a safer and/or simpler process; less hazardous materials; reduced pressures and temperatures; and reduced inventories.
It is also important that such matters are reviewed regularly during the plants life, particularly if there is any change, for example introducing a new process or manufacturing system. Risks arising from site operations should be controlled by good design and plant integrity and effective safety management systems. However, even following these principles, there may still be situations where loss of containment of a dangerous substance could cause a major accident. Emergencies may be dealt with in a number of ways. The most appropriate measures should be determined by risk assessment. Emergency shutdown arrangements Emergency shutdown arrangements should provide protection against those potentially hazardous conditions remaining in the final plant design and be considered as part of the formal process hazard review. The action of an emergency shutdown system should be to bring the plant to a safe state. You could do this by:
Remotely operated shut-off valves Risks from a major accident hazard can be reduced more effectively by fitting pipework with ROSOVs which can be closed quickly in an emergency. They should be installed if a foreseeable release of a dangerous substance from a section of pipework or associated plant could cause a major accident and the consequences could be significantly reduced by rapid isolation. Although ROSOVs are the preferred option other measures might be appropriate, provided the site operator can demonstrate that they can give a similar level of protection. ROSOVs may be manually activated through push-buttons located at some distance from the valve. Leak detection may trigger an alarm, usually both on the plant and in the control room, to which the operator can respond by operating the ROSOVs and other systems as necessary. The advantages of manual activation include:
All these options will depend on the nature of the processes and foreseeable plant conditions.
Isolation of hazardous inventories In an emergency, rapid isolation of vessels or process plant is one of the most effective means of preventing loss of containment or limiting its size. The extent of isolation provision should be designed to ensure a safe process state and minimise loss of containment. Emergency isolation facilities and procedures for all significant inventories should be included in emergency plans. Giving information and training to operations and maintenance staff is important. Site personnel should know the contents of the plan, including specific action they should take in an emergency. Systems for achieving emergency shutdown are given here. The range is not exhaustive. Manually operated valves Manual valve isolation may be acceptable in some cases where more rapid emergency isolation is not necessary for preventing a major accident. Manually operated valves should be readily accessible and clearly marked, considering the difficult and confusing circumstances in which emergency shutdown will probably take place. You should not use them in situations where the operator effecting the isolation would be placed in any danger. This will be a major factor in deciding when to use remotely operated shut-off valves (ROSOVs). However, manual valves will often have been fitted mainly for maintenance work and might not provide the safest or most effective way of achieving emergency isolation. Any mitigation function needs to be specifically recognised and separately considered. Automatic process trips or shutdown valves Valves which are activated by process measurement sensor and close automatically on detection of abnormal process or equipment conditions, such as increased pressure or temperature, normally function as part of a trip or shutdown system. They can be designed with an additional function in mind, ie a role in some circumstances in emergency isolation. However, this needs careful consideration, as the valves may need to be capable of providing tight shut-off. Fireproofing may also be necessary to ensure they continue to function in emergency situations.
the value of an operators assessment regarding the most appropriate measures for dealing with the leak, including isolation; avoidance of spurious trips; avoidance of the potential failure of an automatic device.
Manual activation should be justifiable and the location of push-buttons must not endanger the operator. They should be accessible and in a safe and suitable place in relation to the emergency which may occur. There should normally be at least two activation points, one of which should be in the plant area. The control room would normally be the best place. Activation points should be readily identifiable both on the plant and in operating instructions. A more immediate response to potential danger can be provided by ROSOVs which can be activated by a detection system (for example, detectors for toxic or flammable gas or smoke, situated around critical plant.) Advantages of such automatic activation include:
elimination of potential operator error; more rapid isolation; reduction in calculated releases for risk assessment purposes and consequent off-site effects.
Facilities for the manual activation of ROSOVs should be provided as a back-up to automatic activation, which may result in a faster response in some circumstances, for example, on emergency escape routes from plant.
Design consideration for ROSOVs Emergency isolation systems should be planned to suit the plant system design and operating practices. ROSOVs may be needed at process vessels, pumps and other ancillary equipment and pipework, taking into account likely points of release such as equipment joints and fittings and rotating equipment, for example pump seals. They should be installed as close as possible to the vessel or plant and be accessible for routine testing and maintenance. Generally, valve closure should be as quick as is possible, bearing in mind system design limitations. On complex or interconnecting plant the location of ROSOVs requires careful consideration due to the potential for boxing-in of inventories. This can lead to, for example, overpressurisation of the pipework at increased temperatures. The possible effects of spurious trips should also be considered. A formal assessment such as a hazard and operability study (HAZOP) should consider these aspects. Generic assessment based on sound site standards for isolation and other mitigation measures is acceptable. However, it is important to recognise that release scenarios may be specific. ROSOV selection features There are some important features to be considered in selecting an appropriate ROSOV. The valves should:
Conclusion Measures designed to prevent loss of containment of dangerous substances in an emergency require detailed consideration. Fitting pipework with ROSOVs which can be closed quickly in an emergency, will often be the most effective option, although other methods might be appropriate, provided they can give a similar level of protection. Further reading Guidance on the Control of Major Accident Hazards Regulations 1999 L111 HSE Books 1999 ISBN 0 7176 1604 5 (available in Spring 1999) Management of health and safety at work: Management of Health and Safety Regulations 1992 Approved Code of Practice L21 HSE Books 1992 ISBN 0 7176 0412 8 Five steps to risk assessment INDG163 HSE free leaflet 1995; also available in priced packs of 10, ISBN 0 7176 0904 9 Selection criteria for remote isolation of hazardous inventories CRR 205 HSE Contract Research Report HSE Books 1998 ISBN 0 7176 1678 9 (available in Spring 1999) HSE priced and free publications are available by mail order from HSE Books, PO Box 1999, Sudbury, Suffolk, CO10 6FS Tel: 01787 881165 Fax: 01787 313995. HSE priced publications are also available from good booksellers. For other enquiries ring HSEs InfoLine Tel: 0541 545500, or write to HSEs Information Centre, Broad Lane, Sheffield S3 7HQ. HSE home page on the World Wide Web: http://www.open.gov.uk/hse/hsehome.htm
be classified as safety critical valves and be subject to appropriate inspection and maintenance requirements. Regular testing is required, especially where valve operation is infrequent. Companies should determine the frequency and nature of testing based on design and use. In the absence of this assessment, a minimum of three-monthly intervals is recommended; only perform a dual function (ie control and emergency isolation) in special circumstances and their role in emergency isolation of inventories must be recognised and justified by design; employ fail-safe principles. ROSOVs are generally configured to fail closed. Back-up power/air supplies should be provided if closure on failure of plant systems is not acceptable; remain in the fail-safe position once operated until manually reset; provide effective leak tightness throughout the emergency; be protected against external hazards such as fires or explosions, where the major accident hazard is a fire or explosion risk, for example where the valve could be subject to flame impingement.
This leaflet contains notes on good practice which are not compulsory but which you may find helpful in considering what you need to do.
This publication may be freely reproduced except for advertising, endorsement or commercial purposes. The information it contains is current at 1/99. Please acknowledge the source as HSE.