From: Sent: To: Subject: Ashok Ravuru [ashok.ravuru@lancogroup.com] 11 July 2012 17:33 chandan.pandey@lancogroup.com FW: 125 MW Linear Fresnel plant in Rajastahan

FYIP Regards,
Ashok Ravuru

Deputy General Manager - Solar Thermal

From: Ashok Ravuru [mailto:ashok.ravuru@lancogroup.com] Sent: Wednesday, July 04, 2012 10:38 PM To: 'sudhir.kapur' Cc: 'Martin Selig'; 'Hans Fischer'; 'Sanjay Varghese'; 'Satyendra Kumar'; 'phanindra.p@lancogroup.com'; 'mcs@lancogroup.com' Subject: RE: 125 MW Linear Fresnel plant in Rajastahan

DearSudhir, Pleasefindtheinformationrequestedfromlanco
Soil Investigation Report Already sent Auto cad Drawing of Plot for Solar Field and any grading that may be required will be in Lancos scope Already sent, Confirmation that Lanco would be able to Provide a Shed of Approximate Dimensions 75 meters X 150 mts with a height of 7.5 mtrs in about 4 months from start, along with a Power Connection Water etc. We confirm to provide Shed of Approximate Dimensions 75 meters X 150 mts with a height of 7.5 mtrs based on the agreed Project schedule Other information required from Novatec 1. Typical Foundation Drawings 2. Typical Structural Drawing 3. Steel Weight for structure including dimensions 4. Test Certifications from independent agencies on design, performance for solar field a. Related to Structure b. Receiver Tube 5. Water Quality for cleaning and Feed water 6. Balance of Plant requirements a. Instrument & service Air
1

7. 8. 9. 10. 11. 12. 13. 14.

15. 16. 17. 18. 19. 20. 21. 22.

b. DM, CW and Water for Cleaning c. Any other Heat Balance 100%, 80%,60%,40%, 20% 10% In case of cloud cover, Backup steam available? How many steam minutes? Water Balance Diagram, along with hourly & annual consumption Steam Quality from Steam Generator Mirror (reflector ) and Receiver Cleaning System IBR approvals for Steam Generator and related piping As indicated steam drum & recirculation pumps is excluded from scope. Complete conceptual, basic and detail Engineering to be included along with piping from outflage Flange of feedwater shutoff valve and Outlet flange of Main Steam shutoff valve. Terminal Points to be explicitly mentioned a. Electrical including SLD b. Instrumentation including DCS for complete Plant c. Mechanical- piping, flanges etc. d. Integration Engineering for ( Electrical, Mechanical and C&I) Plant Operation details on 500 degC and 110 bar pressure Control Philosophy Performance Testing for Plant including the Performance software Spares Consumables up to plant handover Construction power, water requirements Project Schedule Manpower Deployment Plan

Lanco would also provide site accommodation as well as Accommodation for Novatec Supervisory Staff as well as Hotel Accommodation I Jiasalme5r for Expats 1. Lanco will provide the accommodation for 5 to 10 people at site the same has been provided to Lanco staff Confirmation that Roads/ Drains as per Solar Field Layout will be in Lancos scope- ok

Hourly data for given TMY file and basic assumptions being considered for generating the below table

Incident Energy Regards,

Absorbed Energy

Dumped Energy

SolarField Losses

Energyto PowerBlock

Solarfield efficiency

GrossPower Output

Auxiliary Power Consumption

RakineCycle efficiency

NetPower Output

Solarto electrical Efficiency

Ashok Ravuru Deputy General Manager - Solar Thermal

From: Phanindra P [mailto:phanindra.p@lancogroup.com] Sent: Tuesday, July 03, 2012 12:53 PM To: 'sudhir.kapur'; ashok.ravuru@lancogroup.com; mcs@lancogroup.com Cc: 'Martin Selig'; 'Hans Fischer'; 'Sanjay Varghese'; 'Satyendra Kumar' Subject: RE: 125 MW Linear fresnel plant in Rajastahan

DearSudhir Pleasefindrepliestofewpointsasbelow:
Confirmation on Time Series DNI The DNI is same as provided earlier. The annual sum is 1932 kwh/m2/year. Please check and confirm if you have the correct TMY. CUF 23% Please provide a quote for the 28% CUF option also. Also the CUF should be net of all parasitic consumption. Target Price for Solar Field We dont have any specific target for the solar field. But our expectation is that it should be around XXX cr/mw, so as to meet the overall capex constraints for the project. Minimum Thermal Energy/Steam (consequently Solar Field Size)required, by November 2013 The field should generate steam of at least 100MWe equivalent. Rest of points, will be clarified by Ashok from our EPC team.

Regards Phanindra LancoSolarEnergyPrivateLtd|PlotNo.229,PhaseI|UdyogVihar,Gurgaon122016| Tel:+91(124)4691551|Mob:+919650910030|www.lancogroup.com


From: sudhir.kapur [mailto:sudhir.kapur@countrystrategy.com] Sent: Tuesday, July 03, 2012 10:37 AM To: phanindra.p@lancogroup.com; ashok.ravuru@lancogroup.com; mcs@lancogroup.com Cc: 'Martin Selig'; 'Hans Fischer' Subject: 125 MW Linear fresnel plant in Rajastahan
3

Dear Phanindra Dear Ashok Thank you for the Courtesy extended during yesterdays discussions, As discussed would be grateful if you could provide the following information at the earliest; Confirmation on Time Series DNI Confirmation that Solar Field be designed for a 125 MW Turbine operating at 110 Bar and 500 Degrees Centigrade , and maximum and Minimum Load at which the Turbine can operate. Standard HMBDs at partial/full/overload conditions Lanco will obtain and provide HMBDs from their selected Turbine Vendor; (Siemens ?) CUF 23% Target Price for Solar Field Minimum Thermal Energy/Steam (consequently Solar Field Size)required, by November 2013 Lanco standard EPC Contract Conditions for the Solar Field Soil Investigation Report Auto cad Drawing of Plot for Solar Field and any grading that may be required will be in Lancos scope Confirmation that Lanco would be able to Provide a Shed of Approximate Dimensions 75 meters X 150 mts with a height of 7.5 mtrs in about 4 months from start, along with a Power Connection Water etc. Lanco would also provide site accommodation as well as Accommodation for Novatec Supervisory Staff as well as Hotel Accommodation I Jiasalme5r for Expats Confirmation that Roads/ Drains as per Solar Field Layout will be in Lancos scope

Please feel free to call for any clarification Kind regards Dr S Kapur

Martin/Hans please let me know if additional information is required Martin Please provide link od Video for Mr Reddy to view Erection Process