Analysis Water Quality Monitoring/ Analysis Water Consumption Monitoring/ Analysis Noise Monitoring/ Analysis/ Measurement Solid Waste & Waste water Management Other Environmental & Social Mitigation Measures as per attached EM!" Total of Item P )otal of Column No. : 3 to be carried for+ard to Schedule No.1 for (rand Summary.

$ 12 2ail: Basis 2ail: Basis 1 Lo-ation Lum+sum

ation and Bther Services

at )ando (hulam Ali alon* +ith allied )ransmission ,ine.


0nit PriceJJ /ty ,ocal Currency Portion # 1 >orei*n Currency Portion 2 ,ocal Currency Portion D#=1 )otal PriceJJ >orei*n Currency Portion 3D#=2

Cum

-um -um

-um -um -um

45m Cum Cum

Cum

Kg

Cum

Cum

Cum

45m 45m 45m +er meter

Ea-h Ea-h +er meter

Ea-h

Ea-h

45m

+er meter

45m

Ea-h

Ea-h

Ea-h

;o.

+er meter

45m

Ea-h Cum 45m 45m Cum &Cum &Cum &45m &45m

Cum

Cum -um -um Cum -um -um

45m

-um 45m

-um -um

-um

@g

&=m

&=m

&=m

)$m

/&=m &=m

)$m

-um

45m

45m

45m

<.M <.M <.M 45m 45m 45m 45m

Ea-h

&<.M <M ;os. ;os. ;os. 45m 45m 45m Ea-h Ea-h Ea-h 45m

45m

45m

<mt 45m 45m

45m 45m 45m

Ea-h

Ea-h 45m &Cum &Cum &Cum

+er meter +er meter

+er meter +er meter

Ea-h Ea-h Ea-h

+er meter Ea-h Ea-h Ea-h Ea-h Ea-h

Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h

Ea-h

Ea-h

Ea-h Ea-h Ea-h Ea-h Ea-h

&Point

&Point

+er meter

+er meter

+er meter

+er meter

Ea-h

Ea-h

Ea-h

Ea-h Ea-h Ea-h

Ea-h Ea-h Ea-h Ea-h

Ea-h

Cum

Cum

45m +er meter

+er meter +er meter +er meter +er meter

Ea-h

Ea-h

Ea-h

Ea-h

Ea-h

Ea-h

Cum Ea-h Mtr.

&Mtr Ea-h Ea-h

Io.

Io.s

Io.s

Io.s

Io.s

Io.s

Io.s

Io.s Io.s Io.s

Io.s

Io.s Ea-h Io.s ;os ;os ;os ;os

Io.s Io.s Io.s Io.s Io.s

Mtrs Ea-h -trs ;ach Ea-h Io. Io.s

Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Lot

Mtrs Ea-h Ea-h Ea-h

Ea-h

Lot

Lot

Io. Io. set Io. Io. Io. Lot Io.s Io.s Io.s Io.s

ooting ooting ooting ooting ooting ooting ooting

-trs

)$m

@g

?ags

.os. .os. .os. .os. .os. .os. .os.

;os. ;os. ;os. ;os. ;os. ;os. ;os. ;os.

KM

;&A .os .os

Schedule No. 1 - &nstallation and Bther Services 1-9: Conversion from


-escription &tem /ty 1 $ #

!" to 1#$!" %A&S' (rid Stations at -i*ri alon* +ith allie

.arth+or< Com+a-tion o earth,or( ,ith +o,er roller in-lu0ing +loughting mi/ing moistening earth to o+timum moisture -ontents in la:ers et-om+lete a) #0K Ma/imum mo0i ie0 AA4"!C 0r: 0ensit: as +er 0ra,ings an0 s+e-i i-ations. )otal Bf &tem 7.8 1#$ !" S+itch Iard .;uipment >oundation E/-avation in oun0ation o .uil0ings).ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+to 30 m an0 li t u+to 1.' m. a) ?n or0inar: soil. Cement -on-rete +lain in-lu0ing +la-ing -om+a-ting inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing o stone aggregate) ,ith out shuttering.7using 4.< -ement) a) <atio 1616@ .) .) <atio 16261 Pa--a .ri-( ,or( in other than .uil0ing i&- stri(ing o Hoints. .7using 4.< -ement) a) ?n 161 -ement mortar .) ?n 16' -ement mortar -) ?n 163 -ement mortar 2am+ +roo -ourse ,ith 7-ement san0 an0 shingle -on-rete 16261) in-lu0ing 2 -oats o as+halti- mi/ture. .7using 4.< -ement) a) 3@ mm thi-(. 4u.*.ase -ourse o +it run gravel granuler +la-ing) -om+a-ting to re5uire0 -ham.er J gravel.& 4u++l:ing illing san0 un0er loor J +lugging in ,ells <ein or-e0 -ement -on-rete ,or( using -oarse san0 in-lu0ing all la.our an0 material e/-e+t -ost o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing) ,hi-h ,ill .e +ai0 se+aratel:. !his rate also in-lu0es all (in0s o orms moul0sLli ting shuttering) -uring ren0ering an0 inishing the e/+ose0 sur a-e 7in-lu0ing s-reening an0 ,ashing o shingle). 1

>

>-1

1'10

>-$

11@.' 130.'

>-#

2@.1= #'.#13 21.=12

>-1

=1.$1@ 1#.1# 3'0

>-1A >1-9

>-2

a) <.C ,or( in roo sla.s) .eams)-olumns ra ts) lintels an0 other stru-tural mem.er lai0 in situ or +re-ast lai0 in +osition -om+lete in all res+e-ts a) <atio 16261 4u++l:ing an0 a.ri-ation o ?nterme0iate gra0e 0e orme0 rein or-ement o 10000 +si 72=$ M+a) :iel0 or <.C.C. in .eams -olumns an0 +ile -a+s) in-lu0ing utting).en0ing la:ing in +osition in-lu0ing -ost o .in0ing ,ire an0 removal o rust et-. %illing ,atering an0 ramming earth un0er loor ,ith sur+lus earth rom oun0ations lea0 u+ to 31 meters an0 li t u+ to 1.'0 meters. %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7e/-avation rom outsi0e lea0 u+to 30m an0 li t u+to 1 .'m). Carriage o 2.@3 CMM&' metri- tons o all material li(e stone aggregate s+a,l) -oal) lime) sur(hiet-.B.>.<ail astening) .ri0ge) gir0ers) +i+es) sheets) rails) M.4 Bars or 1000 ;o. Bri-(s 2'1/ 2=/=$mm or 1000 ;o. tiles 30'/ 1'2/ '1 mm or 1.2' CMM o tim.er or 3.=3 metri- tons o uel ,oo0 .: tru-( or an: other means o,ne0 .: the -ontra-tor. Carriage or earth lea0s 1 K.M. 2#1.#13

>-

1$2@'.@$1

>-3

$'0.=

>-4

2=02.3'

>-5

2=02.3'

>-11 >-1$ >-1# >-11

Cement +lasters 716') u+ to $.00 meter height 13 mm thi-( Painting ne, sur a-es) Pre+aring sur a-e an0 +ainting o guar0 .ars. Priming -oat + t,o -oats. Ere-tion an0 removal o -entering P&Lo,ering J la:ing into tren-hes an0 Hointing -ement -on-rete rein or-e0 +i+eline to -orre-t alignment J gra0e in-lu0ing -utting o +i+es ,here ne-essar: -ost o Hointing material J testing. a) 22' mm. P&% M4 0a,el .ars 1$ mm 0ia an0 1200mm long -om+lete as +er 0ra,ing. Ma(ing holes 1'= mm 0ee+ in -ement -on-rete or stone masonr: an0 re+airing =$ mm 0ia. M4 rail 132.$ Kg +er meter 7#0*l.s +er t.) P&% s,it-h :ar0 gate 1.' in-h >? an0 >? ,ire @ mesh 2N / 2N -om+lete ,ith rail i/ing in +osition as +er 0ra,ing 7vette0 rate) %i/ing in +osition o oun0ation .olts 0ul: assem.le0 in tem+late ,hi-h ,ill .e +rovi0e0 .: the -onta-tor 4&ere-tion in +osition Pre-ast&+re*stresse0 <CC tren-h -overs rom ?3har -on-rete Pvt Lt0. 4hei(hu+ura roa0 Lahore to site rate vette0 .: Manager Civil ;!2C Lahore ;o. 2@' 0ate0 01*01*200$.

@$'.1$# 1##.2' 13$.11#

$'.@11 12$ 21$ 12.1# 11.02

>-12 >-1 >-13

>-14

1@0

>-15

#@.$@

>-$6

%illing e/+ansion Hoint 13 mm thi-( or 102 to 1'2 mm 0ee+ sla. ,ith .itumen mi/e0 ,ith san0 an0 sa, 0ust

#1.'

>-$1 >-$$ >-$# >-$1

Coal tar +ainting lai0 hot irst an0 se-on0 Coat P&% -a.le tra: 2 ,a: o >? angle iron ?&C an-hor .olts i/ing in -a.le tren-h / F. P&% -a.le tra: 3 ,a: o >? angle iron ?&C an-hor .olts i/ing in -a.le tren-h P&%i/ing >? earth stri+ 1.2'N / 0.12'N or s,it-h :ar0 en-ing rame ,ith allie0 .olts) nuts as +er 0ra,ing ;o. P2B&!4*=@$. P& i/ing >? angle iron +ost '0/'0/$mm or .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 0ul: i/e0 in +osition as +er 0ra,ing ;o. P2B&!B 12$. +ost length 0.=0 Mtr. P& i/ing 1 ro,s .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 >.? .ar.e0 ,ire 11 4B>)2*Pl:) 1 +oints i/e0 on >? angle iron +ost 7e/-lu0ing -ost o +ost) P& i/ing o s,it-hing :ar0 en-ing rames as +er 0ra,ing ;o. P2B&!4*=@$ e/-e+t earth stri+ et-. <ate vette0 CE7!J>) BAP2A Lahore. Ma(ing groves 2'/13mm 4u++l: an0 s+rea0ing o -rush stone & ,ater .orn gravel o 11&2 in-h si3e. Bhite ,ashing 3*-oats 2ressing o .an(s or groun0 sur a-e 2ismantling o .ri-( ,or( in -ement mortor 2ismantling o -ement -on-rete +lain 160160@ 1602601 2ismantling o 2.P.C o -ement -on-rete 10mm thi-( J -leaning the site et-6 2ismantlling o ,ire netting tennis -ourt J rame ,or( )otal Bf &tem 7>8 Control Couse 9uildin* 1) E/-avation in oun0ation o .uil0ings).ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+to 30 m an0 li t u+to 1.' m. a) ?n or0inar: soil. 2) Cement -on-rete +lain in-lu0ing +la-ing -om+a-ting inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing o stone aggregate) ,ith out shuttering. . a# (atio 1:2:8 %# (atio 1:4:3 c# (atio 1:2:2 3) Pa--a .ri-( ,or( in oun0ation an0 +linth. a) ?n 16$ -ement mortar

$1@.1=# #@ =' '@

>-$2

=@

>-$

1@'

>-$3 >-$4 >-$5 >-#6 >-#1 >-#$ >-##

210.2' $31 13' $11.2@ '20.2@ 2'.1' 1.0#' 0.'$$ 11.1# 1=.12'

>-#1 >-#2 G

23$.21@

113.319 11.85 19.415 112.1@3

.) ?n 16' -ement mortar -) ?n 163 -ement mortar 2# 0amp proo co$rse with !cement sand and shingle concrete 1:2:2# incl$ding 2 coats o asphaltic mixt$re.48 mm thic,. 4u. .ase -ourse o +it run gran0 granular material 7in-lu0ing +la-ing) mi/ing an0 -om+arting re5uire0 -am.ring an0 gra0e) 5# Bertical damp proo co$rse o 19 mm hic, cement plaster 1:2 with %it$men at 1 ,g per s= m. $) Pa--a .ri-( ,or( in groun0 loor 7in-lu0ing stri(ing o Hoints). a) 16$ C.M. .) 161 C.M. =) <ein or-e0 -ement -on-rete ,or( using -oarse san0 in-lu0ing all la.our an0 material e/-e+t -ost o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing) ,hi-h ,ill .e +ai0 se+aratel:. !his rate also in-lu0es all (in0s o orms moul0sL li ting shuttering) -uring ren0ering an0 inishing the e/+ose0 sur a-e 7in-lu0ing s-reening an0 ,ashing o shingle).

#'.#13 21.=12 85

='.2 '#=.332

110.211 1$.'

a) <.C ,or( in roo sla.s) .eams) -olumns ra ts) lintels an0 other stru-tural mem.er lai0 in situ or +re*-ast lai0 in +osition -om+lete in all res+e-ts. a) <atio 16261. 7Pre-ast) -) Erre-tion in +oison <CC 7Pre-ast) @) 4u++l:ing an0 a.ri-ation o ?nterme0iate gra0e 0e orme0 rein or-ement o 10000 +si 72=$M+a) :iel0 or <.C.C.in .eams -olumns an0 +ile -a+s) in-lu0ing -utting) .en0ing la:ing in +osition in-lu0ing -ost o .in0ing ,ire an0 removal o rust et-. 110.=03

='#0

#) 4ingle la:er o .urnt -la: tiles 22#/1 11/3@ mm lai0 over 100mm earth J 2'mm mu0 +laster ,ithout .hoosa groute0 ,ith -ement san0 163 on to+ o <.C.C roo sla. +rovi0e0 ,ith 1.$$ (g .itumen -oating san0 .lin0e0. 10) Pol:thine sheet 0.2 mm thi-( lai0 over !,o -oatso .itumenusing1.$$(g..itumen hot +er s5.m over loors J 2PCet-. !,o -oats o .itumen lai0 hot using1.$$ (g. +er 45.m over roo J .lin0e0 ,ithsan0 at 0.003 -um +er 45. m. 11) Provi0ing an0 la:ing thermo +ore sheet 3@ mm thi-(. 12) %illing ,atering an0 ramming earth un0er loor ,ith sur+lus earth rom oun0ationslea0 u+ to 31 meters an0 li t u+ to 1.'0meters. 13) %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7e/-avation romoutsi0e lea0 u+to 30m an0 li t u+to 1.'m 11) P&% steel 0oors ,&o grill on outer a-e.

2#0

3$0.#

2#0 110.'= 13'0 $.'2'

1') Carriage o 2.@3 CMM&' metri- tons o all material li(e stone aggregat s+a, -oal)lime) sur(hi et-. B.>. <ail astening) .ri0ge)gir0ers) +i+es) sheets) rails) M.4 Bars or 1000 ;o. Bri-(s 2'1/ 12=/=$mm or 1000 ;o. tiles 30'/ 1'2/ '1 mm or 1.2' CMM o tim.er or 3.=3 metri- tons o uel ,oo0 .: tru-( or an: other means o,ne0 .: the -ontra-tor. Carriage or earth lea0s 1 K.M.

13'0

1$) 4u++l: an0 illing san0 un0er loors or +lugging in ,ells. 1=) Mosai- looring -onsisting o mosai- to++ing o one +art o -ement to t,o +arts o mar.le -hi+s lai0 over 3@ mm thi-( looring o 16261 -ement -on-rete in-lu0ing ru..ing an0 +olishing -om+lete. 13 mm thi-( mosai- to++ing 7,ith gre: -ement). 1@) Bri-( on e0ge looring lai0 in 16$ -ement mortar over a .e0 o 20 mm thi-( 16$ -ement mortar. 1#) Mosai- 0a0o or s(irting ,ith one +art o -ement J 2 +arts or mar.le -hi+s lai0 over 13 mm thi-( -ement +laster 163 -om+lete ,ith inishing an0 +olishing. 10 mm thi-( 7,ith gre: -ement). 20) >lass stri+s or 0ivi0ing an0 looring into +anels. i) 10 mm ,i0e glass stri+s. ii) =' mm ,i0e glass stri+s. iii) 2' mm ,i0e glass stri+s 21) Cement +lasters 716') u+ to $.00 meter height 13 mm thi-( 22) Cement +lasters 7161) u+ to $.00 meter height 13 mm thi-(. 23) Cement +lasters 7163) u+ to $.00 meter height 13 mm thi-( 21) Cement +ointing stru-( Hoints on ,alls. a) <atio 162.

'30

1=0.@

'@.#

32.#13

'$0.=' @0 * 2@0.@' @#.1=2 1==.@@# 210 1 2'.#$@

2') Khuras on roo 7$10/$10/1 '0mm) 2$) Cast iron rain ,ater 0o,n +i+e i/e0 is +la-e e/-lu0ing hea0 an0 shoes .ut in-lu0ing-lam+s et-. a) 100 mm 0ia a) 100 mm 0ia.. P&%i/ing steel la00er or over hea0 tan( ma0e o angle iron '0/'0/$mm -om+lete in all res+e-t. 2=) <ain ,ater 0o,n +i+e -ast iron hea0s i/e0 in +la-e in-lu0ing -ost o -lam+s hol0 ast an0 +ainting 100 mm 0ia C.? hea0s. 2@) 4hoes) .en0s or o sets or -ast iron rain ,ater 0o,n +i+e in-lu0ing i/ing an0 +ainting 2#) Provi0ing an0 i/ing 1$ mm 0ia .ar "oo( or an.. 30) 2ou.le la:er o .uil0ing +a+er lai0 over 2 -oats o hot .itumen PB*3 or PB*1 or loors et- using 1.$$ (g .itumen&45m. 31) P& aluminum natural ano0i3e0 o+en a.le 0ou.le lea 0oor hinge0 ,ithout gla3ing

@.' 1 @ 1 '0 10.$3#

32) P& aluminum natural ano0i3e0 o+en a.le ,in0o, hinge0 ,ithout gla3ing 33) Provi0ing an0 i/ing 2oor lo-( natural ano0i3e0.. 31) P& aluminum 0oor -loser 7single a-tion natural ano0i3e0. 3') P& aluminum 0oor -loser 72ou.le a-tion natural ano0i3e0. 3$) >la3ing ,ith +late glass $ mm thi-( using PVC >as Kit. 3=) P&% +lat orm o 10 / 1mm > ? stra+ %latan0 .ottom or > ? tee iron. '0/100/$mm1='0mm long i/e0 in +osition -om+lete in allres+e-ts as +er0ra,ing ;o. P2B&!B*$2$. 3@) P& M4 Plate 11 4,g 4i3e $00mm 7!ren-h-over) in-lu0ing ,el0e0 ,ith M4 angle iron2' / 2' / 3mm i/e0 in +osition as +er0ra,ing ;o. P2B&!B*$2' 3#) P&% steel rame or 0oor o M4 angle iron'1/'1/' mm M4 lat $1/' mm an0 M4 stra+'1/2' mm. 10) Bhite ,ashing three -oats. 11) Painting ne, sur a-es) Pre+aring sur a-e an0 +ainting o 0oors an0 ,in0o, an: t:+e 7in-lu0ing e0ges). Priming -oat + t,o -oats. 12) !o++ing o -ement -on-rete16261 in-lu0ing sur a-e inishing an0 0ivi0ing into +anels 10mm thi-(. 13) Vin:le loor tiles lai0 ,ith a0hesive 300/300/3m sie on irm oun0ation. 11).4u++l:ing J la:ing -oloure0 gla3e0 China Bare tiles an0 angles in 162 -ementsan0mortor an0 i&- +ointing ,ith -oloure0 -ement to mat-h the tiles 1') 2istem+ering !hree -oats ?&- -ost o +riming -oat 1$) Era-tion an0 removal o -entering 1=) Bottom Khura o Bri-( masonr: in -ement san0 mortar 716$) 1.20 / 0.$1 / 0.11' Mtr. Cver =$mm -ement -on-rete 160160@ 1@) P& M4 Channel 10 / =' mm 300mm Long in-lu0ing groun0ing .olt si3e 12mm 2ia 230mmlong as +er 0ra,ing ;o. P2B&!<*'2' 7vette0 rate) 1#) Pre+aring sur a-e an0 a++l:ing o a-i0 resistan-e +aint 7vette0 rate) '0).2ismantling o .ri-( ,or( in -ement mortor '1).2ismantling o -ement -on-eret 1616@ '2).2ismantling o -ement -on-rete rein or-e0 in se+arating rein or-ement rom -on-rete -leaning Jstraighting the site )otal Bf &tem 7(8

30.'' 1 3 1 3'.='

21.'

'

'.$ 10#3.@2$ 13.12'

=@.# 1@.@1@ 2'.=1 1=3'.11 13$.11#

$ '$

=1.1# 32.3' $.'31 3.'@

WATER SUPPLY, SANITARY AND SEWERAGE/DRAINAGE WORKS. 01) P&Lo,ering J la:ing into tren-hes an0 Hointing -ement -on-ret rein or-e0 +i+eline to -orre-t alignment Jgra0e in-lu0ing -utting o +i+es ,here ne-essar: -ost o Hointing material J testing. a) 1'0 mm .) 22' mm 02) Provi0ing) la:ing) Hointing J testing heav: ,ater or steam 5ualit: >.? or B.? +i+es an0 s+e-ials insi0e .uil0ings J tren-hes. a) 13 mm i&0. .) 20 mm i&0. -) '0 mm i&0. 03) P&% har0 .rass or gun metal +eet value heav: +attern ,ith han0 ,heel on >.? or B.? +i+e lines lai0 in the groun0 or insi0e .uil0ings.20mm 0ia a. 20mm i&0. 01)100mm i&0 gull: tra+ o -ement -on-rete 7in-lu0ing 30'mm/ 30'mm masonr: -ham.er an0 C.? grating 1'0 mm / 1'0 mm). 0') %loor !ra+ 100mm / '0mm 7in-lu0ing '0mm -on-rete -ham.er all roun0).Bith C.? grating. 0$) Provi0ing an0 i/ing C.? soil +i+es ,ith -ement Hoints 7162). a. '0mm i&0. .. 100mm i&0 0=) C.? soil s+e-ials ,ith -ement Hoints 7162). a. 100mm i&0. .. '0mm 0ia 0@) C.? manhole -overs ,ith rames6 a. 300mm i&0 light. .. 1'0mm i&0 light. 0#) 4. !ra+ 102mm i&0 China ,are 7Pa(istan ma0e). 10) Bhite gla3e0 earthen,are ,ater -loset s5uatting Crissa +attern t:+e 0omesti- o .est 5ualit:. 11) 13.' liters -a+a-it: lo, level lushing -istern .est 5ualit:. 12) C.P .i. ta+ 13mm 0ia 13) C.P sto+ -o-(s 13mm 0ia 11) 13mm / 100mm C.P sho,er rose 1') Chromium +late0 to,el rail & ring. <ail $1 0mm/20mm. 1 1$) PVC lushing +i+e 32mm 0ia. 1 20 2'.21'

1$ 22.211 20.3

1 2 3

3.== 13.2 3 2 1 2 1 1 1 2 3 1

1=) PVC lushing .en0 32mm 0ia.. 1@) C.P ,aste -ou+ling 10mm 0ia. 1#) Baste +i+e or sin(s J urinals 10mm 0ia PVC 20) Conne-tions 13mm 0ia 7PVC) 21) Provi0ing an0 i/ing 32 mm 0ia ru..er -hain +lug. 22) Provi0ing an0 i/ing loo(ing glass '$0 / 10' mm si3e irst 5ualit: ,ithout rame7PAK ma0e)

1 1 2 2 1

23) Constru-tion o slui-e valve or ire h:0rant -ham.er $1 0/$1 0mm minimum si3e 230mm thi-( .ri-( ,or( 16' -ement san0 mortar) 111mm thi-( 16$612 -ement -on-rete in oun0ation '0mm thi-( 16261 -ement -on-rete in .e0) ='mm 16261 <CC sla. on to+ an0 13mm thi-( 163 -ement san0 +laster insi0e.

21) >lass shelves $10 / 12' mm si3e ,ith CP .ra-(et ,ith CP railing 2') Bhite gla3e0 earthen ,are ,ash han0 .asin 0omesti- o su+reme 5ualit: $' -m. 2'). P&%i/ing C.P Pillar Co-(

1 1 1

2$).P&%i/ing soa+ 0ish Chromium +late0 1 2=) Bhite gla3e0 earthen ,are e0estal or ,ash han0 .asin 0omestio su+reme 5ualit:. )otal Bf &tem 7C8 & C.C.9 .,.C)R&CA, HBR!S 01) Biring light or an +oints ,ith 1&1.1373.02#) steel insulate0 ,ire in 20mm 73&1N) steel -on0uit $2 mm gauge re-esse0 in ,all or -olumn -om+lete ,ith ,it-h) -eiling rose&.utton hol0er et-. 02) Biring 3&'*+in ' Am+. Ball so-(et +oint ,ith 1.1373&0.02#) PVC insulate0 ,ire ,ith 2.' mm PVC insulate0 earthing -on0u-tor in M4 -on0uit 1#.1 mm 0ia re-esse0 in the ,all or -olumn -om+lete ,ith the s,it-h so-(et -om.ine0. 03) Biring mains ,ith 2*1&=&1.3' 7=.011) PVC insulate0 ,ire in 1#.1 mm 1$ 4B> 71.$2 mm) steel -on0uits re-esse0 in ,all as re5uire0 in-lu0ing all a--essories. 01) Biring mains ,ith 1*1&=&1.01 7=&.011) PVC insulate0 ,ire $$0 volts gra0e in 2'.1 mm 1$ 4B> steel -on0uit re-esse0 in the ,all as re5uire0 in-lu0ing all a--essories.

10

110

#'

0') Biring mains ,ith 2*1&1.=@ 7=.02#) PVC insulate0 ,ire in 1#.1 mm 1$ 4B> 71.$2 m) steel -on0uits re-esse0 in ,all as re5uire0 in-lu0ing all a--essories. 0$) Provi0ing&la:ing an0 -onne-ting har0 0ra,n .are -o++er ,ire 3.2 mm2 711 4B>) as earth -ontinuit: -on0u-tor ,ith an: given main or su.*main in all s:stem o ,iring. 0=) Provi0ing J i/ing lush t:+e 3*+n 1' Am+ 4&Phase +lug so-(et s,it-h 7-om.ine0) as re+la-ement on .oar0 alrea0: e/ist 0@) Provi0ing J i/ing o 0istri.ution .oar0 100 Am+ 100*v 10 ,a: +er +hase ,ith 01*;o ?&C -ir-uit Brea(er 100 Am+s.!.P. an0 outgoing -ir-uit .rea(er $*30 Am+s -om+lete ,ith volt meter sele-tor s,it-h +hase in0i-ation light an0 neutral lin( et-. re-esse0 in ,all

2@0

0#) 4u++l: an0 ere-tion o -eiling an .est 5ualit: Pa( ma0e in-lu0ing ,iring o 0o,n ro0 ,ith 1&1.13 mm 73&.02#) PVC ,ire i/ing o regulator .la0e -ano+: et-. 4i3e '$N 10) Provi0ing an0 su++l:ing o AC4P e/haust an 1'=mm 71@N s,ee+ -om+lete ,ith regulator) 11) Ere-tion o E/haust ans o all si3e0 in the o+ening alrea0: e/ist 12) Provi0ing an0 ere-tion .utter l: shutter or 1'=mm 71@N)s,ee+ e/haust an -om+lete as re5uire0 13) Provi0ing an0 i/ing B.C Ba(elite8s .utton lam+ hol0er ,ith 200mm ,hite glass glo.e an0 galler: et-. 11) Provi0ing an0 i/ing mille0 steel .ar an -lam+ 13 mm 0ia suita.le or <CC <oo 1') Provi0ing an0 i/ing emergen-: itting 72.C) light 1/100 ,att 7in-an0es-ent C.".B) 1$) Provi0ing J i/ing 3*+hase 1*+in ,ater +roo so-(et im+orte0 11'*volts 30 Am+ in-lu0ing .ase -om+lete in all res+e-t as +er 0ra,ing. 1=) Provi0ing an0 i/ing luores-ent tu.e light a++rove0 Phili+s .utton light 1 / 10 ,atts -om+lete ,ith -ho(e starter +re ,ire0 internal -onne-tion -om+lete. )otal Bf &tem 7&8 E S)R..) : SH&)CC IAR- ,&(C)&N( 01) E/-avation in oun0ation o .uil0ings) .ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+ to 30 m an0 li t u+ to 1.' m. a) ?n or0inar: soil. 02) Cement -on-rete +lain i&- +la-ing) -om+a-tion inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing stone aggregate ,ithout shuttering <atio 16261)

2 2 2

$ 1 3 2

20

1@.131

'.='

03) Ere-tion an0 removal or -entering or <.C.C. o +lain -ement -on-rete 7Verti-al) 01) Biring ,ith 2*1&1.1=@ 7=&.02#) PVC ?nsulate0 ,ire in20mm 73&1N) PVC -on0ition re-esse0 in the ,all as re5uire0 0') Biring ,ith 2*1&=&.0@'7=&.03$) PVC insulate0 ,ire in 2'mm 71N) -on0uit re-esse0 in the ,all as <e5uire0 0') Biring ,ith 1*1=&.0@' 7=.03 $) PVC insulation ,ire $$0 volts gra0e in 2'mm71) >.? +i+e on sur a-e. 0$) Biring ,ith 1*1=&1.3'7=.0'2) PVC insulate0 ,ire $$0 Volts gra0e in 2'mm 71) >. Pi+e on sur a-e 0=) Biring ,ith 1*1=&1.3'7=.0'2) PVC insulate0 ,ire $$0 volts gra0e in 30mm 71 1&1N) PVC -on0uit on sur a-e 0@) P&% +o,er so-(et out let 30 AMP '00 Volts gra0e 1 +in ,ater +roo CEC ma(e -om+lete in all res+e-t rate vette0 .: CE;!2C Lahore ;o. 1#@1$ 0ate0) 13*01*2001. 0#) 4,it-h A.C one ,a: 4.P 1' Am+s ,ith si0e o+erating i/e0 "an0le 10) Provi0e i/ing o 0istri.ution .oar0 three +hase 100Vots .3 Ba: +er +hase ,ith one ?C -ir-uit .rea(er 30Am+. !.P. An0 out going .rea(er $*30 Am+. Com+lete ,ith ; lin( in Ball re-esse0. 11) Provi0ing %i/ing !.P J ;L?C s,it-h $00 volts gra0e re,ire a.le !:+e 7$0 am+s) 12) Provi0ing an0 installation o ,eather +roo light .eam loo0 lighting t:+e ;.VM ,ith 100 ,att in-an0es-ent lam+ "ol0er + Lam+ .ase O +late + Pit-h .lo-( + glass -over <ate vette0 .: C.E 7>4C) Lahore ;o. $@#*#0 0ate0 23* 0= 1##@. 13) P&?nstallation o s,it-h :ar0 light Phili+s ma(e t:+e "AV '11&2'0 ,atts ,ith -ho,) -a+a-itor Mer-ur: Va+our luores-ent lam+ i&- -over an0 all a--essories ,ith out +i+e itting vette0 rate C.E. 7>4C) ;orth Lahore ;o. $@# #0 0ate0 23*0=*1##@. 11) %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7E/-avation rom out si0e) lea0 u+ to 31 m an0 li t u+ to 1 .'m 1') !P J ;L?C s,it-h use '00 volts gra0ere,ire a.le t:+e 730 am+s)

10.@ 31'

1'@

12@

'0

210

'

21

20

1 1 ) PVC 74hav:l) Pi+e P2N -lass 1N 7100ml) P22*$&103mm 13'. P?, :-onne-ting har0 0ra,n -o++er ,ire 2.0$mm as earth -ontinuit: -on0u-tor ,ih an: given main or su. main in all ms:stem o ,iring 1@).P&% 220KV 2C 2'0*B in0i-ent lam+ +hli+hs ma(e ;V*1' 7 loo0 light' =0 1'@0 2

1#) P&% 2'0*B mer-ur: lour-ent lam+ +hili+hs ma0e )otal Bf &tem 7E8 ! .R.C)&BN HBR! %&ncludin* )estin* and Commissionin*' 1' 1#$ !" .;uipment a) Assem.l:) ere-tion) oil 0eh:0ration an0 neutral groun0ing arrangement -om+lete o 132&11.' KV) 20&2$ MVA '0 "3) 1 0K?m+e0an-e) Ve-tor 2Q;1 1) Cn Loa0 !a+ Changer) three +hase trans ormers ,ith all a--essories an0 asso-iate0 ,or( in-lu0ing the su++l: o re5uisite materials) -om+lete as +er 0etails given in the s+e-i i-ations an0 0ra,ings. .) 11' KV Metal C/i0e 7>a+less) Lightening Arrestors ,ith 4teel 4u++orting stru-ture an0 -onne-tors. -) 132KV) 10KA) 2000Am+) 110 Volt 3 Pole 4%*$ Cir-uit Brea(er ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. 0) 132KV) 10KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. e) 132KV) 10KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. ) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&' A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors

g) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors

h) 132KV) Voltage !rans ormer P!8s <atio132 KV&93& 110&93 Volt single Pole ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. i) 11 KV Lightening Arrestors I) 132 KV tension string assem.lies -om+lete ,ith har0,are 0ist:+e strength 100 K; having @ insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries ?. Beam 12m ??. Column 10+3.1m ???. Earth Mast 13.1m ?V. Earthing Plat orm

3 3 $

1 $ 1 @

1#$ !" Substation Connectors ?. !ML" ??. !M"" ???. #0B$3% ?V. !M$3A $'1#$ !" Control : Protection System Control Panels: ?. Line Control Panel ,ith P!) CP*20 ??. !rans ormer Control Panel CP*30 ???. !rans ormer Control Panel CP*'0 Relay Panels6 i)6 Line <el: Panel <P*3 ii)!rans ormer rela: +anel <P*1 #' 1#$ !" Substation (eneral .;uipment 7Bi00ers to in0i-ate 5uantities or satis a-tor: -om+letion o ,or() i) All Aluminum -on0u-tor $00mmD 7"a,thorn)

$ 12 . 3 $

1 1 1 2 1

'00 3 231 12 3 1 @

ii) 11 KV Al +i+es $3mm 0ia 1m long. iii) Earth ,ire =&3.0 7#mm 0ia) iv) Earth ,ire tension assem.lies ,ith >*-lam+s v) 11 KV +ost insulator ,ith -lam+. vi) 11 KV stru-ture vii) Earthing +lat orm Cables : accessories 12 !" G,P. Po+er Cables alon* +ith terminations i) 1 -ore 1000 MCM ii) 3 -ore 1&0 AB> 120 s5. mm Control Cables: i) Control Ca.le 1/2.'mmD ii) Control Ca.le @/2.'mmD iii) Control Ca.le 1$/2.'mmD iv) Control Ca.le 1/$mmD Ca.le!ra:s) <a-(s) 4u++orts) -a.les -on0uits et-. .arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*. i)6 #'mmD Co++er -on0u-tor ii)6 Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps.

@00 330Mtrs

1''0 1300 #'0 1251 1

2000 1' 1'0 $0 1'

!:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? Control house .uil0ing lightning +rote-tion s:stem. 4,it-h :ar0 lighting s:stem 11'&210V AC an0 emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling et- as s+e-i ie0 Control .uil0ing ele-tri i-ation s:stem 11'&210V AC J emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling et- as s+e-i ie0. 11 !" Panels i)6 11 KV in-oming +anel 2' KA) 2'00A ii)6 11 KV outgoing +anel 2' KA) $30A 9attery And 9attery Char*er6 i) Batter: 110V 2C) 1'0 A" ii) Batter: Charger 110V 2C iii) AC&2C 4tation Au/iliar: Panel iv) 11&0.11' KV +a0 mounte0 trans ormer) 200KVA ,ith L! Ca.le 1#&.0@3 v) 110 V 2C au/iliar: servi-es s:stem as s+e-i ie0. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing 7,all mounte0) -) Control <oom Air*-on0itioner 1@000 B!M Bin0o, !:+e Total of Item K )otal of Column No. : 3 to be carried for+ard to Schedule No.1 for (rand Summary. CBS) B> C&"&, ? .,.C)R&C HBR!S 1#$ !" S-) )ando(hulamAli A -i*ri )?,ine %>eed >or -i*ri (?S Ne+',en*th $ .16 !m'

3 2 2 ;il ;il ;il 1 1

1 $ 1 1 1 1 1 ' 12 2

,-1

)o+er >oundation at $6?12 de*ree Constru-tion o the to,er oun0ation o the ollo,ing t:+e o to,er in ,ater logge0&normal soil area using 4.< -ement -rush stone si3e FN to SN hill san0 -on-reting -om+lete i&- e/-avation in varie0 t:+e o soil) o+en 0e,atering i re5uire0) stu. setting) +rovi0ing steel ormer as +er a++rove0 0esign -on-rete mi/ ratio ,ith mi/ture ma-hine) -on-rete mi/ ratio 16261 -uring .a-( illing -om+a-ting an0 also -:lin0er -u.e test u+ to the strength 21;&mmD 73000 P4?) at 2@ 0a:s -uring.

?. ??. ???. ?V. V. V?. $ L-2

i.

!o,er !:+e GM1) GM1+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1#@ !o,er !:+e GM30) GM30+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1## !o,er t:+e GM$0) GM*$0+3 at 20 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*200 !o,er !:+e GM1) GM1+3) GM1+$ at 1' 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*110 !o,er !:+e GM30) GM30+3 at 1' 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*111 !o,er t:+e GM$0) GM*$0+3 at 1' 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*112 ?nstallation o groun0ing 4et )o+er )ype Pile >oundation GM1) GM 1+3) GM 1+$R 1 ;o. GM30) GM30+3 R 1 ;o. GM$0) GM$0+3) R 1 ;o. 2,g6 P2B&!C&#02. Pile Hor<@ 66 mm dia. Providin* : Castin* in Situ 9ored RCC Pile in 1:1-1?$:# %Cement concrete of approved crushed stone : coarse sand placed in nominal dia &?C all costs borin* drillin* +ith rotary@ reserved rotary or any approved method@ placin* concrete +ith tremie: e=cludin* cost of supply an fabrication of steel bars reinforcement ca*e@ +hich shall be paid separately includin* +ashin* of shin*le. %HCSR-$61#@ pa*e: 2-$@ item No.1 %ii'.

312 12 21 1 1 1 #3

1 4

ii.

RCC Concrete <ein or-e0 -ement -on-rete ,or( using -oarse san0 e/-e+t the -ost o -on-rete o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing. !his rates also in-lu0es all (in0s o orms moul0s) li ting shuttering) -urring) ren0ering an0 inishing the e/+ose0 sur a-e0 7in-lu0ing s-reening an0 ,ashing o shingle) ) ?n*situ in roo sla.s) -olumn) .eam) ra ts lintels an0 other stru-tural mem.er -om+lete in all res+e-t BC4<*2013) +age '*1)2) item ;o.3*a)7ii)

1@.3

iii.

Steel 4u++l: J %a.ri-ation o interme0iate gra0e 0e orme0 rein or-ement or <CC Piles i&C Cutting .an0ing) la:ing in +osition ,el0ing an0 astening i&- -ost o .in0ing ,ire an0 removal o rust et- 7a) 10)000 P4? 72=$ MPA) Qiel0. BC4<*2013) +age6 '*3) item*= 7a)

13@=3

i".

Cost of -ifference of S.R Cement 4.< Cement 1 Bag T 11$.00 C.P Cement 1 Bag T 1$@.00 2i eren-e 22.00

'30

'30 7BC4<*2013 Page6 22*1) ?tem ;o.1$) J +age6 22*1$ ?tem no. $1#) )otal Cost of P D ,1 F ,$ )o+er .rection !rans+ortation o material rom site store to lo-ation an0 ere-tion o 2&C t:+e to,er installation o AC2) 4ign +late .ar.e0 ,ire an0 -om+lete in all res+e-t or ollo,ing t:+e o to,ers6 !o,er !:+e GM1 !o,er !:+e GM1+3 !o,er !:+e GM30 !o,er !:+e GM30+3 !o,er !:+e GM$0 !o,er !:+e GM$0+3 )otal of &tem M .lectric Heldin* Ele-tri- ,el0ing nuts J .olts on ere-te0 to,ers u+ to $*meters an0 a++l:ing +aint on ,el0e0 nuts J .olts6 !o,er !:+e GM1 &1$0 &to,er !o,er !:+e GM1+3 &2$0 &to,er !o,er !:+e GM30 &310 &to,er !o,er !:+e GM30+3 &1'0 &to,er !o,er !:+e GM$0 &3#2 &to,er !o,er !:+e GM$0+3 &'1' &to,er )otal of &tem N Strin*in* Hor< !he stringing&sagging a--or0ing to Ba+0a stan0ar0 03*;o. -on0u-tor t:+e AC4< L:n/ -on0u-tor an0 01*;o. shiel0 ,ire i&installation o assem.lies) har0,are) 4B 0am+er or l:n/ J earth ,ire) insulator) Hoints) 0ea0 en0 .o0ies an0 Hum+ering 7,here re5uire0) testing an0 -ommissioning -om+lete

=@ 2 1 1 = 1

121'0 '20 1210 1'0 2=11 '1'

1. P (A) (B) (C) (D) (E) (F)

)otal of &tem B )otal Cost of ,FMFNFB Abstract of cost of Part ,-# Eun*le Clearance Iungle -learan-e an0 removing ,ith 30 mater 7site -learan-e or 0emar-ation) 7B4*200@) P&20*2) 1&11 7a) Environmental and Social Mitigation & monitoring costs Air Quality Monitoring/ Analysis Water Quality Monitoring/ Analysis Water Consumption Monitoring/ Analysis Noise Monitoring/ Analysis/ Measurement Solid Waste & Waste water Management Other Environmental & Social Mitigation Measures as per attached EM!" Total of Item P # $% 2ail: Basis 2ail: Basis 01 Lo-ation Lum+sum

)otal of Column No. : 3 to be carried for+ard to Schedule No.1 for (rand Summary.

allation and Bther Services Stations at -i*ri alon* +ith allied )ransmission ,ine.
0nit PriceJJ ,ocal /ty # Currency Portion 1 >orei*n Currency Portion 2 )otal PriceJJ ,ocal Currency Portion D#=1 >orei*n Currency Portion 3D#=2

Io.

-um

-um -um

-um -um -um

45m Cum Cum

-um

Kg

-um

Cum

Cum

45m 45m 45m

+er meter Ea-h Ea-h +er meter Ea-h

Ea-h

45m

+er meter

45m Ea-h Ea-h Ea-h

;o.

+er meter

45m Ea-h Cum 45m 45m Cum &Cum &Cum &45m &45m

Cum

)$m c$m c$m Cum

-um -um &=m

c$m 45m

-um -um

-um

Kg

45m

45m

45m Cum &45m 45m

Cum

-um

45m

45m

45m

<.M <.M <.M 45m 45m 45m 45m Ea-h &<.M

<M ;os. ;os. ;os. 45m 45m

45m Ea-h Ea-h Ea-h 45m

45m

45m

<mt 45m 45m

45m 45m 45m 45m 45m

Ea-h Ea-h

45m &Cum &Cum &Cum

+er meter +er meter

+er meter +er meter +er meter

Ea-h Ea-h Ea-h

+er meter

Ea-h

Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h Ea-h

Ea-h Ea-h Ea-h Ea-h Ea-h

Ea-h

Ea-h

Ea-h Ea-h Ea-h

Ea-h

Ea-h

&Point

&Point

+er meter

+er meter

+er meter

+er meter

Ea-h

Ea-h

Ea-h

Ea-h Ea-h Ea-h

Ea-h Ea-h Ea-h Ea-h

Ea-h

Cum

Cum

45m +er meter

+er meter

+er meter

+er meter

+er meter

Ea-h

Ea-h

Ea-h

Ea-h

Ea-h

Ea-h

Cum

Ea-h Mtr. &Mtr Ea-h

Ea-h

Io.s

Io.s

Io.s

Io.s

Io.s

Io.s

Io.s

Io.s Io.s Io.s

Io.s Io.s Ea-h Io.s

;os. ;os. ;os. ;os.

Io. Io. Io. Io.s Io.s

Mtrs Ea-h Mtrs Ea-h Ea-h Io.s Io.s

Mtrs Mtrs

Mtrs Mtrs Mtrs Mtrs Lot

Mtrs Ea-h Ea-h Ea-h Ea-h

Ea-h Ea-h Ea-h

Lot Lot

Lot

Io.s Io.s set Io.s Io.s Io.s Lot Io.s Io.s Io.s

ooting ooting ooting ooting ooting ooting sets.

meters

Cum

Kg

Bags

Bags

;os ;os ;os ;os ;os ;os

;os. ;os. ;os. ;os. ;os. ;os.

2$.10 KM

;&A

0$ ;os 12 ;os.

Schedule No. 1 - &nstallation and Bther Services


1-C: Conversion from
&tem

!" to 1#$!" %A&S' (rid Stations at )ando Ean Muhammad alon* +ith alli
-escription /ty

.arth+or< )ompaction o earthwor, with power roller incl$ding plo$ghting mixing moistening earth to optim$m moist$re contents in layers etc complete. a# 91C -axim$m modi ied DD&A/E dry density as per drawings and speci ications. )otal Bf &tem 7.8 > 1#$ !" S+itch Iard .;uipment >oundation E/-avation in oun0ation o .uil0ings) .elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+to 30 m an0 li t u+to 1.' m. a) ?n or0inar: soil. Cement -on-rete +lain in-lu0ing +la-ing -om+a-ting inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing o stone aggregate) ,ith out shuttering.7using 4.< -ement) a) <atio 1616@ .) .) <atio 16261 Pa--a .ri-( ,or( in other than .uil0ing i&- stri(ing o Hoints. .7using 4.< -ement) a) ?n 161 -ement mortar .) ?n 16' -ement mortar -) ?n 163 -ement mortar 2am+ +roo -ourse ,ith 7-ement san0 an0 shingle -on-rete 16261) in-lu0ing 2 -oats o as+halti- mi/ture. . 7using 4.< -ement) a) 3@ mm thi-(. 4u.*.ase -ourse o +it run gravel granuler +la-ing) -om+a-ting to re5uire0 -ham.er J gravel.& 4u++l:ing illing san0 un0er loor J +lugging in ,ells

Io.

>-1

1'10

Cum

>-$

120.#2 #0.'

-um -um

>-#

11.03@ @$.02# 0.'2$

-um -um -um

>-1

=1 1#.1# 3'0

45m Cum Cum

>-1A >1-9

>-2

<ein or-e0 -ement -on-rete ,or( using -oarse san0 in-lu0ing all la.our an0 material e/-e+t -ost o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing) ,hi-h ,ill .e +ai0 se+aratel:. !his rate also in-lu0es all (in0s o orms moul0s li ting shuttering) -uring ren0ering an0 inishing the e/+ose0 sur a-e 7in-lu0ing s-reening an0 ,ashing o shingle). a) <.C ,or( in roo sla.s) .eams)-olumns ra ts) lintels an0 other stru-tural mem.er lai0 in situ or +re -ast lai0 in +osition -om+lete in all res+e-ts. a) <atio 16261

2#1.#13

Cum

>-

4u++l:ing an0 a.ri-ation o ?nterme0iate gra0e 0e orme0 rein or-ement o 10000 +si 72=$ M+a) :iel0 or <.C.C. in .eams -olumns an0 +ile -a+s) in-lu0ing utting).en0ing la:ing in +osition in-lu0ing -ost o .in0ing ,ire an0 removal o rust et-. %illing ,atering an0 ramming earth un0er loor ,ith sur+lus earth rom oun0ations lea0 u+ to 31 meters an0 li t u+ to 1.'0meters. %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7e/-avation rom outsi0e lea0 u+to 30m an0 li t u+to 1 .'m).

1$2@'.@$1

Kg

>-3

210.131

Cum

>-4

2=02.3'

Cum

>-5

>-11 >-1$ >-1#

Carriage o 2.@3 CMM&' metri- tons o all material li(e stone aggregate s+a,l) -oal) lime) sur(hiet-.B.>.<ail astening) .ri0ge) gir0ers) +i+es) sheets) rails) M.4 Bars or 1000 ;o. Bri-(s 2'1/ 2=/=$mm or 1000 ;o. tiles 30'/ 1'2/ '1 mm or 1.2' CMM o tim.er or 3.=3 metri- tons o uel ,oo0 .: tru-( or an: other means o,ne0 .: the -ontra-tor. Carriage or earth lea0s 1 K.M. Cement +lasters 716') u+ to $.00 meter height 13 mm thi-( Painting ne, sur a-es) Pre+aring sur a-e an0 +ainting o guar0 .ars. Priming -oat + t,o -oats. Ere-tion an0 removal o -entering P&Lo,ering J la:ing into tren-hes an0 Hointing -ement -on-rete rein or-e0 +i+eline to -orre-t alignment J gra0e in-lu0ing -utting o +i+es ,here ne-essar: -ost o Hointing material J testing. a) 22' mm.

2=02.3'

Cum

@$'.1$# 1##.2' 13$.11#

45m 45m 45m

>-11

$'.@11

+er meter

>-12 >-1 >-13 %*1=*A

P&% M4 0a,el .ars 1$ mm 0ia an0 1200mm long -om+lete as +er 0ra,ing. Ma(ing holes 1'= mm 0ee+ in -ement -on-rete or stone masonr: an0 re+airing =$ mm 0ia. M4 rail 132.$ Kg +er meter 7#0*l.s +er t.) P&% s,it-h :ar0 gate 1.' in-h >? an0 >? ,ire @ mesh 2N / 2N -om+lete ,ith rail i/ing in +osition as +er 0ra,ing 7vette0 rate) %i/ing in +osition o oun0ation .olts 0ul: assem.le0 in tem+late ,hi-h ,ill .e +rovi0e0 .: the -onta-tor 4&ere-tion in +osition Pre-ast&+re*stresse0 <CC tren-h -overs rom ?3har -on-rete Pvt Lt0. 4hei(hu+ura roa0 Lahore to site rate vette0 .: Manager Civil ;!2C Lahore ;o. 2@' 0ate0 01*01*200$. %illing e/+ansion Hoint 13 mm thi-( or 102 to 1'2 mm 0ee+ sla. ,ith .itumen mi/e0 ,ith san0 an0 sa, 0ust Coal tar +ainting lai0 hot irst an0 se-on0 Coat P&% -a.le tra: 2 ,a: o >? angle iron ?&C an-hor .olts i/ing in -a.le tren-h / F. P&% -a.le tra: 3 ,a: o >? angle iron ?&C an-hor .olts i/ing in -a.le tren-h P&%i/ing >? earth stri+ 1.2'N / 0.12'N or s,it-h :ar0 en-ing rame ,ith allie0 .olts) nuts as +er 0ra,ing ;o. P2B&!4*=@$. P& i/ing >? angle iron +ost '0/'0/$mm or .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 0ul: i/e0 in +osition as +er 0ra,ing ;o. P2B&!B 12$. +ost length 0.=0 Mtr. P& i/ing 1 ro,s .ar.e0 ,ire en-ing aroun0 s,it-h :ar0 >.? .ar.e0 ,ire 11 4B>)2*Pl:) 1 +oints i/e0 on >? angle iron +ost 7e/-lu0ing -ost o +ost) P& i/ing o s,it-hing :ar0 en-ing rames as +er 0ra,ing ;o. P2B&!4*=@$ e/-e+t earth stri+ et-. <ate vette0 CE7!J>) BAP2A Lahore. Ma(ing groves 2'/13mm 4u++l: an0 s+rea0ing o -rush stone & ,ater .orn gravel o 11&2 in-h si3e. Bhite ,ashing 3*-oats 2ressing o .an(s or groun0 sur a-e 2ismantling o .ri-( ,or( in -ement mortor 2ismantling o -ement -on-rete +lain

#$ 21# 12.1# 11.02

Ea-h Ea-h +er meter Ea-h

>-14

1@0

Ea-h

>-15

#@.$@

45m

>-$6 >-$1 >-$$ >-$# >-$1

#1.' $1@.1=# #@ =' '@

+er meter 45m Ea-h Ea-h Ea-h

>-$2

=@

;o.

>-$

1@'

+er meter

>-$3 >-$4 >-$5 >-#6 >-#1 >-#$ >-##

210.2' $31 13' $11.2@ $11.2@ 2'.1'

45m Ea-h Cum 45m 45m Cum

>-#1 >-#2 J

160160@ 1602601 2ismantling o 2.P.C o -ement -on-rete 10mm thi-( J -leaning the site et-6 2ismantlling o ,ire netting tennis -ourt J rame ,or( )otal Bf &tem 7>8 S)R..) : SH&)CC IAR- ,&(C)&N( 01) E/-avation in oun0ation o .uil0ings) .ri0ges an0 other stru-tures in-lu0ing 0ag.elling 0ressing re illing aroun0 stru-ture ,ith e/-avate0 earth ,atering an0 ramming lea0 u+ to 30 m an0 li t u+ to 1.' m. a) ?n or0inar: soil.

1.0#' 0.'$$ 11.1# 1=.12'

&Cum &Cum &45m &45m

1@.131

Cum

02) Cement -on-rete +lain i&- +la-ing) -om+a-tion inishing an0 -uring -om+lete 7in-lu0ing s-reening an0 ,ashing stone aggregate ,ithout shuttering <atio 16261) 03) Ere-tion an0 removal or -entering or <.C.C. o +lain -ement -on-rete 7Verti-al) 01) Biring ,ith 2*1&1.1=@ 7=&.02#) PVC ?nsulate0 ,ire in20mm 73&1N) PVC -on0ition re-esse0 in the ,all as re5uire0 0') Biring ,ith 2*1&=&.0@'7=&.03$) PVC insulate0 ,ire in 2'mm 71N) -on0uit re-esse0 in the ,all as <e5uire0 0$) Biring ,ith 1*1=&1.3'7=.0'2) PVC insulate0 ,ire $$0 Volts gra0e in 2'mm 71) >. Pi+e on sur a-e 0@) P&% +o,er so-(et out let 30 AMP '00 Volts gra0e 1 +in ,ater +roo CEC ma(e -om+lete in all res+e-t rate vette0 .: CE;!2C Lahore ;o. 1#@1$ 0ate0) 13*01* 2001. 0#) 4,it-h A.C one ,a: 4.P 1' Am+s ,ith si0e o+erating i/e0 "an0le 10) Provi0e i/ing o 0istri.ution .oar0 three +hase 100Vots .3 Ba: +er +hase ,ith one ?C -ir-uit .rea(er 30Am+. !.P. An0 out going .rea(er $*30 Am+. Com+lete ,ith ; lin( in Ball re-esse0. 11) Provi0ing %i/ing !.P J ;L?C s,it-h $00 volts gra0e re,ire a.le !:+e 7$0 am+s) 12) Provi0ing an0 installation o ,eather +roo light .eam loo0 lighting t:+e ;.VM ,ith 100 ,att in-an0es-ent lam+ "ol0er + Lam+ .ase O +late + Pit-h .lo-( + glass -over <ate vette0 .: C.E 7>4C) Lahore ;o. $@#*#0 0ate0 23* 0=1##@.

'.='

Cum

10.@ 31'

45m +er meter

1'@

+er meter

'0

+er meter

Ea-h

Ea-h

Ea-h

Ea-h

'

Ea-h

13) P&?nstallation o s,it-h :ar0 light Phili+s ma(e t:+e "AV '11&2'0 ,atts ,ith -ho,) -a+a-itor Mer-ur: Va+our luores-ent lam+ i&- -over an0 all a--essories ,ith out +i+e itting vette0 rate C.E. 7>4C) ;orth Lahore ;o. $@# #0 0ate0 23*0=*1##@

21

Ea-h

11) %illing ,atering an0 ramming earth un0er loors ,ith ne, earth 7E/-avation rom out si0e) lea0 u+ to 31 m an0 li t u+ to 1 .'m 1') !P J ;L?C s,it-h use '00 volts gra0ere,ire a.le t:+e 730 am+s) 1 ) PVC 74hav:l) Pi+e P2N -lass 1N 7100ml) P22* $&103mm 13'. P?, :-onne-ting har0 0ra,n -o++er ,ire 2.0$mm as earth -ontinuit: -on0u-tor ,ih an: given main or su. main in all ms:stem o ,iring 1@).P&% 220KV 2C 2'0*B in0i-ent lam+ +hli+hs ma(e ;V*1' 7 loo0 light' 1#) P&% 2'0*B mer-ur: lour-ent lam+ +hili+hs ma0e )otal Bf &tem 7E8 ! .R.C)&BN HBR! %&ncludin* )estin* and Commissionin*' 1' 1#$ !" .;uipment a) Assem.l:) ere-tion) oil 0eh:0ration an0 neutral groun0ing arrangement -om+lete o 132&11.' KV) 20&2$ MVA '0 "3) 1 0K?m+e0an-e) Ve-tor 2Q;1 1) Cn Loa0 !a+ Changer) three +hase trans ormers ,ith all a--essories an0 asso-iate0 ,or( in-lu0ing the su++l: o re5uisite materials) -om+lete as +er 0etails given in the s+e-i i-ations an0 0ra,ings.

23.'

Cum

1 =0

Ea-h Mtr.

1'@0

&Mtr

2 3

Ea-h Ea-h

Io.s

.) 11' KV Metal C/i0e 7>a+less) Lightening Arrestors ,ith 4teel 4u++orting stru-ture an0 -onne-tors. -) 132KV) 10KA) 2000Am+) 110 Volt 3 Pole 4%*$ Cir-uit Brea(er ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. 0) 132KV) 10KA) 2000Am+) 3 Pole single thro, Bus 2is-onne-tors ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors.

Io.s

Io.s

e) 132KV) 10KA) 2000Am+) 3 Pole single thro, Line 2is-onne-tors ,ith e/ten0e0 -ree+age -onne-tors or $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors.

Io.s

) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 12006$006300&' A 71 Core) Line C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. g) 132KV) 10KA) 4ingle Phase Current !rans ormer ratio 2006100&' A 73 Core) !rans ormer C!8s ,ith $00mm45. "ori3ontal Aluminum Con0u-tor ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors h) 132KV) Voltage !rans ormer P!8s <atio132 KV&93& 110&93 Volt single Pole ,ith 4teel 4u++orting 4tru-ture an0 -onne-tors. i) 11 KV Lightening Arrestors H) 132 KV tension string assem.lies -om+lete ,ith har0,are 0is- t:+e strength 100 K; having @ insulators +er string -om+lete ,ith har0,are as s+e-i ie0. 1#$ !" Steel (antries i) Beam 12m ii) Column 10+3.1m iii) Earth Mast 13.1m iv) Earthing Plat orm 1#$ !" Substation Connectors i) !ML" ii) !M"" iii) #0B$3% iv) !M$3A $'1#$ !" Control : Protection System Control Panels: i) Line Control Panel ,ith P!) CP*20 ii) Line Control Panel ,ith P!) CP*30 iii) !rans ormer Control Panel CP*'0 Relay Panels6 i)6 Line <el: Panel <P*3 ii)!rans ormer rela: +anel <P*1 #' 1#$ !" Substation (eneral .;uipment 7Bi00ers to in0i-ate 5uantities or satis a-tor: -om+letion o ,or() i)6 All Aluminum -on0u-tor $00mmD 7"a,thorn) ii) 11 KV Al +i+es $3mm 0ia 1m long.

Io.s

Io.s

3 3 $

Io.s Io.s Io.s

1 $ 1 @ $ 12 3 #

Io.s Io.s Ea-h Io.s ;os. ;os. ;os. ;os.

1 1 1 2 1

Io.s Io.s Io.s Io.s Io.s

'00 3

Mtrs Ea-h

iii) iv)6

Earth ,ire =&3.0 7#mm 0ia) Earth ,ire tension assem.lies ,ith >*-lam+s

2$0 Mtrs 12 3 1 @

Mtrs Ea-h Ea-h Io.s Io.s

v) 11 KV +ost insulator ,ith -lam+. i) 11 KV stru-ture ii) Earthing +lat orm Cables : accessories 12 !" G,P. Po+er Cables alon* +ith terminations i) 1 -ore 1000 MCM ii) 3 -ore 1&0 AB> 120 s5. mm Control Cables: i) Control Ca.le 1/2.'mmD ii) Control Ca.le @/2.'mmD iii) Control Ca.le 1$/2.'mmD iv) Control Ca.le 1/$mmD Ca.le!ra:s) <a-(s) 4u++orts) -a.les -on0uits et-. .arthin* Material Substation (roundin* System for 1#$ <" s+itchyard and control house buildin*. i)6 #'mmD Co++er -on0u-tor ii)6 Earthing ro0 71$mm 0ia) 3m long) iii': Cartrid*es !:+e A !:+e B !:+e C iv': Moulds +ith holdin* clamps. !:+e A !:+e B !:+e C v': (roundin* Connectors !:+e ? !:+e ?? !:+e ??? Control house .uil0ing lightning +rote-tion s:stem. 4,it-h :ar0 lighting s:stem 11'&210V AC an0 emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling et- as s+e-i ie0 Control .uil0ing ele-tri i-ation s:stem 11'&210V AC J emergen-: lighting s:stem 220V J 110V 2C) +o,er so-(ets in-lu0ing -a.ling et- as s+e-i ie0. 11 !" Panels i) 11 KV in-oming +anel 2' KA) 2'00A ii) 11 KV outgoing +anel 2' KA) $30A

@00 330 1$'0 1'00 1000 1''0 1

Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Lot

2000 1'*Ea-h 1'0 $0 1' 3 2 2 ;il ;il ;il

Mtrs Ea-h Ea-h Ea-h Ea-h

Lot

Lot

1 $

Io.s Io.s

iii) Batter: An0 Batter: Charger6 iv) Batter: 110V 2C) 1'0 A" v) Batter: Charger 110V 2C vi) AC&2C 4tation Au/iliar: Panel vii) 11&0.11' KV +a0 mounte0 trans ormer) 200KVA ,ith L! Ca.le 1#&.0@3 viii) 110 V 2C au/iliar: servi-es s:stem ass+e-i ie0. >ire fi*htin* systems a) Mo.ile ire e/tinguisher or s,it-h:ar0 area .) %ire e/tinguisher or -ontrol .uil0ing 7,all mounte0) -) Control <oom Air*-on0itioner 1@000 B!M Bin0o, !:+e Total of Item K )otal of Column No. : 3 to be carried for+ard to Schedule No.1 for (rand Summary. , ,-1 CBS) B> C&"&, ? .,.C)R&C HBR!S 1#$ !" S-) -i*ri A )ando Ean Muhammad )?,ine %>eed >or )ando Ean Muhammad (rid Station Ne+' ,en*th 12.36 !m' )o+er >oundation at $6?12 de*ree Constru-tion o the to,er oun0ation o the ollo,ing t:+e o to,er in ,ater logge0&normal soil area using 4.< -ement -rush stone si3e FN to SN hill san0 -on-reting -om+lete i&- e/-avation in varie0 t:+e o soil) o+en 0e,atering i re5uire0) stu. setting) +rovi0ing steel ormer as +er a++rove0 0esign -on-rete mi/ ratio ,ith mi/ture ma-hine) -on-rete mi/ ratio 16261 -uring .a-( illing -om+a-ting an0 also -:lin0er -u.e test u+ to the strength 21;&mmD 73000 P4?) at 2@ 0a:s -uring.

1 1 1 1 1 1

Io.s 4et Io.s Io.s Io.s Lot

'*Io.s 12*Io.s

2 Io.s

?. V??.

!o,er !:+e GM1) GM1+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1#@ !o,er !:+e GM30) GM30+3 at 20 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*1## !o,er t:+e GM$0) GM*$0+3 at 20 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*200 !o,er !:+e GM1) GM1+3) GM1+$ at 1' 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*110 !o,er !:+e GM30) GM30+3 at 1' 0egree angle o re+ose as +er 0ra,ing ;o. P2B&!C*111

132

Footing

Footing

V???.

Footing

?A

Footing

Footing

XI G&& L-2

i.

!o,er t:+e GM$0) GM*$0+3 at 1' 0egree angle re+ose as +er 0ra,ing ;o. P2B&!C*112 ?nstallation o groun0ing 4et )o+er )ype Pile >oundation GM1) GM 1+3) GM 1+$R 1 ;o. GM30) GM30+3) R 1 ;o. GM$0) GM$0+3) R 1 ;o. 2,g6;o. P2B&!C&#02 Pile Hor<@ 66 mm dia.

2 51

Footing &ets

ii.

Provi0ing J Casting in 4itu Bore0 <CC Pile in 161*1&263 7Cement -on-rete o a++rove0 -rushe0 stone J -oarse san0 +la-e0 in nominal 0ia ?&C all -osts .oring 0rilling ,ith rotar:) reserve0 rotar: or an: a++rove0 metho0) +la-ing -on-rete ,ith tremieJ e/-lu0ing -ost o su++l: an a.ri-ation o steel .ars rein or-ement -age) ,hi-h shall .e +ai0 se+aratel: in-lu0ing ,ashing o shingle. 7BC4<* 2013) +age6 '*2) item ;o.1 7ii). RCC Concrete

138

-trs

iii.

<ein or-e0 -ement -on-rete ,or( using -oarse san0 e/-e+t the -ost o -on-rete o steel rein or-ement an0 its la.our or .en0ing an0 .in0ing. !his rates also in-lu0es all (in0s o orms moul0s) li ting shuttering) -urring) ren0ering an0 inishing the e/+ose0 sur a-e0 7in-lu0ing s-reening an0 ,ashing o shingle) ) ?n*situ in roo sla.s) -olumn) .eam) ra ts lintels an0 other stru-tural mem.er -om+lete in all res+e-t BC4<*2013) +age '*1)2) item ;o.3*a)7ii) Steel

18.4

)$.m

i".

4u++l: J %a.ri-ation o interme0iate gra0e 0e orme0 rein or-ement or <CC Piles i&C Cutting .an0ing) la:ing in +osition ,el0ing an0 astening i&- -ost o .in0ing ,ire an0 removal o rust et- 7a) 10)000 P4? 72=$ MPA) Qiel0. BC4<*2013) +age6 '*3) item*= 7a) Cost of -ifference of S.R Cement 4.< Cement 1 Bag T 11$.00 C.P Cement 1 Bag T 1$@.00 2i eren-e 22.00 7BC4<*2013 Page6 22*1) ?tem ;o.1$) J +age6 22*1$ ?tem no. $1#) )otal Cost of , D ,1 F ,$ )o+er .rection

14894

@g

541

?ags

!rans+ortation o material rom site store to lo-ation an0 ere-tion o 2&C t:+e to,er installation o AC2) 4ign +late .ar.e0 ,ire an0 -om+lete in all res+e-t or ollo,ing t:+e o to,ers6 !o,er !:+e GM1 !o,er !:+e GM30 !o,er !:+e GM$0 )otal of &tem M N .lectric Heldin* Ele-tri- ,el0ing nuts J .olts on ere-te0 to,ers u+ to $* meters an0 a++l:ing +aint on ,el0e0 nuts J .olts6 !o,er !:+e GM1 &1$0 &to,er !o,er !:+e GM30 &3=0 &to,er !o,er !:+e GM$0 &3#2 &to,er !otal ;uts J Bolts )otal of &tem N Strin*in* Hor<

13 1 3

;os. ;os. ;os.

$@@0 1210 11=$ #2#$

;os. ;os. ;os. ;os.

!he stringing&sagging a--or0ing to Ba+0a stan0ar0 03* ;o. -on0u-tor t:+e AC4< L:n/ -on0u-tor an0 01*;o. shiel0 ,ire i&- installation o assem.lies) har0,are) 4B 0am+er or l:n/ J earth ,ire) insulator) Hoints) 0ea0 en0 .o0ies an0 Hum+ering 7,here re5uire0) testing an0 -ommissioning -om+lete )otal of &tem B )otal Cost of ,FMFNFB Abstract of cost of Part ,-# Eun*le Clearance Iungle -learan-e an0 removing ,ith 30 mater 7site -learan-e or 0emar-ation) 7B4*200@) P&20*2) 1&11 7a) Environmental and Social Mitigation & monitoring costs Air Quality Monitoring/ Analysis Water Quality Monitoring/ Analysis Water Consumption Monitoring/ Analysis Noise Monitoring/ Analysis/ Measurement Solid Waste & Waste water Management Other Environmental & Social Mitigation Measures as per attached EM!" Total of Item P )otal of column No. : 3 to be carried for+ardto Schedule No. 2 (rand Summery

1'.=

KM

1. P (A) (B) (C) (D) (E) (F)

;&A

# $% 2ail: Basis 2ail: Basis 01 Lo-ation Lum+sum

;os ;os

d Bther Services

an Muhammad alon* +ith allied )ransmission ,ine.


0nit PriceJJ ,ocal Currency Portion 1 >orei*n Currency Portion 2 )otal PriceJJ ,ocal Currency Portion D#=1 >orei*n Currency Portion 3D#=2

Potrebbero piacerti anche